Notification of 901213 Meeting W/Util in Waltham,Ma to Discuss Initial Results of Impell-developed Seismic Model for Plant Containment Integrity
ML17262A250
Person / Time
Site: Ginna 
Issue date: 11/19/1990
From: Andrea Johnson
Office of Nuclear Reactor Regulation
To: Cowgill C
Office of Nuclear Reactor Regulation
References
NUDOCS 9011270116
Download: ML17262A250 (8)


Text

,RR R~C>,

Wp0 Cy 0

+**++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 November 19, 1990 Docket No. 50-244 MEMORANDUM FOR:

Curtis J. Cowgill, Acting Director Project Directorate I-3 Division of Reactor Projects - I/II FROM:

SUBJECT:

Allen R. Johnson, Project Manager Project Di'rectorate I-3 Division of Reactor Projects - I/II MEETING WITH ROCHESTER GAS

& ELECTRIC CORPORATION (RG&E)/IHPELL>>

R. E. Ginna Nuclear Power Plant DATE & TIME:

December 13, 1990 1:30 p.m. - 4:30 p.m.

LOCATION:

PURPOSE:

ABB Impell 200 South Street Wal tham, Massachusetts 02154 Management meeting to discuss the initial results of the seismic model developed by Impell for the Ginna containment.

The requested meeting by RG&E with the Office of Nuclear Reactor Regulation has been scheduled for December 13, 1990 to review the initial results of the seismic model developed by Impell with regards to the containment integrity.

The agenda will primarily address:

1.

Consideration of appropriate seismic and loss of coolant accident (LOCA) load combinations for"the following:

a.

Structural detail between the cylindrical wall of the containment and the basemat.

b.

Effects of the bellows on the function of the tendons.

c.

Capability of the tension rods to perform their functions.

d.

Boundary conditions on the overall joint design.

d.1 Sliding condition with hinge connection.

d.2 Non-sliding condition with hinge connection.

d.3 Partially fixed base for both conditions.

9011270116 901119 PDR ADOCK 05000244 P

PDC

I 4AP V

1 ~

November 19, 1990

  • PARTICIPANTS:

HRC A. Johnson D. Jeng fl. Asher Utilit G.

ro el L. Sucheski IMPELL G.

EJorkman cc:

See next page

'riginal signed by Allen R. Johnson, Project Manager Project Directorate I-3 Division of Reactor Projects - I/I!

<<'eetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"

43 Federal

~Re ister 28068, 6/28/78.

L 3

MR rook yy 7(g(M PM:PDI-3 ARJohnson:mes

,l 7,F88

/z~

PD: PDI-

)

CJCowgill I( /Q/90 OFFICIAL RECORD COPY Document Name:

GI MEETING 12/13/90

C 4

0 I II

~

1 p

p I

II

/

gl 4

iDr. Robert C. Mecredy Ginna cc!

Thomas A. Moslak, Senior Resident Inspector R.E. Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road

Ontario, New York 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Hs.

Donna Ross Division of Policy Analysis 5 Planning New York State Energy Office Agency Building 2 Empire State Plaza

Albany, New York 12223 Charlie Donaldson, Esq.

Assistant Attorney General New Yor k Department of Law 120 Broadway New York, New York 10271 Nicholas S. Reynolds Winston

& Strawn 1400 L St.

N.W.

Washington, DC 20005-3502

C'.

'ISTRIBUTION Docket or Central File NRC

& Local PDRs PDI-3 Reading T. Nurley/F. Niraglia J. Partlow S.

Varga E. Greenman C. Cowgill A. Chaffee, EAB OGC E. Jordan B. Grimes R.

Wessman A. Johnson G. Bagchi D. Jeng H. Asher ACRS (10)

GPA/PA V. Wilson L. Thomas E. Tana N. Green, Jr.

J. Caldwell K. Abraham, Region I N. Rushbrook J. Johnson, RI

k l.

\\

t~

I