Provides Update on Completion of Plant Mod Work Taken as Corrective Action Improving Existing Intermediate Bldg Ventilation Sys Minimizing Hot & Cold Spot Bldg Conditions
ML17263A513
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/29/1993
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9401110095
Download: ML17263A513 (3)


Text

ACCELERATED DI TRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9401110095 DOC.DATE: 93/12/29 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILXATION MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

Project Directorate I-3

SUBJECT:

Provides update on completion of plant mod work taken as corrective action improving existing Intermediate Bldg ventilation sys minimizing hot

& cold spot bldg conditions.

DISTRIBUTION CODE:

IEOID COPIES RECEIVED:LTR ENCL 0 SIZE: 2 TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response R

D NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244

/

RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/DEXB AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OQ~DIR E

02 RGN1 FILE 01 EXTERNAL EG&G/BRYCE ~ J ~ H ~

NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

RECIPIENT XD CODE/NAME JOHNSON,A AEOD/DSP/ROAB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPB1 NUDOCS-ABSTRACT OGC/HDS1 RES/HFB NRC PDR COPIES LTTR ENCL 1

D D

R D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL ~ /0

rrI!tp!p1II~77/ fj)7!p~lI/plII

<<~iÃS4!iV f'J,i ZPJ17 ROCHESTER GAS AND ELECTRIC CORPORATION I

rrre

~ i i&if*~ e rr~ ',

rose sr sr c

~

89 EAST AVENUE, ROCHESTER N. Y. 14649-0001 ROBERT C. MECREDY Vice President Cinne Nucleer Production December 29, 1993 TELEPHONE AREA CODE 71C 546 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Allen R. Johnson Project Directorate I-3 Washington, D.C.

20555 Subject NRC Inspection Report No. 50-244/88-26, dated May, 23, 1989 Notice Of Violation R.

E. Ginna Nuclear Power Plant Docket No. 50-244 Ref. (a): Letter from R.C. Mecredy (RG&E) to T. T. Martin (NRC) dated August 20, 1990 and letter from R.

C.

Mecredy (RG&E) to W. T. Russell (NRC) dated June 22, 1989.

Dear Mr. Johnson:

The purpose of this letter is to provide an update on the completion of plant modification work taken as corrective action to improve the existing Intermediate Building ventilation system so as to further minimize hot and cold spot building conditions.

This action, summarized in our referenced letters, involved the installation of a ventilation supply air opening from the Turbine Building so that ventilation air for the Intermediate Building is not drawn from outdoors during the winter months.

This supply air opening was also provided with suitable security and fire protection program provisions.

The extensive program which previously required actions to manually close all external openings and monitor plant conditions for extreme conditions in the Intermediate Building and other areas of Ginna Station for freeze protection purposes remains in effect.

This program has proven to be very effective in preventing and monitoring plant areas for freezing conditions which could impact plant equipment.

Our latest corrective actions have further reduced the potential for any adverse effects of cold weather conditions on safety-related equipment in the Intermediate Building.

RG&E is also in a study phase for potential upgrades for the Turbine Building ventilation systems.

The scope of this work is intended to address the need to provide controlled make up provisions such that potential freezing conditions in the Turbine Building are minimized further.

Any potential upgrades 9401110095

'Tt$1229 PDR ADOCK 05000244 P

PDR r 0

that are determined to be necessary for the building resulting from our study will be integrated within our overall plant modifications planning process.

Very truly yours, CAVi317 Robert C.

Mec edy xc:

Mr. Allen R. Johnson (Mail Stop 14D1)

Project.Directorate I-3 Washington, D.C 20555 U.

S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19'406 Ginna Senior Resident Inspector