ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9012120157 DOC. DATE: 90/11/20 NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3
SUBJECT:
Describes current status of procedures to comply w/Generic Ltr 89-08 re erosion/corrosion-induced pipe wall thinning.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTRf ENCL P SIZE:
TITLE: OR Submittal: General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DOCKET 05000244 05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: NRR/DET/ECMB 9H NRR/DOEA/OTSBll NRR/DST/SELB 8D NRR/DST/SRXB 8E 0&/~IAMB EG FILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-3 PD NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NSIC COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP VS TO REDUCE WASTE! CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL ~ P
a
~,
4 g
IIIIIIIIIIIi IIIIIIIIII
'>~
rjjP ri rrrrrr ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER N.K 14649.0001 ROBERT C. MECREDY Vice President Clnna Nudear Production TELEPHOkE AREA COOE we 546.2700 November 20, 1990 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington",
DC 20555
Subject:
Response
to Generic letter 89-08 Erosion/Corrosion Induced Pipe Wall Thinning dated May 2, 1989 R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Johnson:
In a letter dated June 5, 1990, concerning NRC Generic Letter 89-08, RG&E described the important aspects of the Erosion/Corrosion Control Monitoring Program for carbon steel piping at Ginna Station.
RG&E has implemented an Erosion/Corrosion Control Monitoring Program at Ginna and has performed.
a significant number of inspections over the past several years.
Replacement of piping components has occurred, when necessary.
During the 1990 outage, the selection of inspection locations was augmented with a newly developed program manual based upon the requirements of NUREG-1344 and NUMARC Erosion/Corrosion report dated July 11, 1987.
Although the program has been implemented, the procedural controls to formalize the program are not yet complete.
Our June 5 letter committed to completing the procedures for process and administrative controls by 10/30/90.
This letter provides a
current status of these procedures.
The functional groups involved in the Erosion/Corrosion Control Monitoring Program are Corporate Engineering, Materials Engineering and Inspection Services, Ginna Maintenance and Ginna Technical Engineering.
1.
Draft version of the following procedures have been completed:
a)
RG&E Corporate Engineering Procedure, QE-333, "Erosion/Corrosion Control Monitoring Program for Carbon Steel Piping".
".9'012f20157 96ooo244
~pDR AQOCK 0 g,p.
Awol
7
~
I PRESTER GAS AND ELECTRI RP.
DATE 11/20/90 To Mr. Allen R. Johnson SHEET NO.
b)
Materials Engineering and. Inspection Services Procedure, QMEIS-913 "MEIS Implementation of Erosion/Corrosion Procedure".
c)
Ginna Maintenance Procedure, M-1001 "Ginna Maintenance Department Erosion/Corrosion Program Requirements".
d)
Engineering Technical Specification ME-295 for Erosion/Corrosion repair/replacement.
These draft procedures and specification are currently undergoing formal review, as part of the RGRE approval process.
In addition, the following documents will also be revised or prepared:
2.
Existing A-300 series Plant Procedures will be revised by Technical Engineering to implement the requirements of Erosion/Corrosion.
3.
An Erosion/Corrosion Integrated Program Plan document will be prepared to serve as the umbrella mechanism for administering all the pertinent procedures and.
specifications.
The"procedures,and i'ntegrated~program plan will be completed by 3./31/91.'hese documents'will be fully in effect to be utilized during'he 1991 refueling outage inspection.
Very truly yours, Robert C. Mecredy xc:
Mr. Allen R. Johnson (Mail Stop 14D1)
Project Directorate I-3 Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector