ACCELERAT DOCUMENT IHST UTION SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:9311150196 DOC.DATE: 93/10/31
'NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.'NAME AUTHOR AFFILIATION DODGE,R.E.
Rochester Gas 6 Electric Corp.
WIDAY,J.A.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244
SUBJECT:
Monthly operating rept for Oct 1993 for RE Ginna Nuclear Power Plant.W/931111 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA NRR/JARS/OEAB EG~FILR 01 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT.
ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DRIL/RPEB RGNl NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACI'HEDOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
~
~
0 p
~
/ nnnun unnnnn
~
'nnjjujjj%un/'n ROCHESTER GASANDELECTRICCORPORATION o 89EASTA VENUE ROCHESTER, N. Y. 14649%001 JOSEPH A. WIDAY Pront Monogor Ghno Nrnchor Bont TELEPHONE aAEutcooE Tts 546-2700 GINNA STATION November 11, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for October, 1993 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1993.
Very truly yours, se h A. Wida ant Manager JAW:jkl Attachment's c:
Mr. Thomas T. Martin NRC (1)
(
93iiiS0196 931031 PDR ",: ADOCK 05000244 R "
~
~
~
~
OPERATING DATA REPORT DOCKET NO.
50-244 DATE Mov. 11 1W3 CFERATING STAlUS CCHPLETEO BY Robert E. Dodge TELEPHONE 315 524-4C46 Ext. 396 2.
3.
5.
6.
7.
8.
Unit Nsne:
R.E GINNA NUCLEAR PQJER PLANT Reporting Period:
October 1993 Licensed Thermal Power (Wt):
Nameplate Rating (Gross We):
Design Electrical Rating (Net We):
Haxinun Dependable Capacity (Gross M'We):
HaxinLIn Dependable Capacity (Net MWe):
If Changes Occur in Capacity Ratings (Items Notes=
The Reactor Power level averaged 98K for the entire report period.
1520 490 470 490 470 Nunber 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net HWe):
10.
Reasons For Restrictions, If Any:
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22 ~
23.
Hours In Report Period Number of Hours Reactor
'Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (HWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MOC Net)
Unit Capacity Factor (Using OER Net)
Unit Forced Outage Rate This Honth 745 xxx 745 745 1 106 564 376 396 357 709 100K 10(C 102.16K 102.16K 0
Yr.-to-Date 7 296 6 243.29 6 207.25 9 080 726 3 064 633 2 910 477 85.08K 85.08K 84.88y.
84.887.
0 Cunuiative 210 186.45 167 207.96 1 687.55 164 450.38 8.5 233 124 479 77 062 437 73 1C6 408 78.39K 78.39K 75.34K 75.34K 5.66K 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refueli and maintenance March 4 1994.
Duration-40 da s.
25.
If Shut Down At End of Report Period, Estimated Date of Startup 26.
Units In Test Status (Prior to Connercial Operation):
Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COHHERCIAL OPERATION CLNULATIVE TOTAL COHHENCING JANUARY 1, 1975
<<<<QNULATIVE TOTAL COHHENCING NOVEHBER 8,
'1969 xxx Changed back to Eastern Standard Time
- L
~ ~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DA ov 11 1993 COMPLETED BY Robert E.
Dodge TELEPHONE 315 524-4446 ERt.
396 MONTH October 1993 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
478 17
~
481 2 ~
479 18.
481 3 ~
479 19.
481 4 ~
479 20.
481 5.
480 21.
481 6.
479 22.
481 7.
480 23.
481 8.
480 24.
481 9.
479 25.
481 10.
479 26.
481 479 27.
481 12.
479 28.
481 13.
479 29.
481 14.
479 30.
482 15.
480 31.
481 16.
480 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole metgawatt.
DO(:KET NO.
>0-244 IJNITNAMI;R.E. GINNA NUCLEAR POWER PlANT UNIT SHUTDOWN AND POWER REDUCTIONS
(:OhIPLI'.1'I D I3Y o ert Oo ge 1'I'. LI'.PI IONI:.
315 524-4446.
Ex..'396 No.
Date eo co e o 0 oK CV c0n0O m>>0 c u0 oC o 0ch c 0O Licensee Event Report JJ Ew 0
0 lA 0 l/l cD+
c0 Qgo o
Cause 8 Corrective Action to Prevent Recurrence No power reduction for the month of October.
1 F: Forced St Scheduled xtv. 4454949 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain)
II-Other (Explain) 3 hlcthod:
I-hlanual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit (i - Instructions for Preparation of Data Entry Sheets for Liccnscc Event Rcport (LI:R) File (NORE(-
0161)
Exhibit I - Same Source
~
h,
~
0 NARRATZVE
SUMMARY
OP OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE Nov.
11 1993 COMPLETED BY Robert E.Dod TELEPHONE 315 524-4446 Ext.
396 MONTH October 1993 The unit operated at approximately 984 reactor power level for the month of October.