Forwards Insp Rept 50-244/92-15 on 920909-1026.Violation Re Procedural Error Noted But Not Cited
ML17262B069
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/03/1992
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17262B070 List:
References
NUDOCS 9211090004
Download: ML17262B069 (6)


See also: IR 05000244/1992015

Text

NOV 08 1992

Docket No. 50-244

Dr. Robert C. Mecredy

Vice President,

Ginna Nuclear Production

Rochester Gas and Electric Corporation

89 East Avenue

Rochester, New York 14649

Dear Dr. Mecredy:

SUBJECT:

R. E. GINNARESIDENT INSPECTION 50-244/92-15 (9/9/92 - 10/26/92)

This letter transmits

the September

9 to October 26,

1992 inspection findings of Messrs.

T. Moslak and E. Knutson at the R. E. Ginna Nuclear Power Plant.

At the end of the

inspection, Mr. T. Moslak of my staff summarized the findings with Mr. J. Widay and other

members of your staff.

The inspection was focused on areas relevant to public health and safety and examined

the

control ofoperations, maintenance,

and engineering conducted during this period. The plant was

operated safely during this period.

Within this scope, the aggressive management

response

to

strengthen

controls for processing

minor administrative changes

to procedures

following the

identification of a procedural error was noteworthy.

This error represented

a violation of

regulatory requirements

as identified herein.

However, the violation is not being cited because

the criteria specified in Section VII.B of the Enforcement Policy were satisfied in that you

identified and promptly corrected the condition.

Strong engineering support and effective coordination between the maintenance

shops was also

demonstrated

in correcting a degrading fuel oil booster pump discharge pressure

on the "B"

emergency diesel generator.

A proactive approach to addressing

maintenance

issues continues

to be an organizational strength.

/

No response to this letter is required.

Thank you for your cooperation.

Sincerely,

~~hiatal Signed

gy:

)BN83 Q, }jnyj}fg

.

James C. Linville, Chief

Projects Branch 3

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report 50-244/92-15

9211090004

921103

PDR

ADOCK 05000244

8

PDR

OFFICIALRECORD COPE

p

t

Dr. Robert C. Mecredy

NOY 03199R

.

cc w/encl:

R. Smith, Sr. Vice President,

Production and Engineering

Central Records (4 copies)

Director, Power Division

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, Department of Law

State of New York, SLO Designee

K. Abraham, PAO (2 copies)

N. Reynolds, Esquire

OPFXCXAL REC0RD CGA

Dr. Robert C. Mecredy

NOV 03 19+

bcc w/encl:

.Region I Docket Room (with concurrences)

(w/copy of IFS Forms)

W. Lazarus, DRP

J. Linville, DRP

V. McCree, OEDO

A. Johnson, PM, NRR

T. Moslak, SRI - Ginria (w/copy of IFS Forms)

DRS/EB SALP Coordinator

.

bcc w/Letter and Executive Summary Only:

T. Martin, RA

W. Kane, DRA-

C. Hehl, DRP

J. Wiggins, DRP.

R. Cooper, DRSS

W. Hodges, DRS

W. Lanning, DRS

W. Ruland, DRS

L. Bettenhausen,

DRS

J. Joyner, DRS

D. Holody, EO

DRP: RI

Knutson/meo

10/28/92

DRP:RI

Ahk

ilailv~

DRP:RI

zarus

"A/vz

DRP:

I

/I g~

OFFICIALRECORD COPY

A:GIN9215.MEO