ML17262A604
| ML17262A604 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 09/17/1991 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Andrea Johnson NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-88-14, NUDOCS 9109270180 | |
| Download: ML17262A604 (4) | |
Text
ACCELERATED DI TRIBUTION DEMONS TION SYSTEM v
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSI6N NBR:9109270180 DOC.DATE: 91/09/17 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATXON MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Document Control Branch (Document Control Desk)
R
SUBJECT:
Provides correction to util response to generic ltr 88-14, "Instrument Air Supply Sys Problems Affecting Safety Related Equipment."
DISTRIBUTION CODE:
B048D COPIES RECEIVED:LTR
( ENCL 0 SIZE:
TITLE: OR/Licensing Submittal:
Equipment Qualify'.cation D
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 A
RECIPXENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: NRR/DET/EMEB 7E OC/LFILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-3 PD NRR/DET/ESGB 8D OGC/HDS 1 RES/DSIR/EIB NSIC COPIES LTTR ENCL D
D Iv>
pggu/gy yog5 D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL
r.f lr
"(
t
()
. ~
~ IIIIZiP Zrsrnn i'Sjj1 IrIIPII 8
IIII'OCHESTERGAS AND ELECTRIC CORPORATION cI 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C MECREDY Vice Prertdent Clnna Nudear Produnion September 17, 1991 TELEPHONE AREACOOE716 546 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555
Subject:
Correction to RG&E's Response to Generic Letter 88-14 R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Johnson:
By letter dated June 17,
- 1991, RGGE provided written notification that all actions necessary to implement our commitments regarding Generic Letter 88-14, "Instrument Air Supply System Problems Affecting Safety Related Equipment," were complete.
On sheet three of our letter, item 8 of the response to Action 4 stated that RGEE performs a blowdown of the air receivers each shift.
Actually, it is the air compressor after cooler
- traps upstream of the air receivers that are blown down each shift.
This reduces or eliminates the moisture content of the air before it reaches the receivers and is more appropriate than blowdown of the receivers themselves.
Very truly yours, Robert C. Mecredy SCK/184 zc: Mr. Allen R. Johnson (Mail Stop 14D1)
Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector, r
9109270180 910917 iPDR.'
ADOCK 05000244 PDR
'I