ML17261B017

From kanterella
Jump to navigation Jump to search

Clarifies Commitment in Re NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Implementation of Phase of Mod to Reduce Potential for long-term Accelerated Wear Due to Low Flow Operation in Stated Testing Delayed
ML17261B017
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/12/1990
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
Office of Nuclear Reactor Regulation
References
IEB-88-004, IEB-88-4, NUDOCS 9003270136
Download: ML17261B017 (4)


Text

ACCELERATED DLSTJUBUTION DEMONSIRATION SYSKEM

~

~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9003270136 DOC. DATE: 90/03/12 NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

Project Directorate I-3

SUBJECT:

Clarifies commitment in 890724 response to NRC Bulletin 88-004, "potential SAfety-Related Pump Loss."

DISTRIBUTION CODE IE37D COPIES RECEIVED LTR ENCL SIZE:

TITLE: Bulletin 88-004 re Potential Safety-Rela ed Pump Loss NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

DOCKET 05000244" 05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA ALEXIONg T 13E2 1 NRR/DET/EMEB9H3 NRR/DOEA/OGCB11 NRR/DST 8E2 NUDOCS-ABSTRACT RES/DS IR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1

1.1'1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB

MCCOY, M

8E23 NRR/DOEA/OEAB11 NRR/DREP/PEPB9D

&j+MAP-RB12 EG FI.LE 0 RGN1 FILE 01 NRC PDR COPIES LTTR ENCL 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL

ROCHESTER GAS AND ELECTRIC CORPORATION

~ 89 i

'IIC%

IA IQAI~ +C

(.i

".),YDAC

'AA'It, EAST AVENUE, ROCHESTER, N.K 14649-0001 March 12, 1990 TCCCPHONC ARCA COOC 1IC, 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Allen R. Johnson Project Directorate I-3 Washington, D.C.

20555

Subject:

NRC Bulletin 88-04, Potential Safety-Related Pump Loss R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Reference:

(a) Letter from B.A.

Snow (RG&E) to C. Stahle (NRC),

dated July 7,

1988,

Response

to NRC Bulletin 88-04, Potential Safety-Related Pump Loss

Dear Mr. Johnson:

The purpose of this letter is to clarify a commitment made in our July 24, 1989 letter as related to NRC Bulletin 88-04.

In that letter RG&E stated that the interim modification completed duiing the 1989 Refueling Outage, which consisted of the installation of independent 200 gpm recirculation lines for the RHR pumps, removed the concern expressed in the Bulletin of deadheading one pump due to strong/weak pump interaction.

RG&E also stated that the modification included provisions at a later time to further increase the recirculation flow capability by installation of a 450 gpm Recirculation System utilizing control valves.

This was anticipated to be completed by July 1, 1990.

The purpose of this latter phase of the modification was to reduce the potential for long term accelerated wear due to low flow operation during monthly periodic testing. It was established that this was not a required course of action based upon the evaluation performed for Bulletin 88-04 submitted as Attachment B of Reference (a),

and the safety evaluation supporting the as-installed modification.

The implementation of this latter phase of this modification has been delayed.

The reason for this schedule change is RG&E's plan to perform a

revised 10CPR50.46 ECCS analysis that incorporates the dynamic thermal-hydraulic flow phenomena of the Upper Plenum Injection characteristics of the RHR System.

This type of analysis has previously been completed for the Point Beach and Prairie Island nuclear power plants, and is underway for Kewaunee Station.

This revised analysis incorporates Best Estimate methodology per SECY-83-472, and is expected to lower the accident analysis flowrate requirements of the RHR System.

Thus, until the analysis is complete, the optimum RHR recirculation flow will not be known.

y003 i2 F'DR ADOCK 05000244 PDG j~p7 ig)t,q59I ('

This revised analysis is presently scheduled for a mid-1990 start date, and is targeted for completion and submittal to the NRC by mid-1991.

As RGGE stated in our July 24, 1989 letter, the strong/weak pump interaction concerns of Bulletin 88-,04 have been resolved by RG&E's as-installed modification.

We have also established that the 450 gpm Recirculation System previously described is not a

required course of action under Bulletin 88-04.

Therefore, we are removing this as a commitment to the NRC and the NRC's TAC No.

69918, closed out by the August 16, 1989 SER on Bulletin 88-04, can be considered to remain closed.

Very truly yours, Robert C.

M cre Division Manager Nuclear Production GJWK085 Attachment xc: Mr. Allen R. Johnson (Mail Stop 14D1)