ACCELERATED DISTIUBUTION DEMONSTPWTION SYSTEM REGULATOR INFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR:9203230342 DOC.DATE: 92/02/29 NOTARIZED:
NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.
Rochester Gas 6 Electric Corp.
MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Feb 1992 for RE Ginna Nuclear Power Plant.W/920315 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONiA INTERNAL: AEOD/DOA NRR/DL~P /LPEB10 BEG~I:DE=~ 0 EXTERNA EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGNl NRC PDR COPIES LTTR ENCL 1
1 1,
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENT CONTROL DESK ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
~ ~
r/I rl///II IIIIIIIII/
~ I//I/
///
///////////II ZZ.::-:
ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C MECREDY Vtce Prerident Ctnna Nuclear Productton TELEPHONE AREA cOOE T to 546.2700 GINNA STATION March 15, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for February, 1992 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1992.
Very truly yours, Robert C.
Mec edy RCM/deb Attachments cc:
Mr. Thomas T. Martin NRC (1) 9203230342 92022'Tt
'PDR,;
ADOCK 05000244
'R" ~'"
~
~
~
OPERATING DATA REPORT DOCKET NO.
50.244 DATE Mar 15 199 COMPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext. 396 1.
2.
3.
4.
5.
6.
7.
8.
Unit Name:
R.E.
GINNA NUCLEAR POWER PLANT Reporting Period:
Februar 1992 Licensed Thermal Power (MWt):
Nameplate Rating (Gross MWe):
Design Electrical Rating (Het MWe):
Maximrn Dependable Capacity (Gross MWe):
Maximus Dependable Capacity (Net MWe):
If Changes Occur in Capacity Ratings (Items Hotes:
The unit operated at approximately 98X power level for the entire report period.
Exceptions noted on page 4.
1520 490 470 490 470 Hunber 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cwuiative 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate 696 637.'17 614 780 610 262 171 246 937 88.22X 75.49X 75.49X 11.78X 1440 1381.17 1358 1 887 475 638 075 604 588 94.31X 94.31X 89.33X 89.33X 5.69X 195 546.45 154 712.13 1 687.55 152 063.38 1687.55 215 101 988 70 967 682 67 357 135 77.92X 77.92X 74.67X 74.67X 6.05X 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Annual Refuelin and Maintenance Outa e:
Startin March 27 1992 Duration:
43 da s 25.
If Shut Down At Erd Of Report Period, Estimated Date of Startup:
03.01-92 26.
Units In Test Status (Prior to Coomerclal Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- CUMULATIVETOTAL COMMENCING JANUARY 1, 1975
- "CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE March 199 COMPLETED BY obert E.
Do ge TELEPHONE 1
315 524-4446 ext.
396 MONTH Februar 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 481 17.
477 2 ~
481 18'77.
3 ~
-2.8 19.
477 4 ~
-15 20.
265 5.
-15.3 21.
215 6.
324 22.
439 7 ~
114 23.
479 8.
113 24.
478 9 ~
143 25'79 10.
291 26.
478 475 27'79 12.
476 28.
478 13.
477 29.
268 14.
477 30.
15.
476 31.
16.
477 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
UNIT SHUTDOWN AND POWER REDUCTIONS 4
l)O(:KI'.T NO.
UNITNAMI'. R E. GINNA NUCLEAtt POWER PLANT l)A1 I: Ma 15, 1992 COMPLETED BY, Ho.
Date co 4
~
o S Q C0Vlo0 Pl e<<0 o
E u Do <<
own a on Licensee Event Report e
'Ew 0
iA Q Ccl 'Lrr c
0 0Q ZJ0 CJ Cause L Corrective Action to Prevent Recurrence 92-01 2-3-92 S
71.75 0
92-002 CH XXXXX INABILITYTO CONTROL THE A S/G LEVEL ABOVE.Rx TRIP SETPOINT DUE TO DESIGN AND TRANSIENT INDUCED PERTURBATION.
MODIFICATION IS PLANNED FOR THE 1993 ANNUAL REFUELING AND MAINTENANCE OUTAGE AND OPERATING PROCEDURES HAVE BEEN CHANGED 92-02 92-03 2-20-92 2-29-92 S
53.25 B
F 10.75 92-003 HH.'H HTEXCH INSTRU CONDENSER TUBE LEAK 1B2 MATER BOX A MAIN FEED MATER SEAL WATER D/P 1
F: Forced S:
Scheduled REV. 4/8$
4949 t
Reason:
A-Ecluipment Failure (Explain)
B4faintenance or Test C-Refueling D-Regulatory Restriction E&perator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
14fanual 2-Manual Scram.
3-Automatic Scram.
4-Ocher (Explain)
Exhibit G - Instructions for Preparation of Data Encry Sheets for Licensee Event Report (LER) File (NUREG-O161)
Exhibit 1 - Same Source
V IO I
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE March 1992 COMPLETED BY Robert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH Februar 1992 ON FEBRUARY 3 g 1992 g
2220 EST THE UNIT WENT OFF LINE DUE TO LO LO LEVEL (</ 174)
IN THE>>A>> STEAM GENERATOR ON FEBRUARY 2 0 /
1992 g 0 1 3 8 EST STARTED TO REDUCE POWER TO 484 FOR REPAIR OF CONDENSER TUBE LEAK IN THE 1B2 WATER BOX ON FEBRUARY 2 9 ~
1 9 9 2 g 1 3 4 5 EST REACTOR TRIP ON LO LO S/G LEVEL THE UNIT REMAINED OFF THE LINE AT THE END OF THE REPORT PERIOD.