Forwards Rev 7 to Emergency Operating Procedure AP-RCP.1, RCP Seal Malfunction
ML17262B172
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/12/1993
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17262B174 List:
References
NUDOCS 9302250216
Download: ML17262B172 (13)


Text

, ACCEI ERAT~ DOCVMENTDIST VTION SYSTEM REGULAT~ INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9302250216 DOC.DATE: 93/02/12 NOTARIZED:

NO DOCKET N

I*

FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

050 0244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME

'ECIPIENT AFFILIATION JOHNSON,A.

'Project Directorate I-3

SUBJECT:

Forwards<Rev 7 to Emergency Operating Procedure AP-RCP.l, "RCP Seal Malfunction."

DISTRIBUTION CODE:

A003D COPIES RECEIVED:LTR / ENCL /

SIZE'ITLE:

OR/Licensing Submittal:

Suppl 1 to NUREG-0737(Generic Ltr 82-33)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PDl+3 LA JOHNSON,A INTERNAL; R~RG+QHFB11 REG FILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD OC/LFMB RES/DSIR/EIB NSIC COPIES LTTR ENCL 1

1 1

1

)'Ii QS +g$ 7g$ /TTpP

",(Pr NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 9

0l E

s

,I r,

r,

~

4

'W k>

II

~

C

~

~~i

/ ///t uw

//ilerI ES f/

Z/////////I

/ //I////

////////////

ROCHESTER GAS AND ELECTRIC CORPORATION ROBERTC MECREDY Vice President Cinna Nuclear Production rs re L ~irowri 4

89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 TELEPHONE AREACOOE 71B 546 2700 February 12, 1993 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Mr. Allen Johnson Project Directorate l-3 Washington, D.C. 20555

Subject:

Emergency Operating Procedures R. E. Ginna Nuclear Power Plant Docket No. 50-244 Gentlemen:

As requested, enclosed are Ginna Station Emergency Operating Procedures.

Very tr

yours, Robert C. Mecredy Enclosures c:

Mr. Lee Bettenhausen, USNRC, Region 1.

Resident Inspector, Ginna Station 9302250216 9302i2 PDR ADOCK 05000244 P

I I

PDR

J s (

~ >

/~

ll 1

I'

AP-RCP.1 RCP Seal Malfunction

EOP:

AP-RCP.1 TITLE: ~:

RCP SEAL MALFUNCTION REV 6

GE 1 of 6 ROCHESTER GAS AND ELECTRIC COR ORATION GINNA STATION CONTROLLED COPY NUMBER rQ ~

TECHNICAL RE IEW PORC REVI DAT

/

Q.

LANT SUP ENDENT EFFECTIVE DATE QA NON-QA REVIEWED BY:

CATEGORY 1.0 Tl'yI> I DATE

0 I

EOP:

AP-RCP.1 TITLE:

RCP SEAL MALFUNCTION REV:

6 PAGE 2 of 6 A.

PURPOSE This procedure provides the instructions necessary to diagnose and to respond to a reactor coolant pump seal malfunction.

B.

ENTRY CONDITIONS/SYMPTOMS 1.

ENTRY CONDITIONS This procedure is entered from:

a.

ECA-0.1, LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED, Step 11, or b

ES 1

1 g SI TERMINATION Step 12 g or c ~

ES 1 ~ 2 g POST LOCA COOLDOWN AND DEPRES SURIZATION g Step 20, or d.

ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF BOTH STEAM GENERATORS, Step 24, or e.

E-3, STEAM GENERATOR TUBE RUPTURE, Step 34, or f.

ECA-3.1, SGTR WITH LOSS OF REACTOR COOLANT-SUBCOOLED RECOVERY DESIRED, Step 28, or g

ECA 3 ~ 2 ~

SGTR WITH LOSS OF REACTOR COOLANT SATURATEDg RECOVERY DESIRED, Step 21, or h

ECA 3 ~ 3 g SGTR WITHOUT PRESSURI ZER PRESSURE CONTROL/

Step 18, or i

FR I ~ 1 g

RESPONSE

TO HIGH PRESSURI ZER LEVEL/

Step 5.

~

2.

SYMPTOMS -: The symptoms of RCP SEAL MALFUNCTION are; a.

RCP 1A/(1B) No.l SEAL HI-LO FLOW 5.5 GPM 0.25 ALARM B-17/(18), or b.

RCP 1A/(1B)

LABYR SEAL LO DIFF PRESS 15" H20 ALARM, B-9/(10), or c.

RCP lA/(lB) STANDPIPE HI LEVEL +

1 FT alarm, B-3/ (4), or Continued on next page

EOP:

AP-RCP.1 TiTLE:

RCP SEAL MALFUNCTION REV 6

PAGE 3 of 6 2.

SYMPTOMS (cont) d.

RCP 1A/(1B)

STANDPIPE LO LEVEL -4 FT alarm, B-ll/(12), or e.

RCP 1A/(1B) No.

1 SEAL LO DIFF PRESS 220 PSID alarm, B-25/ (26), or f.

RCP 1A/(1B) No.

1 SEAL OUT HI TEMP 200'F alarm, B-1/ (2)

~

EOP:

AP-RCP.1 TITLE: 0 RCP SEAL MALFUNCTION REV:

6 PAGE 4 of 6

STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED CAUTION IF, AT ANY TIME DURING THIS PROCEDURE, A REACTOR TRIP OR SI OCCURS, E-O, REACTOR TRIP OR SAFETY INJECTION, SHOULD BE PERFORMED.

NOTE:

Step 1 is an IMMEDIATE ACTION step.

1 Check RCP No.

1 Seal

~

~

~

Indication:

a.

No.

1 seal leakoff flow - LESS THAN 5.5 GPM

a. IF No.

1 seal leakoff flow greater than or equal to 5.5

GPM, THEN close seal disch vlv(s) AOV-270A (A RCP)

OR AOV

-270B (B RCP)

AND perform the following:

o IF Rx at power, THEN:

1) Trip the Rx.
2) Trip the affected RCP(s).

3)

Go to E-O, REACTOR TRIP or SAFETY INJECTION.

o IF Rx shutdown, THEN:

1) Trip the affected RCP(s).

2)

Go to Step 8.

EOP:

AP-RCP.1 TITLE:

RCP SEAL MALFUNCTION REV:

6 PAGE 5 of 6 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 2

Check No.

1 Seal Indication:

o No.

1 seal leakoff flow-GREATER THAN 0.25 GPM IF No.

1 seal outlet temperature greater than 215'F, THEN go to Step 7.

IF No.

1 seal outlet temperature less than 215'F, THEN verify leakage increase from No.

2 seal to the RCDT.

3 Check No.

2 Seal Indications:

a.

RCP standpipe lo level alarms, B-11/(12) - NOT LIT b.

RCP standpipe hi level alarms, B-3/(4) - NOT LIT

a. IF either RCP standpipe lo level alarm lit, THEN go to Step 4.
b. IF either RCP standpipe hi level alarm lit, THEN go to Step 6.

4 Check Containment Radiation Monitors:

o R NORMAL o

R NORMAL IF RCP standpipe lo level alarm and CNMT radiation increasing, THEN No.

3 seal leakage increase is probable.

Continue plant operation while closely monitoring RCP seal operation.

5 Check Both RCP Diff Press:

o GREATER THAN - 220 PSID IF Rx at power, THEN:

a. Trip the Rx.
b. Trip the affected RCP(s).

c.

Go to E-O, REACTOR TRIP or SAFETY INJECTION IF Rx shutdown, THEN:

a. Trip the affected RCP(s).

b.

Go to Step 8.

EOP:

AP-RCP.1 RCP SEAL MALFUNCTION REV 6

PAGE 6 of 6 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 6

Check Both RCP Labyr Seal Diff Press:

o GREATER THAN -

15 INCHES OF VATER IF Labry seal D/P is low, THEN ensure CCW flow to the RCP thermal

barriers, AND
a. Verify charging in service and check seal infection flow.
b. Ad)ust HCV-142 if desired.
c. Direct AO to check seal in]ection filter D/P.

7 Check Both RCP Seal No.

1 Outlet Temperatures:

o LESS THAN - 215'F IF Rx at power, THEN:

a. Trip the Rx.
b. Trip the affected RCP(s).

c.

Go to E-O, REACTOR TRIP or SAFETY INJECTION.

IF Rx shutdown, THEN:

a. Trip the affected RCP(s).

b.

Go to Step 8.

8 Establish MONXTORING OF RCP SEAL INDICATXON (Refer to ATTACHMENT A as necessary)

NOTE:

Refer to 0-9.3, NRC IMMEDIATE NOTIFICATION, for reporting requirements.

9 Complete NOTIFICATION TO HIGHER SUPERVISXON

-END-

EOP:

AP-RCP.1 TITLE:

RCP SEAL MALFUNCTION 0

REV 6

PAGE 1 of 1 ATTACHMENT A REACTOR COOLANT PUMP SEAL TROUBLE SHOOTING TABLE Alarm S

toms Seal.

No.

1 Seal Injection Leak Off-

.Su l Off Loss Of Malfunction No.

1 No.

2 Seal Seal No.

3 Pump Seal Bearin<

1)

No.

1 seal out hi temperature 200'F 2)

Pump radial bearing water tern erature Hi h 200'F X

3)

Labyrinth seal low differential pressure 15 inches H20 X

4)

No.

1 seal low differential ressure 220 sid 5)

No.

1 seal Low flow 0.25 m

X 6)

No.

1 seal high flow 5.5 m

X 7)

Standpipe high level X

8)

Standpipe low level X Most likely malfunction or alarm 0

Possible malfunction