Monthly Operating Rept for Jul 1992 for Re Ginna Nuclear Power Plant.W/920814 Ltr
ML17262A953
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/31/1992
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9208180027
Download: ML17262A953 (8)


Text

J CCELERATED DIS RIBUTION DEiVIONSTBATION SYSTEiUl REGULA Y INFORMATION DISTRIBUTION, YSTEM (RIDS)

ACCESSION NBR'208180027 DOC. DATE: TAR IZED: NO DOCKET FACIAL: 50-244 Robert Emmet Qinna Nuclear Plant> Unit 1> Rochester Q 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE> R. E. Rochester Qas Zc Electric Corp.

MECREDY> R. C. Rochester Qas Rc Electric Corp.

REC IP. NAME RECIPIENT AFFILIATION SUB JECT: Monthly! ap ar Jul 1'P'P2 for RE Qinna Nuclear Power Pla t. M/920814 1 DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR ENCI SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: License Exp date in accordance eith 10CFR2> 2. 109(>>/19/72). 05000244

/

RECIPIENT COPZES RECIPIENT COPIES ZD CODE/NAME LTTR ENCL ZD CODE/NAME LTTR ENCL PD1-3 LA 3 3 PDl-3 PD 1 D

JOHNSON>

  • 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1

~EH 10 NRR/DOEA/OEAB 1 REG FIL 01 1 1 RGNl 1 EXTERNAL: EG8 J. H 1 1 NRC PDR NSIC 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DFBK.

ROOM Pl-37 (EXT. X079) TO ELIMINATEYOUR NAME FROM DIS fRIBUTION I.ISl'S FOR DOCUlvlEÃlS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

r.

ft lf

~ ~

f) r(, /8/I/I EEI/S IIII II/ III'IIIIIII

/ IIItuu I IIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.K 14649-0001 ROBERT C. MECREOY TELEPHONE Mce President AREA CODE 7 t B 646 2700 Cinna Nudear Production GINNA STATION August 14, 1992 US Nuclear Regulatory Commission Document Control Desk Nashington, DC 20555

Subject:

Monthly Report for July, 1992 Operating Status Information R. E. Ginna Nuclear Power Plant Docket. No. 50-244

Dear Sir:

Pursuant. to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of July, 1992.

Very truly yours, Robert C. Mecred RCM/

Attachments cc: Mr. Thomas T. Martin NRC (1) fl r PDR R

.PDR q208i80027 92o73>

ADOCK 05000244

C

~ ~

OPERATING DATA REPORT DOCKET NO. 50.244 DATE A ust 14 1992 COMPLETED BY obert E. Dodge TELEPHONE 315 524.4446 ext. 396 OPERATING STATUS

1. Unit Name: R.E. GINMA NUCLEAR POWER PLANT Notes: The unit operated at approx.
2. Reporting Period: Jul 1992 97/. reactor power level for
3. Licensed Thermal Power (MWt): 1520 the entire report period.

4~ Nameplate Rating (Gross MWe): 490

5. Design Electrical Rating (Net MWe): 470
6. Maximun Dependable Capacity (Gross MWe): 490
7. Haximun Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons for Restrictions, If Any:

This Month Yr.-to-Date CNMIatlve

11. Hours In Report Period 744 5 111 199 217.45
12. Nunber of Hours Reactor Was Critical 744 3 960.71 157 291.67
13. Reactor Reserve Shutdown Hours 1 687.55
14. Hours Generator On-Line 744 154 570.13
15. Unit Reserve Shutdown Hours 8.5 *
16. Gross Thermal Energy Generated (MWH) 1 097 720 5 413 242 218 627 755
17. Gross Electrical Energy Generated (MWH) 371 098 1 832 402 72 162 009
18. Het Electrical Energy Generated (MWH) 352 761 1 738 295 68 490 842
19. Unit Service Factor 100% 75.62% 77.75%
20. Unit Availability Factor 100% 75.62/ 77.75%
21. Unit Capacity Factor (Using MDC Het) 100.88/ 72.36% 74.50/
22. Unit Capacity Factor (Using DER Net) 100.88% 72.36/. 74.50%
23. Unit Forced Outage Rate 0% 3.89% 6.00%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: 05-09-92
26. Units In Test Status (Prior to Comnercial Operation): Forecast Achieved INITIAL CRITICALITY IHITIAL ELECTRICITY COMMERCIAL OPERATION
  • CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975

<<<<CUMULATIVE TOTAL COYJIENCING NOVEMBER 8, 1969

RAGE DAILY UNIT POWER LE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Au ust 1992 COMPLETED BY Robert E. Dodge TELEPHONE ~1315 524-4446 ext. 396 MONTH Jul 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 474 17. 474 2 ~ 447 18 474

'9.

3 ~ 476 474 4 ~ 480 20. 473

5. 479 21. 471
6. 476 22 472

'3 7 ~ 473 473

'4.

8 ~ 474 479 9 ~ 474 25. 479 10 473 26. 479

'2 475 27 475

'8.

474 472

'3.

473 29. 472

14. 473 30. 472
15. 474 31. 472
16. 474 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DO(:KET NO. ~O-244 UNl1 NAM): R.E. GINNA NUCLEAR POWER KANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:OhtPLf'.1'l:D BY Robert E. Dod e Ginna Station REPORT hfONTH 1'l'. LliP) lON l'.

0 C C 0Cu 0

0I o-l.icen see Em O Io C Cause gI Corrective o I 0 o 0 0 Action to No. Date 0 0 > Event 0 a 0 CC 0 I- Ill 0 0 o Report 0 E Prevent Recurrence 0IA C 0

O O

92-06 ',7-02-92 S 10.20 Planned maintenance on transmission lines.

1 3 F: Forced Reason: Method: Fxhibit G - Instructions S: Scheduled A-Etluipment Failure (Explain) 14fanual for Preparation of Data B-Maintenance or Test 2-hfanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) O161)

E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)

REV. 4/8$ 4949 H-Other (Explain) Exhibit 1 - Same Source

e v l

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE COMPLETED BY Au t 14 199 bert E. Dodge TELEPHONE 1 315 524 4446 ext. 396 MONTH Jul 1992 The unit operated at approximately 974 Reactor Power Level for the month of July, with the exception on July 2.

A power reduction to 74% occurred due to a planned maintenance on transmission lines and returned to full power on July 3 and remained there at the end of the report period.