Text
Fpg~ (
Docket No. 50-244
Rochester
Gas
and Electric Corporation
ATTN:
Mr. Robert
C. Mecredy
Vice President
Ginna Nuclear Production
89 East Avenue
Rochester,
14649
Gentlemen;
Subject:
Inspection
No.I 50-244/91-04$
This letter refers to the initial inspection of the Fitness-For-Duty
(FFD) program
deyeloped for and being
implemented at the
R.
E. Ginna Nuclear
Power Plant.
The inspection
was conducted
on January
23-25,
1991,
by Mr. E. B. King of this
office.
Areas
examined during the inspection
are described
in the inspection report
which is enclosed with this letter.
Within these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews
with personnel,
and observations
by the inspector.
Based
on this inspection,
we determined that the development
and implementation
of your
FFD program are responsive
to both the spirit and intent of the
rule and that the program is aggressive
and comprehensive.
We also
found that
the professionalism
and technical
expertise
exhibited
by personnel
involved in
administering
the program are
commendable.
'owever,
within the
scope of this inspection, it appears
that two of your
activities were not conducted
in full compliance with the requirements
of 10 CFR Part 26 asset forth in the Notice of Violation enclosed
herewith
as
Appendix A.
One of the violations is not being cited because
the criteria
stated in Section
V.G. of the "General
Statement
of Policy and Procedure for
NRC Enforcement Actions,"
10 CFR Part 2, Appendix
C (Enforcement Policy), as
described
in the enclosed
inspection report,
was met.
The other violation has
been categorized
by the severity level indicated in the Enforcement Policy.
You are required to respond to this letter,
and in preparing your response,
you
should follow the instructions in Appendix A.
In addition,
one unresolved
item, concerning
the lack of a policy governing
testing for employees
who have infrequent site access,
was identified during
the inspection.
In your response
to this letter,
we would appreciate
receiving
a
summary of the current status of this item, which is described
in the enclosed
inspection report.
91030500i0
9202~5
ADQCK 05000244
Q
OFFICIAL RECORD
COPY
IR GINNA 91-04 - 0001.0. 0
02/13/91
Rochester
Gas
and Electric Company
0 ]8gf
The responses
requested
by this letter are not subject to the clearance
pro-
cedures of the Office of Management
and Budget as required
by the Paperwork
Reduction Act of 1980,
PL 96-511.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room.
Your cooperation with us is appreciated.
Should you have
any questions
regarding
this inspection,
we would be pleased
to discuss
them with you.
Sincerely,
0,':..
Jaffjeo
( j
Joiner ev
James
H. Joyner,
Chief
Facilities Radiological Safety
and Safeguards
Branch
Division of Radiation Safety
and Safeguards
Enclosures:
1
~
Appendix A - Notice of Violation
2.
NRC Region I Inspection
Report
No. 50-244/91-04
cc w/encls:
R. Smith, Senior Vice President,
Production
and Engineering
'arry H. Voigt, Esquire
Central
Records
(4 copies)
Director,
Power Division
State of New York, Department of Law
Ginna Hearing Service List
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
K. Abraham,
PAO (2) All Inspection
Reports
NRC Resident Inspector
State of New York,
SLO Designee
OFFICIAL RECORD
COPY
IR GINNA 91"04 " 0002.0,0
02/13/91
Rochester
Gas
and Electric Company
Z 5
]gg~
bcc w/encls:
Region I Docket
Room (with concurrences)
Management
Assi stant,
DRMA (w/o encls)
J. Joyner,
DRSS
J. Johnson,
E.
McCabe,
B. Manili, LPM,
K. Brockman,
A. Johnson,
LPM,
D. McGuire, Region II
J.
Creed,
Region III
C. Cain,
Region
IV
M. Schuster,
Region
V
B. Grimes,
NRR/DRIS
P.
McKee,
NRR/RSGB
L. Bush,
NRR/RSGB
G.
McPeek,
NRR/RSGB
RI:
RI:D
Q:NR
- DRSS
King/slj
2/p~l
Kei ig
2/~91
OFFICIAL RECORD
COPY
Bus
yne
2/
1
2/~1
IR GI
A 91-04 - 0003.0.0
02/13/91
'
~0erations
50-244
State of New York,
SLO Designee
Donna
Ross,
Division of Policy Analysis
and Planning
New York State
Energy Office
Agency Building 2
Empire State
Plaza
Albany,
12223
Mr. Robert Smith
Senior Vice President
Production
5 Engineering
Rochester
Gas
& Electric
Company
89 East Avenue
Rochester,
14649
R.
E.
GINNA HEARING SERVICE LIST
Resident
Inspector
R.
E. Ginna Plant
U.S. Nuclear Regulatory 'Commission
'503
Lake Road
Ontario,
14519
Charlie Donaldson,
Esq.
Assistant Attorney General
New York Department of Law
120 Broadway
10271
Ms.
Donna
Ross
Division of Policy Analysis 5
Planning
New York State
Energy Office
Agency Building
2
Empire State
Plaza
Albany,
12223
Nicholas
S.
Reynolds
Winston
8 Strawn
1400
L St.,
N.W.
20005-3502
Regional Administrator,
Region I
U.S. Nuclear Regulatory
Commission
475 Allendale
Road
.
King of Prussia,
19406