ML17261A996

From kanterella
Jump to navigation Jump to search
Forwards Response to Generic Ltr 90-01 Request for Voluntary Participation in NRC Regulatory Impact Survey Re Amount of Time Spent Responding to Various Insps & Audits
ML17261A996
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/28/1990
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-90-01, GL-90-1, NUDOCS 9003120298
Download: ML17261A996 (13)


Text

ACCELERATED DISTjUBUTION DEMONSTIRATION SYSTEM REGULATORY INFORMATION DXSTRXBUTION SYSTEM (RIDS).-

ACCESSION NBR:9003120298 DOC.DATE: 90/02/28 NOTARIZED: NO DOCKET-g FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244.

AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECXPXENT AFFILXATION Information & Records Management, Branch (Post 890827)

SUBJECT:

Forwards response to request for voluntary participation ln NRC regulatory impact survey.

D DISTRIBUTION CODE: A001D COPIES RECEIVED LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution . S NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) ~ 05000244 RECIPIENT COPIES RECXPXENT COPIES A ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 1 PD1-3 PD 1 1 JOHNSON,A 5 5 INTERNAL: NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSBll 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC LFMB 1 0 OGC/HDS2 1 0 6 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR NSIC 1 1 R

D

'S A

"D NOTE TO ALL "RIDS" RECIPIEWIS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE,DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION-LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19

L y )g a

~

\

~ g N'

I

~ J

/ /I/iirirrzrrz gnizwiirzrl

/ jjjj/jj/j/II!

IIIIIIIIIII'////////'//'!!rizzirizz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 0001 TCLCPHONC ARK* COOK /Id 546.2700 February 28, 1990 Information and Records Management Branch Division of Information Support Services-Office of Information and Resources Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Request For Voluntary Participation In NRC Regulatory Impact Survey (Generic Letter No. 90-01)

Gentlemen:

Enclosed is Rochester Gas and Electric Corporation's voluntary response to the USNRC request for regulatory impact survey information.

Any questions regarding the enclosed material should be directed to Mr. Richard Morrill 315-524-4446 extension 655.

Very truly yours, Robert C. Mec d Division Manager Nuclear Production xc: Paperwork Reduction Project (3150-0011)

Office of Management. and Budget Washington, D.C. 20503 0298 900228 0500024+

PDR ADOCK P

NRC Re ulato Im act Surve uestionnaire Sheet

1. Type of inspection, audit or evaluation: Routine NRC ins ections.
2. Based on actual experience over the past several years, about how often is this activity conducted'? Twent -six times 26 er ear.
3. Operations/Construction areas covered:
4. Extent of the activity (how many people, for how long)

Number of ins ectors varies and time ma var from one week to one month.

5 ~ Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item Nl.

a~ Plant Department Heads 4.6% (number involved) 10

b. Plant Manager~a:6 C~ Corporate Department Heads 1.3% (number involved) 10
d. Corporate Vice President 2.14 (number involved) 3 (Division Heads)
e. Chief Nuclear Officer 3.7%

(Senior Vice President, Production and Engineering)

NRC Re ulator Im act Surve uestionnaire Sheet

1. Type of inspection, audit or evaluation: NRC Team Ins ections
2. Based on actual experience over the past several years, about how often is this activity conducted? Three 3 er ear.
3. Operations/Construction areas covered: S ecific to ics such as SSFI E Audit Startu Pre aration.
4. Extent of the activity (how many people, for how long) Four 4 to ei ht 8 individuals for an avera e of two weeks.
5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item gl.

a~ Plant Department Heads 2.0% (number involved) 6

b. Plant Manager 1.2%

c ~ Corporate Department Heads~4. 5. (number involved) 4

d. Corporate Vice President 1.2.% (number involved) 2 e.

(Division Heads)

Chief Nuclear Of ficer~l 2.

(Senior Vice President, Production and Engineering)

NRC Re ulator Im act Surve uestionnaire Sheet

1. Type of inspection, audit or evaluation: INPO evaluations.
2. Based on actual experience over the past several years, about how often is this activity conducted? Four 4 times er ear.
3. Operations/Construction areas covered: 0 erations Maintenance Trainin and Emer enc Pre aredness.
4. Extent of the activity (how many people, for how long)

Varies from fourteen 14 individuals for two weeks to five 5 individuals for three da s.

5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item gl.

a ~ Plant Department Heads 34 (number involved) 10

b. Plant Manager 3%

Co Corporate Department Heads 2.8% (number involved) 7

d. Corporate Vice Presidents 2.7% (number involved) 2 (Division Heads)
e. Chief Nuclear Officer 2.14 (Senior Vice President Engineering and Production)

NRC Re ulator Im act Surve uestionnaire Sheet Type of inspection, audit or evaluation: INPO Accreditation of Trainin ro ress.

2. Based on actual experience over the past several years, about how often is this activity conducted? Ever two 2 ears.
3. Operations/Construction areas covered: Various Trainin ro ram resentl accredited b INPO.
4. Extent of the activity (how many people, for how long) Two visits with three to six individuals each time for one week each visit.
5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item g l.

a0 Plant Department Heads 5.6% (number involved) 2

b. Plant Manager 0.35%

Ce Corporate Department Heads 1. 2% (number involved) 1 d ~ Corporate Vice Presidents 0.35% (number involved) l (Division Heads)

e. Chief Nuclear Officer 0.354 (Senior Vice President, Production and Engineering)

NRC Re ulato Im act Surve uestionnaire Sheet

1. Type" of inspection, audit or evaluation: Tech. S ec.

re ired A Audits.

2. Based on actual experience over the past several years, about how often is this activity conducted'5 Times
3. Operations/Construction areas covered: Not a licable er the uidelines.
4. Extent of'he activity (how many people, for how long)

Internal audits t icall consist of two auditors for 1 week.

5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement, before, during and in response to the activity described in Item gl.

a ~ Plant Department Heads 1% (number involved) 6

b. Plant Manager 2%

c ~ Corporate Department Mgrs. 1% (number involved) 10

d. Corporate Vice Presidents 1.5% (number involved) 6 (Division Heads)
e. Chief Nuclear Officer 2%

(Senior Vice President, Production and Engineering)

NRC Re ulator Im act Surve uestionnaire Sheet

l. Type of inspection, audit or evaluation: New York State De artment Of Environmental Conservation
2. Based on actual experience over the past several years, about how often is this activity continued? One audit er ear
3. Operations/Construction areas covered: All areas of the lant involved in waste dischar e or hazardous material stora e.
4. Extent of the activity (how many people, for how long) One erson for one da
5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item gl.

a ~ Plant Department Heads 0.44 (number involved) 2

b. Plant Manager~0.05 C~ Corporate Department Heade~o.l (number involved) 1 d e Corporate Vice Presidents (Division Heads) 0.054 (number involved) l
e. Chief Nuclear Officer (Senior Vice President, Production and Engineering)

NRC Re ulator Im act Surve uestionnaire Sheet

1. Type of inspection, audit or evaluation: American Nuclear Insurers ANI Ins ection
2. Based on actual experience over the past several years, about how often is this activity conducted7 Six times er ear.
3. Operations/Construction areas covered: Maintenance Radiolo ical Protection Environmental and Plant Safet
4. Extent of the activity (how many people, for how long)

Two individuals for three to four da s.

5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item Nl.

a ~ Plant Department Heads 2e95% (number involved) 3

b. Plant Manager 0.4%

c ~ Corporate Department Heads 0.2% (number involved) 2 Corporate Vice Presidents (number involved)

(Division Heads)

e. Chief Nuclear Officer (Senior Vice President, Production and Engineering)

NRC re ulator Im act Surve uestionnaire Sheet

1. Type of inspection, audit or evaluation: Utilities Mutual Insurers UMI Workmen's Com ensation.
2. Based on actual experience over the past several years, about how often is this activity conducted? Twice each ear.
3. Operations/Construction areas covered: Personnel Safet related to Workman's Com ensation
4. Extent of the activity (how many people, for how long) Two individuals for three da s.
5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item gl.

a ~ Plant Department Heads 2. 8% (number i.nvolved) 1

b. Plant Manager 0.2%

C~ Corporate Department Heads 2.4% (number involved) 1

d. Corporate Vice President (number involved)

(Division Heads)

e. Chief Nuclear Officer (Senior Vice President, Production and Engineering)

NRC Re ulato Im act Surve uestionnaire Sheet

1. Type of inspection, .audit or evaluation:

OSHA Ins ection

2. Based on actual experience over the past several years, about how often is this activity conducted?

Once in two ears

3. Operations/construction area covered: Plant Safet for ersonnel.
4. Extent of the activity (how many people, for how long)

One individual for one ear.

5 ~ Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item gl.

at Plant Department Heads 0.8% (number involved) 1

b. Plant Manager C~ Corporate Department Heads 0.4% (number involved) 1
d. Corporate Vice Presidents (number involved)

(Division Heads)

e. Chief Nuclear Officer (Senior Vice President, Production and Engineering)

' ~ y

,p ~ ~

NRC Re ulato Im act Surve uestionnaire Sheet

1. Type of inspection, audit or evaluation: Triennial Fire Protection Audit
2. Based on actual experience over the past several years, about how often is this activity conducted? Once in three ears.
3. Operations/Construction areas covered: Fire Protection
4. Extent of the activity (how many people, for how long)

Two individuals for a week.

5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item gl.

a ~ Plant Department Heads~1 (number involved) 1

b. Plant Manager 0.034 c ~ Corporate Department Heads 0.5% (number involved) 2 d ~ Corporate Vice Presidents (number involved)

(Division Heads)

e. Chief Nuclear Officer (Senior Vice President, Production and Engineering)