Monthly Operating Rept for Jan 1994 for Re Ginna Nuclear Power Plant.W/940209 Ltr
ML17263A535
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/31/1994
From: Dodge R, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9402150338
Download: ML17263A535 (7)


Text

t ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM t

REGULATORY XNFORMATION DXSTRIBUTXON SYSTEM (RIDS)

ACCESSION NBR:9402150338 DOC.DATE: 94/01/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit, 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas 6 Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATXON

SUBJECT:

Monthly operating rept for Jan 1994 for RE Ginna Nuclear Power Plant.W/940209 ltr. D DISTRIBUTXON CODE: IE24D COPXES RECEIVED:LTR ENCL SIZE:

TXTLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-3 PD 1 1 JOHNSON,A 1 1 D

INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/+ORS/OEAB 1 1 NRR/DRI L/RPEB 1 1 MEG FILE Ol 1 1 RGNl 1 1 EXTERNAL: EGGG BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

/I///I///

t I////////////

//I// iI //g///////

ZZ.'::::

ROCHESTER GAS ANDELECTRIC CORPORATION o 89EASTA VENUE, ROCHESTER, N.Y. 14649<001 Rant r rnna er JOSEPH A. WIDAY Nuctoar Prant TELEPHONE AREA CODE 7 I 6 546-2700 GINNA STATION February 9, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for January, 1994 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of January, 1994.

Very truly yours, os h A. Wid lant Manager JAW:jkl Attachments c: Mr. Thomas T. Martin NRC (1)

. j RA.A.~:I

( 9402150338 9'40131 PDR ADOCK 05000244 PDR R

~ ~

~%

OPERATING DATA REPORT DOCKET NO. 50-2C4 D Feb, 9 1994 COMPLETED BY Robert E Dodge TELEPHONE 315 524-4446 Ext. 396 lPERATING STATUS

1. Unit Hsne: R E GINNA MX1EJLR PAAR PIANT Notes: The unit operated at approximately
2. Reporting Period: Januar 1994 98X power level for the month of
3. Licensed Thermal Power (Wt): 1520 January, except for reduction out-
4. Nameplate Rating (Gross We): 490 lined on page 4.
5. Design Electrical Rating (Het We): 470
6. Maxiaun Dependable Capacity (Gross MMe): 490
7. Maximm Dependable Capacity (Het We): 470
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Nhich Restricted, If Any (Net MNe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumiative

11. Hours In Report Period 744 212 394.45
12. Number of Hours Reactor lies Critical 744 169 270.46
13. Reactor Reserve Shutdown Hours 1 687.55
14. Hours Generator On-Line 744 166 496.38
15. Unit Reserve Shutdown Hours 8.5
16. Gross Thermal Energy Generated (WH) 1 088 03C 1 088 034 236 044 047
17. Gross Electrical Energy Generated (MWH) 370 811 370 811 7e Dsc 170
18. Net Electrical Energy Generated (MNH) 352 324 352 324 74 087 697
19. Unit Service Factor 100X 100X 78.54X
20. Unit Availability Factor 100X 100X 7e.scx
21. Unit Capacity Factor (Using MDC Net) 100.76X 100.76X 75.50X
22. Unit Capacity Factor (Using DER Net) 100.76X 100.76X 75.50X
23. Unit Forced Outage Rate OX 0 'X 5.68X
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refueli and Maintenance March 4 1994 - duration: 38 da s.

25. If Shut Down At End of Report Period, Estimated Date of Startup
26. Units In Test Status (Prior to Conmercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CCMMERCIAL OPERATION CIHULATIVE TOTAL COMMENCING JANUARY 1, 1975 CWULATIVE TOTAL COMMENCIHG NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE Feb. 9 1994 COMPLETED BY:

Robert E. Dodge TELEPHONE: 315 524-4446 Ext. 396 MONTH Zanuar 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 480 17. 480

2. 480 18. 480
3. 479 19. 480 4 480 20. 396

'80

~

5. 479 21. 368
6. 479 22
7. 480 23. 481
8. 480 24. 480
9. 480 25. 480
10. 480 26. 480 480 27. 480
12. 480 28. 481
13. 480 29. 481
14. 480 30. 480
15. 480 31. 480
16. 480 INSTRUCTIONS 1 On this format, MWe-Net for each list the average daily unit power level in day in reporting month. Compute to the nearest whole megawatt.

~

NO. '%OCKET UNITNAMI: R.E. GINNA NUCLEAR POWER SLANT UNIT SHUTDOWN AND POWER REDUCTIONS (:OhlPLI(1 I;D BY ge Tl'.LI.PIIONI'. 315 524-4446 Ext. 3 6 C

0 c0 IA c

0 c o S~

coo Licensee Ew c Cause L Corrective 0

sy 0 0 0 0 o Action to No. Date Event a o Vl o >R lA o o Prevent Recurrence I- O~ O ecn c Report II l/l

'U 0

94-01 1-20-94 F 13.32 Frazil ice buildup on intake struc-ture.

94-02 1-20-94 F 19.53 Increased voltage from 240V to 480V.

Root cause investigation is in pro-gress ~

F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-hlanual for Preparation of Data B-Maintenance or Test 2-hfanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. F vent Rcport (LER) F i le (NUR F(-

D-Regulatory Restriction 4-Other (Explain) 01 Cil )

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

II-Ocher (Explain) Exhibit I - Same Source

l

/

U

NARRATXVE

SUMMARY

OP OPERATXNG EXPERXENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: F COMPLETED BY:

obert E.Do e TELEPHONE: 315 524-4446 Ext. 396 MONTH Januar 1994 During the month of January, the average power level was 984.

On January 20th & 21st, power was reduced to as low as 494 due to frazil ice buildup on the intake structure. Returned to full power'n January 21st and remained there at the end of the report period.