Forwards Insp Rept 50-244/91-20 on 910826-30.No Violations Noted.Weakness Identified in Erosion/Corrosion Exam Program in That Listing of Unacceptable Components W/Open Wall Thickness Rept Not Published During Outages
ML17262A614
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/01/1991
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17262A615 List:
References
NUDOCS 9110140021
Download: ML17262A614 (4)


See also: IR 05000244/1991020

Text

ocT 01 l991

Docket No. 50-244

Dr. Robert

CD Mecredy

Vice President

Ginna Nuclear Production

Rochester

Gas

and Electric Corporation

89 East Avenue

Rochester,

New York

14649

Dear Dr. Mecredy:

Subject:

Inspection

Report 50-244/91-20

This refers to the safety inspection

conducted

by Mr.

R. A. McBrearty of this

office on August 26-30,

1991 at the

R.

E. Ginna Nuclear

Power Plant, Ontario,

New York of activities authorized

by

NRC License

No ~

DPR-18 and to the

discussions

of our findings held by Mr. McBrearty with Mr. J.

A. Widay of your

staff at the conclusion of the inspection.

The inspection

was directed

toward the inservice inspection

program,

steam

generator

tube

eddy current examination

and the balance of plant erosion/

corrosion

program.

These

inspections

are

used to determine that programs

you

have in place to detect inservice degradation

satisfy your commitments

and

regulatory requirements.

Generally,

we found your program implementation

satisfactory.

Areas

examined during this inspection

are described

in the

NRC

Region I Inspection

Report which is enclosed with this letter.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and

representative

records,

interviews with personnel,

and observations

by the

inspector.

Within the

scope of this inspection,

no violations were observed.

However,

a

weakness

was identified in the erosion/corrosion

examination

program in that

a

listing of unacceptable

components with open wall thickness

reports is not

published during outages for use

by the plant staff in assuring that problem

erosion/corrosion

situations

are corrected prior to plant startup.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincerely,

ll)~ 4+'L V 4 \\

Jacque

P. Durr, Chief

Engineering

Branch

Division of Reactor Safety

Enclosure:

NRC Region I Inspection

Report

Number 50-244/91-20

9110140021

911001

PDR

ADQCK 05000244

G

PDR

OFFICIAL RECORD

COPY

IR GINNA 91 20

0001'0'0

09/30/91

Th'Ol

1

OQT 01

1S91

Rochester

Gas

and Electric Corporation

cc w/encl:

R. Smith, Senior Vice President,

Production

and Engineering

Central

Records

(4 copies)

Director,

Power Division

State of New York, Department of Law

Ginna Service List

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

K. Abraham,

PAO (18)

SALP Reports

and (2) All Inspection

Reports

NRC Resident

Inspector

State of New York,

SLO Designee

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

DRS

SALP Coordinator

DRSS

SALP Coordinator

J. Joyner,

DRSS

M. Conner,

SALP Reports

Only

J. Linville, DRP

E.

McCabe,

DRP

A. Johnson,

PM,

NRR

C.

Y. Cheng,

NRR

S. Black,

EDO

Paul Boehnert,

Chairman,

ACRS (AIT Reports Only)

Roy Fuhrmeister,

Senior Allegation Coordinator,- RA

f/hi~.

RI: DRS

X<>~c~>

McBrearty/gcb

9/z'//91

q".(rV

R3: DRS

Gray

9/Z.f'/91

RI: DRS

Durr

(IS/ / /91

OFFICIAL RECORD

COPY

IR GINNA 91-20

0002.0.0

09/23/91

R.

E.

GINNA SERVICE LIST

Resident

Inspector

R.

E. Ginna Plant

U.S. Nuclear Regulatory

Commission

1503

Lake

Road

Ontario,

New York

14519

Charlie Donaldson,

Esq.

Assistant Attorney General

New York Department of Law

120 Broadway

New York,

New York

10271

Ms.

Donna

Ross

Division of Policy Analysis

6

Planning

New York State

Energy Office

Agency Building

2

Empire State

Plaza

Albany,

New York

12223

Nicholas

S.

Reynolds

Winston 5 Strawn

1400

L St.,

N.W.

Washington,

DC

20005-3502

Regional Administrator,

Region I

U.S. Nuclear Regulatory

Commission

475 Allendale

Road

King of Prussia,

Pennsylvania

19406