Provides Notification of Revision to QA Manual,App B,Third Interval Inservice Insp Program.Rge No Longer Requires Use of Relief Request Re Field Verification Initiated on Bolted Flange Connection Above Condensate Test Tank
ML17262B101
Person / Time
Site: Ginna 
Issue date: 12/09/1992
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9212150171
Download: ML17262B101 (5)


Text

~ccrc.za<TEO oocui~~ z oISrruau TION SYSTEbl REGULARLY INFORMATION DISTRIBUTI(SYSTEM (RIDS)

AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas

& Electric Corp.

REClP.NAME RECIPIENT AFFILIATION JOHNSONFA.R.

Project Directorate I-3 h

ACCESSION NBR:9212150171 DOC.DATE: 92/12/09 NOTARIZED: NO DOCKET PACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244i h

SUBJECT:

Provides notification of revision to QA Manual,app B,third interval inservice insp program.RGE no longer requires use of relief request 10 described in NRC response ltr dtd I

900806.

D DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR ENCLj SIZE: A TITLE: OR Submittal: Inservice Inspection/Testa.ng/Relief from ASME Code RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONFA INTERNAL: NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS1 RES MILLMAN,G EXTERNAL EG&G BROWN F B

'" NRC PDR'OPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-3 PD NRR/DET/EMEB 7E

= REG FILE 01

~V B

EG&G RANSOMEFC NSIC COPIES LTTR ENCL (tP(7>Q ((gg 5 g 7F M,/0LPP /~Pg-g I

D NOTE TO ALL "RIDS RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM PI-S7 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

l

/'7 0

TOTAL NUMBER OF COPIES REQUIRED:

LTTR ~

ENCL

\\

ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C. MECREDY trice Pres(dent Cinna Nudear Production December 9,

1992 TELEPHONE AREACODE 71B 546 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Allen R. Johnson Project Directorate I-3 Washington, D.C.

20555

Subject:

Quality Assurance Manual, Appendix B

Ginna Nuclear Power Plant Inservice Inspection Program for the 1990-1999 Interval R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Johnson:

The purpose of this letter is to provide notification of a revision to the R.E.

Ginna Station Quality Assurance Manual Appendix B,

Third Interval Inservice Inspection Program.

Specifically, Rochester Gas and Electric (RG&E) no longer requires the use of Relief Request number 10.

Relief Request number 10 is described in detail in the Commission's response letter dated August 6, 1990.

Relief Request number 10 is no longer required since field verification identified a bolted flange connection located above the standby auxiliary feedwater pumps Condensate Test Tank.

This bolted flange connection can provide the needed isolation for hydrostatic testing with the insertion of a blind flange.

Further, an engineering evaluation was performed to determine if the 150-1 piping line specification could withstand the required hydrostatic test pressure of 1760 to 1865 psig associated with the Class 3

piping line specification of 902s.

This evaluation confirmed that capability.

Mechanical Engineering Analysis ME-91-0012 Rev.

0 dated August 7.,

1991 contains the necessary justification.

Very truly yours, Robert C. Mecredy GAL/219

~-400<'3 92121 DCK O5OOO 50171 921209

'pOR

~D pDR

Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector

C~-

l k

'IW