ACCELERATED DI RIBUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9312200008 DOC.DATE: 93/11/30 NOTARIZED:
NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME
-.AUTHOR AFFILIATION DODGE,R.E.
Rochester Gas 6 Electric Corp.
WIDAY,J.A.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION R
SUBJECT:
Monthly operating rept for Nov 1993 for RE Ginna Nuclear Power Plant.W/931210 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
D 05000244 /
RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: AEOD/DOA NRR/DO+S/OEAB Et M~
01 EXTERNAL EGGG BRYCE iJ
~ H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DRIL/RPEB RGN1 NRC PDR COPIES LTTR ENCL 1
1 1
1' 1
1 1
1 1
D D
R D
NOTE TO ALL"RIDS" RECIPIENTS:
A D
D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
t zzp (zsumzs
'ii"'si iznirzut ROCHESTER GASANDELECTRICCORPORATIONo 89EASTAVENUE, ROCHESTER, N.Y. 14649%001 JOSEPH A. WIDAY Plant Manager Glnna Nuclear Plant TELEPHONE AREACODE 716 546.2700 GINNA STATION I
December 10, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for November, 1993 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1993.
Very truly yours, Joseph A. Widay Plant Manager JAW:jkl Attachments c:
Mr. Thomas T. Martin NRC (1) 9312200008 931130 i PDR ADOCK 05000244 R
..ZDR
4 OPERATING DATA REPORT COMPLETED 8 DOCKET NO.
50-244
. 10 1993 OPERATING STATUS R
rt
~ Dodge TELEPHONE 315 524-4446 Ext. 396 1 ~
2.
3.
5 ~
6.
7.
8.
Unit Nano:
R.E GINNA NUCLEAR P(NER PLANT Reporting Period:
November 1993 Licensed Thermal Power (MWt):
Nameplate Rating (Gross MWe):
Design Electrical Rating (Het MWe):
Maximm Dependable Capacity (Gross MWe):
Maxiaun Dependable Capacity (Het MWe):
If Changes Occur in Capacity Ratings (Items Notes Unit operating experiences outlined on page 4.
1520 490 470 490 470 Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Het MWe):
10.
Reasons For Restrictions, If Any:
11.
12.
13.
14.
15 ~
16.
17.
18.
19.
20.
21.
22 ~
23.
Hours In Report Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Het)
Unit Forced Outage Rate This Month 720 574.50 558 731 946 246 679 233 173 77.50X 77.50X 68.90X 68.90X 22.50/
Yr.-to-Date 8 016 6 817.79 6 765.25 9 812 672 3 311 312 3 143 650 83.44X 83.44X 2.34X Cunulative
- 0 210 906.45 167 782.46 1 687.55 165 008.38 8.5 233 856 425 77 309 116 73 379 581 78.39X 78.39X 75.32X 75.32X 5.73X 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refueli and maintenance March 4 1994.
Duration-40 da s.
25.
If Shut Down At End of Report Period, Estimated Date of Startup 26.
Units In Test Status (Prior to Comnerciai Operation):
Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975 CLNULATIVE TOTAL COMMENCING NOVEMBER 8, 1969
i t
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant ATE: De 10 1993 COMPLETED BY:
TELEPHONE:
Rob r E.
Dodge 315 524-4446 Ext.
396 MONTH November 1993 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
481 17.
403 2 ~
482 18.
-10 3 ~
481 19.
-10 4 ~
481 20.
5.
481 21 ~
-10 6.
482 22.
7 ~
481 23.
214 8.
482 24.
478 9.
482 25.
479 10.
172 26.
480 27.
480 12'8 28.
480 13'61 29.
480 14.
263 30.
479 15.
241 31.
481 16.
477 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT hlONTH November DOCKET NO 50-244 UNITNAhll'. R E. GINNA NUCLEAR POWER<PLAQT DATE De 10 3
COhIPLI'.l ED BY Robert ge TI'.LI'.Pl ION E.
31 5 524-4446 e xt. 396 Ho.
Date c0 0
~
0 Q ~
c0 00 It'.
L0 c v 0
eown C
0 CL licensee Event Report 0
Ew 0
0 0
EA c0 lA c
0 0
E 0
Couse 8 Corrective Action to Prevent Recurrence 93-05 11/10/93 43.57 LER-06 CH INS'EU A Feedwater Regulator Controller failure, unit shutdown.
93-06 11/14/93 93-07 11-17-93 37.05 118.33 A
1
-A 1=
HI PIPE XX HH HTEXCH Condenser tube leak, pawer reduction B S/G blowdown steam line leak, unit shutdawn.
l F: Forced S:
Scheduled REV. 485 4949 Reason:
A-Equipment Failure (Explain)
B-hlaintenance or Test C-Refueling D-Regulatory Restriction E.Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 hlethod:
l-hlanual 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-oi6I)
Exhibit I - Same Source
~
~
V
~
~
C NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE:
ec.
0 1993 COMPLETED BY:
TELEPHONE:
315 Ro 6r E.Dodge 524-4446 Ext.
396 MONTH November 1993 The events during the month of November were as follows:
On 11/10/93, a reactor trip occurred due to malfunction on A S/G feedwater regulating valve.
The unit returned to service on 11/12/93.
On ll/14/93, while at 85% power level reduced load for condenser tube leak repair.
The unit was returned to full load on ll/16/93.
On 11/17/93, commenced reactor shutdown due to steam leak in B
S/G blowdown line.
After repairs, the unit was restored to service on 11/22/93, and remained there at the end of the report period.