MEMO COMMENTS ON DRAP DEIS JUl 89 587 MEMORANDUM FOR:

George

Pangburn, Project Manager Operations Branch Division of Low-Level Waste Management and Decommissioning, NMSS FROM:

Derek A. Widmayer, Civil Engineer Technical Branch

'ivision of Low-Level Waste Management and Decommissioning, NMSS

SUBJECT:

COMMENTS ON DRAP AND DEIS FOR THE RIFLE, CO UMTRA SITE Enclosed are my comments on the draft Remedial Action Plan (RAP) and the draft Environmental Impact Statement (EIS) for the former Union Carbide lf Corporation Uranium Mill Sites, Rifle, Colorado.

If~you have any questions, or wish to discuss the review, contact me at X74263.

i

Enclosures:

Comments Derek A. Widmayer, Civil Engineer Technical Branch Division of Low-Level,Waste Management and Decommissioning, NMSS Nfl Record Filo

( 87p812p1 10 87p7~

pDR NAB>E pDR W~-b2 Distribut otl

't'ai) g~eturi~ to

. 623 3SI r:

0 I

1

1\\ ~

RIFLE GEOTECHNICAL ENGINEERING GTl - dRAP - Fi ure 3.3 Pa' B Characterization of Vanadium Ponds Figure 3.3 on page 14 shows three areas labeled as Vanadium Ponds on the New Rifle processing site.

Page B-7 of Appendix B discusses the estimation of the depth of contamination beneath these ponds of 5 feet. It is stated that no boreholes were drilled during site characterization because the ponds were filled with process liquor at the time the site characterization was done.

It is explained that the ponds have been dredged since the time of site characterization, and the depth of contamination has been re-,estimated as 3.5 feet.

This new estimated depth of contamination should be supported by field data.

Additionally, the disposition of the dredged material should be described.

If the dredged material is to 'be moved with the tailings and other contaminated materials, it may be necessary to characterize it since it may exhibit properties different than the tailings and the other contaminated materials.

GT2 - dRAP - Pages 56, Pages D-144 and D-145; Figures D.4.51 thru D.4.61;

.Figures d.5.40a thru D.5.40d; Figures D.5.57a thru D.5.61c dEIS - Pa e D Shear Stren th Tests and Values (a) Figures D.5.40a to D.5.40d and Figures D.5.57a to D.5.61c report results of "staged" triaxial shear strength tests performed on in-situ and remolded radon cover soil at three different densities and three different moisture contents.

These results are questionable because the laboratory samples were tested at densitites and moisture contents which are different from the planned design values.. It is standard engineering practice to perform triaxial compression tests on several samples of the same material at the same density and moisture content.

The staff recommends that the stability analysis use shear strength values determined by this standard engineering practice, or that clear justifications be given as to why these staged triaxial tests give results that are as representative as the test results are when employing the standard engineering practice.

(b)

Figures D.40a to D.40d report the results of 1 laboratory test for shear strength conducted on the in-situ soils at the Estes Gulch site.

The staff recommends that additional tests be conducted or that a justification be given that substantiates the use of only 1 test for shear strength on the in-situ soils.

(c)

Figures D.4.51 through D.4.61 report results of triaxial shear strength tests performed on tailings at three different densities and moisture contents.

Therefore, the staff has the same comments and recommendations that are discussed in GT2 (a) directly above.

Ib

E 1 t

~

~

rr

RIFLE GEOTECHNICAL ENGINEERING (d)

Page D-145 reports the results of one unconsolidated-undrained triaxial test for the sand-slime tailings.

As discussed in GT2 (b) above, the staff recommends more testing, or a discussion that justifies the use of one test result for determining this property of the tailings.

Also, the results from this test should be displayed graphically like the other test results in Appendix D.

(e)

The text on page D-144 admits that none of the tests for strength reported in Figures D.4.51 through D.4.61 were conducted with moisture contents and dry densities that replicate field conditions.

Additionally, although some of the tests were conducted on sand-slime mixtures, there were no strength tests performed on a sample with the expected typical field mixture of 55% sand -- 45K slime.

The staff is concerned that the strength parameters resulting from these tests are not representative compared to strength parameters resulting from tests that could be conducted on samples with field condition sand-slime mixtures, densities, and moisture contents.

GT3 - dRAP - Fi ure 4.3 Pa es 48 and 72 - Dis osal Site Characterization Figure 4.3 shows an area of small debris flow partially within the approximate site location.

On page,72 of the text, the discussion on this debris flow says that this area will be completely covered by the pile and thus is eliminated as a problem.

The site plan on page 48 that displays the locations of borings and test pits shows that this area was not characterized.

The staff feels that this area should be characterized because it may exhibit properties significantly different from soils tested at the Estes Gulch site.

Such differences may be significant when considering the long-term stability of the site.

GT4 - dPAP - Pa e B-15 and Table B.1.5 - Radon Cover Lon -Term Moisture Content The long-term moisture content of the radon barrier has been identified as 17.4% in Table B. 1.5.

The staff is concerned that this value may not be representative of the actual long-term moisture content.

The staff's concerns are based on two reasons.

First, the average of the in-situ moisture content values for soils from the Estes Gulch site is only 8.2%.

Second, the semi-arid climate of the site vicinity (average annual precipitation is 11.02 inches and there is "high evaporation" (dEIS, page 71)) would indicate that the maximum placement moisture content of 17.95 (Table D.5.2) would be reduced to a lower value than 17.4%.

The staff recommends that values that have been measured for the near surface material existing at the borrow site should be correlated to the conditions at the actual disposal site to aid in the selection of a conservative long-term moisture value for the cover.

~,

~

0

RIFLE GEOTECHNICAL ENGINEERING GT5 - dRAP - Pa e D-67 and Fi ure D.3.9 - Geomor hic Characteristic Figure D.3.9 shows two areas of landslide or slump deposits within 1000 feet of the proposed Estes Gulch site.

These areas are briefly discussed on page D-67 and the conclusion reached is that the deposits do not affect the proposed tailings disposal area.

Mhile this may be true, there should be additional information that describes why other nearby areas are not susceptible to similar processes and why a continuing minor slumping of the northeast deposit will not become larger and affect the stability of the pile.

Characterization of these movements may be required, or a justification of why some characterization is not needed.

GT6 - dRAP - Table D.4.1 and Pa e D-145 - Parameter Value Discre ancies (a) The parameters reported in Table D.4.1 for maximum dry density and optimum moisture content for the placed tailings are reversed.

Therefore, the values for density and moisture content currently listed under "Old Rifle" are supposed to be under "New Rifle," and vica-versa.

(b) The parameter for phi reported in Table D.4. 1 for the short-term strength of the placed tailings does not agree with the text on page D-145.

This discrepancy should be corrected.

(c) The assumed parameters for phi reported in Table 0.4.1 for the other "contaminated materials" are not justified with any discussion in the text.

The references that were used to obtain these assumed values and a discussion about why these assumed values are representative should be included, at a minimum, to substantiate the choices of parameter values.

GT7 - dEIS -

Pa e

108 - Back round Radiation A Rn-222 value of 1.4 pCi/1 is reported in this section of the draft EIS as an "average background concentration" in soil from measurements at four locations in the Rifle area.

The discussion goes on to say that for a variety of

reasons, the actual annual average radon concentration would probably be lower than 1.4 pCi/1.

However, in the dRAP, the same average value is presented along with the statement that, "The average outdoor background radon concentration is unknown..."

Also, reported in the dRAP is the fact that quarterly average measurements at a minimum of 20 locations around the site for one year are going to be made.

The apparent discrepancy in whether or not the average background concentration value is known or has been measured should be corrected, and the measurement program described above that is discussed in the dRAP should also be described in the dEIS.

C I

~.

RIFLE GEOTECHNICAL ENGINEERING 4

GT8 - dRAP - Page D-155 dEIS - Pa e A Tailin s Pile Construction Strength test values for the relocated tailings and the assumptions that no extensive lenses of slimes would exist in the compacted tailings are both based on the expected uniform mixing of sands and slimes of the two existing Rifle tailings piles.

Because of this uniform mixing assumption, it is stated that no appreciable differential and total settlement will occur.

Procedures and operations that will be specified to give the expected uniform mixing should be described.

~'

I 5