ML17262A171

From kanterella
Jump to navigation Jump to search
Forwards Summary of 900911 Telcon Re Modified Boron End Point Test Sequence to Measure Rod Cluster Control Assembly Bank Worths to Be Performed During Startup Testing of Cycle 21
ML17262A171
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/25/1990
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9010040143
Download: ML17262A171 (6)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM t

t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

A'CCESSION NBR:9010040143 DOC.DATE: 90/09/25 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

Project Directorate I-3

SUBJECT:

Forwards summary of 900911 telcon re control rod worth measurements

& modified boron end point test.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal:

General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

DOCKET 0 05000244 05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

0 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DOEA/OTSB1 1 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC L G

ILE 01 NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

0 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 17 ENCL 15

2, r/ /E/1$

SEI/

SS/8

/ffff/ 'i/ill/liP r

ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 Nt>>

ROBERT C. MECREDY Vice Prerident Clnna Nuclear Production September 25, 1990 TELEPHONE AREACODETtB 646 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Allen R. Johnson Pxoject Directorate I-3 Washington, D.C.

20555

Subject:

Summary of Telephone Call Concerning Control Rod. Worth Measurements R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Johnson:

Attached is a summary of a telephone call between RGGE, Westing-

house, and the NRC on September 11, 1990.

The purpose of the call was to discuss a modified boron end point test to measure RCCA bank worths.

This test will be performed during startup testing of Cycle 21.

RWE/119 Attachment Very truly yours, Robert C. Mecredy xc: Mr. Allen-R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector 90l0040143,'900925 PDR ADooK os000244, I

p pc/ I I I/I8+

p oo/

I (I

SUMMARY

OF TELEPHONE CALL

SUBJECT:

Modified Boron End Point Test Sequence for RG&E Cycle 21 DATE:

September 11, 1990, at 0900 PARTICIPANTS:

RGGE NRC WESTINGHOUSE Bob Eliasz Steve Adams Al Johnson Margaret Chatterton Howard Ritchings Tom Moslak Bob Meyer Don Hill Dave Krieg Lou Grobmyer Fred Frank The attached test summary was discussed.

The test is to be performed on a

one time basis during startup testing for Cycle 21.

The test willreplace the current sequential 4 bank reactivity worth measurements.

In this test, the reactivity worth of all 5 banks will be measured.

All other startup tests will still be done.

The test will be done by new procedures.

The procedures will have the required safety reviews before implementation.

The purpose of the test is to obtain confirmatory information on individual bank worths.

Previous tests at Ginna have resulted in a good boron end point agreement and.

good. total reactivity worth agreement as calculated by the reactivity computer.

However, the difference between individual bank measurements and predictions were larger than desired even though the acceptance criteria was met.

The proposed test will provide the worth of each bank individually and the measurement will minimize reliance on calculations.

RGGE will provide the NRC copies of the Cycle 21 startup test results.

M.

Chatterton and H.

Ritchings will be placed on distribution for these results.

M. Chatterton and H. Ritchings stated they had no problems with the test as described in the attachment.

The test was straight forward and did not deviate significantly from current measurement practices.

This summary was prepared by RGGE and reviewed by Westinghouse.

Modified Boron End Point Test Sequence'or RG&E Cycle 21 This strategy in establishing the RCCA bank Test Sequence is to (1) measure the reactivity worths in the order of increasing reactivity and (2) minimize the test time and/or water usage by taking advantage of a potentially small difference in reactivity worth between three control banks.

For purposes of generality, the RCCA banks are numbered from 1 to 5 in the order of increasing worth based.

on the predicted worth of each RCCA bank inserted with all other banks fully withdrawn.

Pretest (I)

Establish the RCCA bank Test Sequence.

(a)

Identify the shutdown. bank as bank 5

(b)

Identify control bank A as bank 4

(c)

Based on the predicted worth, assign the designations Z,

Y, and Z to the remaining control banks based on the order of increasing reactivity worth.

(d) If the difference in reactivity worth between X and Z is less than or equal to 100 pcm, then identify:

bank Y as 1

bank X as 2

bank Z as 3

(e) If the difference in reactivity worth between Z and Z is greater than 100 pcm,> then identify:

bank X as 1

bank Y as 2

bank Z as 3

The RCCA banks will be measured in the sequence established above beginning with 1 and ending with 5.

Test Step J

(1)

Initial, criticality.

(2)

Determine the flux level corresponding to onset of nuclear heating.

(3)

Perform the reactivity computer checkout.

(4)

Perform ARO boron concentration and MTC tests.

(5)

Using the reactivity computer, determine the differential and integral worth of bank 1 by diluting bank 1 into the core.

This step ends with bank 1 fully inserted and. all other banks out.

(6)

Perform a

boron end point measurement with bank 1 fully inserted and all other banks fully withdrawn.

(7)

Alternately withdraw bank 1 and insert bank 2 until bank 1 is fully withdrawn or bank 2 is fully inserted.

(8) If adjustment to final position of step 7 is required in order to perform a boron end point measurement, adjust the boron concentration by boration (compensating for reactivity by withdrawing bank 1) or by dilution (compensating for reactivity by insertion of bank 2).

Measure the reactivity change with the reactivity computer.

(9)

Perform a

boron end.

point measurement for bank 2 fully inserted, all other banks fully withdrawn.

(10) Alternately withdraw bank 2 and insert bank 3 until bank 2 is fully withdrawn or bank 3 is fully inserted,.

(11) If adjustment to final position of step 10 is required in order to perform a boron end point measurement, adjust the boron concentration by boration (compensating for reactivity by withdrawing bank 2) or by dilution (compensating for reactivity by insertion of bank 3).

Measure the reactivity change with the reactivity computer.

(12) Perform a

boron end.

point measurement for bank 3 fully inserted, all other banks fully withdrawn.

(13) Alternately withdraw bank 3 and insert bank 4 until bank 3 is fully withdrawn.

(14) Adjust the boron concentration by dilution, compensating for reactivity by insertion of bank 4.

Measure the reactivity change with the reactivity computer.

This step ends with bank 4 fully inserted and all other banks out.

(15) Perform a

boron end. point measurement for bank 4 fully inserted, all other banks fully withdrawn.

(16) Alternately withdraw bank 4 and insert bank 5 until bank 4 is fully withdrawn.

(17) Adjust the boron concentration by dilution, compensating for reactivity by insertion, of bank 5.

Measure the reactivity change with the reactivity computer.

This stop ends with bank 5 fully inserted, all other banks out.

(18) Perform a

boron

end, point measurement for bank 5 fully inserted, all other banks fully withdrawn.

(19) Establish control bank overlap configuration by boration and interchange of RCCA banks.

(20) Reset overlap computer and turn plant over to operations.

RWEN140