Ack Receipt Re Administrative Oversight That Resulted in Four Licensed Operators Not Receiving Procedure Review Packages for Two Yr Period.Violation Will Not Be Cited Due to Licensee Corrective Actions
ML17263A149
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/18/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17263A151 List:
References
NUDOCS 9303020394
Download: ML17263A149 (2)


Text

Docket No. 50-244 FEB 1 t: 199~

Dr. Robert C. Mecredy Vice President, Ginna Nuclear Production Rochester Gas and Electric Corporation 89 East Avenue Rochester, New York, 14649

Dear Dr. Mecredy:

SUBJECT:

AUDITFINDING ON PROCEDURE REVIEWS BY OPERATORS This acknowledges your letter of January 25, 1993, in which you discuss an administrative oversight that resulted in four licensed operators not receiving procedure review packages for a two year period.

Specifically, during a quality assurance audit, Ginna personnel identified that abnormal and emergency procedure changes had not been routed to four recently licensed operators from November 1990 to September 1992.

Based on subsequent evaluations, you concluded that you were "confident that each shift operator was cognizant of procedural requirements existing during this period,"

We appreciate your efforts to identify and correct the oversight described above.

Our operator licensing personnel reviewed the evaluation and corrective actions described in your letter and found them to be satisfactory.

Had NRC personnel found this noncompliance with-the 10 CFR 55.59(c)(3)(iv) procedure review requirement for licensed operators, we believe that it would have been categorized as a Severity Level V violation.

As such, this violation willnot be cited because your efforts in,identifying and correcting the oversight meet the criteria specified in section V.G. of the NRC enforcement policy (10 CFR 2, Appendix C).

No response to this letter is necessary.

Thank you for your cooperation.

Sincerely, ogQQ2~

Lee H. Bettenhausen, Chief Operations Branch Division of Reactor Safety OFFICIALRECORD COPY G:RGENCV1.WP 9303020394 930218 PDR ADQCK 05000244 6

PDR

Dr. Robert C. Mecredy PPB 18 1993 CC:

R. Smith, Senior Vice President, Production and Engineering Central Records (4 copies)

Director, Energy and Water Division State of New York, Department of Law N. Reynolds, Esquire Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2) (w/copy of letter dated January 25, 1993)

NRC Resident Inspector State of New York, SLO Designee (w/copy of letter dated January 25, 1993) bcc; Region I Docket Room (with concurrences)

L. Bettenhausen, DRS DRS/EB SALP Coordinator J. Linville, DRP G. Meyer, DRS W. I mrus, DRP T. Moslak, SRI - Ginna

. A, Johnson, PM, NRR V. McCree, OEDO J. D'Antonio, DRS OL Facility File DRS File Rl:DRS D'Antonio/dmg/ajk 02

/93 RI:DR Meyer 02/l'l/93 RI DRS Be enhausen 02/@93 OFFICIALRECORD COPY G:RGENCV1.WP