ACCELERATED DILUTION DEMONS'TION SYSTEM ACCESSION NBR:9211240118 DOC.DATE: 92/10/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AU'ZH.NAME AUTHOR AFFILIATION DODGE,R.E.
Rochester Gas
& Electric Corp.
MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Oct 1992 for RE Ginna Nuclear Power Plant.W/921115 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTRj ENCL
(
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
R, D
05000244 8
RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONPA INTERNAL: AEOD/DOA NRR~Jgg XPEB10 G FILE 01 EXTERNAL'G&G BRYCE gJ ~ H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGNl NRC PDR
.COPIES LTTR ENCL 1
1 1
1 1'
1 1
1 1
A D
D
~~gus 't 917>
NOTE TO ALL "RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
r ti h
P
Pi
//////I////I
/
aeo
/S//g/1
//////Z1////
1/////////III
/////////////
ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER N.K 14649-0001 ROBERT C MECREDY Vice President Cinna Nudear Production TELEPHONE AitEACODE 71B 546 2700 GINNA STATION November 15, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for October, 1992 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.'1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1992.
Robert C. Mecred RCM/
Attachments cc:
Mr. Thomas T. Martin NRC (1)
))n 9211240118 921031 PDR ADOCK 05000244 R:'-'.
"PDR
~
~
OPERATING DATA REPORT DOCKET NO.
50.244 DATE Nov r 15 1992 COMPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524-4446 ext. 396 1 ~
2 ~
3.
4.
5.
6.
70 8.
Unit Name:
R.E.
GINNA NUCLEAR P(NER PLANT Reporting Period:
October 1992 Licensed Thermal Power (MWt):
Nameplate Rating (Gross MWe):
Design Electrical Rating (Net MWe):
Maximus Dependable Capacity (Gross MWe):
Maxinxm Dependable Capacity (Net MWe):
If Changes Occur in Capacity Ratings (Items Notes:
The unit operated at approx.
97/ reactor power level for the entire report period.
1520 490 470 490 470 Nunbcr 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr. ~ to Date Cmuiative 11.
12.
13.
14.
15 ~
16.
17.
18.
19.
20.
21 ~
22.
23
'ours In Report Period Hunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Avai labi lity Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate 745***
745 745 1 103 684 375 437 357 045 100%
100%
101.97%
101.97/
0/.
7 320 6 169.71 6 073.75 8 677 792 2 935 534 2 786 749 82.97%
82.97%
81.00%%u.
81.00%
- 2. 51%
201 426.45 159 500.67 1 687.55 156 779.13 8.5 221 892 305 73 265 141 69 539 296 74.80%
74.80/,
5.92%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refueli and Maintenance
. March 19 1993 45 da s 25'fShut Down At End Of Report Period, Estimated Date of Start~:
26.
Units In Test Status (Prior to Comnercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
<<CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
<<<<ClÃULATIVE TOTAL COMMENCING NOVEMBER 8, 1969
- CHANGE FROM EASTERN DAYLIGHT SAVINGS TIME TO EASTERN STANDARD TIME
V
~
~
AVERAGE DAXLY UNXT POWER LINTEL DOCKET NO.
UNIT DATE COMPLETED BY 50-244 R.E. Ginna Nuclear Power Plant Novemb 15 1992 Robert E.
Do ge TELEPHONE 1
315 524-4446 ext.
396 MONTH October 1992 DAY AVERAGE DAXLY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LWGK (MWe-Net) 478 17'79 2 ~
478 18.
479 3 ~
478 19.
479 4 ~
478 20.
479 5.
478 21 ~
479 6.
478 22.
478 7 ~
478 23'79 8.
478 24.
479 9.
479 25.
479 10.
479 26.
479 479 27'79 12.
478 28.
480 13.
478 29.
480 14.
478 30.
479 15.
478 31.
479 16.
478 XNSTRUCTXONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
ll'
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH DOCKET NO.
~O 24"
'NiTNAMER.E. GINNA NUClEAk POWER PlANT l)ATE
(:OMP LI:.Tl;D BY I
Robert E. Dodge Tl:.U:.PllONl:.
315-524-4446 erat.
396 nna tat on Ho.
Date 0
III 4
~
0 O~
n C0 VI O
cc h
4I >>4 4 II 4>> 0 n'MI4 OO Licensee Event Report 0
Em 0
0 III 0 III (J O EA C
0 Q
O Cause 8a Corrective Action to Prevent Recurrence No power reduct1on for the month of October.
1 F: Forced St Scheduled rIEV 4IS5 4949 Reason:
A-Equipmeat Failure (Explain)
B+faintenaace or Test C-Refueliag D-Regulatory Restriction E&perator Training 8c License Examiaacioa F-Administrative
&Operational Error (Explain)
Hither (Explain)
Method:
14faaual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Iastruccions for Preparatioa of Daca Entry Sheets for Licensee Evenc Report (LER) File (NUREG-O161)
Exhtbit 1 - Same Source
NARRATIVE
SUMMARY
OP OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Nove er 15 1992 COMPLETED BY Robert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH October 1992 The unit operated at approximately 974 Reactor Power Level for the month of October and remained there at the end of the report period.