Monthly Operating Rept for Oct 1992 for Re Ginna Nuclear Power Plant.W/921115 Ltr
ML17262B091
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1992
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9211240118
Download: ML17262B091 (8)


Text

ACCELERATED DILUTION DEMONS'TION SYSTEM ACCESSION NBR:9211240118 DOC.DATE: 92/10/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AU'ZH.NAME ,

AUTHOR AFFILIATION DODGE,R.E. Rochester Gas & Electric Corp.

MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION Monthly operating rept for Oct 1992 for Ginna Nuclear j

SUBJECT:

RE Power Plant.W/921115 ltr. R, DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL ( SIZE:

TITLE: Monthly Operating Report (per Tech Specs) D NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 8

RECIPIENT COPIES RECIPIENT .COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A PD1-3 LA 3 3 PD1-3 PD 1 1 JOHNSONPA 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 D NRR~Jgg XPEB10 1 1 NRR/DOEA/OEAB 1' G FILE 01 1 1 RGNl 1 1 EXTERNAL'G&G BRYCE g J ~ H 1 1 NRC PDR 1 1 NSIC 1 1

't 917>

~~gus D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

r ti h P

Pi

< //////I////I

/ aeo

/S//g/1 //////Z1////

1/////////III /////////////

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.K 14649-0001 ROBERT C MECREDY TELEPHONE Vice President AitEACODE 71B 546 2700 Cinna Nudear Production GINNA STATION November 15, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for October, 1992 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.'1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1992.

Robert C. Mecred RCM/

Attachments cc: Mr. Thomas T. Martin NRC (1)

))n R:'-'.

9211240118 921031 PDR ADOCK 05000244 "PDR

~ ~ OPERATING DATA REPORT DOCKET NO. 50.244 DATE Nov r 15 1992 COMPLETED BY Robert E. Dodge TELEPHONE 315 524-4446 ext. 396 OPERATING STATUS 1 ~ Unit Name: R.E. GINNA NUCLEAR P(NER PLANT Notes: The unit operated at approx.

2~ Reporting Period: October 1992 97/ reactor power level for

3. Licensed Thermal Power (MWt): 1520 the entire report period.
4. Nameplate Rating (Gross MWe): 490
5. Design Electrical Rating (Net MWe): 470
6. Maximus Dependable Capacity (Gross MWe): 490 70 Maxinxm Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Nunbcr 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr. ~ to Date Cmuiative

11. In Report Period 745*** 7 320 201 426.45
12. Hunber of Hours Reactor Was Critical 745 6 169.71 159 500.67 13.

14.

'oursReactor Reserve Shutdown Hours Hours Generator On-Line 745 6 073.75 1 687.55 156 779.13 15 ~ Unit Reserve Shutdown Hours 8.5 *

16. Gross Thermal Energy Generated (MWH) 1 103 684 8 677 792 221 892 305
17. Gross Electrical Energy Generated (MWH) 375 437 2 935 534 73 265 141
18. Net Electrical Energy Generated (MWH) 357 045 2 786 749 69 539 296
19. Unit Service Factor 100% 82.97%
20. Unit Avai labi lity Factor 100% 82.97%

21 ~ Unit Capacity Factor (Using MDC Net) 101.97% 81.00%%u. 74.80%

22. Unit Capacity Factor (Using DER Net) 101.97/ 81.00% 74.80/,

23 Unit Forced Outage Rate 0/. 2. 51% 5.92%

'f

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refueli and Maintenance . March 19 1993 45 da s 25 Shut Down At End Of Report Period, Estimated Date of Start~:

26. Units In Test Status (Prior to Comnercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

<<CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975

<<<<ClÃULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

      • CHANGE FROM EASTERN DAYLIGHT SAVINGS TIME TO EASTERN STANDARD TIME

V

~ ~

AVERAGE DAXLY UNXT POWER LINTEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Novemb 15 1992 COMPLETED BY Robert E. Do ge TELEPHONE 1 315 524-4446 ext. 396 MONTH October 1992 DAY AVERAGE DAXLY POWER LEVEL 2 ~

(MWe-Net) 478 478 17 18.

'79 DAY AVERAGE DAILY POWER LWGK (MWe-Net) 479 3 ~ 478 19. 479 4 ~ 478 20. 479

5. 478 21 ~ 479 6.

7 8.

~

478 478 478 22.

23 24.

'79 478 479

9. 479 25. 479 10.

12.

479 479 478 26.

27 28.

'79 479 480

13. 478 29. 480
14. 478 30. 479
15. 478 31. 479
16. 478 XNSTRUCTXONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. ll'

DOCKET NO. ~O 24"

'NiTNAME R.E. GINNA NUClEAk POWER PlANT UNIT SHUTDOWN AND POWER REDUCTIONS l)ATE

(:OMP LI:.Tl;D B Y I Robert E. Dodge REPORT MONTH Tl:.U:.PllONl:. 315-524-4446 erat. 396 nna tat on h

n 4I >> 4 III C 4 II Licensee Em O EA C Cause 8a Corrective 0 0 4>>> 0 0 0 Ho. Date 4 0 VI Event III 0 Q Action to

~

0 O O~ O n'MI 4 Report 0 III (J Prevent Recurrence cc O

O No power reduct1on for the month of October.

1 F: Forced Reason: Method: Exhibit G - Iastruccions St Scheduled A-Equipmeat Failure (Explain) 14faaual for Preparatioa of Daca B+faintenaace or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueliag 3-Automatic Scram. Evenc Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) O161)

E&perator Training 8c License Examiaacioa F-Administrative

&Operational Error (Explain) rIEV 4IS5 4949 Hither (Explain) Exhtbit 1 - Same Source

NARRATIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Nove er 15 1992 COMPLETED BY Robert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH October 1992 The unit operated at approximately 974 Reactor Power Level for the month of October and remained there at the end of the report period.