NOV 08 1992
Docket No. 50-244
Dr. Robert C. Mecredy
Vice President,
Ginna Nuclear Production
Rochester Gas and Electric Corporation
89 East Avenue
Rochester, New York 14649
Dear Dr. Mecredy:
SUBJECT:
R. E. GINNARESIDENT INSPECTION 50-244/92-15 (9/9/92 - 10/26/92)
This letter transmits
the September
9 to October 26,
1992 inspection findings of Messrs.
T. Moslak and E. Knutson at the R. E. Ginna Nuclear Power Plant.
At the end of the
inspection, Mr. T. Moslak of my staff summarized the findings with Mr. J. Widay and other
members of your staff.
The inspection was focused on areas relevant to public health and safety and examined
the
control ofoperations, maintenance,
and engineering conducted during this period. The plant was
operated safely during this period.
Within this scope, the aggressive management
response
to
strengthen
controls for processing
minor administrative changes
to procedures
following the
identification of a procedural error was noteworthy.
This error represented
a violation of
regulatory requirements
as identified herein.
However, the violation is not being cited because
the criteria specified in Section VII.B of the Enforcement Policy were satisfied in that you
identified and promptly corrected the condition.
Strong engineering support and effective coordination between the maintenance
shops was also
demonstrated
in correcting a degrading fuel oil booster pump discharge pressure
on the "B"
A proactive approach to addressing
maintenance
issues continues
to be an organizational strength.
/
No response to this letter is required.
Thank you for your cooperation.
Sincerely,
~~hiatal Signed
gy:
)BN83 Q, }jnyj}fg
.
James C. Linville, Chief
Projects Branch 3
Division of Reactor Projects
Enclosure: NRC Region I Inspection Report 50-244/92-15
9211090004
921103
ADOCK 05000244
8
OFFICIALRECORD COPE
p
t
Dr. Robert C. Mecredy
NOY 03199R
.
cc w/encl:
R. Smith, Sr. Vice President,
Production and Engineering
Central Records (4 copies)
Director, Power Division
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York, Department of Law
State of New York, SLO Designee
K. Abraham, PAO (2 copies)
N. Reynolds, Esquire
OPFXCXAL REC0RD CGA
Dr. Robert C. Mecredy
NOV 03 19+
bcc w/encl:
.Region I Docket Room (with concurrences)
(w/copy of IFS Forms)
W. Lazarus, DRP
J. Linville, DRP
V. McCree, OEDO
T. Moslak, SRI - Ginria (w/copy of IFS Forms)
DRS/EB SALP Coordinator
.
bcc w/Letter and Executive Summary Only:
T. Martin, RA
W. Kane, DRA-
C. Hehl, DRP
J. Wiggins, DRP.
R. Cooper, DRSS
W. Hodges, DRS
W. Lanning, DRS
W. Ruland, DRS
L. Bettenhausen,
J. Joyner, DRS
D. Holody, EO
DRP: RI
Knutson/meo
10/28/92
DRP:RI
Ahk
ilailv~
DRP:RI
zarus
"A/vz
DRP:
I
/I g~
OFFICIALRECORD COPY
A:GIN9215.MEO