'gocket No. 50-244
~)
Dr. Robert C. Mecredy Vice President, Nuclear Production Rochester Gas
& Electric Corporation 89 East Avenue Rochester, New York 14649
Dear Dr. Mecredy:
November 12, 199
SUBJECT:
REVIEW OF PROPOSED AMENDMENT TO TECHNICAL SPECIFICATION 6.5.1, "PLANT OPERATIONS REVIEW COMMITTEE (PORC)
FUNCTION", R.
E.
GINNA NUCLEAR POWER PLANT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. H83569)
We have reviewed your letter dated March 23,
- 1992, submitted to amend Technical Specification 6.5. 1, "Plant Operations Review Committee (PORC)
Function."
The staff was concerned with the lack of a specification to the actual number of PORC members.
By removing the specific titles of PORC
- members, the number of PORC members becomes indeterminate.
The staff requires a 'statement describing the number of PORC members.
This can be a fixed
- number, or a minimum and maximum number.
If a fixed number is chosen, and it is larger than the current
- number, then the quorum needs to be revised to
- ensure, as a minimum, the current percentage of PORC members is required for a quorum.
If it is not a fixed number, then the quorum requirement of Section 6.5. 1.3 should be revised to reflect the staff position that the quorum should be a majority of the regular members.
We ask that you respond to this request for additional information (RAI) at your earliest convenience.
The reporting and/or recordkeeping requirements contained in this iletter affects fewer than ten respondents; therefore, the Office of Management and Budget (OHB) clearance is not required under P.
L.96-511.
Sincerely, Original signed by Allen R. Johnson, Project Manager Project Directorate I-3 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc:
See next page
+00-
+0
+0 o.0 Po oo oc CaIQ ogL DISl RI BUTION:
Docket File 50-244 NRC 5 Local PDRs PDI-3 Reading SVarga JCalvo WButler TClark AJohnson RSkokowski OGC ACRS (10)
JLinville, RI is-. tg5 P2a ~ rl >~
OFFICE NAME LA:PDI-3 TC1 ar8 PDI-3 PH PDI-3 R.Skokowski AJohnson:mw D'DI-3 WButler DATE
/ 262 OFFICIAL RECORD COPY Document Name:
GIH83569.RAI
( /
/92
~/ /9'92
/4>/92
P 0,
~
f f
pl%
'a H
1
1I' 0
Vlp ce 0
t7 +>>*<<~
Docket No. 50-244 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 e
November 12, 1992 Dr. Robert C. Mecredy Vice President, Nuclear Production Rochester Gas 8 Electric Corporation 89 East Avenue Rochester, New York 14649
Dear Dr. Mecredy:
SUBJECT:
REVIEW OF PROPOSED AMENDMENT TO TECHNICAL SPECIFICATION 6.5.1, "PLANT OPERATIONS REVIEW COMMITTEE (PORC)
FUNCTION", R. -&. GINNA NUCLEAR POWER PLANT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. M83569)
We have reviewed your letter dated March 23,
- 1992, submitted to amend Technical Specification 6.5. 1, "Plant Operations Review Committee (PORC)
Function."
The staff was concerned with the lack of a specification to the actual number of PORC members.
By removing the specific titles of PORC
- members, the number of PORC members becomes indeterminate.
The staff requires a statement describing the number of PORC members.
This can be a fixed
- number, or a minimum and maximum number.
If a fixed number is chosen, and it is larger than the current
- number, then the quorum needs to be revised to
- ensure, as a minimum, the current percentage of PORC members is required for a quorum.
If it is not a fixed number, then the quorum requirement of Section 6.5 '.3 should be revised to reflect the staff position that the quorum should be a majority of the regular members.
We ask that you respond to this request for additional information (RAI) at your earliest convenience.
The reporting and/or recordkeeping requirements contained in this letter affects fewer than ten respondents; therefore, the Office of Management and Budget (OMB) clearance is not required under P.
L.96-511.
Sincerely, cc:
See next page Wo A len R. Johnp'on, Project Manager Pr ~ect O'terate 1-3 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Dr. Robert C. Hecredy R.E.
Ginna Nuclear Power Plant CC:
Thomas A. Hoslak, Senior Resident Inspector R.E.
Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road
- Ontario, New York 14519 Regional Administrator, Region I
U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Ms.
Donna Ross Division of Policy Analysis 5 Planning New York State Energy Office Agency Building 2 Empire State Plaza
- Albany, New York 12223 Charlie Donaldson, Esq.
Assistant Attorney General New York Department of Law 120 Broadway New York, New York 10271 Nicholas S.
Reynolds Winston 5 Strawn 1400 L St.
N.W.
Washington, DC 20005-3502 Hs.
Thelma Wideman
- Director, Wayne County Emergency Management Office Wayne County Emergency Operations Center 7370 Route 31
- Lyons, New York 14489 Hs.
Mary Louise Heisenzahl Administrator, Monroe County Office of Emergency Preparedness 111 West Fall Road, Room 11 Rochester, New York 14620
~,