Forwards App B to Ginna Nuclear Power Station Inservice Insp Program for 1990-1999 Interval, & Suppl 1 to App B, High Energy Piping Outside Containment Sys Pressure Tests Steam Generator Tubing Reactor Coolant... for Approval
ML17261A897
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/21/1989
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17261A898 List:
References
NUDOCS 8907260179
Download: ML17261A897 (281)


Text

AC CELEBRATED Dl BUTION DE MON S TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8907260179 DOC.DATE: 89/07/21 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R. Project Directorate I-3

SUBJECT:

Forwards "App B Ginna Nuclear Power Station ISI Program for 1990-1999 Interval," 6 Suppl 1 to App B.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR g ENCL J SIZE: +Code FSO TITLE: OR Submittal: Inservice Inspection/Testing/Relief from ASME NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 0 PD1-3 PD JOHNSON,A 1 1 INTERNAL: AEOD/DSP/TPAB NRR/DEST/MEB 9H NRR/DEST/MTB 9H I hl NUDOCS-ABSTRACT I OC Fs 1 0 OGC/HDS2 1 0 G FILE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: EGGG BROWN,B 1 1 EG&G ROCKHOLD,H O LPDR NRC PDR 1 1 NSIC D

NOZE K) ALL "RIDS" RECIPZEPIS:

S PLEASE HELP US TO REZQCE KQSZR! CXNZACZ %HE DOCUMERZ COFZROL DESK RDCN Pl-37 (EXT. 20079) KO EKaIMINLTB ACR NAME FBCH DIPHGBOTIQN LISTS BDR DOCUMERIS YOU DEPT NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL

S

~l b

y Cp tr 4 L ysJ tt I

g l>w q

rntstZ@I S~>VZizrl SKI

'II Zizzstie ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 0001 July 21, 1989 "lCLCPHONC ARCA COOC 716 546.2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-3 Washington, D.C. 20555

Subject:

Third 10-Year Inservice Inspection Interval R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Johnson:

Rochester Gas and Electric Corporation has prepared a submittal for the third 10-Year Inservice Inspection Interval. This interval will begin on January 1, 1990. The program is incorporated as Appendix B of the Quality Assurance Manual for Ginna Station, and satisfies 10 CFR Part 50.55a dated May 5,,1988 (,implementing the 1986 edition of ASME Section XI).

The submittal is divided into seven sections and 3 attachments as follows:

Sections:

Section 1 provides a general introduction and specifies Examination Methods, Repair Requirements, Replacement Requirements, System Pressure Testing, Snubber Inspection and Testing, and Repair Criteria for Steam Generator Tubes and Tube Sleeve Combinations.

'ection 2 provides the Class 1 Program Plan.

Section 3 provides the Class 2 Program Plan.

Section 4 provides the Class 3 Program Plan.

Section 5 provides the Class 1, 2, and 3 Component Supports Plan.

Section 6 provides the Augmented Inservice Inspection Program Plan.

Section 7 provides the Relief Requests.

Attachments:

Attachment A provides the ISI Line List.

Attachment B provides a copy of the ISI PEIDs.

Attachment C provides the Allocation Tables necessary to meet the requirements of IWB, IWC, and IWD.

Supplement- 1 to Appendix B is titled, "Inservice Inspection Program Plan". 0 8907260l79 89072i PDR ADOCK 05000244 E 9 PDC l

h Sixteen individual Relief Requests are included in Section 7 of the submittal. The subject matter of these Relief Requests are not new or unique to previous RG&E Inservice Inspection Program submittals.

We request approval of this submittal in order to support the January 1, 1990 implementation requirement.

Very truly yours, Robert C. Mecre y General Manager Nuclear Production GJW4056 Attachments xc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Gi;nna Senior Resident Inspector

'0-Year Inservice Examination Program Plan Table For Class 3 Components INTRODUCTION This examination plan table establishes the third 10-year interval inservice examination program for Class 2 at Binna Station This program

~

incorporates the requirements of the current revision of Appendix- B, "Binna Station Inservice Inspection Program for the 1990-1'7'P9 Interval" of the Binna Quality Assurance Nanual.

The tables of this section contain the schedules of the nondestructive examinations to be performed, as well as those examined during the f irst and second interval . They are separated into sections according to major systems or components and sub-divided to list the actual component, area or weld to be examined.

For categories not required by Table IWD-2500 of Section XI to have complete coverage over the 10-year inspection interval, al 1 comoonents or welds are listed to ensure a complete accounting of the systems. The IWF requirements of Section XI for Component Supports are also 'ncluded as applicable in the Class Z tables.

The information for Class ~ Components is tabulated in the same format as Class 1. The isometric drawings are found af ter the tables.

~Ffo7Woi71 page 1 of

1g '7 IS i?

Ul I

JJ$ L 1 C

I IP O.

S

'P t ~

'I X

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR PONER STATIOH UHIT 1 PAGE: 1 REVISION: 0 IHSERVICE 'INSPECTION PROGRAM PLAN CLASS 3 COMPOHENTS INSPECTION INTERVAL PLAN STATUS COMP. COOL. PUMPS DISCH.TO COMP. COOL.HT EX I FIRST 'SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI I I

SUMMARY

EXAMIHATION AREA CATGY NDE I

-OUTAGE- - - - - - I INSTRUCTIONS NUHBER IDENTIFICATION ITEH HO METH I 1 2 3 1 2 3 4 1 2 3 I <<~CALIBRATION BLOCK**

PLANT LINE: BB.AC5-152 FIG NO C-2 500200 CCU086 D.B VT-3 1 PAINT.

RIGID SUPPORT - IUA D2.50 2- C C S.382-356, SH. 86, REV.

360, 8364 3X 4 X 87 - VT ON WELD - OK - GB.

500205 CCU086 F-8 VT-3 1 PAINT.

RIGID SUPPORT F2.00 2- S-382-356, SH. 86, REV. 1 360, 8364 3X F2.10, .30, .40 4 X PLANT LINE: 10A.AC5-152 FIG NO C-2 500210 CCU087 F-A VT-3 1 PAINT.

RIGID RESTRAINT - IWA F1.00 2- C - S.382-356I SH. 87, REV. 1 360, 8363 3- F1.10, .30, .40 4-86 INSIG: NO GREASE IN 2 FITTINGS - ACCEPT - JO.

88 - INSIG: MINOR U/C < 1/32" ON FILLET MELD ACCEPI'.-RAL.

500220 CCU088 F.A VT-3 1 PAINT.

GUIDE F1.00 2. C C S-382-356( SH. 88, REV. 1 360, 8363 3- F1.10, .30, .40 4-PLANT LINE: BA-AC5-152 FIG NO C-2 500230 CCU089 D.B VT-3 1- PAINT.

RIGID SUPPORT I'WA 02.50 2- C S-382.356, SH. 89, REV. 1 360, 8364 3- X 4 - X 88 VT-1 PERFORMED OH 'MELD OK-ACCEPT.-RAL.

GATE: 06/02/89 ROBERI'. rGINHA

~ ~

NUCLEAR POMER STATION UNIT 1 PAGE: 2

,e<

REViSION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS COMP. COOL. PUMPS 0 ISCH. TO COMP. COOL.HT EX ' FIRST SECOHD THIRD ZONE NUMBER: -ASHE I PERIOD PERIOD PER IOO SEC. XI I

SUMMARY

EXAHINATION AREA CATGY NOE I OUTAGE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO HETH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK*"

PLANT LINE: BA-ACS-152 FIG NO C-2 500235 CCU089 F-8 VT-3 1 S.382-356, SH. 89, REV. 1 RIGlb SUPPORT F2.00 2- F2.10, .30, .40 360, 8364 3. X 4 - X PLANT LIME: 100-AC5-152 FIG NO C-2 500240, CCU090 O.B VT-3 1- PAINT.

RIGfD RESTRAIHT - fQA, 02.20 2- C S-382-356I SH. 90, REV. 1 360, B363 3- X 4 X 86 - VT-1 IHSIG: PINHOLE . 1/32" DIA. IN PIPE - ACCEPT TS.

500245 CCU090 F-A VT-3 1 S-382-356, SH. 90I REV. 1 RIGID RESTRAINT F1.00 2- F1.10, .30, .40 360, 8363 3 - - X 4 - - X dt

98;KDho0: '0 DATE: 06/02/89 ROBERT E.'GIHNA NUCLEAR POWER STATION UNIT 1 ,PAGE:

~012 vBR REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN I CLASS 3 COHPONEHTS INSPECTION INTERVAL PLAN STATUS

' EQV )C Ql i gv As AUX. COOLING 'MTR. TO NON-REG. HT. EXCH. I FIRST SECOHD THIRD I 8 894lf.

ZONE NUHBER: ASHE PERIOD PERIOD PERIOD I 'C SEC Xl I I SUHHARY EXAHINATION AREA CATGY NDE I

- -OUTAGE I IHSTRUCTIONS...., .. 0. 0 ,

NUHBER IDENTIFICATION ITEH NO NETH [ 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK*"

PLANT LINE: 6E-AC6-152 FIG NO C-3

~ Ce <<qp 500300 CCU102 D-B VT-3 1 S-382-356, SH.. 1)2, REV...)

RIGID HANGER - IMA D2.50 2- C C 320, C320 3 - - X 4 - - X 87 - VT ON 'MELD - ACCEPT - CJF.

500305 CCU102 F-C VT-3 1- S-382-.356, SH...102, REV, 1 RIGID HANGER F3.00 2- F3.10, r30, .40 320, C320 3- X 4 X 500310 CCU105 F-C VT-3 1 S-382-356( SH. 105, REV. 0 RIGID HAHGER F3.00 2- C C F3. 10, .30, .40

e SDC 320, C320 3-4 500320 CCU106 F-C VT-3 1 S 382 356, SH 106,

~ REV. 0 RIGID RESTRAINT F3.00 2- C C F3.10, .30, .40 320, C320 3-4 85 - PAINT CHIPPING - ACCEPT. - PAL. OTHER: LOOSE NUT - REJECT. - PAL. TROUBLE CARD-85951. LOOSE HUT REPAIRED ACCEPT PAL 87 - INSIG: RUST, CHIPPED PAINT - ACCEP'I - CJF.

500330 CCU107 D 8 VT-3 1 S-382-356, SH. 107, REV. 2 RIGID RESTRAINT - IMA. D2.50 2 . C 320, C320 3 - - X 4 - - X 88 . Vj-3( REJI SHIMS INCORRECT-NOT TO PR!NT-REJECTED ~ NOREC/INSIG; SHINS ARE INSTALLED CORRECTLY PER H.P. LILLEY 2-29 88. ACCEPT. USE-AS-IS. DRAMING MILL BE REVISED TO AS BUILT CONSTRUCTION.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER STATION UNIT 1 4 PAGE: 4 REVISION B~" 0 IHSERVICE INSPECTION PROGRAH PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS AUX COOLING UTR. TO NON-REG. HT. EXCH. I FIRST SECOND 'THIRD ZONE MllMBER: ASHE I PERIOD 'ERIOD PERIOD SEC. XI I SUHMARY EXAHINATION AREA CATGY HDE I -OUTAGE I INSTRUCTIONS NUHBER IDENTIFICATION" ITEH NO METH 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK**

PLANT LINE: 6E-AC6-152 FIG NO C-3 500335 CCU107 F-C VT-3 1- S.382.356( SH. 107I REV. 2 RIGID RESTRAIHI- F3.00 2- .F3.10, .30, .40 320, C320 ~

3 - - X 4 - - X 500340 CCU108 F-C VT-3 1 S-382.356, SH. 108, REV. 1

'IGID HANGER F3.00 2- C C F3.10, .30, .40 320, C320= 3-4 500350'CU109 F-C VT-3 1 S 382 356( SH. 109( REV. 1 RIGID HANGER F3.00 2- C C F3.10, .30, .40 320, C320 3-4-

I ~

(

85 - IHSIG: NO I;D. TAG - ACCEPT -PAL.

500360 CCU110 F-C VT-3 1- S-382-356, SH. 110, REV. 2 RIGID HANGER F3.00 2- C F3.10, .30, .40 320, D320 3--

4-86 - INSIG: CHIPPED PAINT "ACCEPT . HJS.

~

500370 CCU111 F.C VT-3 1 S-382-356, SH. 111', REV. 1 RIGID HANGER F3.00 2- C C F3.10, .30, .40 320, A320 3-4 85 - OTHER: 4 LUGS I(Et:DED ON COMPONENT. VT-1 EXAH PERFORMED ON TELOS - ACCEPT -PAL.

PLANT LIME: 68-AC6-152 FIG MO C-3 500380 CCU171 F.C 'T-3 1- S-382 356, SH. 171, REV. 0 RIGID RESTRAINT F3.00 2- C C F3. 10, .30, .40 340, 8340 3-

'I 4

85 - INSIG: PAINT CHIPPING OFF SUPPORT - ACCEPT - PAL.

88 - INSIG: LIGHT SURFACE RUST - ACCEPT - GB.

P8%>>, >>I} '>>'TP6)

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POHER STATIOH UNIT 1 PAGE."yOIB l0'P REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION IHTERVAL PLAN STATUS  :"JD .704 41, AUX. COOLING WTR. TO NON-REG. HT. EXCH. I FIRST SECOND THIRD I '<."8l'e'0'>>45 ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I I ."'>> IWA~B IF! >H>>8 CATGY NDE -OUTAGE- I INSTRUCTIOQSiI.,D.. I TvFOI FBP9iv ITEN NO NETH I 2 3 1 2 3 4 1 2 3 I-- >>*CALIBRATTON BLOCK".>> ...

TvA 0 PLANT LINE: 68-AC6-152 FIG NO C-3

~tg g g 2$ JO <

500390 CCU172 F-8 VT-3 1 S 382 356 SH 172r RgV F 1 GUIDE - RIGID SUPPORT F2.00 2- C F2.10, .30, .40; ~ r 340, 8340 3-4 500400 CCU173 F-C VT.3 1 S-382-356, SH. 1'P, PEV.(1 RIGID RESTRAIH'T F3.00 2- C C F3 10 ~ 30@ ~ 40 E 0 340, 0340 3 .

4-85 - PAINT ON GREASE FITTINGS ACCEPT. - PAL. OTHER: LOOSE HUI' REJECT. - PAL.TROUBLE CARD-85952. LOOSE HUT REPAIRED ACCEPT - PAL ~ v>>

5004'IO CCU174 F C VT-3 1- S-382-356( SH. 174( REV. 1 RIGID RESTRAINT F3 F 00 2. C C F3.10, .30 '40 Y , HE 340, D340 3-4-

~ ' p~C' 86 IHSIG: HISSING GREASE FITTING. ACCEPT TS. ~,<< ilAr .,>> ~

IW 500420 CCU'l75 F-C VT.3 1 S.382-356, SH. 175, REV. 1 RIGID RESTRAINT F3.00 2- C C  : F3 10ll 30IG340..TI ". BHI ~ -..8 340, D340 3-4-

~ ~

85 - INSIG: PAINT ON GREASE FITTINGS ACCEPT - PAL. Vs'

'BE 500430 CCU176 F-C VT-3 1 S-382-356, SH. 176, REV. 1 RIGID HANGER F3.00 2- C C F3 ~ 10 ~ a30>> 40 340, D340 3-4-

86 INSIG'HIPPED PAIN'T St RUST ACCEPT JO

.lB,~/

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 6 REV(SION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS AUX. COOLING 'WTR. TO NON-REG. HT. EXCH. I FIRST SECOND THIRD I ZONE'NUMBER: ASHE I PERIOD PER ICO PERIOD I SEC. XI I I "CATGY NDE -OUTAGE I INSTRUCTIONS

'ITEM NO METH i'I 2 3 1 2 3 4 1 2 3 <<*CALIBRATION BLOCK**

PLANT LINE: 6B-AC6-152 FIG NO C.3 500440 CCU177

)1 GUIDE -'WU<<-BOET 340, D340"

'3.00 F-C VT-3 1 2-3-

4-C C S.382-356, SH. 177, F3. 10, .30, .40 REV. 1 86 - INSIG: CHIPPED 8 MISSING PAINT, SURFACE RUST ACCEPT - TS.

500450 CCU178 F-C VT-3 1 S-382-356, SH. 178, REV. 1 RIGID RESTRAINT F3.00 2- C C F3.10, .30, .40 340, C340 3-4 500460 CCU179 0 8 VT-3 1 PAINT.

VARIABLE SPRING - IWA 02.40 2- C S-382-356, SH 179@ REV 1 340, C340 3 - X 4 - X 86 VT 3'REJ'NCORRECT SCALE SETTING T/C 86 307 St NCR 86 031 VT-3 REEXM:

RE-EXAHINATION AFTER REPAIR ON T/C 86 307 & NCR 86 031.

500465 CCU179 F-C VT-3 1 S.382-356, SH. 179, REV. 1 VARIABLE SPRING F3.00 2- F3.10, .30, .40 340, C340 3 - X 4 - X 500470 CCU180 D-B 'VT-3 1 S-382-356( SH. 180, REV. 1 GUIDE - IWA D2.20 2- C C 340, C340 3- - X 4 - - X 85 - VI' INSIG: NORTH 8 EAST LUGS TOUCHING PIPE - NO WEAR ACCEPT - PAL. VT OTHER: 'WELD PAINTED - ACCEPT - PAL.

87 - IHSIG: INSULATED PAINT OH LUGS BUT WELDS COULD BE EXAHINED - ACCEPT - CJF.

<<SXSP "0 DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POMER S'IATIOH UNIT 1 r PAGE: ' 'T'p F REV I S I OH: 0 INSERVI CE, INSPEC'I ION PROGRAH PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS AUX ~ COOLING 'LITR. TO NON-REG. HT ~ EXCH. I FIRST SECOND THIRD' PPJi'ilU ZONE NUMBER: ASME I PERIOD PERIOD 'ERIOD )

SEC. XI I -I yr I'> i!MAyB 1'vM~Z SUMHARY EXAMINATION AREA CATGY NDE I


OUTAGE-- - I INSTRUCTIONS NUMBER, IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 6B-AC6-152 FIG NO C-3

< 'a,",3 0)AOJF 500475 CCU180 F-A I VT-3 1 S-382.356, SH. 180, RE)

GUIDE F1.00 2- F1.10, .30, 40.,

~

I s 340, C340 3- X 4 - - X

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POMER STATIOH UNIT 1 PAGE: 8 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS COMP.COOL.HT:EXCHS. TO RESIDUAL HT.EXCHS: I FIRST SECOND THIRD I ZONE NUMBER:" ASHE I PERIOD 'PERIOD PERIOD SEC. XI I I SUHHARY EXAMINATION AREA CATGY HDE I OUTAGE I INSTRUCI'IONS NUHBER IDENTIFICATION ITEM NO HETH i 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK**

PLANT LINE: 10L-AC5-152 FIG MO C-4 500500 CCU135 F.C VT.3 S-382-356, SH. 135, REV. 2 RIM RESTRAINT F3.00 2- C C F3.10, .30, .40 360, 8363 3-4 500510 CCU136 F-C VT-3 1 S-382.356, SH. 136, REV.

RIGID RESTRAINT F3.00 2- C C F3.10, .30, .40 360, 8363 3-4-

500520 CCU'I37 D-B VT-3 1- S-382-356I SH. 137, REV. 2 GUIDE - RIGID HAHGER - IWA 02.20 2- C C 360, 8363 3- X 4 X 87 - INSIG: CORROSION ON LUG MELD - ACCEPT - GB. VT ON MELD . OK-GB.

500525 CCU137 F-A VT-3 1 S.382.356, SH. 137, REV. 2 GUIDE F1.00 2- F1.10, .30, .40 360, B363 3- X 4- X PLANT LIHE: 148-AC5-152 FIG NO C-4 500530 CCU138 D-8 VT.3 1 PAINT.

GUIDE - .IWA 02.20 2- C C S-382.356( SH. 138I REV. 0 360,'363; 3- X 4- X 88 - INSIG: VT-1;LIGHT SURFACE RUST-ACCEPT.-(U/C < 1/32" OM N.E. LUG 8 N.SIDE WELD.-ACCEPT..RAL. EXAM LIMITED TO TOP 3 1/4" OF LUGS DUE TO PERMANENT FIRE PROTECTION FOAM.

500535 CCU138 F.A VT-3 'I- S-382-356, SH. 138, REV. 0 GUIDE F1.00 2 F1.10, .30, .40 360, 8363 3. X 4- X

98'50%: BIAG DALE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UHIT 1 PAGE:,, 9 5

REVISIOH: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS COMP. COOL.HT.EXCHS.TO RESIDUAL HT.EXCHS. I FIRST SECOND THIRD I PFMrJ ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I ~ <O~, c s ')L <F ~ MMliL SUHHARY EXAMINATION AREA CATGY NDE I -OUTAGE - - - -

I IHSTRUCTIONS NUMBER IDEHTIFICATIOH ITEH HO NETH -i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK~*

f g p/1 gf Q PLAHT LINE'48-ACS-152 FIG NO C-4

'5 iD:

500540 CCU139 D B VT-3 1 SH.g9, REV.,O 0060',('-382-356, GUIDE - IWA 02.20 2. C C

. ac;8 340, 8344 3- X 4- X 86 - IHSIG: VT-II VT-3 . PAINT PEELING. VI'-1 RUST ON WELDS. VT-3 RUST ON LUGS 8 INSIDE OF SUPPORT. ACCEPT - GB,.

88 INSIG: CORROSION ON LUG WELDS ~ BOTTOM LUG WELD WIRE BRUSHED < RE-EXAM.nNO DEGRADATIOH OF PIPE- ACCEPT..-GBi hl

'i"'.F .Dc".

500545 CCU139 F A VT.3 1 S-382-356, SH. 139, REV. 0 GUIDE F1.00 2- F1.10, ~ 30, .40 340, 8344 3- X sc EDP..

4 X 500550 CCU140 F-C VT-3 1- S-382-356, SH. 140, REV. 2 RIGID RESTRAINT F3.00 2- C C F1.10, .30, .40 340, 8340 3-4-

85 INSIG: UPPER GREASE FITTIHG PAINTED . ACCEPT - AG. 'I ~

87 - INSIG: DOES NOT SWIVEL DUE TO PAINT - ACCEPT - CJF.

Fccc .CIL 500560 CCU'I41 F-C VT-3 1 S-382-356, SH. 141( REV. 1 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 340, 8340 3-4

~ gC I 500570 CCU142 F-C VT-3 1 S.382-356I SH 142, REV. 2

~

RIGID F3.00 2. F3.10, .30, .40 3-RESTRAINI'40, A340 4

8'a~P 8."

500580 CCU143 F-C VT-3 1 S-382-356, SH. 143( REV. 1 RIGID RESTRAINT F3.00 2. C C F3.10, .30, .40 340, A340 3- 4 'I ~

4

.DATE:. 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 10 REVIS10N:

"0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS COMP. COOL.H'T.EXCHS.TO RESIDUAL HT.EXCHS. I FIRST SECOND THIRD I ZONE,NUHBER: '"ASME I PERICO -PERIOD "

'PERIOD I SEC. Xi I I

SUMMARY

EXAHINATIOH AREA CATGY NDE I

- OUTAGE- I INSTRUCTIONS NUMBER IDENT IF ICATION ITEM NO HETH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 14B.AC5-152 FIG NO C-4 500590 CCU144 F-C VT-3 1 S.382 356, SH. 144, REV.

RIG)b RESTRAINT F3.00 2 C C F3.10, .30, .40 340, A340 3-4-

PLANT LINE: 10G-ACS-152 FIG NO C-4 500600 CCU145 F-A VT-3 1 S-382-356, SH. 145, REV. 2 GUIDE F1.00 2- C C F1.10, .30, .40 340, A340 3-4-

500610 CCU146 D-B VT-3 1 BINOCULARS REOUIRED.

GUIDE - RIGID RESTRAINT - IWA D2.20 2- C C S-382-356, SH. 146, REV. 1 340, B330 3- X 4 X 86 - VT-1: INSIG: WELDS RUSTED - ACCEPT - GB.

88 - VT-1 PERFORMED ON WELD-OK 2-4-88IGB.

500615 CCU146 FA VT3 1- S-382-356( SH. 146, REV. 1 GUIDE F1.00 2- F1.10, .30, .40 340, 8330 3- X 4 X PLANT LINE: 10F-AC5-152 FIG NO C-4 500620 CCU147 F A VT.3 1 S-382-356, SH. 147, REV. 2 GUIDE - RIGID SUPPORT F1.00 2- C C F1.10, .30, .40 340, 8340 3-4 500630 CCU148 F-A VT.3 1- BINOCULARS, LIH. EXAM.

GUIDE F1.00 2. C C S-382.356, SH. 148, REV. 1 340, 8330 3- F1.10, .30, .40 4

85 - OTHER: EXAM PERFORMED WITH BINOCULARS - LIHITED AREA OF EXAHINATION.

06/02/89 9BKSO~ '0: ""

I4 0 DATE: ROBERT E. GINNA NUCLEAR POMER STATION UNIT 1 PAGE: ., )3,..

REVISION: 0 INSERVICE IHSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS COMP. COOL.HT.EXCHS.TO RESIDUAL HT.EXCHS. FIRST SECOHD THIRD I ABP'V~H BvvO' ZONE NUMBER: ASHE PERIOD PERIOD PERIOD SEC. Xl I 'Vi v'v X'<<AVIPM SUHMARY, EXAMIHATION AREA CATGY NDE I OUTAGE- - - - - I INSTRUCI IONS, -

~ ~ ~ a - ~ p ~

NUHBER IDENT IF I CAT IOH ITEM NO METH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 10E-AC5-152 FIG NO C.4 500640 CCU149 FC VT3 1- S-382-356, SH. 149, RE(]3.

RIGID RESTRAINT F3.00 2- C F3.10, .30, .40 360, B363 3.

4 86 - INSIG: NO SUPPORT IDENTIFICATION TAG ACCEPT - WSG.

r~~

V riV r

~ \ L

".'o00 I I~

V; 'V VXIV, VC  ? Ii '0?

BOJ gv",

C.

' (<<4 '

( < V~i

~ ' ~ ~ h 'hhh iV i

'V

'( LV':

L VS ~

DATE=I 06/02789 ROBERT E. GINNA HUCLEAR POIJER STATION UNIT 1 PAGE: 12 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPOHENTS INSPECTION INTERVAL PLAN STATUS AUX. COOL. MTR. TO PEN 124 127 128 8 131 I . FIRST SECOND THIRD I ZONE NUMBER: ASHE PERIOD PERIOD PERIOD I SEC. XI I I

SUMMARY

EXAHINATIOH AREA CATGY NDE OUTAGE- INSTRUCT IONG NUMBER IDENT IPTCAT ION ITEH NO METH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: BA-AC6-152 FIG NO C-5 500700 CCU151i F-C VT-3 1 S 382 356'H ~ 150 ~ REV 3 RIGID RESTRAINT F3.00 2 C C F3.10, .30, .40 340, A340 3 4

500710 CCU151 D-B VT-3 1 PAINT.

RIGID RESTRAINT - IWA 02.20 2- C C S-382 356, SH. 151, REV.

340, A340 3- X 4 X 88 - INSIG: PAIHT PEELED AT LUGSI ACCEPT.-RAL. VT-1 ON WELD OK-ACCEPT..RAL.

500715 CCU151 F-C VT-3 1 S-382-356, SH. 151, REV. 1 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 340, A340 3- X 4- X 500720 CCU152 F.C VT-3 1 S-382-356, SH. 152, REV. 2 RIGID RESTRAINT F3.00 2- C C F3.10, .30, .40 340, A340 3-4 85 IHSIG: PAINT ON GREASE FITTINGS ACCEPT - PAL 500730 CCU 153 F-A VT-3 1 S-382-356, SH. 153, REV. 1 GUIDE F1.00 2 C C F1.10, .30, .40 340, A340 3-500740 CCU154 F C VT.3 1 S-382-356, SH. 154, REV. 1 RIGID RESTRAINT F3.00 2- C C F3.10, .30, .40 340, A340 3-4-

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POMER STATION UNIT 1 PAGE".,c'< 13BTA0 0 'EVISION:

INSERVICE )INSPECTION PROGRAH PLAN  :(O'0 'BR CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS AUX. COOL. WTR. TO PEN 124 127 128 8 131 FIRST SECOND THIRD I

, 0 1 >><< '0" XUA I

ZONE NUHBER: ASME PERIOD PERIOD PERIOD :i'BPv<<iM BwCE J

SEC>> XI I I SUHHARY>'XAHINATI ON AREA CATGT NDE I

-OUTAGE- INSTRUCTIONS ~ <<<<<<.'i cv "AXS .

"Aug',!P NUHBER -" IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK~,Tl<<zG>

PLANT LINE: BA-AC6-152 FIG NO C.5 ~!<<

~

<<c<<c<<<<j, 500750 CCU155 F-C VT-3 1- S-382-356, SH. 155, REV-'."ts i9"002 RIGID RESTRAINT F3.00 2- C C F3. 10, .30, .40 3-

,=..'lDic'5 340, A340 4-INSIG: GREASE FITTINGS HISSING - ACCEPT - PAL 88 - INSIG: HINOR CORROSION ON THREADED BOLT 8 AT BOTTCH OF CLAHP.-ACCEPT.-RAL. <<

0<<D c'Gc'.

<< ~

f 0( .".c c,

.c 'J T "c'I c ~ i ~ c

DATE";I 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 14 REVISION: 0 INSERVICE INSPECTION. PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL STATUS COMP. COOL.PMPS. SUC.FM RES.HT.EX.& SG.TK ' F IRSI'LAN SECOND I'HIRD I ZOHE NUMBER: ASME I PERIOD PERICO PERIOD I SEC. XI I- I SUMHARY EXAHINATION AREA CATGY NDE I -OUTAGE- I INSTRUCTIONS NUHBER IDENT IFICATI'ON ITEH NO METH ( 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK>>>>

PLANT LINE: 10J-AC5-152 FIG NO C-6 500760 CCU.156'<<'IGID D-8 VT-3 1 S-382-356, SH. 156, REV. 1 SUPPORT - IWA D2.50 2- C C 360, 8360 3- X 4- X 88 - VT-1 PERFORMED ON WELD-OK-ACCEPT. RAL.

'5 C.

500765 CCU156 F-8 VT-3 1 S-382-356, SH. 156, REV. 1 RIGID SUPPORT F2.00 2- F2.10, 30, .40

~

360, B360 3- X

4. X PLANT LINE: 14C.AC5-152 FIG NO C-6 500770 CCU158 D-8 VT-3 1. LEAD INS.

VARIABLE SPRING - IWA 02.r 0 2 C S 382 356, SH. 158, REV. 1 340, 8343 3 . X 4- X 86 . VT-3:REJ: SPRING OFF-SCALE LOW - T/C 86-308 & NCR 86-033. VT-3 REEXH:

RE-EXAMINATIOH AFTER REPAIR ON T/C 86 308 & NCR 86 033. VI'-1:Ol'HER: NO EXAMINATION DUE TO RADIATION MONITOR SHIELD.

88 - NOREC.: VT-1 ON WELD OK )ACCEPT.-G.B.1 SETTING 9 0>>=1379¹(COLD 9 1368¹ ACCEPT.-G.B.

'V3S 500775 CCU158 F-C VT-3 1 S-382-356, SH. 158, REV. 1 SPRING F3.00 2- F3.10, .30, .40, .50 3ro, 8343 3- X 4- X 500780 CCU159 F C VI'-3 1 S-382-356, SH. 159, REV. 1 RIGID RESTRAIHT F3.00 2- C C F3.10, .30, .40 320, 8323 3-4 .

500790 CCU160,:.. 0-B VT-3 1 PAINT.

VARIABLE SPRING -'.I'WA D2.40 2- C S-382-356, SH. 160( REV.

320, 8320 3-4 88 INSIG: MINOR RUST ON PIPE LUG ATTACHMENI'CCEPT. RAL.SETTING I/2") VT-1 ON W'ELD ACCEPT. RAL ~

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER STATION UNIT 1 PAGE'$80 15ITAO REVI S I OH: 0 INSERVICE!INSPECTION PROGRAM PLAN t.!". IBI VBR CLASS 3 COMPONENTS INSPECTIOH INTERVAL PLAN STATUS COMP. COOL.PMPS. SUC.FM RES.HT.EX.& SG.TK FIRST SECOHD THIRD c'" '~ . IOI ."=. AMDD I I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD :r'58"UH SEC ~ XI - I I

- - - - - - V: " ';I"4/"-

EPOS'NSTRUCTIONS SUMHARY. EXAHINATION AREA CATGY NDE - OUTAGE I

'PA'iWl8 I

NUMBER IDENT'IFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 *~CALIBRATION BLOCK~*i' ~ ~ i'-'"~ UP PLANT LINE: 14C-AC5 ~ 152 FIG NO C.6 500795 CCU160 F-C VT-3 1 S 382-356, SH. 160, REV "1': 0'~002 SPRING F3.00 2- F3.10, .30, .40, '.50.;s 320, 8320 3- X 4 X

)'00800 CCU165 F.C VT-3 1- S-382-356, SH. 165, REV. 1 VARIABLE SPRING F3.00 2- C C F3.10, .30, .40, .50 320, A320 3- s U%clDD'2 4-500810 CCU166 F-C VT-3 1 S 382 356'H 166'EV

~ 0 RIGID RESTRAINT F3.00 2- C C F3.10, .30, .40 320, A320 3-4-

85 - OTHER: BOLT IN PIPE CLAMP IS LOOSE. - PAL. TROUBLE CARD-85955. LOOSE BOLT REPAIRED

- ACCEPT - PAL ~ 'i 87 - INSIG: RUST( PAINT CHIPPED - ACCEPT - TS.

PLANT LINE: 10H-ACS-152 FIG NO C-6 500820 CCU167 D-8 VT-3 1 PAINT.

VARIABLE SPRING -'MA 02.40 2- C C S-382-356, SH. 167, REV. 1 320, 8330 3. X F'I.' UD~

4 X 88 - NOREC: VT-3) VT-1 PERFORMED ON 'WELD) ACCEPT- RAL. SETI'ING AT 1 1/8",2918¹ ~

500825 CCU167 F-C VI'.3 1 S-382-356, SH. 167, REV.;01 05 DDr SPRING F3.00 2- F3.10, .30,;:40,":50,'ID:.'<

320, 8330 3- X 4- X 500830 CCU168 F-A VT-3 1- S.382-356, SH. 168, REV.".:1 D"""~;"2 GUIDE F1.00 2- C C Fl 10, 30, .40'

~ ~

" ~iIRAK 320, 8330 3-4-

DATE:; 06/02/39 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 16 REVISION: 0 IHSERVICE .INSPECTION PROGRAH PLAN CLASS 3 COHPONEHTS INSPECTIOH INTERVAL PLAN STATUS COMP.COOL.PMPS. SUC.FH RES.HT.EX.S SG.TK I FIRST SECOND THIRD I 2ONE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I SUHHARY EXAHINATION AREA CATGY NDE I

- -OUTAGE- INSTRUCTIONS NUHBER IDEHT I F ICATION ITEH NO NETH 1 2 3 1 2 3 4 1 2 3 j **CALIBRATIONBLOCK**

PLANT LINE: 101-ACS-152 FIG NO C.6 500840 CCU169. D-8 VT-3 1 S-382-356, SH. 169, REV. 1 VARIABLE SPRING - IWA 02.40 2- C C 320, A320 3- X 4 X 88 - INSIG: RUST ON PIPE SURFACE AT PIPE LUG WELD-ACCEPT.-RAL: VT-1 ON 'WELD ACCEPT. RAL.

500845 CCU169 F-C Vl'-3 1 S.382.356, SH. 169, REV. 1 SPRING F3.00 2- F3.10, .30, .40, .50 320, A320 3- X 4 X 500850 CCU170 0-B VT-3 1 PAINT GUIDE - IWA 02.20 2- C S-382-356, SH. 170, REV. 0 320, 8320, 3- X 4- X 86 - VT-1: INSIG: LAST 2" BOTH LUGS RUSTED - ACCEPT - GB.

500855 CCU170 F-A VT-3 1 S-382-356, SH. 170, REV. 0 GUIDE F1.00 2- F1.10, .30, .40 320, 8320 3- X 4 X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER STATION UNIT 1 PAGE:

'0 I'P'A"

vC;B<VaP REVISION: 0 INSERVICE INSPEC'I ION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION IHTERVAL PLAN STATUS AUX.COOL. IN 8 OUT FOR BORIC ACID EVAPOR. I FIRST SECOND THIRD I
r,'3 'A.r, 3HL3 ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I

SUMMARY

EXAHINATION AREA CATGY NDE I

- OUTAGE- I INSTRUCTIONS NUMBER IDENI'IFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK*~

PLANT LINE: 6C-AC6-152 FIG NO C-7 500900 CCU127 F-A VT-3 1 S-382-356, SH. 127, REV. 1 GUIDE F1.00 2 C C F1.10, .30, .40 340, B340 3

((

4 500910 CCU128 D-8 VT-3 1 PAINT.

GUIDE - IUA D2.50 2- -'C C S 382-356I SH. 128, REV.

340, B340 3- X 4- X 86 - VT.1: INSIG: STANCHION CUT OFF ORIGINAL SUPPORT - ACCEPT - MJS.

88 - INSIG: CORROSION OH TOP OF STRUCTURAL TUBE-ACCEPT..G.B.;CORROSION ON STANCHION. ACCEPT..G.B. VT 1 ON MELD - OK.

500915 CCU'128 F-8 VT-3 1 S-382-356( SH. 128( REV. 1 GUIDE F2.50 2- F2.10, .30, .40 340, B340 3- X 4- X 500920 CCU129 D.B VT-3 1 PAINT.

ANCHOR - IMA D2.50 2. C S-382-356, SH. 129, REV. 1 340, B340 3-4-

500925 CCU129 F-A VT-3 1 S-382-356, SH. 129, REV. 1 ANCHOR F1.00 2- F1.10, .30, .40 340, 8340 3- X 4- X 500930 CCU130 F-C VT-3 1 S-382-356, SH. 130, REV. 1 RIGID HANGER F3.00 2 C C F3. 10, .30, .40 320, 8320 3-4-

DATF: 06/02/89 ROBERT E. GINHA NUCLEAR P(NER STATION UNIT 1 PAGE: 18 REVISIOH: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS AUX.COOL. IN & OUT FOR BORIC ACID EVAPOR. FIRST SECOND THIRD I I'ONE NUMBER: ASHE I PERICO PERICO PERIOD SEC. XI - I I

SUMMARY

EXAHIHAT I ON AREA CATGY NDE OUTAGE I INSTRUCTIONS HUMBER IDENTIFICATION ITEM NO HETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK**

PLANT LINE: 6C-AC6-152 FIG NO C-7 500940 CCU13,1 F-C VT-3 1- S-382-356, SH. 131, REV. 1 RIGID .HANGER F3.00 2- C F3.10, .30, .40 320, 8320 3-4 500950 CCU132 F-C VT.3 1- S-382-356( SH. 132, REV. 1 RIGID HANGER F3.00 2- C C F3. 10, .30, .40 320, 8320 3-4-

PLANT LINE: 6G AC6 152 FIG NO C-7 500960 CCU218 D B VT-3 1- S.382 356, SH. 218, REV. 1 RIGID HANGER - I'WA D2.20 2- C C 320, 8320 3- X X

85 - OTHER: A VT-1 EXAM WAS PERFORMED ON LUGS AHD TELOS ACCEPT - GB.

500965 CCU218 F.C VT-3 1 S.382.356I SH. 218, REV. 'I RIGID HANGER F3.00 2- F3.10, .30, .40 320, 8320 3- X 4- X 500970 CCU219 F.C VT-3 1 S-382-356, SH. 219, REV. 1 RIGID HANGER F3.00 2. C C F3.10, .30, .40 320, 8320 3.

~ 4 500980 CCU220 F-C VI'-3 1 S-382.356I SH. 220( REV. 1 RIGID HANGER F3.00 2- C C F3. 10, .30, .40 320, 8320 3-4-

B DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE:

'i8 19+ i I i' R REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONEHTS INSPECTION INTERVAL PLAN STATUS i ~ ~

i'OD ALA AUX.COOL. IN & OUT FOR BORIC ACID EVAPOR. FIRST SECOND THIRD I I '- P'> L 6 i'CS ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. Xi CATGY NDE I -OUTAGE- - - -. -

I I INSTRUCTIONS

~ i ~ ( (3 (P Ol

'E(41 IB ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIONBLOCK~"

PLANT LINE: 6G-AC6-152 FIG NO C-7 500990 CCU221 F-C VT-3 1 LADDER & BINOCULARS REOUIREDf RIGID RESTRAINT F3.00 2- C C S.382-356, SH. 221, R(V. 1 320, 8320 3- F3. 10, .30, .40 4

501000 CCU161 F-A VT-3 1 S-382.356, SH. 161, REV. 1 GUIDE F1.00 2- C C F1.10, .30, .40 320, 8320 3.

4-501010 CCU162 F-C VT-3 1 S-382-356, SH. 162, REV. 1 RIGID RESTRAIHT F3.00 2- C C F3. 10, .30, .40 340, 8340 3-87 - INSIG: NO MOVEMENT DUE TO PAINT. - CJF.

501020 CCU'I63 F-C VT-3 1 S-382.356, SH. 163, REV. 1 RIGID F3.00 2- C C F3.10, .30, .CO 3-RESTRAINT'40, 8340 4.

501030 CCU164 D.B VT-3 1 S-382-356, SH. 164, REV. 1 AHCNOR - IWA 02.20 2. C C 340, 8340 3- X 4- X 85 . OTHER: EXTRA 3" X 6" X 3/C" PLATE WELDED AT 90 DEGREES TO PLATE . ACCEPT - GB.

87 - INSIG: EXTRA LEG 3" X 6" X 3/4" . ACCEPT . CJF. VT OH WELDS, - OK-CJF.

c'"4>i,"' v'P

('F 501035 CCU164 F.A VT.3 1- S-382-356, SH. 164, REV. 1 ANCHOR F1.00 2- F1.10, .30, .40 340, 8340 3- X 4- X

DATE: 06/02/89 ROBERT ED GINHA NUCLEAR POWER STATION UNII' PAGE: 20 REVISION: 0 .INSERVICE INSPECTION PROGRAH PLAN

,CLASS 3 COMPONENTS IHSPECTION INTERVAL PLAN STATUS AUX.COOL.WTR'. FROM PEN 124 125 126 8 130 I FIRST SECOND THIRD, I ZOHE NUMBER: ASHE I PERIOD a PERIOD PERIOD SEC. XI I I SUMHARY EXAHINATION AREA CATGY NDE I OUTAGE I INSTRUCTIONS NUMBER IDENT IF ICATION ITEM NO METH 1 2 3" 1 2 3 4 1 2 3 I

    • CALI BRAT ION BLOCK*>>

PLAHT LINE: 8B-AC6-152 FIG NO C-5 501100 CCU227 F-C VT-3 1 S-382-356, SH. 227, REV. 1 RIGID RESTRAINT F3.00 2- C C F3.10, .30, .40 340, A340 3-4 85 - INSIG: GREASE FITTING PAINTED - ACCEPT - PAL 501110 CCU228 D-8 VT-3 1 S-382-356( SH. 228( REV. 1 GUIDE - IWA 02.20 2- C 340, A340 3- X

4. X 87 - VT ON WELDS . OK - CJF.

501115 CCU228 F-A VT-3 1 S-382-356, SH. 228, REV. 1 GUIDE F1.00 2- F1.10, .30, .40 340, A340 3- X 4- X 501120 CCU229 F-C VT-3 1- S-382-356( SH. 229, REV. 1 RIGID RESTRAINT F3.00 2. C C F3.10, .30, .40 ~

340; A340 3-4-

85 - IHSIG: GREASE FITTIHG MISSING - ACCEPT - PAL 501130 'CCU230 F-C VT-3 1 S-382-356i SH. 230, REV. 1 RIGID RESTRAINT a F3.00 2- C F3.10, .30, .40 340, A340 3 .

4-501140 'CCU231 F C VT-3 1 S-382-356, SH. 231, REV. 1 RIGID HANGER F3.00 2 .- ~- C C F3.10, .30, .40 340, 8340 3-4-

DATE: 06/02/89 ROBERT E. GINNA HUCLEAR POWER STATION UNIT 1 PAGE: "" 21 TAC REV I SION: 0 INSERVI CE.IIHSPECT I ON PROGRAM PLAN i~I'R CLASS 3 COMPOHEN'IS INSPECTION INTERVAL PLAN STATUS AUX.COOI..WTR. FROM PEN 124 125 126 8 130 FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. Xi - I SUHMARY EXAMIHATI ON AREA CATGY HDE - - 0 U T A G E - - - - - - I INSTRUCTIONS ~ ljpb 7 NUMBER." IDENTIFICATION ITEM NO HETH I 1 2 3 1 2 3 4 1 2 3 I

- **CALIBRATION BLOCK**

PLANT LINE: BB-AC6-152 FIG NO C.S 501150 CCU232 F-C VT-3 1 S 382 356) SH 232) REV 1 t ~ /02 R!GID RESTRAINT F3.00 2- C C F3.'IO, .30, .40 340, B340 3-4-

501160 CCU233 F.C VT-3 1 S.382-356, SH. 233, REV. 1 RIGID RESTRAINT F3.00 2- C F3.10, .30, .40 340, 8340 3-4-

87 - Ol'HER: CCU 232 8 CCU 233 ARE REVERSED ON LINE. ACCEPT - TS.

PLANT LINE: 60-AC6-152 FIG NO C-5 501170 CCU234 F-C VT-3 1 S-382-356, SH. 234, REV. 1 RIGID RESTRA!NT F3.00 2- C C F3.10, .30, .40 340, A340 3-4 85 - INSIG: PAINT ON GREASE FITTIHGS - ACCEPT - PAL 501180 CCU235 F-C VT-3 1 S.382-356, SH. 235, REV.. 1 RIGID HANGER F3.00 2- C C F3. 10, .30, .40 340, A340 3-4 501190 CCU236 F.C VT-3 S-382-356, SH. 236, REV.L>1 GCI'0)

RIGID RESTRAINT F3.00 1

2- C F3.10, .30, .40 )~

340, A340 3-4-

501200 CCU237 F-C VT.3 1 S-382-356, SH. 237, 'REV."-1 i~'

R!GID RESTRAINT F3.00 2 C C F3.10, .30, .40 ui 340, A340 3-4-

85 - INSIG: GREASE FITI'INGS ARE PAINTED - ACCEPT - PAL

DATER- 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 22 REVI SIGH: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONENtS INSPECTION INTERVAL PLAN STATUS AUX.COOL.FRM PEN 131 TO RV SUPPORT COOL. I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PER I CO PERIOD PERIOD SEC ~ XI I I SUHHARY EXAHIHAT I ON AREA CATGY HDE I ---OUTAGE- I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 4 1 2 3 I ""CALIBRATION BLOCK**

PLANT LINE: 6F-AC6-152 FIG NO C.9 501300 CCU01 F-C VT-3 1- S-382-356, SH. 001, REV. 0 RIGID HANGER F3.00 2- 0 C C F3.10, .30, .40 240, 243 3-4-

85 - BOLT HAS RUST OH THREADS - ACCEPT. - PAL. OTHER: LACK OF FULL THREAD ENGAGEHENT - REJECT. PAL. TROUBLE CARD.85957.

RESCHEDULE TO 2 ND INtERVAL - 6 TH OUTAGE.

86 - THIS IS THE EXAHINATIOH OF THE HANGER AFTER REPAIRS ON T/C 85.957. - ACCEPT - PAL.

88 - INSIG: NO I.D. TAG ON HANGER-ACCEPT-JO.

501310 CCU04 O-B VT.3 1 S-382-356, SH. 004, REV. 1 ANCHOR - IWA . D2.20 2. C

- 240, 243 3- X 4- X 87 - VT ON WELDS - OK - TS.

501315 CCU04 F-A VI'-3 1 S-382-356( SH. 004/ REV. 1 ANCHOR F1.00 2- F1.10, .30, .40 240, 243 3- X 4 X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE:

REVISION: 0 INSERVICE;INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION IHTERVAL PLAN STATUS AUX.COOL.'WTR.FRM RV SUP.COOL.TO PEN 130 I FIRST SECOND THIRD I '3'UHHARY year 20NE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I EXAHIHAT ION AREA CATGY NDE I OUTAGE I INSTRUCTIONS NUHBER 'DENT I F I CAT ION ITEN NO NETH I 1 2 3 1 2 3 4 1 2 3 I

  • "CALIBRATIOH BLOCK~*

PLANT LINE: 6H-AC6-152 FIG NO C 9 501400 CCU17 D B VT-3 1 S-382-356/ SH. 17, REV. 1 ANCHOR - I'WA D2.20 2- C C 240, 243 3-4-

87 - VT ON WELDS OK- TS.

501405 CCU17 F-A VT-3 1 S-382-356, SH. 17, REV. 1 ANCHOR F1.00 2- F1.10, .30, .40 240, 243 3- X 4 X 501410 CCU02 F-C VT-3 1 S.382.356, SH. 002, REV. 1 RIGID HANGER F3.00 2 . C F3.10, .30, .40 240, 243 3.

4-

DATET3 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 24 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTIOH INTERVAL PLAN STATUS PIT FIRST

  • SECOND THIRD SW COMP. COOL.& SP.FUEL HT EXS. DISCH I I ZOHE NUMBER: ASME I PERIOD PERIOD PERIOD

'EC. XI -

I

SUMMARY

EXAMIHATION AREA CATGY HDE I


OUTAGE-- I INSTRUCTIONS NUMBER IDEHTIFICATIOH ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 20D-SWO-125-9 FIG NO C 11 501500 SWU148 F-C VT-3 1 S.382 358, SH. 148, REV. 1 RIGID HANGER F3.00 2- C C F3.10, .30, .40 340, 0345 3-4-

85 - INSULATION OH " U" BOLT.

501510 SWU149 F-C 'VT-3 'I- S.382-358, SH. 149, REV. 1 RIGID HANGER F3.00 2 C F3.10, .30, .40 340, D345 3-4-

501520 SWU150 F-A VT-3 1 S-382-358, SH. 150, REV. 2 GUIDE F1.00 2 C F1.10, .30, .40 340, 0345 3-4-

501530 SWU151 F-A VT-3 1 INS.

GUIDE F1.00 2- C C S-382-358, SH. 150, REV. 2 340, 0340 3- F1.10, .30, .40 4-88 - INSIG:GUIDE DIFFERENT FROM DWG. S382-358 SH 151. ACCEPT. AS IS 'W/ DIFFERENCES FROM DWG. MJS ~

50'1540 SWU152 F A VT-3 1 S.382.358, SH. 152, REV. 1 RIGID SUPPORT F1.00 2- C C F1.10, .30, .40 340, 0340 3-4 501550 SWU153 F-C VT-3 1 IHS.

U BOLT F3.00 2. C C S-382 358, SH. 153, REV. 2 340, 0340 3- F3.10, .30, .40 4-85 INSULATION OH " U " BOLT.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER S'IATION UNIT 1 PAGE: 25:<,<

REVI SION: 0 INSERVICEMNSPECTIOH PROGRAM PLAN ~ 1~ vB>

CLASS 3 COMPONENI'S INSPECTION IHTERVAL PLAN S'TA'IUS SU COMP. COOL.& SP.FUEL PIT HT EXS. DISCH I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I

SUMMARY

EXAHINATION AREA CATGY NDE - -.OUTAGE- - ~

I INSTRUCTIONS NUMBER 1 IDENTIFICATION ITEM NO METH ( 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK*~

PLANT LINE: 20D-SN0.125.9 FIG NO C.11 501560 SW154 F-C VT-3 1 S-382-358, SH. 154( REV. 2 RIGID HANGER F3.00 2. C F3.10, .30, .40 340, D340 3-4-

501570 SW155 F-C VT-3 1 I NS.

U BOLT F3.00 2 ~ C C S-382.358, SH. 155, REV. 2 340, B340 3 . F3.10, .30, .40 4

85 IHSULATIOH ON " U " BOLT.

87 - INSIG: INSULATION ON U-BOLT, NUTS EXPOSED - ACCEPT -CJF.

501580 SW156 F.C VT-3 1 S-382-358, SH. 156( REV. 2 RIGID HANGER F3.00 2- C F3.10, .30, .40 340, 8340 3.

4 87 - INSIG: INSULATION OH CLAMP( BOI.TS EXPOSED. - ACCEPT - CJF.

501590 SW157 F-A VT.3 S-382-358( SH. 157, REV. 1 GUIDE F1.00 2- C F1.10, .30, .40 360, 8363 3-4-

87 - INSIG: REMOVED LUGS EXAM. NO INDICA'IIONS OH BASE METAL. PAINT BLISTERED - ACCEPT GB.

501600 SW158 D.C VT-3 1 IHS.

RIGID HAHGER . INA 03.20 2- C C S-382-358, SH. 158, REV.

360, B363 3- X 4 X 88 - Vl'-1 PERFORMED ON MELO OK-ACCEPT. RAL.

DATE'6/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UHIT 1 PAGE: 26 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3'COMPONENTS I N SP ECT I ON INTERVAL PLAN STATUS SW COMP. COOL.8 SP.FUEL PIT NT EXS. DISCH I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. Xr SUHMARY EXAHINATION AREA CATGY HDE --OUTAGE. -. -. -

I I INSTRUCT IOHS NUMBER IDENTIFICATION ITEN NO HETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 20D-S'WO 125-9 FIG NO C-11 501605 SWU158 F-A VI'-3 1- S-382-358, SH. 158, REV. 1 RIGID HANGER F1.00 2- F'1.10, .30, .40 360, 8363 3- X 4 ~ X 501610 SWU159 F-A VT-3 1 S-382-358, SH. 159, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 360, 8363 3-4-

PLANT LINE: 14F-S'W0-125.9 FIG NO C-1'I 501620 SWU160 F C VT-3 1- INS.

RIGID RESTRAINT F3.00 2- C C S-382-358( SH. 160( REV. 1 360, 8363 3- F3.10, .30, .40 4

I 85 CLAHP IS INSULATED.

87 - INSIG: CHIPPED & BLISI'ERED PAINT ON CLAMP - ACCEPI' GB.

501630 SWU161 0-C VT-3 1 INS.

RIGID HANGER IllA D3.20 2- C C - S-382-358, SH. 161, REV. 1 360, 8363 3- X 4 X 88 . VT-1 PERFORMED ON WELD-OK-ACCEPT.-RAL.

501635 SWU161 F C VT-3 1 S 382 358'H 161 i REV 1 RIGID HANGER F3.00 2 F3.10, .30, .40 360, 8363 3- X C

4 X 501640 SWU162 FC= VT.3 1 S-382.358, SH. 162( REV. 1 RIGID RESTRAIN'I F3.00 2- C F3.10, .30, .40 360, 8363 3-4-

87 . INSIG: BLISTERED PAINT ON PAINT ON CLAMP ACCEPT - GB.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 27- AS REV IS I OH: 0 INSERVICEAINSPECTION PROGRAM PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SW COHP.COOL.S SP.FUEL PIT HT EXS. DISCH I FIRST SECOND THIRD I ZONE NUHBER: ASHE PERIOD PERIOD PERIOD ~ L,'L I

SEC. XI I SUHHARY EXAHINATION AREA CATGY NDE 0 U T A G E I INSTRUCTIONS NUHBER 'DENTIFICATION ITEN NO HETH i 1 2 3 1 2 3 4 1 2 3 **CALIBRATIOHBLOCK**

PLANT LINE: 14F-SW0-125.9 FIG NO C-11 501650 SWU163 F-C VT-3 1- IHS.

~ ~

RIGID RESTRAINT F3.00 2- C C S-382-358, SH. 163, REV. 0 360, 8363 3- F3.10, .30, .40 4

85 INSULATIOH ON BRACKET.

PLANT LINE: 14G-SWO-125-9 FIG NO C-11 501660 SWU164 O.C VT-3 1 S-382-358, SH. 164, REV. 1 RIGID MANGER - IWA D3.20 2- C 360, 8363 3- X 4- X 87 . VT ON WELDS - OK. . GB.

501665 SWU164 F C VT-3 1 S-382-358, SH. 164, REV. 1 RIGID HANGER F3.00 2- F3.10, .30, .40 360, 8363 3- X 4- X PLANT LINE: 6E-SW0.125-9 FIG NO C-11 501670 SWU175 D.C VT-3 1 S 382 358, SH. 175, REV. 3 RIGID RESTRAINT - IWA D3.20 2- C C 340, A340 3 . X 4- X 87 . Vt ON LUGS - OK . SJD.

50'I 675 SWU175 F C VT-3 1 S-382-358( SH. 175, REV. 3 RIGID RESTRAINT F3.00 2 F3.10, .30, .40 340, A340 3 . X 4- X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 28 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS S'W CONP.COOL;& SP.FUEL PIT HT EXS. DISCH I FIRST SECOND THIRD I ZONE NUHBER: ASHE PERIOD " PERIOD 'PERIOD I

SEC. Xi I I SUHHARY EXAHINATI OH AREA CATGY NDE - 0 U T A G E - - - - - - I INSTRUCTIONS NUHBER IDEHTIFICAT!ON ITEH NO HETH 1 2 3 1 2 3 4 1 2 3 I **CALIBRAT IOH BLOCK"~

PLANT LINE: 6E-SWO-125-9 FIG NO C-11 501680 SWU176 D-C VT-3 1- INS RIGID RESTRAINT - I'WA 03.20 2- C C - S.382-358( SH. 176, REV. 3 340, A340 3- X 4 X 88 - VT-1 PERFORHED ON WELD,-ACCEPT.-RAL.

501685 SWU176 F-C VT-3 1 S-382-358, SH. 176, REV. 3 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 340, A340 3- X 4- X 501690 SWU177 F-C VT-3 1- S-382-358I SH. 177, REV. 2 RIGID RES'TRAIHT F3.00 2 C C F3.10, .30, .40 340, A340 3-4-

86 - INSIG: SPACERS ON COMPONENT ACCEPT - HJS.

501700 SWU 178 F-C VT-3 1 INS.

RIGID RESTRAINT F3.00 2 . C C S.382-358, SH. 178i REV. 1 340, A340 3- F3.10, .30, .40 4

BB-VT-3,REJ.-LOCKNUT RESTRAINIHG STRU'f FROH TURHING NOT RUN DOWH ALL-TNE.WAY.PAINT BUILD.UP ON NUT. NCR G88-031.

V'f-3,NOREC.- EXAHINED AFTER REPAIRS ACCEPT.-GB.

50'l710 SWU179 F.A VT-3 1 S.382.358, SH. 179I REV. 1 GUIDE F1.00 2- C C F1.10, .30, .40 340, A340 3-4 501720 SWU180 F-C VT-3 1 INS.

U.BOLT F3.00 2- C C S-382-358, SH. 180, REV. 1 340, A340 3- F3.10, .30, .40 4-85 - LIHITA'flOH - INSULATION ON " U " BOLT.

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 29 REVISION: 0 INSERVICEINSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECT IOM INTERVAL PLAN STATUS SW COMP. COOL.B SP.FUEL PIT H't EXS. DISCH I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I I SUHHARY EXAHINATION AREA CATGY NDE - 0 U T A G E - - - - - - INSTRUCTIONS I I NUHBER IDENT IF I CAT IOM ITEN NO NETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLAMT LINE: 6E-SWO-125 9 FIG HO C 11 501730 SWU181 F-A V1'-3 1 S-382-358, SH. 181, REV. 1 GUIDE F1.00 2- F1.10, .30, .40 340, A340 3-4-

501740 SWUI82 F-C VT-3 INS ~

U-BOLT F3.00 2- C S-382-358, SH. 182, REV. 1 340, A340 3- F3.10, .30, .40 4-85 - INSULATION OM " U 4 BOLT.

501750 SWU183 F-A VT-3 1 INS.

GUIDE F1.00 2- C S-382 358, SH. 183, REV. 1 340, 8340 3- F1.10, .30, .40 4

501760 SWU184 F-C VT-3 1- INS.

RIGID RESTRAINT F3.00 2- C C S-382-358, SH. 184, REV. 1 340, 8340 3- F3. 10, .30, .40 4-85 - IHSULATION OM PIPE CLAMP.

87 NO MOVEMENT DUE TO PAINT ACCEPT - CJF.

501770 SWU185 F.C VT.3 1- INS.

U BOLT F3.00 2- C C S-382-358, SH. 185, REV. 1 340, 8340 3 ~ F3.10, .30, .40 4-88 - INSIG. PAINT CHIPPING OM WELD ACCEP'T-G.B.

PLAMT LIME: 6D.S'W0-125.9 FIG NO C.11 501780 SWU186 D-C VI'-3 1 S-382-358( SH. 186, REV. 1 RIGID HANGER IWA 03.20 2- C C 340, A340 3- X 4- X

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 30 REV I SION: 0 IHSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS IHSPECTION INTERVAL PLAN STATUS SW COMP. COOL.B SP.FUEL PIT HT EXS. DISCH I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. XI -

I I SUMHARY EXAMINATION AREA CATGY NDE I

- - ~ -OUTAGE- - - - - - I INSTRUCTIONS NUHBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 I ~*CALIBRATION BLOCK*"

PLANT LINE: 60-S'WD-125-9 FIG NO C-11 501785 SWU186 F-A VT-3 1 S-382-358, SH. 186, REV. 1 RIGID HANGER F1.00 2- F1.10, .30, .40 340, A340 3- X 4 ~ X 501790 SWU187 F-A VT-3 1 S.382-358, SH. 187, REV.

GUIDE F1.00 2- C C F1.10, .30, .40 340, A340 3-4-

501800 SWU188 D.C VT-3 1 INS.

GUIDE - RIGID RESTRAINT - IWA D3.20 2- C C S-382-358( SH. 188( REV. 2 340, A340 3- X 4- X 88 - VT.1 PERFORMED ON WELD-OK-ACCEPT. RAL.

501805 SWU188 F A VT-3 1 S.382.358, SH. 188, REV. 2 RIGID RESTRAINI'40, F1.00 2- F1.10, .30, .40 A340 3 . X 4 X

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 31 REVI SION: 0 INSERVICEylNSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTIOH INTERVAL PLAN STATUS SVC.WTR.TO CDHP.COOL.& SP.FL.PIT HT.EXS. I FIRSI SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. Xl I I SUHHARY EXAHINATION AREA CATGY NDE ---OUTAGE- I INSTRUCTIONS NUHBER" IOEHT IF I CATION ITEH NO HETH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK**

PLANT LINE: 14H-SU0-125.9 FIG NO C.12 501850 SW189 F-A VT-3 1- INS.

GUIDE F1.00 2- C C S-382-358, SH. 189, REV. 1 360, A363 3. F1.10, .30, .40 4 .

85 - INSULATED PIPE.

501860 SW190 F-A VT 3 INS.

GUIDE F1.00 2- C S-382-358, SH. 190, REV. 1 360, A360 3- F1.10, .30, .40 4-501870 SW191 O-C VT-3 1 INS.

GUIDE - RIGID SUPPORT - IMA 03.20 2- 0 C C S-382-358/ SH. 1911 REV. 0 360, B363 3- X 4- X 85 - VT-1 INSIG: HINOR PITS IN RUSTED AREAS AROUND LUGS - ACCEPT - PAL. OTHER: LUGS NOT TO PRINT SIZE - REJECT - PAL.

NCR 485 070 GENERA'TED TO ENGIHEERING. RESCHEDULE TO 2 ND IN'TERVAL-6TH OUTAGE.

86 - VT-1: IHSIG: HINOR PITTIHG,RUST - ACCEPT - JO. NEW LUGS PER HCO: ECH 2512-189. THIS HOO CORRECTS NCR 85 - 070.

50'1875 SW191 F-C VT-3 1 S-382-358, SH. 191, REV. 0 RIGID SUPPORT F1.00 2- F1.10, .30, .40 360,'363 3- X 4- X 501880 SW192 F C VT.3 1 I HS.

GUIDE F1.00 2 . C C S-382-358I SH. 192I REV. 1 360, 8363 3- F1.10, .30, .40 4-85 - INSIG: SOUTH AND ~ EAST LUGS TOUCHING PIPE - NO HEAR - ACCEPT - PAL.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 32 REVISION: " 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION IHTERVAL PLAN STATUS SVC.WTR.TO COMP. COOL.8 SP.FL.PIT HT.EXS. I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC Xl I I

SUMMARY

EXAHINATION AREA CATGY NDE I

. OUTAGE- I INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK*>>

PLANT LINE: 14H-S'WO-125-9 FIG NO C-12 501890 SWU193 D-C VT-3 1- INS.

RIGID HANGER - IWA 03.20 2- C S-382 358/ SH. 193( REV. 0 340, B340 3- X 4- X 86 - VT-1:INSIG: RANDOM RUST ON WELD(CHIPPED PAINT -.ACCEPT CJF ~ VT-3:REJ: 7/8" HALF-NUT MISSINGi7/8" RCO RECESSED IN BOTTOM OF SHACKEL. KK T/C 86-431 VT-3 REEXM: AFTER T/C 86-431 REPAIRS. ACCEPT - GB.

501895 SWU193 F B VT-3 1 S-382.358, SH. 193, REV. 0 RIGID HANGER F2.00 2- F2.10, .30, .40 340, B340 3- X 4- X 501900 SWU194 D-C VT-3 1 S-382-358, SH. 194, REV. 0 RIGID HANGER - IWA D3.20 2- C C 340, D340 3. X 4 X 85 VT INSIG: LIGHT RUST ACCEPT PAL. SUPPORT IS PAINTED.

87 - IHSIG: RUST ON WELD BETWEEN LUG 8 PIPE. RUST ON PIPE AT LUGS.- ACCEPT - CJF. VT ON WELD - OK.

CJF.

501905 SWU194 F 8 VT-3 1- S-382-358, SH. 194, REV. 0 RIGID HANGER F2.00 2- F2.10, .30, .40 340, 0340 3- X 4- X 501910 SWU195 F-A VT-3 1 INS.

GUIDE F1.00 2 . C S 382 358, SH. 195) REV. 1 340, 0340 3- F1.10, .30, .40 4-86 - INSIG: NO I.D. TAG ACCEPT JO.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 33 REVISION: 0 IHSERVICETIHSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SVC.'WTR'TO COMP. COOL.& SP.FL.PIT HT.EXS. I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I SUHHARY EXAHIHATION AREA CATGY NDE I OUTAGE I INSTRUCT IONS NUHBER IDENTIFICATION ITEN HO NETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK**

PLANT LINE: 14H-SWO-125-9 FIG NO C-12 501920 'WU196 D-C VT-3 1 I HS.

RIGID SUPPORT - IMA 03.50 2- C C S-382-358, SH ~ '96, REV. 1 340, D340 3- X 4- X 86 - VT-1: IHSIG: PITTING ON COHPONENT. WELD CROWN RUSTED - ACCEPT - JO. VT-3: IHSIG:

CHIPPED PAINT AND RUST - ACCEPT - JO.

501925 SWU196 F-8 VT-3 1 S.382-358, SH. 196, REV. 1 RIGID SUPPORT F2.00 2- F2. 10, .30, .40 340, D340 3- X 4- X PLANT LINE: 20B-SWO-125-9 FIG NO C-12 501930 SWU197 D-C VT-3 1 382 358'H 197>> REV 0 RIGID SUPPORT I WA 03.50 2- C C 340, D340 3- X 4- X l?"'

85 . VT-3, V'I INSIG: RUST - ACCEPT - PAL.

87 . INSIG: RUST ON MELD . ACCEPT . CJF. VT ON WELD - OK.

CJF 501935 SWU197 F-8 VT-3 1 S-382-358, SH. 197, REV. 0 RIGID SUPPORT F2.00 2. F2.10, .30, .40 340, D340 3- X 4 X 501940 SMU198 0-C VT-3 1 I NS.

RIGID SUPPORT - IWA D3.50 2 C C S.382.358, SH. 198, REV. 1 340, D340 3 . X 4 X 86 VI': INSIG: STUD WITH NUT INSTEAD OF BOLT - ACCEPT - MJS.

88 REJ:LUGS TURNED 90 OEG.TO PRINT,SPACER BETWEEN NUT & PLATE N.E.LUG,1/8"X10"X1"SHIH NO GROUT-KK. INSIG: RE EXAH INDICATES THAT SUPPORT WAS REWORKED TO PRESENT CONFIGURATION.-ACCEPT HJS. 'T-1 >>

PERFORMED-ACCEPTABLE-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 34 REVI SION: , INSERVICE. INSPECI'IOM PROGRAM PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR.TO COMP.COOL.& SP.FL.PIT HT.EXS. I F IRS'I SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I I SUHHARY EXAMINATION AREA CATGY NDE I OUTAGE- - - - I IHSTRUCTIONS NUHBER IDENTIFICATIOH ITEH HO NETH i 1 2 3 1 2 3 4 1 2 3 I *"CALIBRATION BLOCK**

PLANT LINE: 208-SWO-125-9 FIG NO C-12 501945 SWU198 F.B S-382-358, SH. 198, REV. 1 VT-3'2.00 RIGID SUPPORT 2 F2.10, .30, .40 340, D340 3. X 4- X 501950 SWU199 F-A VT-3 1 S-382-358, SH. 199, REV. 1 GUIDE F1.00 2 C C F1.10, .30, .40 340, D340 3 .

4-87 - INSIG: HISSING I.D. TAG. MISSING 2" X 2" X 3/4" WASHER PLATE - ACCEPT - CJF.

501960 SWU200 F-A VT-3 1 INS.

GUIDE F1.00 2- C C S-382-358, SH. 200, REV. 0 340, D340 3- F1.10, .30, .40 4-501970 SWU201 F-C VT.3 S.382.3581 SH. 201, REV. 1 RIGID RESI'RAINT - U-BOLT F3.00 2- C C F3.10, .30, .40 340, D345 3-4 86 - INSIG: HO GREASE IN 2 FITTINGS - ACCEPT - HJS.

PLANT LIME: 20A.SW0-125-9 FIG NO C-12 501980 SWU202 F-A VT-3 1 INS.

GUIDE F1.00 2- C C S-382-358I SH. 202, REV. 1 340, D340 3- F1.10, .30, .40 4

85 - INSULATED PIPE.

501990 SWU203 F-A VT-3 1 INS.

GUIDE F1.00 2 . C C S-382-358, SH. 203, REV. 2 340, D340 3- F1.10, .30, .40 4

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 35 REVISION: 0 INSERVICE"FINSPECTION PROGRAH PLAN CLASS 3 COMPOHEHTS INSPECT IOH INTERVAL PLAN STATUS SVC.LITR.'TO COMP. COOL.B SP. FL.PIT HT.EXS. I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I I

SUMMARY

'EXAHINATIONAREA CATGY NDE I OUTAGE I INSTRUCTIONS NUMBER 'DENTIFICATION ITEH NO HETH 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIONBLOCK+*

PLANT LINE: 18A-SUO-125-9 FIG NO C-12 502000 SW204 F-C VT-3 1 INS.

RIGID RESTRAINT F3.00 2- C C S-382-3581 SH. 204, REV. 1 340, 8340 3- F3. 10, .30, .40 4-85 - INSIG: GREASE FITTING IS PAINTED - ACCEPT - PAL. INSULATED PIPE AND CLAHP.

87 - INSIG:INSULATION ON CLAMP, BOLTS EXPOSED - ACCEPT - CJF.

PLANT LINE: 14I-Sl$ -125.9 FIG NO C.12 502010 SW205 F-C VT-3 1 I NS.

RIGID RESTRAINT F3.00 2- C S.382.358, SH. 205, REV. 1 340, B344 3- F3. 10, .30, .40 4-86 - INSIG: MISSING 8 UNGREASED GREASED FITTIHGS ACCEPT - MJS.

502020 SW206 F-C VT-3 1- I NS.

RIGID HANGER -U BOLT F3.00 2- C S-382-358, SH. 206, REV. 1 340, 8344 3- F3.10, .30, .40 4

502030 SW207 F-A VT-3 1 INS.

GUIDE F1.00 2- C C S.382-358, SH. 207, REV. 1 360, 8363 3- F1.10, .30, .40 4

85 - IHSULATED PIPE.

87 - INSIG: OLD ATTACHHENT REHOVED - PIPE OK. BLISTERED PAINT - ACCEPT - GB.

502040 SW208 F C VT-3 1- I NS.

RIGID HANGER F3.00 2. C S-382.358, SH. 208i REV. 1 360, 8363 3- F3.10, .30, .40 4

86 - VT-1:INSIG: LIGHT RUST ON 'MELO AND PIPE, HO PAINT ON PIPE OR SUPPORT - ACCEPT KK. VT-3:REJ: HAIL IN PLACE OF COTTER PIN - JO. T/C 86.429. VT-3 REEXM: AFTER T/C 86.429 REPAIR.

ACCEPT SUPPORT-TS

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 36 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COMPOHENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR.TO COMP. COOL.& SP.FL.PIT H'T.EXS. I FIRSI SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I SUHHARY EXAMINATION AREA CATGY NDE I -OUTAGE- - - - - - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO HETH 1 2 3 1 2 3 4 1 2 3 I

  • ~CALI BRAT ION BLOCK**

PLANT LINE: 14I-SWO-125-9 FIG NO C-12 502050 SWU209 F.C VT-3 1 INS.

RIGID HANGER F3.00 2- C C S 382-358/ SH. 209/ REV.

360, 8363 3- F3.10, .30, .40 4-85 - INSULATED HANGER AND PIPE.

502060 SWU210 F-A VT-3 1 INS.

GUIDE F1.00 2- C C S-382-358, SH. 210( REV. 2 360, 8363 3- F1.10, .30, .40 4-85 - INSULATED PIPE.

88 -REJ/NOREC-ARC BURN ON I-BEAM ADJACEN'I TO WELD(AT TOE)OF LOWER SUPPORT ATTACHMEHTS,1/4"XS/32"DP.. DEFECT NO NOTICEABLE AFFECT ON SUPPORT OR COLUHN-USE AS IS M.P.LILLEY 2-16 88.NO RE-EXAM. MPL ADVISED ABOUT ASHE Xl(1986)EXAH CRITERIA MJS 2-22 88 PLANT LINE: 20A-SWO-125-9 FIG NO C-12 502070 SWU211 F-A Vl'-3 S-382 358, SH. 211, REV. 1 GUIDE F1.00 2- C C F1.10, .30, .40 340, 0340 3-4 86 - INSIG: ANCHOR BOLTS - SIZES OK - ACCEPT - HJS.

502080 SWU212 D.C VT-3 1 INS.

RIGID SUPPORT - IWA D3.50 2- 0 C S-382-358, SH. 212i REV. 0 340, 0340 3 X 4 X 85 . VT-3 INSIG: 4 BOLTS LACK ENGAGEHENT . ACCEPT . PAL. VT-1 OTHER: WELD TO ELBOW IS UNDERCUT AND UNDERFILLED - REJECT

- PAL. NCR ¹85-069 GENERATED TO ENGINEERING. RESCHEDULE TO 2 ND IHTERVAL - 6 TH OUTAGE.

86 VT-1:REJ: WELD NOT REPAIRED ON NCR 85-069. VT-3: INSIG: LUGS RECESSED -ACCEPT - JO. Pl': EXAM AFTER REPAIRS ON NCR 85-069 & T/C 85-1191. VT-1 EXAH AFTER REPAIRS.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 37 REVISION: 0 INSERVICE 'INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION IHTERVAL PLAN STATUS SVC.WTR'.TO COMP. COOL.8 SP.FL.PIT HT.EXS. I FIRS1 SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. Xl I I

SUMMARY

EXAMINATION AREA CATGY NDE - - - -OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIONBLOCK**

PLANT LINE: 20A-SWO-125-9 FIG HO C-12 502085 SWU212 F 8 VT-3 1- S-382-358, SH. 212, REV. 0 RIGID SUPPORT F2.00 2- F2.10, .30, .40 340, D340 3X 4 X 502090 SWU213 0 C VT-3 1- I NS.

RIGID SUPPORT - IWA D3.50 2- S-382 358, SH. 213, REV. 0 340, 0340 3 - X 4 - X 86 - VT-1:INSIG: LIGHT RUST ON PIPE & WELD ACCEPT - JO. UNDERSIZE WELD &

INCOMPLETE FILL FOR 6" OF 28" OF MELO. NCR86-035. GAI EVALUATION 13N1-GR-L1411 USE AS IS PER M.P. LILLEY 2/26/86.

502095 SWU213 F-8 VT-3 1 S-382-358, SH. 213, REV. 0 RIGID SUPPORT F2.00 2- F2. 10, .30, .40 340, 0340 3 - X 4 - X 502100 SWU214 F C VT-3 1 IHS.

RIGID RES'TRAIHT F3.00 2- C C S-382-358( SH. 214, REV. 1 340, C340 3- F3.10, .30, .40 4-85 - INSIG: GREASE FITTING IS PAINTED ACCEPT PAL. INSULATED PIPE.

87 . INSIG: INSULATION ON CLAMP, BOLTS EXPOSED . ACCEPT - CJF.

502110 SWU215 F-C VT.3 1 IHS.

RIGID RESTRAINT - U BOLT F3.00 2- C C S.382-358I SH. 215, REV. 1 340, C340 3- F3.10, .30, .40 4-86 - INSIG: GREASE FITTINGS PAINTED. LOCKING NUTS OK IN PRESENT LOCATION - ACCEPT - MJS.

502120 SWU216 F.C VT.3 1 I NS.

RIGID RESTRAINT F3.00 2- C C S-382-358, SH. 216, REV. 1 340, C340 3. F3. 10, .30, .40 4-85 - INSIG: GREASE FI'TYING IS PAINTED ACCEPT PAL. SUPPORT IS PAINTED. IHSULATED PIPE.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UHIT 1 PAGE: 38 REVISION: INSERVICE ilNSPECT IOH PROGRAH PLAN CLASS 3 COHPOHENTS INSPECTION IH'IERVAL PLAN STATUS SVC.MTR.TO COHP.COOL.B SP.FL.PIT HT.EXS. I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I I SUHHARY EXAHINATION AREA CATGY NDE - 0 U T A G E - - - - - - INSTRUCTIONS I

HUHBER IDENI'IFICATION ITEH NO HETH I 1 2 3 1 2 3 4 1 2 3 I

    • GALI BRAT ION BLOCK*>>

PLANT LINE: 6C-SWO-125-9 FIG NO C-12 502130 SMU120 D-C VT-3 1 INS.

VARIABLE SPRING - IWA D3.40 2- C C S-382-358, SH. 120, REV. 1 340, A340 3 X 4 X 86 = 'VI'-1:INSIG: U/C 1/64" DEEP X 1/12" .LONG. LIGHT RUST ON MELD 8 PIPE ACCEPT HJS.= VT-3:REJ: SPRIHG CAH SETTING AT 0. UNACCEPTABLE PER AS BUILT DRAWING - HJS. NCR 86 032 VT-3:REEXAH: EXAH. AFTER REPAIR ON NCR 86-032 ACCEPI'8

- VARIABLE SPRING SETTING AT 310: VT.1 PERFORHEO ON WELD OK ACCEPT.-RAL.

502135 SMU120 F-C VT-3 1 S-382-358, SH. 120, REV. 1 VARIABLE SPRING F3.00 2- F3. 10, .30, .40 340, A340 3X 4 X 502140 SWU121 F-C VT.3 INS.

RIGID RESTRAINT F3.00 2- C C S-382.358, SH. 121, REV. 0 340, A340 3- F3.10, .30, .40 4-85 - PIPE IS FULLY INSULATED, CLAHP IS PARTIALLY COVERED.

502150 SWU122 F.A VT-3 1- INS. LADDER REQUIREDI GUIDE F1.00 2- C S-382 358( SH. 122, REV. 3 340, A340 3- F1.10, .30, .40 4

86 - VIEW NOR'TH: HOT FULL THREAD ENGAGEMENT RIGHT REAR NUT. FIRE SYS'IEH SPRAY DEFLECTOR TACK MELDEO TO WEST SIDE OF BOX BEAM NCR 86 037. USE AS IS PER H.J. LILLEY 2/26/86.

88 INSIG.-ONE THREAD SHORT OF FLUSH ON ONE NUI',EAST TUBE. NUT ENGAGEHENT FUNCTIONALLY OK ACCEPT..'M.S.G.

502160 SWU123 F-A VT-3 1 S-382-358( SH. 123, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 340, A340 3.

4-

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATIOH UNIT 1 PAGE: 39 REVISION: 0 IHSERVICE'~INSPECTION PROGRAN PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SVC.MTR.TO COMP. COOL.B SP.FL.PIT H'I.EXS. I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC XI SUNNARY EXAMINATION AREA CATGY HDE I

-OUTAGE- -- I I INSTRUCTIONS NUNBER'DENT I F I CATION ITEN NO NETH / 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK~~

PLANT LINE: 6C.SM0-125-9 FIG NO C-12 502170 SWU124 F-8 VT-3 1- I NS.

RIGID SUPPORT F2.00 2- C C S.382-358, SH. 1241 REV. 2 340, A340 3- F2.10, .30, .40 4-85 . INSIG: THREAD ENGAGEHEHT ON ONE BOLT (STUD)'SHORT 1 THREAD ACCEPT - PAL. LIMITATION PIPE IS INSULATED.

502180 SWU125 F-A VT-3 1 INS.

GUIDE F1.00 2- C C S-382-358i SH. 125, REV. 2 340, A340 3- F1.10, .30, .40 4-85 INSULATED PIPE.

502190 SWU126 F-C VT-3 1 INS. LADDER REOUIREDI RIGID RESTRAINT U BOLT F3.00 2- C C - S-382 358, SH. 126, REV. 2 340, A340 3- F3.10, .30, .40 4.

86 - INSIG: FITTING HISSING OH LOWER SWIVEL EYE ~ SWIVEL PAINTED 8 MILL NOT HOVE - ACCEPT GH.

88 - IHSIG: MINOR RUST ON PLATE WELD AREA-ACCEPT.-R.A.L. I HUT'LUSH WITH STUD. THREAD EHGAGEHENT FUHC'IIONALLY OK-ACCEPT.-W.S.G.

502200 SWU127 F-A VT-3 1 INS.

GUIDE F1.00 2- C S.382-358, SH. 127, REV. 2 340, 8340 3- F1.10, .30, .40 4-502210 SWU128 F-C VT-3 1 IHS.

RIGID HANGER F3.00 2- C C S-382-358, SH. 128, REV. 2 340, 8340 3- F3.10, .30, .40 4-85 - INSULATED PIPE AND CLAMP.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER STATIOH UNIT 1 PAGE: 40 REVISION: 0 4 INSERVICE IHSPECT ION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR.TO COMP. COOL.& SP.FL.PIT H'T.EXS. I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI -

I I

SUMMARY

EXAHINATION AREA CATGY HDE -----OUTAGE- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO HETH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 6C-SWO-125-9 FIG NO C-12 502220 SNJ129 F-C VT-3 1 S-382-358, SH. 129, REV. 2 RIGID RESTRAINT - U BOLT F3.00 2- C C F3.10, .30, .40 340, 8340 3-4-

86 - INSIG: PAINT CRACKING AI.OHG FILLET HELD. SNIVEL EYE PAIN'IED & MILL NOT HOVE - ACCEPT - GH.

DATE 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 41 REVISION: 0 INSERVICE".INSPECI'ION PROGRAM PLAN CL'ASS 3 COMPONENTS INSPECT'ION INTERVAL PLAN STATUS SVC.WTR.TO A 8 B DIESEL GEN.WTR.COOLERS I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I SUMHARY EXAHINATION AREA CATGY NDE I

-OUTAGE- - - I INSTRUCTIONS NUMBER'"'DENTIFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRAT ION BLOCK**

PLANT LINE: 10B-SWO-125-9 FIG NO C-13 502250 SWU249 F-A VT-3 1 S-382-358, SH. 249, REV. 1 GUIDE F1.00 2- C F1.10, .30, .40 610, 8620 3-502260 SWU250 F-A VT-3 1 S-382-358,'H. 250, REV. 1 GUIDE F1.00 2- C F1.10, .30, .40 610, B620 3-4 502270 SWU251 O-B VT-3 1 S-382-358, SH. 251, REV. 0 RiGID SUPPORT - IWA D2.50 2- C 610, B620 3- X 4-87 - VT OH WELDS . OK - GB.

502275 SWU251 F-8 VT-3 1 S-382-358, SH ~ 251, REV. 0 RIGID SUPPORT F2.00 2- F2.10, .30, .40 610, 8620 3- X 4 - X 502280 SWU252 D-8 VT-3 1 S-382.358, SH. 252, REV. 1 RIGID SUPPORT - IWA D2.50 2- C 610, 8620 3- X 4 X 87 - VT ON WELDS . OK. - GB.

502285 SWU252 F.B VT-3 1 S-382-358I SH. 2521 REV. 1 RIGID SUPPORT F2.00 2- F2.10, .30, .40 610, 8620 3- X 4 X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER STATION UNIT 1 PAGE: 42 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COMPONEN'IS INSPECTION INTERVAL PLAN STATUS SVC.WTR.TO A 8 B DIESEL GEN.WTR.COOLERS I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI I

- I SUHHARY EXAHINATION AREA CATGY NDE I OUTAGE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO HETH i 1 2 3 1 2 3 4 1 2 3 I **GALI BRAT ION BLOCK**

PLANT LINE: 10B-SN0-125-9 FIG NO C-13 502290 SNU253 F-A VT-3 1- S.382-358, SH. 253, REV. 1 GUIDE F1.00 2- C C F1. 10, .30, .40 610, 8620 3-4-

502300 SNU254 F-C VT-3 1 INS ~

MECHANICAL SNUBBER F3.00 2- C C S-382-358, SH. 254, REV. 0 610, 8620 3- F3.10, .30, .40, .50 4-85 - THIS IS A MECHANICAL SHUBBER.

88 - SNUBBER SFRIAL ¹ IS 12508 NITH A SETTING OF 1 1/8" AT A TEHP. OF 79 DEG.F..

DATE: 06/02/89 ROBERT'. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 43 REVISIOH: 0 IHSERVICEt'INSPECTION PROGRAH PLAN CLASS 3 COHPONEHTS INSPECTION INTERVAL PLAN STATUS SVC. WATER FROM PEN. 308 311 315 8 323 I FIRST SECOHD THIRD ZONE HUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I I SUHHARY EXAHINATIOH AREA CATGT HDE -OUTAGE- - - - - - I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO NETH I 1 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIONBLOCK**

PLANT LINE: BD.SW0.125.9B FIG NO C.14 502400 SWU291 0-8 VT-3 1 S.382-358, SH. 291, REV. 1 RIGID RESTRAINT - IWA D2.20 2- R C 420, A420 3- X 4-II X

85 - COHPONENT INSTALLED IN 1984. FIRST EXAH IN 2 ND INI'ERVAL 3 RD PERIOD.

87 - VT ON WELDS - OK. - CJF.

502405 SWU291 F.C VT-3 1 S.382-358, SH. 291/ ~ REV. I RIGID RESTRAINT F3.00 2. F3. 10, .30, .40 420, A420 3-4 .

502410 SWU292 F-C VT-3 1 I NS.

RIGID RESTRAINT F3.00 2- C S-382-358, SH. 292, REV. 4 420, A420 3- F3. 10, .30, .40 4-PLANT LINE: 10A-SW0.125-9B FIG NO C-14 502420 SWU293 F-C VT-3 1- S-382-358, SH. 293, REV. 0 RIGID RESTRAINT F3.00 2- R C F3. 10, .30, .40 420, A420 3-4-

85 - COHPONENT IHSTALLED IN 1984. FIRST EXAM IN 2 ND INTERVAL - 3 RD PERIOD.

PLANT LINE: 14J-SWO-125-9B FIG NO C-14 502430 SWU294 F-C VT-3 1 S-382-358, SH. 294, REV. 0 RIGID RESTRAINT F3.00 2- C F3.10, .30, .40 420, A420 3-4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 44 REV I S ION: 0 IHSERVICE IHSPECT ION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS SVC. WATER. FROM PEN. 308 311 315 8 323 FIRST SECOND THIRD I ZOHE NUMBER: ASME I PERIOD PERIOD PERIOD SEC ~ Xl I I

SUMMARY

EXAMINATION AREA CATGY HDE I OUTAGE I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO METH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK*"

PLANT LINE: 14J-SW0.125.9B FIG NO C-14 502440 SWU295 D-8 VT.3 1- S-382-358I SH. 295( REV. 0 RIGID HANGER - IWA D2.20 2- R C 420, A420 3- X 4- X 85 - COMPOHEHT INSTAI.LED IH 1984. FIRST EXAM IN 2 ND INTERVAL - 3. RD PERICO.

87 - VT ON WELDS - OK. - CJF.

502445 SWU295 F-A VT-3 1- S-382-358/ SH. 295( REV. 0 RIGID HANGER F1.00 2- F1.10, .30, .40 420, A420 3- X 4- X 502450 SWU296 F-C VT-3 1 IHS.

RIGID RESTRAINT F3.00 2- C S-382 358I SH. 296, REV. 0 420, A420 3- F3.10, .30, .40 4-88 INSIG: PIN AT STRUT TO PLATE ATTACHMENT PROTRUDES 2" OH ONE SIDE -ACCEPT .AFU 27 CLAMP IN CONTACT WITH STRUT; NO WEAR OH STRUT OR CLAMP SOME PAINI'HIPS ACCEPT GB. CLEARANCE IN COLO CONDITION AT 1/4" PER M.P.LILLEY 2-15.88 502460 SWU297 F-C Vt-3 1 S-382-358, SH. 297, REV. 0 RIGID RESTRAINT F3.00 2. R C F3.10, .30, .40 420, A420 3 .

4-85 - COMPONENT INSTALLED IN 1984. FIRSI'XAM IN 2 HD INTERVAL - 3 RD PERIOD.

502470 SWU298 F C Vt-3 1 INS.

RIGID RES'IRAINT F3.00 2- C S-382 358, SH. 298, REV. 0 420, A420 3- F3.10, .30, .40 4

88 . INSIG:S'IRUt IN CONTACT W/ CABLE TRAY 18" ABOVE CENTER LINE OF PIPE. NO APPARENT 'WEAR ON STRUT OR CABLE TRAY.

ACCEPT.- GB.

i DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 45 REVISION: 0 INSERVICE"INSPECI'ION PROGRAM PLAN CLASS 3 COMPONENI'S INSPECTION INTERVAL PLAN STATUS SVC. WATER FROM PEN. 308 311 315 8 323 I FIRST SECOND THIRD I ZOHE NUHBER: ASNE PERIOD PERIOD PERIOD SEC. XI I

SUMMARY

EXAMIHATION AREA CATGY HDE OUTAGE- - - - - - I INSTRUCT IOHS NUMBER IDENTIFICATION ITEH NO NETH [ 1 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK**

'PLANT LIHE: 14J-SWO-125-9B FIG NO C-14 502480 SWU299 D.B VT-3 1 S 382 358'H 299'EV 0

.RIGID RESTRAINT - IWA D2.20 2- R C 420, A420. 3 - X

4. X 85 - COMPONENT INSTALLED IH 1984. FIRST EXAH IN 2 HD INTERVAL - 3 RD PERIOD.

87 - V'I ON WELDS OK. CJF.

502485'WU299 F-C VT-3 1 S-382.358, SH. 299, REV. 0 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, A420 3- X 4- X 502490 SWU300 F.C VT.3 1 INS RIGID RESTRAINT F3.00 2- C S-382.358, SH. 300, REV. 0 420, A420 3- F3.10, .30, .40 4-PLANT LINE: 80-SWO- 125-9B FIG NO C-14 502500 SWU307 F C VT-3 S-382-358, SH. 307, REV. 0 RIGID HAHGER F3.00 2- C F3.10, .30, .40 420, A420 3-4 PLANT LINE: BF-SW0-125.9B FIG NO C-14 502510 SWU310 F-C VT-3 1 S-382-358, SH. 310, REV. 0 RIGID RESTRAINT F3.00 2- R C F3.10, .30, .40 420, A420 3-4-

85 - COMPONENT INSTALLED IN 1984. FIRST EXAH IN 2 ND INTERVAL - 3 RD PERIOD.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 46 REVISION: , 0 INSERVICE IHSPECTION PROGRAM PLAN CLASS 3 COMPONENTS ZONE NUMBER: 'SME SVC. WATER FROM PEN. 308 311 315 8 323 SUMHARY EXAMINATION AREA INSPECTION IHTERVAL SEC. XI CATGY, HDE I

I I

I FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD I

I I INSTRUCTIONS NUMBER IDEN'TIFICATION ITEM NO METH 1 2 3 1 2 3 4 1 2 3 I ~*CALIBRATIOH BLOCK**

PLANT LINE: BE-SWO 125 9B FIG NO C-14 502520 SWU311 F-C VT-3 1- IHS.

RIGID RESTRAINT F3.00 2- C S-382-358, SH. 311, REV. 0 420, A420 3- F3.10, .30, .40 4.

88 VT 3 i RE J I HO SNAP RING ON PI H FROM STRUT TO CLAMP TO PREVENT PIN FROM FALL ING OUT VT.3, NOREC; RE-EXAM AFTER REPAIRS OH T/C 88-0841 & NCR G88 034,SHAP RING REPLACED-ACCEPT-KK.

502530 SWU312 D-B VT-3 1 S.382-358, SH. 312, REV. 1 RIGID RESTRAINT - I'WA D2.20 2- R C 420, A420 3- X 4 X 85 . COMPONEHT IHSI'ALLED IN 1984. FIRST EXAM IH 2 HD INTERVAL . 3'RO PERIOD.

87 - Vl'H WELDS - OK. . CJF.

502535 SWU312 F-C VT-3 1 S.382-358, SH. 312, REV. 1 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, A420 3- X 4 X

DATE: 06/02/89 ROBERT E. GINHA HUCLEAR P(NER STATION UNIT 1 PAGE: 47 REVISION: 0 INSERVICE "INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS SVC. UTR.-INTERNED. BLDG. 16" 8 20" HORS. I FIRST- SECOND THIRD ' o'i ZONE NUHBER: ASME I PERIOD PERICO PERIOD 1 SEC. XI I I

SUMMARY

EXAHINATION AREA CATGY NDE - 0 U T A G E - - - - - - INSTRUCTIONS I

NUMBER ~ IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK~>>

PLANT LINE: 16C-SN0.125.9 FIG HO C-16 502700 SNU314 F-C VT-3 1 S-382-358I SN. 314, REV. 2 RIGID RESTRAINT F3.00 2- R C F3.10, .30, .40 420, A420 3-4-

85 - COMPONEN'I INSTALLED IN 1984. FIRST EXAH ~IN 20ND 'INTERVAL - 3 RD PERICO.

502710 SNU315 F-A VT-3 1 IHS.

GUIDE F1.00 2- C S-382-358 SH. 315 REV. 1 420, A420 3 - - ~ F1.10, .30, .40 4

88 - EXAMIHED BOL'TS/NUTS THAT EXTENT TO SUB-BASEMEHT.

502720 SWU316 O-B VT-3 1 S-382-358( SH. 316, REV. 1 GUIDE - IWA 02.20 2. R C 420, A420 3- X 4- X 85 COMPONENT INSTALLED IN 1984. FIRST. EXAM IN 2 ND INTERVAL - 3 RD PERIOD.

87 IHSIG: RUST ON ALL LUGS - ACCEPI' CJF. VT ON LUG MELOS OK. - CJF.

502725 SNU316 F-A V'I.3 1 S-382.358, SH. 316) REV. 1 GUIDE F1.00 2- F1.10, .30, .40 420, A420 3- X 4- X 502730 SR)317 F-C VT-3 1 INS.

RIGID RESTRAINT F3;00 2- C S-382-358, SH. 3'l7, REV. 0 420, A420 3- F3.10, .30, .40 4

88 - VT-3 REJ:NEST SlOE SHAP RIHG NOT IN PLACE, NCR G88 037 VT-3 HOREC; EXAHINEO AFTER REPAIRS. ACCEPT..SJD.

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR P(NER STATION UNIT 1 PAGE: 48 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPOHENTS INSPECTIOH IHTERVAL PLAN STATUS SVC. MTR.- INTERNED. BLDG. 16" & 20" HDRS. I FIRST SECOND THIRD I ZOHE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I I SUHHARY EXAHIHAT I ON AREA CATGY HDE I -OUTAGE--- INSTRUCTIONS NUHBER IDENT IF ICATION ITEM NO NETH I 1 2 3 1 2 3 4 1 2 3 I

    • CALI BRAT ION BLOCK**

PLANT LINE: 16C-SWO-125-9 FIG HO C-16 502740 SW318 F-C VT-3 1- S-382-358, SH. 318, REV. 0 RIGID RESTRAINT F3.00 2- C C F3.10, 30, .40 400, A401 3.

4-502750 SW319 F-C VT-3 1 INS.

RIGID RESTRAINT F3.00 2- C C S-382-358/ SH. 319I REV. 1 400, A401 3- F3.10, .30, .40 4-502760 SW320 F C VT-3 1 S-382-358, SH. 320, REV. 0 RIGID RESTRAINT F3.00 2. C F3.10, .30, .40 400, A401 3-4 502770 SW321 F-C VT-3 1- S-382-358, SH. 321, REV. 1 RIGID F3.00 2. C C F3.10, .30, .40 3.

RESTRAIHI'00, A401 4

502780 SW322 F-C VT-3 1 INS.

VARIABLE SPRING F3.00 2- C C S-382-358, SH. 322, REV. 0 400, A401 3- F3. 10, .30, .40, .50 4-88 - VARIABLE SPRING SETTING IS .75" AT 1700II, AT A TEMP. OF 54 DEG. F.

502790 SW323 D-B VT-3 S-382-358( SH. 323, REV. 0 GUIDE - IWA 02.20 2- C 400, A401 3- - X 4 - - X 502795 SW323 F-A VT.3 1 . S-382-358, SH. 323( REV. 0 GUIDE F1.00 2- F1.10, .30, .40 400, A401 3- - X 4 - - X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: ,49 REVISION: 0 INSERV ICE'il NSPECT IOH PROGRAM PLAN

.CLASS 3 COHPONENTS INSPECTION INI'ERVAL PLAH STATUS SVC. WTR.-IN'TERMED. BI.DG.16" 8 20" HDRS. I FIRST SECOHD THIRD ZONE NUHBER: ASME I PERICO PERICO PERICO SEC XI I I

SUMMARY

EXAMINATION AREA CATGY NDE I

- 0 U T A G E - - - - - - I INS1'RUCT IONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK"*

PLANT LINE: 16C-SW0.125-9 FIG NO C. 16 502800 SWU324 F-C VT-3 1 S 382-358i SH. 324, REV. 0 RIGID RESTRAINT F3.00 2- C C F3.10, .30, .40 400, A401 3-4-

502810 SWU325 F-C VT-3 1 IHS.

VARIABLE BRING F3.00 2- C S-382.358, SH. 325, REV. 1 400, A401 3- F3. 10, .30, .40, .50 4-88 - SETTING OF 1.2" 0 496 LBS. AT A TEHP. OF 54 DEG. F..

502820 SWU326 F-C VT-3 1 S.382.358, SH. 326, REV. 0 RIGID RESTRAINT F3.00 2- C C F3.10, .30, .40 400, A401 3-4 502830 SWU327 F C VT-3 1 INS.

VARIABLE SPRING F3.00 2- R C S-382.358, SH. 327, REV. 0 400, A401 3- F3.10, .30, .40, .50 4

85 - COMPONENT INSTALLED IH 1984. FIRST EXAM IN 2 ND IN'IERVAL - 3 RD PERICO.

88 VT-3, INSIG: CHIPPED PAINT-ACCEPT. KK. VT-1 PERFORMED ON WELD-ACCEPT.-RAL PLANT LIHE: 20B-SW0-125.9 FIG HO C-16 502840 SWU328 D-8 VT-3 1 S-382-358, SH. 328'EV. 0 RIGID RESTRAINT - IWA D2.20 2- R C 400, A401 3- X 4 X 85 - COMPONENT INSTALLED IN 1984. FIRST EXAM IN 2 ND IHTERVAL 3 RD PERIOD.

87 . INSIG: RUST - ACCEPT CJF. Vi'N WELD - OK CJF.

DATE: 06/02/89 ROBERT E. GIMHA NUCLEAR POMER STATIOM UNIT 1 , PAGE: 50 REVI SION: INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SVC. MTR.-INTERNED. BLDG.164 8 20" HDRS. I FIRST SECOND THIRD I ZONE MUHBER: ASHE I PERIOD PERIOD PERIOD I SEC ~ XI I I SUHHARY EXAMINATION AREA CATGY NDE OUTAGE I INSTRUC'TIONS NUMBER IDENT I F I CAT I OH ITEN NO NETH I 1 2 3 1 2 3 4 1 2 3 I *"CALIBRATIOMBLOCK**

PLANT LIME: 20B-SMO-125-9 FIG MO C-16 502845 SWU328 F-C VT.3 1- S-382-358, SH. 328, REV. 0 RIGID RESTRAINT F3.00 2- F3. 10, .30, .40 400, A401 3- X 4 X 502850 SMU329 F-C VT-3 1 I MS.

RIG!D RESTRAINT F3.00 2- C S-882-358, SH. 329, REV. 2 400, A40'I 3- F3. 10, .30, .40 4-502860 SMU330 F-C VT-3 1- S-382-358, SH. 330, REV.O RIGID RESTRAINT F3.00 2 . R C F3.10, .30, .40 400, A401 3-4-

85 - COMPONENT INSTALLED IN 1984. FIRST EXAM IH 2 ND IHTERVAL 3 RD PERIOD.

502870 SMJ331 F-C VT-3 1 S-382-358, SH. 331, REV. 0 RIGID RESTRAINT F3.00 2- R C F3.10, .30, .40 400, A401 3-4-

85 COMPONENT INSTALLED IH 1984. FIRST EXAM IH 2 HD INTERVAL - 3 RD PERIOD.

502880 SWU332 F-C VT-3 1- INS.

RIGID RESTRAINT F3.00 2- C S-382-358, SH. 332( REV. 0 400, A401 3- F3.10, .30, .40 502890 SMU333 F C VT-3 1 S-382-358, SH. 333, REV. 0 RIGID RESTRAINT F3.00 2 . C F3.10, .30, .40 400, A401 3-4 .

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POHER STATION UNIT 1 PAGE: 51 REVISION: 0 INSERVICERINSPECTION PROGRAM PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAH STATUS SVC. MTR.- INTERHED. BLDG.16" 8 20" NDRS. I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA SEC. Xr CATGY NDE I

-OUTAGE- ---- I I INSTRUCTIONS NUMBER, IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I "*CALIBRATIOH BLOCK**

PLANT LINE: 20B-SW0.125-9 FIG NO C-16 502900 SWU334 F C VT-3 1 IHS.

RIGID RESTRAINT F3.00 2- R C S.382.358( SH. 334, REV. 0 400, A401 3. F3. 10, .30, .40 4

85 - COHPONENT INSTALLED IN 1984. FIRST EXAM IH 2 HD IN'IERVAL - 3 RD PERIOD.

502910 SW335 F-C VT-3 1 S.382-358, SH. 335, REV. 0 RIGID RESTRAINT F3.00 2- C F3.10, .30, .40 400, A401 3 .

4-

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 52 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR..INTHD.BLDG.16"HD.TO PEN 312-320 I FIRST SECOHD THIRD ZONE NUHBER: ,ASME I PERIOD PERIOD PERIOD SEC. XI I I SUHHARY EXAMINATION AREA CATGY HDE I OUTAGE I INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK"*

PLANT LINE: 14E-SWO-125-9 FIG NO C-16B 502920 SWU336 F-A VT-3 1 INS.

GUIDE F1.00 2- C C - S-382-358, SH. 336, REV. 0 400, A401 3- F1.10, .30, .40 4-88 - INSIG: PIPE RUSTED WITH HINOR PITTING < 1/64"-ACCEPT.;FOAH FILLING BE'TWEEN LUGS OK-RAL.

502930 SWU337 0 8 VT-3 1 S-382-358, SH. 337, REV. 1 RIGID RESTRAINT I WA D2.20 2- C 420, 420 3- X 4- X 502935 SWU337 F-A VT-3 1 S-382-358, SH. 337, RE@. 1 RIGID RESTRAINT F1.00 2- F1.10, .30, .40 420, 420 3 . X 4- X 502940 SWU338 F.C VT-3 1 I NS.

RIGID RESTRAINT F3.00 2- C S-382.358, SH. 338, REV.

420, 420 3 . F3.10, .30, .40 4

88 . INSIG: CLAHP BOLTED IN 2 AREAS & DOUBLE NUTTED.CLAHP PINNED TO SUPPORT PLATE-ACCEPT.-KK.

502950 SWU339 F-C VT-3 1 INS RIGID RESI'RA INT F3.00 2- C S-382-358( SH. 339( REV. 2 420, 420 3- F3.10, .30, .40 4-88 - IHSIG: IHSULATION NOT REHOVED.ACCEPT.-CJF 502960 SWU340 D-B VT-3 1- S.382-358, SH. 340, REV. 0 RIGID HANGER - IWA D2.20 2- C 420, 420 3- X 4- X

DATE: 06/02/89 ROBERT ED GIHHA NUCLEAR POWER STATION UNIT 1 PAGE: 53 REVISION: 0 IHSERVICE;.INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR.- INTMD.BLDG.16+MD.TO PEN 312-320 I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I

SUMMARY

EXAHI NATION AREA CATGY HDE I OUTAGE- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 4 1 2 3 **CALIBRATION BLOCK**

PLAHT LIHE: 14E-SWD-125-9 FIG NO C-16B 502965 SWU340 F C VT.3 1 S-382-358, SH. 340, REV. 0 RIGID HANGER F3.00 2- F3.10, .30, .40 420, 420 3- X 4- X 502970 SWU341 F.C VT-3 1 S.382.358, SH. 341, REV. 0 RIGID RESTRAINT F3.00 2- F3. 10, .30, .40 420, 420 3-502980 SWU342 F.C VT-3 1 INS.

RIGID RESTRAINT F3.00 2- C S-382.358, SH. 342, REV. 0 420, 420 3- F3.10, .30, .40 4-502990 SWU343 F-C VT-3 1 S-382-358, SH. 343, REV. 0 RIGID RESTRAINT F3.00 2- C C F3.10, .30, .40 420, 420 3 4-PLANT LINE: 6H.SW0-125-9 FIG NO C-16B 503000 SWU344 D.B VT-3 1 IHS.

RIGID RESTRAIHT - IWA D2.20 2 ~ C S 382-358, SH. 344, REV. 0 420, 420 3- X 4- X 88 INSIG: VT 1, LIGHT RUST-ACCEPT.-KK.

503005 SWU344 F-C VT-3 1 S-382-358, SH. 344, REV. 0 RIGID RESTRAINT F3.00 2 F3.10, .30, .40 420, 420 3- X 4 ~ - ~

X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 54 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SVC. WTR. - INTMD.BLDG. 16" KD. TO PEN 312-320 I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI - I I

SUMMARY

EXAMINATION AREA CATGY NDE I

-OUTAGE- - - - - - I INSTRUCTIONS NUMBER IDENT I F ICATION ITEM HO HETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 6H-SWO-125-9 FIG NO C-168 503010 SWU345 F-C VT-3 1 S.382-358, SH. 345, REV. 0 RIGID RESTRAINT F3.00 2- C C F3. 10, .30, .40 420, 420 3-4 85 - NOTE: SWIVEL PAINTED.

503020 SWU346 F-C VT-3 1- INS. LADDER REQUIREOI RIGID RESTRAINT F3 F 00 2. C C S-382-358, SM. 346, REV. 0 420, 420 3- F3.10, .30, .40 4-85 - NOTE: SWIVEL PAINTED.

88 INSIG: CLAHP INSULATED.ACCEPT..CJF.

PLANT LINE: BC-SWD-125-9 FIG NO C-16B 503030 SWU368 F-C VT-3 1- S.382-358, SM. 368( REV. 0 RIGID MANGER F3.00 2- C F3.10, .30, .40 420, 420 3-4-

PLANT LINE: BA-SWO-125-9 FIG NO C-16B 503040 SWU369 F-C VT.3 1 S-382-358( SH. 369( REV. 0 RIGID RESTRAINT F3.00 2- C C F3.10, .30, .40 420, 420 3-4-

85 - NOTE: SWIVEL PAINTED.

87 - INSIG: PIN SEEHS TOO LONG ACCEPT - GB.

503050 SWU370 F.C VT-3 1 INS.

MECHANICAL SNUBBER CL-2 F3.00 2- C C S.382.358, SH. 370, REV. 0 420, 420 3- F3.10, .30, .40, .50 4-88 - SNUBBER SERIAL ¹ IS 11464 WITH A SETTING OF 2 3/8" AT A TEMP. OF 52 DEG. F..

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR P(NER STATION UNIT 1 .PAGE: 55 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR.-INTHD.BLDG.I4"KD.TO CHILL. ASB I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PER I OO SEC. XI I I SUHHARY EXAHINATION AREA CATGY NDE I

---OUTAGE- I INSTRUCTIOHS HUHBER IDENTIFICATION ITEM HO METH 3 1 2 3 4 1 2 3 I ~~CALIBRATION BLOCK*~

PLANT LIHE: 6H-SU0-125.9 FIG NO C-16A 503100 SW347 F-C VT-3 1 S-382-358, SH. 347, REV. 0 RIGID RESTRAINT F3.00 2 . R C F3.10, 30, .40

~

420, 420 3.

4-85 COMPONENT INSTALLED IN 1984. FIRST EXAM IN 2 ND INTERVAL - 3 RD PERIOD.

503110 SW348 F-C VT-3 1 IN S. P RIGID RESTRAINT F3.00 2- C S-382.358, SH. 3481 REV. 0 420, 420 3- F3. 10, .30, .40 4-88 - INSIG: INSULATION HOT REMOVED ACCEPT. COMPONENI'-CJF.

503120 SW349 D.B VT-3 1 S-382-358, SH. 349( REV. 0 RIGID SUPPORT - IWA 02.50 2- R C 420, 420 3- X 4- X 85 - COMPONENT INSTALLED IN 1984. FIRST EXAM IN 2 ND INTERVAL 3 RO PERIOD.

87 . VT ON NELDS - OK. - CJF.

503125 SW349 F.C VT-3 1 S.382.358, SH. 349, REV. 0 RIGID SUPPORT F3.00 2- F3.10, .30, .40 420, 420 3- X 4 X 503130 SW350 D-B VT-3 1 INS.

RIGID SUPPORT - IMA D2.50 2- C S-382-358, SH. 350I REV. 0 420, 420 3- X 4- X 88 . INSIG: VT 1 LIGHT RUST ON WELD ACCEPT-CJF.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 56 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS SVC. WTR. - IN TMD. BLDG. 14" ND. TO CHILL. A8B I F IRS'T SECOND THIRD I ZONE NUMBER: ASME -

[ PERIOD PERIOD PERIOD SEC. XI -

SUMMARY

EXAMINATION AREA CATGY NDE I

I

- OUTAGE- -- I INSTRUCTIONS NUHBER IDENT IF I CAT IOH- ITEH NO METH i 1 2 3 1 2 3 4 1 2 3 I ~*CALIBRATION BLOCK**

PLANT LINE: 6H-SWO-125-9 FIG NO C-16A 503135 SWU350 F-C VT-3 1 S-382-358, SH. 350, REV. 0 RIGID SUPPORT F3.00 2- F3.10, .30, .40, 420,. 420 3- X 4- X 503140 SWU351 F-C VT-3 1 S-382-358, SH. 351, REV. 0 RIGID RESTRAINT F3.00 2 . R C F3.10, .30, .40 420, 420 3-4 85 . COMPONEHT INSTALLED IN 1984. FIRST EXAM IH 2 ND INTERVAL - 3 RD PERIOD.

503150 SWU352 F-C VT-3 1 I NS.

RIGID RESTRAINT F3.00 2- R C S-382-358, SH. 352, REV. 0 420, 420 3- F3.10, .30, .40 4-85 - COMPONENT INSTALLED IN 1984. FIRST EXAH IN 2 ND IHTERVAL - 3 RD PERIOD.

88 INSIG: BOLT 9 NORTH EAST CORNER 1" HOT 3/4"-ACCEPT. KK.

503160 SWU353 F-C VT-3 1 I NS.

RIGID HANGER F3.00 2- C S.382.358( SH. 353, REV. 0 420, 420 3- F3.10, .30, .40 503170 SWU354 D-8 VT-3 1 S-382-358I SH. 354/ REV. 0 RIGID RESTRAINT - I'WA D2.20 2- R C 420, 420 3- X 4 X 85 - COMPONEHI'NSTALLED IN 1984. FIRST'XAH IN 2 ND INTERVAL - 3 RD PERIOD.

87 . INSIG: RUST ON WELD - ACCEPT - CJF. VT ON WELDS - OK.

CJF.

0

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR P(NER STATION UNIT 1 PAGE: 57 REVI SIGH: 0 IHSERVICE>>INSPECTION PROGRAM PLAH CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN SI'ATUS SVC.IJTR.-INTMD.BLDG.14"HD.TO CHILL. ASB I FIRST SECOND THIRD I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I SUMHARY EXAMIHATION AREA CATGY NDE I OUTAGE------ I INSTRUCTIONS NUMBER I DENT IF ICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 6H-SWO-125-9 FIG NO C-16A 503175 SNU354 F-C VT-3 1 S-382 358, SH. 354, REV. 0 RIGID RESTRAINT F3.00 2- F3. 10, .30, .40 420, 420 3- X 4 X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 58 REVI S ION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONEHTS ZONE NUHBER: 'SHE SVC.WTR.-INTHD.BLDG.16"& 20" HEADERS SUMHARY EXAHINATION AREA INSPECTION INTERVAL SEC. XI CATGY NDE I

I I

I FIRST PERIOD PLAN STATUS SECOND PERIOD

-OUTAGE-THIRD PERIOD I

I INSTRUCTIONS NUHBER IDENT IF I CATION ITEN NO NETH i 1 2 3 1 2 3 4 1 2 3 I **GALI BRAT ION BLOCK**

PLANT LINE: 160-SWO-125-9 FIG HO C-16 503200 SWU361 F-A VT-3 1- IHS.

GUIDE F1.00 2- R C S-382-358, SH. 361, REV. 0 420, 420 3. F1.10, .30, .40 4-85 - COMPONENT..INSTALLED IN 1984. FIRST EXAH IH 2 ND IN'IERVAL - 3 RD PERIOD.

88 INSIG: PIPE RUSTED WITH HINOR PITTING < 1/64 -ACCEPT.)FOAH FILLING BETWEEN GUIDE LUGS OK-RAL.

503210 SWU362 D-8 VT-3 1- S-382-358, SH. 362, REV. 0 RIGID SUPPORT IWA D2.50 2 C 420, 420 3- X 4 . X 503215 SWU362 F-B VT-3 1- S-382-358, SH 362(

~ REV. 0 RIGID SUPPORT F2.00 2- F2.10, .30, .40 420, 420 3- X 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 59 REVISION: 0 INSERVICE'?INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR.PUMPS A B C & 0 DISCH.SCR.HOUSE I F IRST SECOND THIRD I ZOHE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I I SUMHARY EXAMINATIOH AREA CATGY HDE I -OUTAGE- I I HSTRUCT I ONS NUMBER IDEHTIFICATIOH ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I

    • CALI BRAT ION BLOCK**

PLANT LINE: 20A-SWO-125-9 FIG NO C-17 503300 N727 D-B VT-3 I NS.

GUIDE - IWA D2.20 2- C C C SS-380-358I SH. 138 100, 110 3 X 4 X 85 - INSIG: RUST ON SADDLES 8 PLATE WELDED TO CHANHEL - ACCEPT - GB.'NSULATION'OHRCHANHELS. RESCHEDULE VT-1 TO 2 ND INTERVAL - 6 TH OUTAGE.

86 - VT-1:INSIG: WELDS RUSTEO,MISSING LEG WELDS. NO WELD ONE SIDE. HCR 86-019. WELOS SUFFICIEHT-USE AS ts PER M.P. LILLEY 3/11/86.

88 - INSIG: VT-1 ON INTEGRAL WELDS CORROSION-ACCEPT(CHIPPED PAINT OH CHANNEL WELD ACCEPT. NO APPARENT CHANGE SINCE LAST INSPECTION ON 1/86-GB.

503305 H727 F.A ,

VT.3 1- SS.380.358, SH. 138 GUIDE F1.00 2- F1. 10, .30, .40 100, 110 3X 4 X 503310 H 728 D-8 VT-3 1 I NS.

GUIDE - IWA D2.20 2- C C SS-380-3581 SH. 139 100, 110 3 - X 4 - X 86 - Vl'-1:IHSIG: ALL 'WELDS RUSTED. HISSING LEG WELDS( HO WELD ONE SIDE NCR 86 019. EXISTING WELDS ARE SUFFICIENT. USE AS IS PER M.P.LILLEY 3/11/86.

503315 N728 F-A VT-3 1 SS-380-358I SH. 139 GUIDE F1.00 2- F1.10, .30, .40 100, 110 3. X 4 . X 503320 N729 D-B VT-3 INS.

GUIDE - IWA 02.20 2 . C C SS-380-358( SH. 140 100, 110 3 -

4 .. - X X

86 VT-1:INSIG:NO WELD BOTTOM SADDLE. BOTH SIDE SADDLES 8 TOP SADDLE HISSING CENTER LEG WELDS. WELDS RUSTED. NCR 86 019. W'ELOS SUFFICIENT FOR PURPOSE INTENDED. USE AS IS PER M.P.LILLEY 3/11/86. VT-3:INSIG: CHIPPED PAINT & RUST .

ACCEPT - JO.

88 IHSIG: VT-1 INTEGRAL WELOS CORROS!ON-ACCEPT. NO APPARENT CHAHGE SIHCE LAST INSPECTION 1/86 GB.

DATE: 06/02/89 ROBER'I E. GINHA NUCLEAR POWER STATION UNIT 1 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN CLASS 3 COMPOHEHTS INSPECTION INTERVAL PLAN STATUS SVC.WTR.PUMPS A B C & 0 OISCH.SCR.HOUSE I FIRST SECOND THIRD I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD SEC. XI - I I

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE I INSTRUCTIONS HUHBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 4 1 2 3 *~CALIBRATION BLOCK**

PLANT LINE: 20A-S'W0-125.9 FIG HO C-17 503325 H729 F-A VT-3 1 SS-380.358I SH. 140 GUIDE F1.00 2- F1.10, .30, .40 100, 110 3- . X 4 - - X 503330 N730 0-B VT-3 1 IHS.

GUIDE - IWA 02.20 2- C C C SS-380-358, SH. 141 100, 110 3- X 4- X 85 - INSIG: CORROSION ON BOTTOM PROTECTIVE SADDLE & ON PLATE 'WELDED TO CNANHEL - ACCEPT GB INSULATION ON SADDLES. RESCHEDULE VT- 1 'TO 2 ND INTERVAL - 6 TH OUTAGE.

86 - VT-1:INSIG: RUSTED & CHIPPED PAINI'. TOP AND BOTH SIDE SADDLES MISSIHG. NCR 86-019. EXISTING WELDS ARE SUFFICIENT FOR SADDLES TO FUNCTION AS INTENDED. USE AS IS M.P.LILLEY 3/11/86. VT-3:INSIG: CHIPPED PAINT - ACCEPT -TS.

88 . INSIG: VT-1 INTEGRAL WELOS.RUST-ACCEPT.NO APPARENT CHANGE SINCE LAST INSPECTION ON 1/86-GB.

503335 H730 F-A VT-3 1 SS-380-358, SH. 141 GUIDE F1.00 2- F1.10, .30, .40 100, 110 3 - ~

X 4- X 503340 N731 D-8 VT.3 INS ~

GUIDE - IWA D2.20 2- C C SS-380-358, SH. 142 100, 110 3- X 4 X 86 - VT-1:IHSIG: RUST & CHIPPED PAINT. 'WELDS UNACCEPTABLE NCR 86-019. WELDS ARE SUFFICIENT FOR SADDLES TO PERFORM AS INTENDED. USE AS IS PER H.P. LILLEY 3/11/86. VT-3:INSIG: CHIPPED PAIHT .

ACCEPT TS.

503345 N731 F-A VT-3 1 SS.380-358/ SH. 142 GUIDE F1.00 2. F1.10, .30, .40 100, 110 3- X 4- X

DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR POWER STATION UNIT 1 PAGE: 61 REVISION: 0 IHSERVICENIHSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECI'ION INTERVAL .PLAN STATUS SVC.'WTR.PUMPS A B C 8 0 DISCH.SCR.HOUSE I FIRST SECOND THIRD ZOHE NUMBER: ASHE I PERIOD PERICO PERIOD SEC XI I

SUMMARY

EXAMIHAT I OH AREA CATGY NDE -OUTAGE IHSTRUCI'IONG NUMBER IDENTIFICATION ITEM NO METH I 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK~*

PLANT LINE: 20B-SWD-125-9 FIG NO C-17 503350 N732 D.B VT-3 1 INS.

GUIDE - IWA D2.20 2- C C C - SS-380-358I SH. 143 100, 110 3- X 4 . X 85 - INSIG: CORROSION ON TOP 8 BOTTOM CHANNEL 8 SADDLE & PLATE WELDED TO CHANNEL - ACCEPT - GB. INSULATIOH ON SADDLES. RESCHEDULE VT-1 TO 2 ND IHTERVAL - 6 TH OUTAGE.

86 - VT-1:IHSIG: ALL 'WELDS RUSTED. NO WELD ON CENTER LEG OF. SADDLE. HCR 86-019. EXISTING WELDS ARE SUFFICIENT FOR SADDLES TO PERFORH AS INTENDED. USE AS IS. M.P.LILLEY 3/11/86.

88 - INSIG: VT-1 OH INTEGRAL WELDS CORROSION-ACCEPT. NO APPARENT CHANGE SIHCE LAST IHSP. 1/86-GB.

503355 N732 F-A VT-3 1 SS-380-358, SH. 143 GUIDE F1.00 2- F1.10, .30, .40 100, 110 3. X 4- X 503360 H733 D-B VT-3 1 INS.

GUIDE - IWA D2.20 2- C C SS.380-358, SH. 144 100, 110 3- X 4 X 86 VT 1:INSIG:WELDS RUSTED. BOTTOM WELDS MISSING OH SIDE SADDLES. OHLY 2 WELDS ON BOTTOM SADDLE. BOTTOM SADDLE CUT 8 TAPERED. HCR 86 019. EXISTING WELD ARE SUFFICIENT USE AS IS. M.P. LILLEY 3/11/86 VT-1:IHSIG: RUST 8r CHIPPED PAINT ACCEPT - JO.

503365 N 733 F-A VT-3 1 SS-380-358, SH. 144 GUIDE F1.00 2- F1.10, .30, .40 100, 110 3- X 4- X PLANl'INE: 140-SWO 125-9 FIG NO C-17 503370 N 734 D-B VT-3 1 INS.

GUIDE I WA D2.20 2- C C SS-380-358, SH. 145 100, 110 3- X 4- X 85 - IHSIG: RUST ON ROLLER SURFACE - ACCEPT - RAL. IHSULATION OH GUIDE.

87 - REJ: ROLLER PIH OUT OF PIPE STAHD,CORROSION 8 PAINT CHIP,SOUI'M SADDLE LEG BEHT. NO CLEARANCE BETWEEN STOP 8 SADDLE. T/C 87-8'13 NRI AF'TER REPAIR ON T/C 87-813 ACCEPT- GB. VT WELD OK

DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR POWER STATION UHIT 1 PAGE: 62 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS SVC.'WTR.PUMPS A B C 8 0 OISCH.SCR.HOUSE I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I

- I SUHHARY EXAHINAY I OH AREA CATGY NDE I -OUTAGE INSTRUCTIONS NUHBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 j **CALIBRATIONBLOCK**

PLANT LINE: 14D-S'WO-125-9 FIG NO C-17 503375 N 734 F-A VT-3 1- SS-380.358I SH. 145 GUIDE F1.00 2- F1.10, .30, .40 100, 110 3- X 4- X PLANT LINE: 14C-SWO-125-9 FIG NO C-17 503380 N735 D-B VT-3 1 INS.

GUIDE - IWA D2.20 2- C SS-380.3581 SH. 145 100, 110 3- X 4- X 88 -VT-3IREJ.-FRONT WASNERS LOOSE, BOLTS 00 NOT TURN 8 NOT IN CONTACT WITH MOUNTING PLATE.VT.3(¹2);

INSIG..VT-1;CORROSION ON SIDES OF SADDLE 8 INTEGRAL WELDS,U/C<'l/32"ON SADDLE BY ROLLER ACCEPT GB. (NCR G88 028).VT-3(¹3)-EXAM.AFTER REPAIRS(ACCEPT.-GB 503385 N 735 F-A VT-3 1 SS-380.358, SH. 145 GUIDE F1.00 2- F1.10, .30, .40 100, 110 3- X 4 X PLANT LINE: 148-SWO-125-9 FIG NO C-17 503390 N736 D-B VT.3 1- INS.

GUIDE - IWA 02.20 2- C C SS-380-358, SH. 147 100, 110 3- X 4- X 85 - INSIG: RUST ON ROLLER SURFACE. LACK OF THREAD ENGAGEMENT - ACCEPT - MJS.

503395 N736 F-A VT-3 1 .SS-380.358, SH. 147 GUIDE F1.00 2- F1.10, .30, .40 100, 110 3- X 4 X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 63 REVISION: 0 IHSERVICEI'INSPECTION PROGRAH PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR.PUMPS A B C & D DISCH.SCR.HOUSE I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SUHHARY EXAMiNATION AREA SEC.

CATGY Xl NDE I

-OUTAGE ------I I INSTRUCTIONS NUHBER IDEHTIFICATIOM ITEH NO NETH 1 2 3 1 2 3 4 1 2 3 I

  • "CALIBRATION BLOCK**

PLANT LINE: 14A-SWO-125-9 FIG NO C-17 503400 H737 D.B VT-3 1 INS. NCR 86.019 GUIDE - IWA D2.20 2 . 0 0 C SS-380-358, SH. 148 100, 110 3 X 4 X 86 - IMSIG:RUST.SADDLE BENT AWAY FROM PIPE 9 TOP & BOTTOM.LEG BENI'N. CHIPPED PAINT. REJ: HISSING 'WELDS.

NORTH SADDLE FELL OFF. HCR 86-019 NOT REPAIRED IN 1986. EXAMINE IN 1987 A I & 0 - HJS.

87 Ol'HER:HOT REPAIRED ON HCR 86-0'19 EXAM!NE AFTER REPAIR OR IN 1988.

88 VT-3(NOREC1-ACCEPT.-PAL NEW SUPPORT AS PER ECN2512-210 . BASELINE EXAM. 1988 503405 N737 F-A VT.3 1 SS-380.358, SH. 148 GUIDE F1.00 2- F1.10, .30, .40 100, 110 3 X 4 X 503410 N738 O.B VT-3 1 I NS.

GUIDE - IWA 02.20 2 ~

C C SS-380.358, SH. 149 100, 110 3. X 4 X 85 - IHSIG: CORROSION ON VIBRATION ELIHINATOR - ACCEPT - GB. IHSULATED GUIDE.

87 - INSIG: RUST & CHIPPED PAINT - ACCEPT - TS. VT WELD - OK - TS.

503415 N738 F-A VT-3 1 SS-380.358, SH. 149 GUIDE F1.00 2. F1.10, .30, .40 100, 110 3 - X 4- X PLAMT LINE: 14B-SW0-125.9 FIG NO C.17 503420 N739 O-B VT-3 1 INS.

GUIDE - IWA 02.20 2- C C SS-380-358, SH. 151 100, 110 3 - . X 4 - ~ X 85 - CONDENSATIOM & 'CORROSION OM VIBRATION ELIHINATORS . ACCEPT . GB. OTHER: LOOSE HUTS OM TOP AND BOTTOM BOLTS.

REJECT - GB. INSULATED GUIDE. TROUBLE CARD.85966. LOOSE NUT REPAIRED - ACCEPT - PAL 88 - INSIG: VT-1(SURFACE RUST ACCEPT. U/C < 1/32" TOP & SIDES OF SADDLE WELD ACCEPT. HO APPARENT CHANGE SINCE LAST INSPECTION IH 1985. GB.

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 64 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR.PUMPS A B C & D DISCH.SCR.HOUSE "I FIRST SECOND THIRD I ZONE NUMBER: ASME PERIOD PERIOD PERIOD I SEC. XI -

I I

SUMMARY

EXAMINATION AREA CATGY NDE OUTAGE I INSTRUCTIONS NUMBER IDENT I F ICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK*"

PLANT LINE: 14B.SW0-125-9 FIG NO C-17 503425 H739 F-A VT-3 1- SS-380-358( SH. 151 GUIDE F1.00 2- F1.10, .30, .40 3-100, 110 4 .. - X X

PLANT LINE: 14C-SWO-125-9 FIG NO C-17 503430 N740 D-B VT-3 1 INS GUIDE - IWA D2.20 2- 0 0 C C SS-380-358, SH. 153 100, 110 3- X 4- X 86 -REJ:U/C SADDLE WELD TO PIPE.INSUFFICIEHT WELD FILL.'IIELD SPATTER. SADDLE HAS ONLY 2 LEGS. CORROSION ON WELDS.

VIBRATOR ELIMINATOR MISSING - SHOULD BE CNAHNEL. NCR 86-019 NOT REPAIRED IN 1986 - EXAMINE IN 1987 A I & 0 - MJS.

87 -OTHER:NOT REPAIRED ON NCR 86.019 EXAMINE AFTER REPAIR OR IN 1988.

88 . INSIG: VT-1 NCR-86-019 UNDERCUT<1/324 DEEP ACCEPT. GB. USE-AS IS PER M.J.LILLEY MEMO 3/86. IHSIG: CHIPPED CONCREATE-ACCEPT.-GB. NO CHANGE SINCE LAST INSPECTION 2/86.GB.

503435 N740 F-A VT-3 1 SS-380-358, SH. 153 GUIDE F1.00 2. F1.10, .30, .40 100, 110 3- X

4. X PLANT LINE: 140-SWO-125-9 FIG NO C-17 503440 N741 D-B VT-3 1 INS. HCR 86.019 GUIDE - I'WA D2.20 2- 0 0 C C SS.380-358( SH. 155 100, 110 3- X 4 X 86 - INSIG:RUST- ACCEPT - CJF. REJ: SADDLES HAVE 2 LEGSI HOT 3. UPPER RIGHT HAND CORNER LEG BOLT LOOSE. NCR 86 019 HOT REPAIRED IN 1986 - EXAMINE IN 1987 A I & O. - MJS.

87 -OTHER:NOT REPAIRED ON NCR 86-019 EXAMINE AFTER REPAIR OR IN 1988.

88 EXAM AFTER REPAIRS NCR 86 019 & T/C 87 4486 BOLT TIGHT-OK ACCEPT GB. INSIG:VT-1 RUST 9 INTEGRAL WELDS &

SADDLE LEGS-ACCEPT. U/C INSIDE SADDLE < 1/32" ACCEPT-GB. NO CHANGE SINCE LAST INSPECTION 2/86 GB.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 65 REV I S ION: 0 INSERVICEHIHSPECTION PROGRAM PLAN CLASS 3 COMPOHEHTS IHSPECT ION INTERVAL PLAN STATUS SVC.WZR.PUMPS A B C 8 0 DISCH.SCR.HOUSE I FIRST SECOND THIRD ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI - I I

SUMMARY

EXAMINATIOH AREA CATGY NDE I

- 0 U T A G E - - - - - - I INSTRUCTIOHS NUMBER'DENTIFICATION ITEM NO METH I 1 2 3 1 2 3 4 .1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 140-SWO-125-9 FIG NO C-17 503445 H741 F-A VZ-3 1 SS-380.358/ SH. 155 GUIDE F1.00 2- F1. 10, .30, .40 100, 110 3- X 4 X PLANT LINE: 14A-SWO-125-9 FIG NO C-17 503450 N742 D.B VZ-3 1 INS.

RIGID SUPPORT - IWA D2.20 2- R C C S-380-358, SH. 157 3- X 4- X 85 - IHACCESSIBLE IH 1985. RESCHEDULE TO 2 ND INTERVAL 6 TH OUTAGE ~ INSULATED.

86 - VT-1:INSIG:RUST - ACCEPT - SJD. V'I-3:INSIG: HEAVY RUST. PLATE WELDED TO SUPPORT. ALL STUDS & NUTS BENZ OUT. HCR 86-019. STUDS WILL PERFORM THEIR INTENDED FUNCTION USE AS IS. M.P.LILLEY 3/11/86.

88 - INSIG: VT-1 SURFACE RUST NOTED-ACCEPT. NO APPAREHZ CHANGE SINCE LAST INSPECTION IN 1/86 GB.

503455 N742 F-A VT-3 1 S-380-358( SH. 157 RIGID SUPPORT F1.00 2- F1.10, .30, .40 100, 110 3- X 4- X PLANT LINE: 14B-SWO 125-9 FIG NO C 17 503460 H743 D 8 VT-3 1 INS.

RIGID SUPPORT - IWA D2.20 2- C C S 380-358, SH. 158 100, 110 3- X 4 - - ~

X 86 VT-1:INSIG: HEAVY RUST ON WELD SURFACE ACCEPT SJD. Vj-3:INSIG: STUDS BENT OUTWARD. NCR 86.019 STUDS WILL PERFORM THEIR INTEHDED FUHCTION. USE AS IS. PER M.P.LILLEY 3/11/86.

88 - INSIG: VT-1 RUST NOTED-ACCEPT. NO APPAREHT CHANGE SINCE LAST INSPECTED ON 1/86 GB.

503465 H743 F.A S-380.358, SH. 158 RIGID SUPPORT F1.00 F1.10, .30, .40 100, 110 3- X 4 X

DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR POWER STATION UNIT 1 PAGE: 66 REVI S ION: 0 INSERVICE INSPEC'TION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SVC.MtR.PUHPS A B C 8 D DISCH.SCR.HOUSE I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERICO PERIOD SEC. XI -

I I SUHHARY EXAMINATION AREA CATGY HDE I


OUTAGE-- I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 14C-SWO-125-9 FIG NO C-17 503470 H744 D 8 Vt-3 1 INS.

RIGID SUPPORT - IWA D2.20 2- R C C S-380-358, SH. 159 100, 110 3- X 4- X 85- INACCESSIBLE IN 1985. RESCHEDULE TO 2 ND INTERVAL - 6 TH OUTAGE. INSULATED.

86- VT-1:IHSIG: HEAVY RUST ON MELD - ACCEPT - SJD. V'I-3:IHSIG HEAVY RUS'T.BOLTS BENT OUTWARD. 1 OVERSIZE 8 1 UNDERSIZE 'WASHER. NCR 86.019. STUDS 8 NUTS 'WILL FUHCTION SATISFACTORILY. USE AS IS H.P. LILLEY 3/11/86.

INSIG: VT-1 CORROSION 8 RUST THROUGHOUT-ACCEPT. NO APPARENT CHANGE SINCE LAST IHSP.ON 1/86-GB.

503475 H744 F-A VT-3 1 S-380-358, SH. 159 RIGID SUPPORT F1.00 2- F1.10, .30, .40 100, 110 3 . X 4- X PLANT LINE: 14D-SW0-125.9 FIG NO C-17 503480 N745 D.B V'I-3 INS.

RIGID SUPPORT - I'WA D2.20 2- R C C S-380-358, SH. 160 100, 110 3- X 4- X 85 - INACCESSIBLE IN 1985. RESCHEDULE TO 2 ND IHTERVAL - 6 TH OUTAGE. IHSULATED.

86 - VT-1:INSIG: HEAVY RUST - ACCEPT - SJD. VT-3:INSIG: BOLTS AND STUDS BENT OUTWARD NCR 86-019. STUDS WILL PERFORH THEIR IHTENDEO FUNCTION. USE AS IS H.P. LILLEY 3/11/86.

88 - INSIG: INTEGRAL MELO RUST NOTED THROUGHOUt-ACCEPT. OTHER: GOUGE ON VALVE 1 7/8"X 3/16"X 1/8"DP. U'I MALL THICKHESS 9 GOUGE 1.6".GOUGE 7.8X OF WALL,< 10K ACCEPT. HO APPARENT CHANGE SINCE LAST INSPECTION IN 1/86 GB.

503485 N745 F-A VT-3 1 S-380-358, SH. 160 RIGID SUPPORT '1.00 2 . F1.10, .30, .40 100, 110 3- X 4- X PLANT LIME: BI-S'M0-125.9 FIG NO C-17 503490 N746 D-B VT-3 1 INS.

RIGID SUPPORT - IWA D2.20 2- C C S.380.358I SH. 161 100, 110 3- X 4- X 86 - Vl'-1 INSIG: WELD 8 COHPONENT ARE RUSTED - ACCEPT - JO.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 67 REVISION: 0 INSERVICE "INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS IHSPECTION INTERVAL PLAN STATUS SVC.WTR.PUMPS A B C & 0 DISCH.SCR.HOUSE I FIRST SECOHD THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI - I I

SUMMARY

EXAMINATION AREA CATGY NDE I

-OUTAGE- - - - - -

I I HS'IRUCT IONS NUMBER IDENTIFICATION ITEM NO METH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK"*

PLANT LINE: 8l-SWO-125-9 FIG NO C-17 503495 H746 F-A VT-3 1 S-380-358, SH. 161 RIGID SUPPORT F1.00 2- F1.10, .30, .40 100, 110 3- X 4- X 503500 N747 D-B VT-3 1 IHS.

GUIDE - IWA 02.20 2- C C ~

- - C SS.380-358, SH. 163 100, 110 3 X 4 X 85 - IHSIG: CORROSIOH - SURFACE RUST ON PLATE & ROLLER STANDS- ACCEPT - GB. INSULATIOH ON SADDLES. RESCHEDULE VT-1 TO 2 ND INTERVAL - 6 TH OUTAGE.

86 - VT-1:INSIG: CHIPPED PAINT & RUST. ONE LEG OF SADDLE PULLED AWAY FROM PIPE. VT.3:INSIG: ONLY THREE LEGS AGAIHST PIPE. NCR 86 019. SADDLE HAS ONLY THREE LEGS. USE AS IS. M.P. LILLEY 3/11/86.

503505 N747 F-A VT-3 ' SS-380-358, SH. 163 GUIDE F1.00 2- F1.10, .30, .40 100, 110 3X 4 X 503510 H750 D-8 VT.3 IHS.

ANCHOR I'WA D2.20 2- 0 C SS-380-358, SH. 166 100, 110 3- X 4 - X 86 - INSIG:WELDS RUSTEO . ACCEPT - CJF. 5/8" FLAT BOLT WITH WASHER LOOSE NCR 86 019. NOT REPAIRED IN 1986. EXAMIHE IH 1987 A I & 0 - HJS.

87 -OTHER:NOT REPAIRED ON HCR 86-019 EXAHINE AFTER REPAIR OR IN 1988.

88 - VT-1:EXAH AFTER REPAIRS ON NCR 86 019 & T/C 87-4485 BOLT TIGHT-OK( ACCEPT .GB. 1 1/2"SQND BOLT LOOSE PER PRIHT.GB. RANDOM RUST-ACCEP'I GB. NO CHAHGE SINCE LAS'I IHSPECTION 2/86 GB.

503515 N750 F-A VT-3 1 SS-380-358, SH. 166 ANCHOR F1.00 2- F1. 10, .30, .40 100, 110 3 - X 4 - X

DATE: 06/02/89 REVISION: 0 ROBERt E. GINNA NUCLEAR POWER STATION UNIT

" INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COHPONEHTS 1

INSPECTION INTERVAL PLAH STATUS SVC.WTR.-INTERNED.BLDG.TO A 8 B CHILLERS I FIRST SECOND THIRD ZONE NUHBER: ASME I PERIOD PERIOD PERIOD SEC. XI I I

SUMMARY

EXAMINATION AREA CATGY NOE OUTAGE I INSTRUCTIONS NUMBER IDENT IF ICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK*~

PLAN'I LINE: 68-SWO-125-9 FIG NO C-18 503600 SWU382 - S'WH 37 F-C VT-3 1 INS.

RIGID RESTRAINT F3.00 2- C C S-382-358, SH. 382, REV. 2 420, 420 3- F3.10, .30, .40 4

85- OTHER: LOOSE NUT - REJECT PAL. INSULATED PIPE & CLAMP. 'TROUBLE CARD 85-1018. LOOSE NUt REPAIRED-ACCEPT -PAL EXAMINED AS SWH37.

SUMMARY

0 503830 88- INSIG PAINT CHIPPED' THREAD EXPOSED ACCEPTED TS 503610 SWU383 F-C VT-3 1- S-382-358, SH. 383, REV. 1 RIGID RESTRAINT F3.00 2- C F3.10, .30, .40 420, 420 3-4-

503620 SWU384 D-8 VT-3 1 S-382-358, SH. 384, REV. 1 RIGID RESTRAINT - IWA D2.20 2- R 420, 420 3X 4 X 85 - COMPONENT INSTALLED IN 1984. FIRST EXAH IN 2 ND INTERVAL - 3 RD PERICO.

87 - Vt ON WELDS OK - CJF.

503625 SWU384 F-C VT-3 1 S-382-358( SH. 384( REV. 1 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3X 4 X 503630 SWU385 - SWH 36 F-C VT-3 1 INS.

RIGID RESTRAINT F3.00 2. C C S-382-358, SH. 385, REV. 1 420, 420 3- F3.10, .30, .40 4-85 - IHSIG: INSULATION AROUND CLAMP - ACCEPT -PAL. EXAMINED AS SWH36

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 69 REVISION: 0 INSERVICEMIHSPECTIOH PROGRAH PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR..INTERMED.BLDG.TO A 8 B CHILLERS I FIRST SECOND THIRD I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I

SUMMARY

EXAMINATION AREA CATGT NDE I -OUTAGE- I I HSTRUCT I ONS NUMBER IDEHT IF I CATION ITEH NO HETH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATION BLOCK**

/

PLANT LINE: 6B-SWO-125-9 FIG NO C-18 503640 SWU386 D-B VT-3 1 IHS.

RIGID RESTRAINT - IWA D2.20 2- C C S-382-358, SH. 386, REV. 1 420, 420 3- X 4 - X 86 - VT-3: INSIG: WASHERS BETWEEN SWIVEL EYE & BRACKET - ACCEPT SJD.

503645 SWU386 F-C VT-3 S-382.358, SH. 386, REV.

RIGID RESTRAINT F3.00 2- F3.10, .30, .40 3- X 4 - X 503650 SWU387 - SWH 60 F-C VT-3 1- INS.

RIGID RESTRAIN'T F3.00 2- C C S.382-358, SH. 387, REV. 1 420, 420 3- F3. 10, .30, .40 4-85 - INSULATED PIPE AND CLAMP. EXAMINED AS SWN60.

503660 SWU388 . SWH 35 F-C VT-3 1 INS.

RIGID RESTRAINT F3.00 2- C C S.382.358, SH. 388, REV. 1 420, 420 3- F3.10, .30, .40 4-85 . Ol'HER: LOOSE NUT( STRUT TURNS - REJECT - PAL. Sl'RUT DIFFERENT FROM DRAWIHG.TROUBLE CARD 851017 INSULATED PIPE AND CLAMP. LOOSE NUT REPAIRED - ACCEPT - PAL EXAHINED AS SWH35

SUMMARY

¹ 503810 503670 SWU389 F-A VT-3 1 INS ~

GUIDE F1.00 2- C S-382-358I SH. 389, REV. 1 420, 420 3- F1. 10, .30, .40 4-503680 SWU390 D.B VT-3 1 IHS.

RIGID RESTRAINT - GUIDE . IWA D2.20 2- C S-382-358, SH. 390, REV. 1 420, 420 3- X 4 X 86 - VT-1: INSIG: RUST - ACCEPT - CJF. INSULATIOH REHOVED FOR EXAH.

88 - IHSIG: VT-1, RUST B INTEGRAL WELD-ACCEPT.GB.

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 70 REVISIOH: 0 IHSERVICE INSPECTION PROGRAM PLAN CLASS 3 COHPOHENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR.-INTERMED.BLDG.TO A 8 B CHILLERS I FIRST SECOND THIRD I 2ONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC XI I I SUHMARY EXAMINATION AREA CATGY NDE I OUTAGE- - - - - -

I INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 I <<<<CALIBRATION BLOCK<<<<

PLAHT LINE: 6B-SWO-125-9 FIG NO C.18 503685 SWU390 F-A VT-3 1 S-382-358, SH. 390, REV. 1 RIGID RESTRAINT - GUIDE F1.00 2 F1.10, .30, .40 420, 420 3 4

503690 SWU391 - SWH 33 F C VT-3 1 INS.

RIGID RESTRAINT F3.00 2- C S-382-358i SH. 391, REV. 1 420, 420 3- F3.10, .30, .40 4-85 - LOOSE HUT - STRU'I TURNS - REJECTS - PAL ~ STRUT DIFFERENT FROM DRAWING. INSULATED PIPE 8 CLAMP. TROUBLE CARD 1016. LOOSE NUl' STRUT REPAIRED ACCEPT - PAL EXAMINED AS SWH33.

SUMMARY

¹ 503790 503700 SWU392 F-A VT-3 1 S-382-358, SH. 392, REV. 1 GUIDE F1.00 2- C F1.10, .30, .40 420, 420 3-4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER ST'ATION UNIT 1 PAGE: 71 REVISION: 0 INSERVICEi INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SVC.WTR. DIESEL GEN. BLDG 8 TURBINE BLDG I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERICO PERICO PERIOD SEC ~ XI I I SUHHARY EXAHIHAT ION AREA CATGY NDE - - 0 U T A G E - - - - - - I INSTRUCTIONS I

NUHBER IDEHT IF ICATION ITEH NO METH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 6G-SW0-125.9 FIG NO C-13 503880 SWTH38 F-C VT-3 1 INS.

R!GID HANGER F3.00 2- C C S.380-358, SH. 169( REV. ?

420, 420 3- F3.10, .30, .40 4-85 - INSIG: BOTTOH OF CLAHP IS RUSTED - PAINT CHIPPED FROH PIPE CLAHP - ACCEPT PAL. INSULATED PIPE.

88 - VT-3,REJi PLATE WELDED TO TURNBUCKLE & BOTTOH EYE. PLATE CUT OFF, WELD REHAINS ON 'TURNBUCKLE AND BOTTOH EYE NCR G88-033. VT-3INOREC; RE-EXAH AFTER REPAIRS ACCEPT-PAL.

DATE: 06/02/89 ROBER'T E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 72 REVISION: 0 INSERVICE INSPECTION PROGRAN PLAN CLASS 3 COHPOHENTS INSPECTION INTERVAL AUX. FW PUNPS OISCH - INTERNED. BLDG. I F IRST I ZOHE NUNBER: ASHE I PERIOD I SEC ~ XI I I SUHNARY EXANINATION AREA CATGY NDE I 0 U T A G E I INSTRUCTIONS NUHBER IDENT IF I CAT'ION ITEN NO NETH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK"*

r PLAHT LINE: 3A-FW7-900-1B FIG NO C-1F 505000 AFU 08 D.B VT-3 1- INS.

GUIDE - RIGID RESTRAINT IWA 02.20 2. S-382-352I SH. 008, REV. 0 420, 420 3 X 4 X 505005 AFU 08 F-A VT-3 'I S-382-352, SH. 008, REV. 0 GUIDE - RIGID RESTRAINT F1.00 2 . F1.10, .30, .40 420, 420 3X 4 X 505010 AFU.09 D-8 VT-3 1 S-382-352( SH. 009, REV. 0 GUIDE - RIGID RESTRAINT - IWA 02.20 2-420, 420 3- X 4 - X 505015 AFU.09 F-A VT-3 1 S 382 352'H 009 REV 0 GUIDE - RIGID RESTRAINT F1.00 2- F1.10, .30, .40 420, 420 3- X

4. X 505020 AFU-10 F-C VT-3 1 AFU-50 GUIDE - U-BOLT F3.00 2- S-382-352( SH. 010, REV. 0 420, 420 3- F3.10, .30, .40 4-505030 AFU.11 D-8 Vl'-3 1 I NS.

VARIABLE SPRING - I'WA D2.40 2- S-382-352, SH. 011, REV. 0 420, 420 3- X

4. X 505035 AFU-11 F-C VT-3 1 S.382-352, SH. 011, REV. 0 VARIABLE SPRIHG F3.00 2- F3.10, .30, .40, .50 420, 420 3.

4-

DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR POMER STATION UNIT 1 PAGE: 73 REVISION: 0 INSERVICE~IHSPECTIOH PROGRAH PLAN CLASS 3 COHPONEN'IS INSPECTION INTERVAL PLAN STATUS

~ AUX. FW PUHPS DISCH - INTERNED. BLDG. I FIRST SECOND THIRD ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I I SUHHARY EXAHINATION AREA CATGY HDE I -OUTAGE- I INSTRUCTIONS NUHBER IDENT IF ICATION ITEH HO HETH 1 2 3 1 2 3 4 1 2 3 **CALI BRAT I OH BLOCK**

PLANT LINE: 3A-FW7.900 18 FIG NO C-1F 505040 AFU-12 F-C VT-3 1 S.382-352, SH. 012, REV. 0 RIGID RESTRAINT F3.00 2- F3. 10, .30, .40 420, 420 3 .

4-505050 AFU.13 F-C VT-3 1 S-382-3521 SH. 013, REV. 0 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3-4 505060 AFU 14 F-C VT-3 1 S-382-352, SH. 014, REV. 0 RIGID RESTRAINT F3.00 2 . F3.10, .30, .40 420, 420 3-4 '-

505070 AFU-15 F-C VT-3 1 S-382-352, SH. 015, REV. 0 RIGID RES'IRAINT F3.00 2- F3.10, .30, .40 420, 420 3.

4-505080 AFU 16 F-C VT-3 1 S-382.352, SH. 16, REV. 0 RIGID RESTRAIN'T F3.00 2- F3.10, .30, .40 420, 420 3-4-

505090 AFU.17 F-C VT-3 1 S-382-352, SH. 17I REV. 0 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3-4-

505100 AFU-18 D-8 VT-3 1- INS.

RIGID RESTRAINT - INA 02.20 2- S.382-352, SH. 18, REV. 0 420, 420 3- X 4 - X

DATE: 06/02/89 ROBERT E ~ GINHA NUCLEAR PONER STATION UNIT 1 PAGE: 74 REVI SION: 0 INSERVICE.IHSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS AUX. FM PUMPS DISCH - IMT RMED. BLDG. I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC'I I I

SUMMARY

EXAMINATION AREA CATGY HDE I

-OUTAGE------ I INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH i 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK**

PLANT LIHE: 3A-FW7-900-1B FIG HO C-1F 505105 AFU 18 F-A VT-3 S-382-352, SH. 18, REV. 0 RIGID RESTRAINT F1.00 2- F1.10, .30, .40 420, 420 3- X X

505110 AFU-19 F C VT-3 S.382.352, SH. 19, REV. 0 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3.

505120 AFU-20 F-C VT.3 S-382-352, SH. 20, REV. 0 RIGID RESTRAINT F3.00 2- F3. 10, .30, .40 420, 420 3 .

4-505130 AFU-21 F-C VT-3 S-382-352I SH. 21, REV. 0 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3-4-

PLANT LINE: 3A-FW7.900-1B FIG NO C-1C 505140 AFU.22 F-C VT-3 S-382-352, SM. 22, REV. 0 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3 .

505150 AFU.23 F-A VT-3 S-382-352, SH. 23, REV. 0 GUIDE - RIGID HAHGER F1.00 2- F1.10, .30, .40 420, 420 3-505160 AFU-24 F-C VT.3 S-382-352, SH. 24, REV. 0 RIGID RESTRAINT F3.00 2 . F3.10, .30, .40 420, 420 3 .

4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER STATION UNIT 1 PAGE: 75 REVISION: 0 IHSERVICEsiNSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS AUX. FW PUMPS DISCH - INTERNED. BLDG. I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. XI -

I I CATGY NDE I

- 0 U T A G E - - - - - - I INSTRUCTIONS ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I *~CALIBRATIOH BLOCK**

PLANT LINE: 3A-FM7.900-1B FIG NO C-1C 505170 AFU-25 F C VT-3 1 S-382-352, SH. 25, REV. 0 U BOLT F3.00 2- F3.10, .30, .40 420, 420 3-4-

505180 AFU-26 F-C VT-3 1- S-382-352, SH. 26, REV. 0 RIGID HANGER F3.00 2- F3.10, 30, .40 420, 420 3-4-

505190 AFU.27 F-C VT-3 1 S.382.352( SH 27, REV.

~ 0 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3-4-

505200 AFU-28 F.C VT-3 1 S-382-352( SH. 28, REV. 0 RIGID HANGER F3.00 2 F3. 10, .30, .40 420, 420 3-4-

505210 AFU.29 F-C VT-3 S.382.352( SH. 29( REV. 0 GUIDE - U-BOLT F3.00 2- F3. 10, .30, .40

/20, 420 3-4-

505220 AFU.99 0-8 VT-3 1 IHS.

ANCHOR - INA D2.20 2- S-382 352( SH. 99, REV. 1 420, 420 3- X 4- X 505225 AFU-99 F-A VT-3 1 S 382 352, SH. 99, REV. 1 "ANCHOR F1.00 2- F1.10, .30, .40 420, 420 3- X 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 76 REVISION: 0 'INSERVICE IHSPECT ION PROGRAH PLAN CLASS 3 COHPONENI'S INSPECTION INTERVAL PLAN STATUS AUX. FW PUMPS OISCH INTERNED. BLDG. I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATIOH AREA CATGY NDE I

I


OUTAGE--- I I INSTRUCTIONS NUHBER IDENI'IFICATION ITEN NO METH I 1 2 3 1 2 3 4 1 2 3 I

  • ICALI BRAT ION BLOCK**

PLANT LINE: 3A-FW7-900-1B FIG NO C-1C 505230 AFU-100 D-8 VT-3 1- INS.

GUIDE - ILIA D2.20 2- S-382-352, SH. 100, REV. 1 420, 420 3 . X 4- X 505235 AFU-100 F-A VT-3 1 S-382.352, SH. '100, REV. I GUIDE F1.00 2- F1.10, .30, .40 420, 420 3- X 4 X 505240 AFU.101 F-C VT-3 1 S-382-352, SH. 101, REV. 1 HECHANICAL SNUBBER F3.00 2- F3 '0, .30, .40, 50~

450, 450 3-505250 AFU-102 F-A VT-3 1 AFU-94 GUIDE F1.00 2- S-382-352, SH. 102, REV. 1 450, 450 II 3 F1.10, .30, .40 4-505260 AFU 103 F C VT.3 1 S-382-352( SH. 103( REV. I HECHANICAL SNUBBER F3.00 2. F3.10, .30, .40 450, 450 3-4 505270 AFU-104 AUG. VT.3 1 EXAMINE AS A CLASS 2 2-SUPPORI'HESE VARIABLE(SPRING) XSCR EXAHINATIOHS ARE NOT 450, 450 3 X REQUIRED BY CODE.

4 X PLANT LIHE: 3D-FW7-900-1 FIG NO C-1E 505280 AFU.30 D.B VT-3 1 IHS. AFU.35 GUIDE - RIGID RESTRAINT - IWA 02.20 2- S.382-352, SM. 30I REV. 0 420, 420 3- X 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER STATION UNIT 1 PAGE: 77 REVISION: 0 IHSERVICECINSPECT ION PROGRAM PLAN CLASS 3 COMPOHEHTS IHSPECTIOH INTERVAL PLAN STATUS AUX. F'N'PUMPS DISCH - INTERMED. BLDG. I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC XI -

~

I I CATGY HDE I -OUTAGE INSTRUCTIONS ITEH HO METH I 1 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIONBLOCK**

PLANT LINE: 3D-FM7-900.1 FIG NO C.1E 505285 AFU-30 F-A VT-3 1- S-382-352, SH. 30, REV. 0 GUIDE - RIGID F1.00 2- F1.10, .30, .40 3-RESTRAIN1'20, 420 X 4 . X 505290 AFU-31 F-C VT-3 1 AFU.45 MECHANICAL SNUBBER F3.00 2 . S.382-352, SH. 31, REV. 0 420, 420 3- F3.10, .30, .40 4-505300 AFU-32 F-A VT-3 1 AFU-53 GUIDE F1.00 2- S-382-352, SH. 32, REV. 0 420, 420 3- F1.10, .30, .40 4

505310 AFU-33 0 B VT-3. 1 IHS.

RIGID RESTRAINT - IWA 02.20 2- S-382-352I SH. 33I REV. 0 420, 420 3- X X

505315 AFU-33 F-A VT-3 1 S-382-352, SH. 33, REV. 0 RIGID RESTRAINT F1.00 2- F1.10, .30, .40 420, 420 3 . X 4 X 505320 AFU-34 F-C VT-3 1- AFU 46 MECHANICAL SNUBBER F3.00 2- S 382 352, SH. 34, REV. 0 420, 420 3- F3. 10, .30, .40 4-PLANT LINE: 30-FO7-900-1 FIG NO C-1D 505330 AFU-35 D.B VT-3 1- IHS. AFU-30 GUIDE - RIGID RESTRAINT - IWA 02.20 2- S-382-352, SH. 35, REV. 0 420, 420 3- X 4 . X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER SI'ATION UNIT 1 -PAGE: 78 REVI SIGH: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS AUX. FH PUHPS DISCH - INTERNED. BLDG. I FIRST SECOND THIRD ZONE HUHBER: ASHE I PERIOD PERIOD PERICO SEC. XI -

I I SUHHARY EXAHINATION AREA CATGY HDE I

-OUTAGE- I INSTRUCT IOHS HUHBER IDEHTIFICATION ITEH NO HETH I 1 2 3 4 1 2 3 **CALIBRATIONBLOCK PLANT LINE: 30-FW7-900-1 FIG NO C-10 505335 AFU 35 F-A VT-3 1 S-382-352, SH. 35, REV. 0 GUIDE - RIGID RESTRAINT F1.00 2- F1.10, .30, .40 420, 420 3 - X 4 - X PLANT LINE: 3E-F'N7-900-1 FIG NO C-1D 505340 AFU-36 F-C VT-3 1 S-382-352, SH. 36, REV. 0 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3 .

4-505350 AFU.37 F-C VT-3 1 S-382-352, SH. 37, REV. 0 GUIDE - U-BOLT F3.00 2. F3.10, .30, .40 420, 420 3 .

4-505360 AFU.38 F-A VT-3 1- S-382-352, SH. 38, REV. 0 GUIDE - RIGID HANGER F1.00 2- F1.10, .30, .40 420, 420 3-4-

505370 AFU.39 F-A VT-3 1 S-382-352, SH. 39, REV. 0 GUIDE . RIGID HANGER F1.00 2- F1.10, .30, .40 420, 420 3 .

4-505380 AFU-40 F-C VT-3 1- SQJ-364 RIGID RESTRAINT F3.00 2. S-382-352, SH. 40, REV. 0 420, 420 3. F3.10, .30, .40 4-505390 AFU-41 D B VT-3 1 IHS.

GUIDE RIGID RESTRAINT IWA D2.20 2- S-382.352, SH. 4II REV. 0 420, 420 3- - X 4 - - X

DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR POWER STATION UNIT 1 PAGE: 79 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN CLASS 3 COMPONEHI'S INSPECTION INI'ERVAL PLAN STATUS AUX. FW PUMPS DISCH - INTERNED. BLDG. I F IRST SECOND THIRD ZOHE NUHBER: ASHE PER I PERICO PERICO CO SEC. XI I I SUHHARY EXANINATI OH AREA CATGY NDE 0 U T A G E - - - - - - I INSTRUCTIONS I

NUHBER IDENT IF I CAT I OH ITEM HO NETH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK"*

PLANT LINE: 3E-FW7-900-1 FIG NO C-1D 505395 AFU-41 F-A VT-3 1 S-382-352, SH. 41, REV. 0 GUIDE - RIGID F1.00 2- F1.10, .30, .40 3-RESTRAINI'20, 420 - X 4 - - X 505400 AFU 42 F-C VT-3 1 ~ S-382-352, SH. 42, REV. 0 RIGID RESTRAINT F3.00 2. F3.10, .30, .40 420, 420 3-4-

505410 AFU 43 F C VT-3 1- S-382-352, SH. 43, REV. 0 RIGID RESTRAINT F3.00 2- F3. 10, .30, .40 420, 420 3-4-

PLANT LINE: 3C-F'W7.900-1 FIG NO C.1E 505420 AFU.44 F-A VT-3 1 AFU.47,AFU-52 GUIDE F1.00 2- S-382.352( SH. 44I REV. 0 420, 420 3. F1.10, .30, .40 505430 AFU.45 F.C VT-3 1 AFU-31 VARIABLE(SPR!NG) F3.00 2- S-382-352( SH. 45, REV. 0 420, 420 F3. 10, .30, .40, .50 4-505440 AFU 46 F-C VT-3 1 AFU-34 VARIABLE(SPRIHG) F3.00 2- S.382-352, SH. 46, REV. 0 420, 420 3 . F3. 10, .30, .40, .50 4-PLANT LINE: 3E-FW7.900-1 FIG NO C-10 505450 AFU-47 F.A VT-3 1 AFU.44/AFU 52 GUIDE F1.00 2- S-382-352, SH. 47, REV. 0 420, 420 3- F1.10, .30, .40 4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 80 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONEHTS INSPECTION INTERVAL PLAN STATUS AUX. FW PUHPS DISCH - INTERNED. BLDG. I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I

- I SUHHARY EXAHINATION AREA CATGY NDE I

-OUTAGE- - - - -

I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO NETH 1 2 3 1 2 3 4 1 2 3 I *~CALIBRATION BLOCK**

PLANT LINE: 3A-FW7-900-1A FIG NO C-1A 505460 AFU-48 D-8 VI'-3 1 I NS.

GUIDE - RIGID RESTRAINT - I'WA D2.20 2- S-382-352, SH. 48, REV. 0 420, 420 3 . X 4- X 505465 AFU-48 F-A VT-3 1 S-382-352, SH. 481 REV. 0 GUIDE - RIGID RESTRAINT F1.00 2 F1.10, .30, .40 420, 420 3 . X 4- X 505470 AFU-49 O.B VT-3 1 IHS.

GUIDE . RIGID RESTRAINT . IWA 02.20 2 . S-382.352( SH. 49I REV. 0 420, 420 3- X 4- X 505475 AFU.49 F A VT-3 1 S-382-352, SH. 49, REV. 0 GUIDE - RIGID RESTRAINT F1.00 2- F1.10, .30, .40 420, 420 3- X 4- X 505480 AFU.50 F-A VT-3 1 AFU-10 GUIDE F1.00 2- S-382-352, SH. 50, REV. 0 420, 420 3. F1.10, .30, .40 4-505490 AFU-51 F-C VT-3 1 S-382-352I SH. 51, REV. 0 VARIABLE(SPRING) F3.00 2 F3.10, .30, .40, .50 420, 420 3 4-505500 AFU-52 F-C VT-3 1 AFU.44IAFU-47 HECHANICAL SNUBBER F3.00 2 . S-382-352, SH. 52, REV.

420, 420 3- .30, .40, .50 0'3.10, 4-

DATE: 06/02/89 ROBERT E. GIHHA,NUCLEAR POWER STATION UNIT 1 PAGE: 81 REVISION: 0 INSERVICE'~INSPECTION PROGRAH PLAN CLASS 3 COMPONENTS I NSPEC1'ON INTERVAL PLAN STATUS AUX. FW PUMPS DISCH - INTERNED. BLDG. I FIRST SECOND 'HIRD I ZOHE HUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI I I

SUMMARY

EXAMIHAT I OH AREA CATGY NDE I


OUTAGE--- I INSTRUCTIONS NUMBER'DEN'I IF ICATION ITEM HO METH i 1 2 3 1 2 3 4 1 2 3 I

    • CALI BRAT ION BLOCK>>."

PLANT LINE: 3A-FW7-900-1A FIG NO C-1A 505510 AFU-53 F A VT-3 1 AFU-32 GUIDE F1. 00 2- S-382-352, SH. 53, REV. 0 420, 420 3- F1.10, .30, .40 4-505520 AFU 54 F-C VT-3 1 S-382-352, SH. 54, REV. 0 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420 '20, 3-4-

505530 AFU.55 F-A Vr-3 S-382-352, SH. 55, REV. 0 GUIDE F1.00 2- F1.10, .30, .40 420, 420 3-4-

505540 AFU 56 D 8 VT-3 1 INS. AFU-117 GUIDE - IWA D2.20 2- S.382.352, SH. 56, REV. 0 420, 420 3 - - X 4 - . X 505545 AFU-56 F-A VT-3 1 S-382-352( SH. 561 REV. 0 GUIDE F1.00 2- F1.10, .30, .40 420, 420 3 - - X 4 - . X 505550 AFU.105 D.B VT-3 1 I NS.

ANCHOR IWA 02.20 2 . S-382 352( SH. 105, REV. 0 450, 450 3- X 4- X 505555 AFU.105 F-A VT-3 1 S-382-352, SH. 105, REV. 0 ANCHOR F1.00 2- F1.10, .30, .40 450, 450 3-4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POMER STATION UNIT 1 PAGE: 82 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS AUX. FM PUMPS DISCH - INTERNED. BLDG. I F IRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I I SUHHARY EXAHI NATION AREA CATGY HDE (

--OUTAGE-- INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIOHBLOCK*>>

PLANT LINE: 3A-FW7.900.1A FIG NO C.1A 505560 AFU-106 F-A VT-3 AFU-118 GUIDE F1.00 2- S-382-352, SH. 106, REV. 0 450, 450 3- F1.10, .30, .40 505570 AFU-107 F-A VT-3 1 AFU-108IAFU-109 RIGID RESTRAINT F1.00 2- S-382.352, SH. 107, REV. 0 450, 450 3- F1.10, .30, .40 4-505580 AFU-108 D-8 VT-3 1 INS. AFU-107,AFU-109,AFU 119 VARIABLE(SPRING) - IHA 02.40 2. S-382-352, SH. 108, REV. 0 450, 450 3- X 4 X 505585 AFU.108 F-C VT-3 1 S-382-352, SH, 108, REV. 0 VARIABLE(SPRING) F3.00 2- F3.10, .30, .40, .50 450, 450 3- X 4- X 505590 AFU-109 AUG. VT-3 1 AFU-107,AFU-108(AFU-119 HYDRAULIC SNUBBER XSCR 2 EXAHINE AS A CLASS 2 SUPPORT 450, 450 3 . X THESE EXAMINATIONS ARE NOT 4- X REQUIRED BY CODE.

S-382-352, SH. 109, REV. 0 505600 AFU-110 AUG. VT-3 1 AFU-122,AFU-123 EXAHINE AS A VARIABLE(SPRING) XSCR 2 . CLASS 2 SUPPORT THESE 450, 450 3 . X EXAHIHATIONS ARE HOT REQUIRED 4- X BY CODE.

S.382-3521 SH. 110( REV. 0 505610 AFU-111 AUG. VT-3 AFU.123 EXANINE AS A CLASS 2 HECHANICAL SNUBBER XSCR 2- SUPPORT THESE EXAHINATIONS ARE 450, 450 3- X NOT REOUIRED BY CODE.

4- X S 382-352( SH. 111I REV. 0

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 83 REVISION: 0 INSERVICEg,INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS AUX. FW PUMPS DISCH INTERMED. BLDG. I FIRST SECOND THIRD ZONE NUHBER: ASME I PERICO PERIOD PERIOD SEC. XI I

SUMMARY

EXAMINATION AREA CATGY NDE I

-OUTAGE- - - I INSTRUCT IOHS NUMBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 5A-FW7-900-1 FIG NO C-1 505620 AFU.62 D-8 VT-3 1 IHS.

RIGID SUPPORT - IWA 02.20 2- C C - S-382-352, SH. 62, REV. 1 420, 420 3- X 4- X 85 - THIS IS A RIGID SUPPORT, NOT A GUIDE - RIGID HANGER. EXAMINED ON

SUMMARY

¹ 500010.

88 - Vl'-1 ON WELD OK, GB.

505625 AFU 62 F-A VT-3 1 - ~ S-382-352, SH. 62, REV. 1 RIGID SUPPORT F 1.00 2- F1.10, .30, .40 420, 420 3- X 4- X 505630 AFU.63 F C VT.3 I S.382-352, SH. 63, REV. 1 RIGID RESTRAINT F3.00 2- C F3. 10, .30, .40 420, 420 3-4 505640 AFU.64 F-A VT-3 1 S 382 352( SH. 64, REV. 1 GUIDE F1.00 2- C C F1.10, .30, .40 420, 420 3-4-

85 - EXAHINED OH SUHMARY ¹ 500030.

505650 AFU-65 F-C VI'-3 1 S-382-352, SH. 65, REV. 1 RIGID RESTRAINT F3.00 2- I C F3.10, .30, .40 420, 420 3-4-

505660 AFU 66 O-B VT-3 1 I NS.

RIGID RESTRAINT - IWA. 02.20 2- C C S 382-352) SH. 66( REV. 1 420, 420 3 . X 4 X 85 VT-I: INSIG: UNDERCUT 'LESS THAN 1/64" DEEP X 3/8" LONG - ACCEPT 'WSG. EXAMINED ON

SUMMARY

¹ 500050.

DATE: 06/02/89 ROBERT E ~ GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 84 REVISION: 0 INSERVICE INSPECTIOH PROGRAH PLAN CLASS 3 COMPONEN'IS INSPECTION INTERVAL PLAN STATUS AUX. FW PUMPS DISCH - IHTERMED. BLDG. I FIRST SECOND THIRD I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I CATGY NDE I -OUTAGE- INSTRUCTIONS ITEM HO METH W 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 5A-FW7-900-1 FIG NO C-1 505665 AFU-66 F.C VT.3 1 S-382-352, SH. 66, REV. 1 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3- X 4- X 505670 AFU.67 F.C VT-3 1 S-382-352( SH. 67, REV. 1 RIGID HANGER F3.00 2- C C F3.10, .30, .40 420, 420 3-4-

85 - OTHER: LOOSE NUT OH CLEVIS REJECT - RALE 'TROUBLE CARD-85954 LOOSE NUT REPAIRED ACCEPT PAL EXAMINED ON

SUMMARY

¹ 500060.

505680 AFU 68 F-C VI'-3 1 S-382-352, SH. 68, REV. 1 RIGID RESTRAINT F3.00 2 . C F3.10, .30, .40 420, 420 3 .

4 REMOVED-ACCEPTS 88 INSIG: WIRE ON CLAMP HOLDING ADJACENT PIPE)NO EFFECT OH SUPPORT,T/C TO REMOVE WIRE-ACCEPT. GB. NOREC: RE-EXAM OH 2-5-88, WIRE -CJF.

505690 AFU.69 F-A VT-3 S-382-352, SH. 69, REV. 1 GUIDE F1.00 2- C F1.10, .30, .40 420, 420 3-4 .

505700 AFU-70 F-8 VT 3 1 S-382-352, SH. 70, REV. 1 RIGID SUPPORT F2.00 2 C C F2.10, .30, .40 420, 420 3 ~

4-85 - EXAMINED OH

SUMMARY

¹ 500100.

PLANT LINE: 3H-FW7.900.1 FIG NO C.1 505710 AFU.71 F-C VT.3 1- S-382-352, SH. 71, REV. 1 RIGID RESTRAINT F3.00 2 . F3.10, .30, .40 420, 420 3-4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 85 REV I S ION: 0 INSERVICE>INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS AUX. FW PUMPS DISCH - INTERNED. BLDG. I FIRST SECOND THIRD I ZONE HUMBER: ASME I PERIOD PERIOD PERICO I SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE I

I -OUTAGE- -- I I INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO HETH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK**

PLANT LIHE: 3H-FW7-900-1 IG NO C-1 505720 AFU-72 D.B VT-3 1 INS.

RIGID SUPPORT - IWA D2.20 2- S-382-352, SH. 72, REV. 1 420, 420 3- X 4- X 505725 AFU-72 F-8 VT-3 1 S-382-352, SH. 72, REV. 1 RIGID SUPPORT F2.00 2- F2.10, 30, .40

~

420, 420 3 . X 4 . X 505730 AFU-73 F-C VT-3 1 S-382-352, SH. 73, REV. 1 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3-4-

505740 AFU-74 F C VT-3 1 S-382-352, SH. 74, REV. 1 RIGID RESTRAINT F3.00 2. F3. 10, .30, .40 420, 420 3-4-

PLANT LINE: 3J-FW7-900-1 FIG NO C-1B 505750 AFU 75 F-C VT-3 1 S.382.352, SH. 75, REV. 1 MECHANICAL SNUBBER F3.00 2. F3. 10, .30, .40, .50 420, 420 3-4 505760 AFU.76 F.C VT 3 1 S 382 352, SH. 76, REV. 1 VARIABLE(SPRING) F3.00 2- F3.10, .30, .401 .50 420, 420 3.

4 505770 AFU.77 F-A VT-3 MSU-66 GUIDE F1.00 2. S-382.352, SH. 77I REV. 1 420, 420 3. F1.10, .30, .40 4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POMER STATION UNIT 1 PAGE: 86 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS AUX. FN PUHPS OISCH - IHTERHED. BLDG. I FIRST SECOHD THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. Xi I SUHHARY EXAHIHAT I ON AREA CATGY NDE - -OUTAGE- I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK*~

PLANT LINE: 3J-FM7-900-1 FIG NO C-1B 505780 AFU-78

  • F-C VT-3 1 S-382-352, SH. 78, REV. 1 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3-4-

505790 AFU-79 F-A VT-3 1- HSU 68 GUIDE -,RIGID HANGER F1.00 2- S-382-352, SH. 79, REV. 1 420, 420 3- F1.10, .30, .40 4-505800 AFU-80 F C VT-3 1 S-382-352, SH. 80/ REV. 1 RIGID HANGER F3.00 2 F3. 10, .30, .40 420, 420 3-4 505810 AFU.90 D-B VT-3 1 INS.

ANCHOR IWA 02.20 2 . S-382-352, SH. 90, REV. 1 420, 420 3 . X 4- X 505815 AFU-90 F-A VT-3 1 S-382-352, SH. 90, REV. 1 ANCHOR F1.00 2- F1.10, .30, .40 420, 420 3- -, X 4- X 505820 AFU.91 F-A VT.3 1 SHU-390 GUIDE F1.00 2 S-382-352( SH. 91I REV. 1 420, 420 3- F1.10, .30, .40 4-505830 AFU-92 F-C VT.3 1 S-382.352, SH. 92, REV.

RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3-4

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 87 REVISION: 0 IHSERVICE'IHSPECTION PROGRAH PLAN CLASS 3 COHPOHENTS INSPECTION INTERVAL PLAN STATUS AUX. FW PUMPS DISCH - INTERNED. BLDG. I FIRST SECOND THIRD I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I SUHHARY EXAHINATIOH AREA CATGY NDE I

- OUTAGE- I IHSTRUCT IONS NUHBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK**

PLANT LIHE: 3J-FW7-900-1 FIG NO C-18 505840 AFU-93 D.B VT-3 1 . INS.

GUIDE - IWA 02.20 2- S-382-352, SH. 93, REV. 1 420, 420 3- X 4- X 505845 AFU.93 F-A VT-3 1- S-382-352, SH. 93, REV. 1 GUIDE F1.00 2 - '- F1.10, .30, .40 420, 420 3- X 4- X 505850 AFU.94 F A VT-3 1 S-382.352, SH. 94, REV. 1 GUIDE F1.00 2- F1. 10, .30, .40 450, 450 3-4 505860 AFU.95 F A VT-3 1 S-382.352, SH. 95i REV. 1 RIGID RESTRAINT F1.00 2- F1.10, .30, .40 450, 450 3-4-

505870 AFU.96 D 8 VT-3 1 INS.

RIGID RESTRAIHT - IWA D2.20 2- S-382-352, SH. 96, REV. 1 450, 450 3 - - X 4 - - X 505875 AFU.96 F-C VT-3 1 S-382-352, SH. 96( REV. 1 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 450, 450 3 - - X 4 - - X 505880 AFU.97 F-C VT-3 1 S.382-352, SH. 97, REV. 2 VARIABLE(SPRING) F3.00 2- F3.10, .30, .40, .50 450, 450 3 .

4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PRIER STATION UNIT 1 PAGE: 88 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS AUX. FW PUMPS OISCH - INTERMED. BLDG. I F IRST . SECOND 'THIRD ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC ~ XI I I CATGY NDE I

-OUTAGE- - - - I INSTRUCTIONS ITEH HO METH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBI.OCK**

PLANT LINE: 3J-FW7-900-1 FIG NO C-1B 505890 AFU-98 AUG. VT-3 1- INS. CLASS 2 SUPPORT (EXEMPT)

HECHAHICAL SNUBBER XSCR PT 2- DO PT EXAM ON ATTACHMENT WELDS 450, 450 3- X EXAH NOT REQ'D BY CODE 4- X PLANT LINE: 3F-FW7-900-1 FIG NO C-1 505900 AFU-81 F-C VT-3 1 S-382 352i SH. 81, REV. 1 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 420, 420 3.

4-505910 AFU-82 D.B VT-3 1 INS.

RIGID SUPPORT - IWA D2.20 2- S-382-352, SH. 82, REV. 1 420, 420 3- X 4- X 505915 AFU-82 F 8 VT-3 1 S-382-352, SH. 82, REV. 1 RIGID SUPPORT F2.00 2. F2.10, .30, .40 420, 420 3. X X

505920 AFU.83 F-C 1- AFU.87 RIGID RESTRAINT F3.00 2- S-382-352, SH. 83, REV.

420, 420 3- F3.10, .30, .40 4-505930 AFU-84 F-C VI'-3 1 S-382-352, SH. 84, REV. 1 RIGID RESTRAINT F3.00 2 . F3.10, .30, .40 420, 420 3 .

4 PLAHT LINE: 3G-FW7-900-1 FIG NO C.1A 505940 AFU-85 F.A VT.3 1 S.382-352, SH. 85, REV. 1

~ GUIDE F1.00 2. F1.10, .30, .40 420, 420 3.

4-

DATE: 06/02/89 ROBERT ED GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 89 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN

'CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS AUX. FW PUMPS DISCH - INTERNED. BLDG. I FIRST SECOND THIRD I ZOHE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. Xi I I SUMHARY EXAMIHATION AREA CATGY HDE - 0 U T A G E - - - - - - I INSTRUCT IONS I

NUMBER IDENTIFICATION ITEM NO METH J 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LIHE: 3G-FW7-900-1 FIG NO C-1A 505950 AFU 86 F AC VT-3 1- S-382-352, SH. 86, REV.

RIGID RESTRAINT F3.00 2- F3. 10, .30, .40 420, 420 3.

4-505960 AFU-112 D.B VT-3 'I IHS.

ANCHOR - IWA D2.20 2- S-382.352, SH 112I REV. 0 420, 420 3- - X 4 - - X 505965 AFU-112 F A VT-3 1 S-382-352, SH 1121 REV. 0 ANCHOR F1.00 2 . F1.10, .30, .40 420, 420 3- - X 4 - - X 505970 AFU.113 F-A VT-3 1 S-382-352, SH. 113I REV. 1 GUIDE F1.00 2- F1.10, .30, .40 420, 420 3-4-

505980 AFU.114 F.A VT-3 1 S-382-352, SH. 114, REV. 0 GUIDE F1.00 2- F1.10, .30, .40 420, 420 3-4-

505990 AFU.115 F-A VT-3 1 S-382-352, SH. 115, REV. 0 GUIDE F1.00 2 . F1.10, .30, .40 420, 420 3-4 506000 AFU 116 F.C VT-3 1 S-382-352, SH. 116, REV. 0 RIGID RESTRAINT F3.00 2- F3. 10, .30, .40 420, 420 ~ 3 4-

DATE: 06/02/89 ROBERT E. GINNA HUCLEAR P(QER STATION UNIT 1 PAGE: 90 REVISIOH: 0 'NSERVICE INSPECTION PROGRAH PLAN CLASS 3 COMPONEHTS INSPECTION INTERVAL PLAN STATUS AUX. F'N PUMPS DISCH - INTERMED. BLDG., I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERICO PERICO PERIOD I SEC XI -


OUTAGE------I

~ I I

SUMMARY

EXAMINATION AREA CATGY NDE I INSTRUCTIONS HUHBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I ~*CALIBRATION BLOCK**

PLANT LINE: 3G-FW7.900-1 FIG NO C-1A 506010 AFU 117 D 8 VT-3 1- INS. AFU-56 GUIDE - IWA D2.20 2- S-382-352, SH. 117, REV. 0 450, 450 3- X 4- X 506015 AFU-117 F-A VT-3 1 S-382-352( SH. 117, REV. 0 GUIDE F1.00 2- F1.10, .30, .40 450, 450 3- X 4- X 506020 AFU-118 F-A VT-3 1 AFU-106 GUIDE F1.00 2 . S-382 352, SH. 118, REV. 0 450, 450 3 . F1.10, .30, .40 4-506030 AFU 119 F C VT-3 1 AFU-IDB,AFU-109)AFU-120 RIGID RESTRAINT F3.00 2 . S-382-352( SH. 119( REV. 0 450, 450 3- F3.10, .30, .40 4

506040 AFU-120 F-C VT-3 1- AFU.119 RIGID RESTRAINT F3.00 2. S-382-352I SH. 120, REV. 0 450, 450 3- F3.10, .30, .40 4 .

506050 AFU-121 F-C VT-3 1- S.382.352, SH. 121, REV. 0 RIGID RESTRAINT F3.00 2. F3.10, .30, .40 450, 450 3-4 506060 AFU-122 F.C VT-3 1 AFU 1 10(AFU 123)AFU 124 VARIABLE(SPRING) F3.00 2- S-382.352, SH. 122, REV. 0 450, 450 3- F3. 10, .30, .40 4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 91 REVISION: 0 INSERVICE, INSPECTION PROGRAH PLAN CLASS 3 COMPONEN'fS INSPECTION INTERVAL PLAN STATUS AUX. FW PUMPS OISCH - INTERNED. BLDG. I FIRST SECOND THIRD I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I SUHMARY EXAHIHAT IOH AREA CATGY HDE I OUTAGE I INSTRUCTIONS NUHBER IDENTIFICATION ITEM NO HETH i 1 2 3 1 2 3 4 1 2 3 I

~*CALIBRATION BLOCK**

PLANT LINE: 3G-FW7-900-1 FIG NO C-1A 506070 AFU.123 AUG'T-3 1 AFU-110,AFU-111,AFU-122, 124 MECHANICAL SHUBBER XSCR 2- EXAHINE AS A CLASS 2 SUPPORT 450, 450 3- X THESE EXAMINATIONS ARE NOT 4 X REQUIRED BY CODE.

S-382-352, SH. 123, REV. 0 506080 AFU 124 AUG. VT-3 1 AFU-1101 AFU-122i AFU.123 HECHANICAL SNUBBER XSCR 2- EXAHINE AS A CLASS 2 SUPPORT 450, 450 3- X THESE EXAMINATIONS ARE NOT X REQUIRED BY CODE.

S.382-352, SH. 124, REV..O

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 92 REVISION: 0 INSERVICE 'INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STANDBY AUX FW FRM PEN 119 TO A S G FWND I FIRST SECOND THIRD I ZOHE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. Xi -

I I

SUMMARY

EXAMIHATIOH AREA CATGY NDE I

- - - - 0 U T A G E - - - - - - I INSTRUCTIONS NUMBER IDENT IF ICATION ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: INCV FIG NO C.20 507000 AFW-14 AUG'T-3 1 THESE EXAMIHATIONS ARE NOT VARIABLE(SPRING) CL 2 XSCR 2- REQUIRED BY CODE.

240, 243 3 X S.381-270, SH. 14I REV. 4 4 X 86 - INSIG: LIGHT RUST ON SUPPORT & HAHGER. NO I-:D.TAG - ACCEPT - PAL. INDICATOR OFF SCALE

- LOW. HCR 86 057. GAI CALCULATIONS FOR JUSTIFICATION. USE AS IS PER M. P. LILLEY 3/7/86.

507010 AFW-15 AUG. VT-3 1 THESE EXAMIHATIONS ARE NOT GUIDE CL 2 XSCR 2- REQUIRED BY CODE.

240, 243 3 - X S-381-270, SH..15, REV. 3 4 - X 507020 AFW-16 AUG. VT.3 1 THESE EXAMINATIOHS ARE NOT GUIDE CL.2 XSCR PT 2- R C REQUIRED BY CODE. SCAFFOLD 3-240, 243 4 .. - X X

S-381-270, SH. 16, REV. 4 88 VT 3gNOREC PTgOTHER HT TO BE PERFORHED IN LIEU OF PT ~ HTgOTHERI MT NOT PERFORHED ~ HP WOULD NOT SHEAR W/0 SCAFFOLD-SCAFFOLD NOT BUILT. RESCHEDULE TO 2ND INTERVAL 9TH OUTAGE, 1989.

507030 AFW.17 AUG. VT-3 1 THESE EXAMINATIONS ARE GUIDE CL-2 XSCR PT 2 - ~ C BY CODE.

NOI'EQUIRED 270, 270 3. X S 381 270, SH. 17, REV. 6 4 . X 507040 AFW 18 AUG. VT-3 1 THESE EXAMINATIONS ARE NOT GUIDE CL-2 XSCR 2- C REQUIRED BY CODE.

270, 270 3- X S-381-270, SH. 18, REV. 4 4 X 86 INSIG: CHIPPED PAINT ACCEP'I TS.

507050 AFW 19 AUG. VT.3 THESE EXAMINATIONS ARE NOT GUIDE CL-2 XSCR PT 2- C REQUIRED BY CCOE.

260, 263 3. X S-381-270, SH. 19, REV. 5 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 93 REVISION: 0 INSERVICEI INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STANDBY AUX F'W FRM PEN 119 TO A S G FUND I FIRST SECOND THIRD I ZOHE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I SUHMARY EXAHINATION AREA CATGY NOE - 0 U T A G E - - - - - - I I HSTRUCT I ONS NUHBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I ~~CALIBRATION BLOCK**

PLANT LIHE: INCV FIG NO C.20 507060 AFW.20 AUG. VT-3 1- THESE EXAMINATIONS ARE NOT GUIDE CL-2 XSCR PT 2- C - REQUIRED BY CODE. SCAFFOLD 260, 263 3- X S-381-270 SH. 20, REV. 4 4- X 88 -'T-3, INSIG; PAINT REMOVED FROM WELDS. ACCEPT.GB. MT, NOREC;-ACCEPT.GB (NOTE MT IN LIEU OF PT) 507070 AFW-21 AUG. VT-3 1 THESE EXAMIHATIONS ARE NOT GUIDE CL-2 XSCR PT 2- C REQUIRED BY CODE.

240, 241 3- X S-381-270H SH. 21, REV. 4 4- X 507080 AFW-32 AUG. Vr-3 THESE EXAMINATIONS ARE NOT GUIDE CL-2 XSCR 2- REQUIRED BY CODE.

240, 241 3- X S-381-270, SH. 32, REV. 3 4- X 507090 AFW-22 AUG. VT-3 1 THESE EXAMINATIONS ARE NOT GUIDE CL-2 'SCR 2 . C REQUIRED BY CODE.

260, 263 3X S.381-270, SH. 32, REV. 4 4 X 507100 AFW.23 AUG. VT-3 1 THESE EXAMINATIONS ARE NOT GUIDE CL 2 XSCR 2- C REQUIRED BY CODE ~

260, 263 3 - X S-381-270, SH. 22, REV. 3 4 . X 507110 AFW-24 AUG. VT-3 1 THESE EXAMINATIONS ARE NOT 2-GUIDE 260, 263 CL-2 XSCR PT 3 ..

4 - -

X X

C REQUIRED BY CODE.

S-381-270, SH. 23, REV. 4 507120 AFW-25 AUG. VT-3 1 THESE EXAMIHATIONS ARE NOT HYDRAULIC SNUBBER CL-2 XSCR 2- C REQUIRED BY CODE.

260, 263 3 . X S.38'1-270, SH. 25, REV. 4 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 94 REVI SION:, 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STANDBY AUX FW FRM PEN 119 TO A S G FWHD I FIRST SECOND THIRD I ZONE NUHBER: ASME PERIOD PERIOD PERIOD I SEC. XI - I I

SUMHARY EXAMIHATION AREA CATGY HDE I OUTAGE I INSTRUCTIONS NUHBER IDENTIFICATION ITEM NO METH i 1 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIOHBLOCK~*

PLANT LINE: INCV FIG NO C-20 507130 AFW-26 AUG. Vl'-3 1 THESE EXAMINATIONS ARE NOT HYDRAULIC SNUBBER CL 2 XSCR 2- C REQUIRED BY CODE. GRINNELL 260, 263 3- X S-381-270, SH. 26, REV. 4 4- X 87 - SHUBBER SETTING AT 2.9/16. CHART SETTING AT 2.1/2 - ACCEPT - CJF.

507140 AFW-27 AUG. VT-3 1 THESE EXAMIHATIONS ARE NOT HYDRAULIC SHUBBER CL-2 XSCR 2- C REQUIRED BY CODE.

260, 263 3 . X S-381-270I SH. 27, REV. 4

4. X 88 VT-3,REJ OIL DRIPPING FROM RESERVOIR. VT-3,NOREC; RE-EXAM AF'IER REPAIRi-ACCEPT..GB. SNUBBER SERIAL ¹ IS 12904 WITH A SETTIHG OF 2 3/4" AT A TEMP. OF 75 DEG. F..

507150 AFW-29 AUG. VT-3 1 THESE EXAMINATIONS ARE NOT HYDRAULIC SNUBBER CL-2 XSCR 2- C REQUIRED BY CODE.

260, 263 3- X S-381-270, SH. 29, REV. 4 4 X 507160 AFW.28 AUG. VT-3 1 THESE EXAHINATIONS ARE NOT HYDRAULIC SHUBBER CL.2 XSCR 2 REQUIRED BY CODE.

260, 263 3- X S-381.270, SH. 28, REV. 4 4- X 507170 AFW.31 AUG. VT-3 1 THESE EXAMINATIONS ARE HYDRAULIC SNUBBER CL-2 XSCR 2- 0 C HOI'EQUIRED BY CCOE. GRINNELL 260, 263 3- X S.381-270( SH. 31, REV. 3 4- X 87 -REJ:IHCORRECT SHUBBER SETTING.NCR G87.072. VT-3: SNUBBER REPAIRED AND IHSTALLED PER H-401 (R.E. GIHNA PROCEDURE) 3/17/87. PERFORM VT-3 EXAM IN 1988 A I 8 0 88 VT 3,REJ; SNUBBER LEAKING REJECT VT-3,NOREC; RE-EXAM AFTER REPAIRS ACCEPT.-GB. SNUBBER SERIAL ¹ IS 21011 WITH A SETTING OF 2 1/4" AT A TEMP. OF 78 DEG. F.

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 95 REVISION: 0 INSERVICE"INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STANDBY AUX FW FRM PEN 119 TO A S G FWND I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I SUHMARY EXAMINATION AREA CATGY NDE I

-OUTAGE---- -

I INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I *~CALIBRATION BLOCK**

PLANT LINE: INCV FIG NO C-20 507180 AFW.30 AUG. VT-3 1 THESE EXAHIHATIOHS ARE NOT VARIABLE(SPRING) CL-2 XSCR 2- C REOUIRED BY CODE.

260, 263 3X S-381-270, SH. 30, REV. 4 4 X 88 - INSIG: 'WEAR ON PIPE FROM CONTACT W/ SUPPORT-NO MEASUREABLE WALL LOSS-ACCEPT."-'GB. VARIABLE SPRING SET AT 2 1/2" WITH 672 LBS AT A TEMP. OF 74 DEG. F..

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 96 REVI SION:, 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STDBY AUX FW FRM PEN 119 - AUX FW PUMP C I FIRST SECOND THIRD I ZONE HUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI - I I

-OUTAGE -

SUMMARY

EXAHINATION AREA NUHBER IDENTIFICATION CATGY NDE ITEH HO HETH I

I 1 2312341-23 I I

INSTRUCTIONS

+*CALIBRATIOH BLOCK**

PLANT LINE: 3A-FWB-902-A FIG NO C-21 507200 AFW-51 AUG. VT.3 1- THESE EXAMINATIONS ARE NOT GUIDE CL-2 XSCR PT 2- C REQUIRED BY CODE. PAINT.

340, A340 3 X S-381-270, SH. 51; REV. 3 4 X 86 - VT-1:INSIG:GRIND MARK.ACCEPT-JO. REJ: ARC STRIKE . T/C 86.428 VT-3:REJ: CEMENT CHIPPED 7"X10"X3/4" DEEP. T/C 86.428 & 86-1079. V'I.1,VT-3 8 PT RE EXAM AFTER T/C REPAIRS - ACCEPTABLE 88 - IHSIG:INTERHITTEHT CHIPPED PAINT 8 RUST ON AHGLE IRON IN CONT'ACT W/FLOOR.-ACCEPT. GB.

507210 AFW-52 D-B VT-3 1 S-381-270I SH. 52, REV. 3 GUIDE I WA D2.20 2 C 340, A340 3- X

4. X 87 - INSIG: GROUT HISSIHG, ONE CORNER 2 1/4" X 1-1/2" ACCEPT CJF. VT ON LUG 'WELDS - OK

- CJF.

507215 AFW.52 F-A VT-3 1 S-381-270, SN. 52, REV. 3 GUIDE F1.00 2- F1. 10, .30, .40 340, A340 3; X 4 - X 507220 AFW-72 F-C VT-3 1- S-381-270, SH. 72, REV. 2 U-BOLT F3.00 2- C F3.10, .30, .40 340, A340 3-4-

507230 AFW-73 F-C VT-3 1 S 381 270i SH 73i REV 1 U BOLT F3.00 2- C F3.10, .30, .40 340, 8340 3-4-

507240 AFW-74 F AC VT-3 1 S-381-270, SH. 74( REV. 3 U BOLT F3.00 2- F3.10, .30, .40 340, 8341 3-4-

86 . INSIG: PAPER I.D. TAG - ACCEPT - JO.

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STAtION UNIT 1 PAGE: 97 REVISION: 0 INSERVICE$'INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECj'ION INTERVAL PLAN STATUS STDBY AUX FW FRH PEN 119 - AUX FW PUMP C I FIRST SECOND THIRD I 2ONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I

- I

SUMMARY

EXAHINATION AREA CATGY NDE I

-OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK**

PLANT LINE: 3A-FWB-902-A FIG NO C.21 507250 AFW-75 F-C VT-3 1 S.381-270, SH. 75, REV. 1 U BOLT F3.00 2- C F3.10, .30, .40 340, B341 3-4-

507260 AFW-76 F.C VT-3 1 S.381-270, SH. 76, REV. 1 U BOLT F3.00 2- C F3.10, .30, .40 340, 8343 3-4-

88 - Vt 3,REJ NO LOCKNUTS ON U.BOLT, INSUFFICIENT THREAD EHGAGEHENT. VT-3, IHSI G; RE-EXAH AFTER REPAIR, THREAD ENGAGEHEHT < 1 THREAD SHY- ACCEPT;COMPONENT ACCEPT..GB.

507270 AFW-77 F-C Vt-3 1- S.381-2701 SH. 77I REV. 2 U-BOLT F3.00 2- C F3.10, .30, .40 340, 8343 3-4-

507280 AFW-78 F-C Vt-3 1 S-381-270, SH. 78, REV. 2 U BOLT F3.00 2- F3.10, .30, .40 340, 8343 3 .

4-86 INSIG: PAPER I.D. TAG - ACCEPT- JO.

507290 AFW-79 F-A VT-3 1 S-381-270, SH. 79, REV. 0 GUIDE F1.00 2- C F1.10, .30, .40 340, 8344 3-4 5 07300 AFW-80 F A VT-3 1 S-381-270I SH. 80I REV. 2 F1.00 2- C F1.10, .30, .40 340, 8344 3-4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 98 REVI S ION: 0 INSERVICE INSPECTION PROGRAM PLAH CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS STDBY AUX FW FRM PEN 119 - AUX FW PUMP C I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERICO PERIOD PERIOD SEC. XI - I I

SUMMARY

EXAHIHATION AREA CATGY NDE I OUTAGE I INSTRUCTIONS NUMBER IDENT IF ICATION ITEH HO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 3A-FWB-902-A FIG NO C-21 507310 AFW-81 F-C VT-3 1- S.381-270, SH. 81, REV. 2 U BOLT F3.00 2- C F3.'IO, .30, .40 340, 8344 3-4.

507320 AFW-82 F-A VT-3 1 S-381-270, SH. 82, REV. 2 GUIDE F1.00, 2- C F1.10, .30, .40 340, D345 3-86 . IHSIG: PAPER I.D. TAG . JO.

507330 AFW-83 F-A VT-3 1 S-381-270, SH. 83, REV. 1 GUIDE F1.00 2- C F1.10, .30, .40 340, D345 3-4-

507340 AFW-84 F-A VT-3 1 S-381-270, SH. 84, REV. 3 GUIDE F1.00 2- C F1. 10, .30, .40 340, D345 3-4-

507350 AFW.85 F-C VT-3 1 S-381-270, SH. 85, REV. 2 U.BOLT F3.00 2- C F3.10, .30, .40 340, 0345 3-4-

507360 AFW.86 F-C VT-3 1 S.381-270, SH. 86( REV. 1 RIGID HANGER F3 F 00 2- F3.10, .30, .40 360, 0360 3-4.

86 - REJ: LOOSE HUTS ON PIPE CLAMP - T/C 86-309. REEXM:

RE-EXAMINATION AFTER REPAIR OH T/C 86 309.

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 99 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAH STATUS STDBY AUX FW FRM PEN 119 - AUX FW PUMP C I FIRST SECOND THIRD ZONE NUMBER: ASHE I PERIOD PERICO PERIOD SEC. XI I

SUMMARY

EXAMINATION AREA CATGY HDE I 0 U T A G E I INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 i **CALIBRATIOHBLOCK**

PLANT LINE: 3A-F'W8.902-A FIG NO C-21 507370 AFW.87 D 8 VT-3 1 S-381-270, SH. 87I REV. 2 ANCHOR - IWA D2.20 2- C 860, 860 3- X 4- X 87 - VT OH WELDS . OK. - CJF.

507375 AFW 87 F-A VT-3 1 S-381-270, SH. 87I REV. 2 ANCHOR F1.00 2. F1.10, .30, .40 860, 860 3- X 4- X 507380 AFW 88 D-B VT-3 1 S-381-270, SH. 88, REV. 2 GUIDE . IWA 02.20 2. C 860, 860 3 X 4 X 88 - VT-1 ON WELDS OK-TS.

507385 AFW-88 F-A VT-3 1- S.381-270, SH. 88, REV. 2 GUIDE F1.00 2- F1.10, .30, .40 860, 860 3 X 4 X 507390 AFW.89 F-A VT-3 1 S-381-270, SH. 89, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4-

507400 AFW-90 VT-3 1 S-381-270, SH. 90, REV. 2 GUIDE- F1.00 2- F1.10, .30, .40 860, 860 3-."-'-A 4

86 - REJ: WEAR: PAIHT WORH OFF AHD SLIGHT WEAR ON PIPE. LIGHT RUST ON UNPAINI'ED AREAS - NCR 86.018 VT-3'REEXAM:

EXAMINATION AFTER REPAIRS OH HCR 86 018 - SUPPORT IS ACCEPTABLE - GB.

DATE: 06/02/89 ROBERT E. GINNA HUCLEAR POWER STATIOH UNIT 1 PAGE: 100 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STDBY AUX FW FRH PEN 119 - AUX FW PUMP C FIRST SECOND THIRD I I

ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I I SUHHARY EXAMINATION AREA CATGY NDE I OUTAGE- - - - - -

I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 3A-FWB-902-A FIG NO C-21 507410 AFW-91 F-A VT.3 1- S-381-270, SH. 91, REV. 3 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4-

507420 AFW-92 F-A VT-3 1 S-381-270, SH. 92, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4-

88 - V'I-1 ON WELD-OK-TS.

PLANT LINE: 3A-FWB-902-A FIG NO C-22 507430 AFW-96 F-A VT-3 1 S-381-270, SH. 96, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4-

507440 AFW-95 F-A VT-3 1 S.381.270, SH. 95, REV. 2 GUIDE F1.00 2- F1. 10, .30, .40 860, 860 3-4-

86 INSIG: FLOOR AHCKOR SET INTO CEMEN'I AT AHGLE - ACCEPT - JO.

507445 AFW.120 FA VI'3 1 S-381-270, SH. 120, REV. 2 GUIDE F1.00 2 C F1.10, .30, .40 860, 860 3-4-

87 - INSIG: RUST ON GUIDE - ACCEPT CJF.

507450 AFW-94 D.B VT.3 1 S-381-270, SH. 94, REV. 3 GUIDE - IWA D2.20 . 2- C 860, 860 3- X 4- X 88 VT-1 OH WELD OK-TS.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 101 REVI SION: 0 IHSERV ICE 'INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STDBY AUX FW FRM PEN 119 - AUX FW PUMP C I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD (

SEC. XI - I I

SUHMARY EXAHINATION AREA CATGY NDE I -OUTAGE- - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH i 1 2 3 1 2 3 4 1 2 3 *~CALIBRATIOH BLOCK**

PLANT LINE: 3A-F'WB-902-A FIG NO C-22 507455 AF'W 94 F-A VT-3 1 S-381-270, SH. 94, REV. 3 GUIDE F1.00 2- F1.10, .30, .40 860, 860 3- X 4- X 507460 AFW.93 F-A VT.3 1 S-381-270, SH. 93, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3.

4-507470 AFW-122 F-A VT-3 1 S-381-270, SH. 122, REV. 2 GUIDE F1.00 2 C F1.10, .30, .40 860, 860 3-4-

86 - IHSIG: PAPER I.D. TAG FADED & TORN - ACCEPT JO.

507480 AFW 118 AUG. VT.3 1 IN ADDITION . DO VISUAL EXAM ANCHOR XSCR 2- C ON ATTACHMENT WELDS. THESE 860, 860 3 - - X EXAMINATIONS ARE NOT REOUIRED 4 - - X BY CCOE.

S-381-270, SH. 118, REV. 4 87 VI'N WELDS - OK. - CJF.

PLANT LINE: 3C-FW8-902 FIG NO C.23 507490 AFW.97 F-A VT-3 1 S-381-270I SH. 97I REV. 3 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4-

507500 AFW.98 F A VT-3 1 S-381-270, SM. 98, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATIOH UHIT 1 PAGE: 102 REVISIOH: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STDBY AUX FM FRM PEH 119 - AUX FM PUMP C I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI SUHHARY EXAHINATION AREA CATGY NDE I

I

- OUTAGE -- INSTRUCTIONS HUHBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 3C-F'W8-902 FIG NO C-23 507510 AFM 99 F A VT-3 1 S-381-270, SH. 99, .REV,. 3 GUIDE F1.00 2- F1.10, 30, .40

~

860, 860 3-4-

86 . INSIG: SLIGHI'UST IN UNPAINTED AREAS . ACCEPT KK.

507520 AFM 100 F-A VT-3 1 S-381-270, SH. 100, REV. 3 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4 507530 AF W. 101 O.B VT-3 1 . S-381-270I SH. 101( REV. 2 ANCHOR - IWA 02.20 2- C 860, 860 3- X 4- X 88 . VT-1 ON WELDS-OK.TS.

507535 AFW.101 F-A VT-3 1 S-381 270, SH ~ 101, REV. 2 ANCHOR F1.00 2- F1.10, .30, .40 860, 860 3- X 4 X 507540 AFW 102 F-A VT-3 1 S-381-270, SH. 102, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4 507550 AFW.103 F-A VT-3 1 S-381-270, SH. 103, REV. 2 GUIDE F1.00 2- F1.10, .30, .40 860, 860 3-4-

86 - IHSIG: LIGHT RUST ON UNPAINTED AREAS - ACCEPT KK.

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 103 REVISION: 0 IHSERVICE",IHSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN SI'ATUS STDBY AUX FW FRM PEH 119 - AUX FW PUMP C I FIRST SECOHD, THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I SUHMARY EXAMIHATI ON AREA CATGY NDE I OUTAGE I INSTRUCT IOHS NUMBER IOEHT IF ICATION ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK**

PLANT LINE: 3C-FWB-902 FIG HO C-23 507560 AFW-104 F-A VT-3 1 S-381-270, SH ~ 104, REV. 2 GUIDE F1.00 2. C F1.10, .30, .40 860, 860 3 .

507600 AF'W-105 F-A VT-3 1 S-381-270, SH. 105, REV. 2 GUIDE F1.00 2. F1.10, .30, .40 860, 860 3-4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 104 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STANDBY AUX FW FRM PEN 123 TO B S 0 F'WHD FIRST SECOHD THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI I SUHHARY EXAHINATION AREA CATGY'DE OUTAGE I INSTRUCTIONS HUHBER IDENT IF I CATION ITEH HO METH 1 2 3 1 2 3 4 1 2 3 I *"CAI.IBRATION BLOCX**

PLANT LINE: INCV FIG NO C-24 508000 AFW 03 AUG. VI'-3 1- THESE EXAMINATIONS ARE VARIABLE(SPRING) CL.2 XSCR 2- C BY CQOE ~

NOI'EQUIRED 240, C243 3 X S-381-270, SH. 3, REV.

4 X 86 - INSIG: LIGHT RUST ON SUPPORT AHD HANGERI HO I.D. TAG. ACCEPT - PAL.

508010 AFW 04 AUG. VT-3 1 THESE EXAMINATIONS ARE NOT GUIDE CL-2 XSCR 2- C REQUIRED BY CODE.

240, C243 3 - X S-381-270( SH. 4/ REV.

4 X 508020 AFW-05 AUG. VI'-3 1 THESE EXAMINATIONS ARE NOT GUIDE CL.2 XSCR PT 2 R C REQUIRED BY CODE. SCAFFOLD 240, C243 3- - X S-381-270, SH. 5, REV.

4 - - X 88 - VT.3,NOREC; PT,OTHER; MT TO BE PERFORMED IN LIEU OF PT. MT, OTHER; MT NOT PERFORMED. HP WOULD NOT SMEAR W/0 SCAFFOLD. SCAFFOLD HOT BUILT-RESCHEDULE TO 2ND INTERVAL 9TH OU'TAGE, 1989.

508030 AF'W-06 AUG. VT-3 1 THESE EXAMINATIONS ARE NOT GUIDE CL.2 XSCR 2- C REQUIRED BY CODE.

240, C243 3- X S.381-270, SH. 6, REV.

4 X 508040 AFW-07 GUIDE 240, C243 CL-2 AUG.

XSCR PI'-3.

VT-3 C

THESE EXAMINAI'IOHS ARE NOT REQUIRED BY CODE.

S.381-270, SH. 7, X REV.

4 . X 508050 AFW-08 AUG. VT-3 1- THESE EXAMINATIONS ARE GUIDE CL.2 XSCR PT 2- C BY CODE.

NOI'EQUIRED 260, 0262 3- X S-381-270, SH. 8, REV.

4 X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 105 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONENI'S INSPECTION INTERVAL PLAN STATUS STANDBY AUX FW FRH PEN 123 TO 8 S G FWHD I FIRST SECOND ,

THIRD ZONE HUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I I SUHHARY EXAMIHATI OH AREA CATGY HDE OUTAGE I IHSTRUCT IONS NUHBER IOEHTIF ICATIOH ITEH NO NETH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK**

PLANT LINE: INCV FIG NO C-24 508060 AFW 09 AUG. VT-3 1 THESE EXAHIHATIONS ARE NOT GUIDE CL-2 XSCR 2 C REQUIRED BY CODE.

260, D262 3- X S-381-270, SH. 9, REV.

4- X 88 INSIG: CHIPPED PAINT-ACCEPT. GB.

508070 AF'W 10 AUG. VT-3 1 THESE EXAHINATIONS ARE NOT HYDRAULIC SNUBBER CL-2 XSCR 2- C REQUIRED BY CODE.

260, D262 3- X S-381-270, SH. 10, REV.

4 X 508080 AFW.11 AUG. VT-3 1 THESE EXAHINATIONS ARE NOT VARIABLE(SPRING) CL-2 XSCR 2 . REQUIRED BY CODE.

260, 0262 3- X S-381-270i SH. 11, REV.

4- X 86 - INSIG: PAINT CHIPPED - ACCEPT - JO.

508090 AFW-13 AUG. VT-3 1 THESE EXAHINAI'IONS ARE NOT HYDRAULIC SHUBBER CL-2 XSCR 2- C REQUIRED BY CODE. GRINNELL 260, 0262 3 X S-381-270i SH. 13I REV.

4 X 87 . SHUBBER SET AT 4-1/2" 508100 AF W-12 AUG. VT-3 1- THESE EXAHINATIONS ARE HOI' GUIDE CL-2 XSCR 2- REQUIRED BY CODE.

260, D262 3. X S-381-270, SH. 12, REV. 4 4 - X 88 .INSIG:LEFT WASHER BENT HUI'AS COHPLETE CON'IAC'I WITH WASHER)CHIPPED PAINT-INTERHIT'TENT ACCEPT-GB.

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 106 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3'COMPONENTS IHSPECTION INTERVAL PLAN STATUS STDBY AUX FW FRM PEN 123 - AUX FW PUMP D I FIRST SECOND '

THIRD I ZONE NUMBER:- ASME I PERIOD PERIOD PERIOD I SEC. XI

--OUTAGE--- --

I I

SUMMARY

EXAMIHAT I OH AREA CATGY NDE I I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANI'INE: 3A-FW8.902-B FIG NO C-25 508146 AFW-51 F-A VT-3 1 S-381-270, SH. 51I REV. 3 GUIDE F1.00 2- F1.10, .30, .40 340, A340 3-4-

508148 AFW-52 F-A VT-3 1 S 381 270'H 52'EV 3 GUIDE F1.00 2- F1.10, .30, .40 340, A340 3-4-

508150 AFW-53 F.A VT.3 1 S-381-270, SH. 53, REV. 0 U BOLT F1.00 2. C F1.10, .30, .40 340, A340 3.

4-86 - INSIG: NO I.D. TAG - ACCEPT - SJD.

508160 AFW-54 F-A VT-3 1 S-381-270, SH. 54, REV. 0 GUIDE F1.00 2- C F1.10, .30, .40 360, A360 3 .

4 508170 AFW 55 F A VT-3 1 S-381-270) SHY'5, REV. 1 GUIDE F1.00 2- C F1.10, .30, .40 360, A360 3-4-

508180 AFW 56 0-8 VT-3 1 S-381-270, SH. 56, REV. 1 GUIDE - I'WA 02.50 2 . C 360, A360 3 . X 4 X e

508185 AFW-56 F-A VT-3 1 S.381-270, SH. 56, REV. 1 GUIDE F3.00 2. F3.10, .30, .40 360, A360 3. X 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 107 REVI S I OH: 0 INSERVICE.INSPECTION PROGRAH PLAN CLASS 3 COHPONEHTS INSPECTION INTERVAL PLAN STATUS STDBY AUX FM FRH PEH 123 - AUX FW PUHP D I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC ~ XI I I SUHHARY EXAHIHAT ION AREA CATGY NDE I -OUTAGE- - - - - - I INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO HETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 3A-FWB-902-8 FIG NO C-25 508190 AF'M.57 F-A VT-3 1 BINOCULARS.

GUIDE F1.00 2- C S-381-270, SN. 57, REV. 0 360, A360 3- F1.10, .30, .40 4-86 - BINOCULARS USED FOR EXAH.

508200 AFM-58 F-A VT-3 1- S-381.270, SN. 58, REV. 0 GUIDE F1.00 2 . C F1.10, .30, .40 360, A360 3 .

4 508210 AFW.59 F-A VT-3 1 BIHOCULARS NEEDED.

GUIDE F1.00 2- C S-381-270, SH. 59, REV. 0 360, B360 3. F1.10, .30, .40 4-508220 AFM-60 F-A VT-3 1 S.381-270, SN. 60( REV. 0 GUIDE F1.00 ~ 2- C F1.10, .30, .40 360, 8360 3-4-

508230 AF'M 61 F-A VT-3 1 8 INOCULARS.

GUIDE F1.00 2- C S-381-270( SH. 61I REV. 0 360, 8360 3- F1.10, .30, .40 4-86 - BINOCULARS USED FOR EXAM.

508240 AFW 62 0 8 VT-3 1 S.381-270, SH. 62, REV. 0 GUIDE - IWA 02.50 2 . C 360, 8360 3. X 4- X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE:

REVISION: 0 INSERVICE IHSPECT ION PROGRAM PLAH CLASS 3 COHPOHENTS INSPECTION INTERVAL PLAN STATUS STDBY AUX FW FRM PEN 123 - AUX FW PUMP 0 I F IRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I

-- I SUHMARY EXAMINATION AREA CATGY NDE --OUTAGE---- INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO HETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATlONBLOCK**

PLANT LINE: 3A-FW8-902.8 FIG NO C-25 508245 AFW-62 F-A VT 3 1 S-381-270, SH. 62, REV. 0 GUIDE F1.00 2- F1.10, .30, .40 360, 8360 3- X 4 X 508250 AFW.63 F-A VT-3 1 BINOCULARS NEEDED.

GUIDE F1.00 2 C S-381-270, SH. 63, REV. 0 360, 8360 3- F1.10, .30, .40 4

508260 AFW 64 F-A VT-3 1 S.381-270( SH. 64/ REV. 0 GUIDE F,1.00 2. C F1.10, .30, .40 360, 8360 3-4 508270 AFW.65 F-A VT-3 1 BINOCULARS.

GUIDE F1.00 2- C S-381-270, SH. 65, REV. 0 360, 8360 3. F1.10, .30, .40 4

86 . BINOCULARS USED FOR EXAH.

508280 AFW-66 F.A VT-3 1 S.381-270, SH. 66, REV. 0 GUIDE F1.00 2- C F1.10, .30, .40 360, B360 3-4-

508290 AF'W 67 F A VT-3 1 BIHOCULARS HEEDED.

GUIDE F1.00 2- C S.381.270, SH. 67, REV. 0 360, 8360 3. F1.10, .30, .40 4-508300 AFW.68 D-8 VT-3 1 S.381-270, SH. 68I REV. 1 GUIDE - I'WA D2.20 2- C 360, 8360 3- X 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 109 REVISION: 0 .INSERVICE"INSPECTION PROGRAH PLAN CLASS 3 COHPOHEHTS INSPECTION IN'IERVAL PLAN STATUS STDBY AUX F'W FRM PEN 123 - AUX FW PUMP 0 I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC XI

~

I

SUMMARY

EXAHINATION AREA CATGY NDE I

-OUTAGE--- I INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH '

1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK**

PLANT LINE: 3A-FWB-902-B FIG NO C-25 508305 AFW-68 F-A VT-3 1- S-381-270, SH. 68, REV. 1 GUIDE F1.00 2- F1.10, .30, .40 360, 8360 3- X 4- X 508310 AFW-69 F-A VT-3 1 S.381-270( SH. 69, REV. 2 GUIDE F1.00 2 . F1.10, .30, .40 360, C360 3-4.

~ 86 INSIG NOT PAINTED. PAPER I ~ D. TAG - ACCEPT . JO.

508320 AFW.70 F-A VT-3 1- S-381-270, SH. 70, REV. 1 GUIDE F1.00 2- C F1.10, .30, .40 360, C360 3-4 87 - EXAMINED FROM HAH-LIFT DUE TO RESTRICTIONS - ACCEPT - TS.

508330 AFW-71 F-A VT-3 1 S-381-270( SH. 71, REV. 3 RIGID HAHGER F1.00 2- C F1.10, .30, .40 360, C360 3.

4-88 - INSIG: LIGHT RUSf THROUGHOUT.-ACCEPT. RAL.

508340 AFW-116 D-B VT-3 1- S-381-270I SH. 116, REV. 1 ANCHOR - IWA D2.20 2 C 860, 860 3- X 4- X 508345 AFW.116 F.A VT 3 1 S.381-270, SH. 116, REV. 1 ANCHOR F1.00 2- F1.10, .30, .40 860, 860 3 . X 4- X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UHIT 1 PAGE: 110 REV I SION: 0 IHSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONEHTS INSPECTION INTERVAL PLAN STATUS STDBY AUX FW=FRM PEN 123 - AUX FW PUMP D I FIRST SECOND THIRD I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI SUHHARY EXAMINATION AREA CATGY NDE I

I

- -OUTAGE- - - -- I INSTRUCTIONS NUHBER IDENTIFICATION ITEM HO HETH 1 2 3 1 2.3 4 1 2 3 I <<*CALIBRATION BLOCK**

PLANT LINE: 3A-FWB-902-B FIG NO C-25 508350 AF'W-115 F-A VT-3 1 S-381-270, SH ~ 115, REV. 2 GUIDE F1.00 2- F1.10, .30, .40 860, 860 3-4-

86 - INSIG: PAINT HISSING ON UHDERSIDE OF BRACKET ACCEPT - SJD.

508360 AFW 119 F-A VT.3 1 S-381-270, SH. 119, REV. 2 GUIDE F1.00 2 C F1.10, .30, .40 860, 860 3-4 508370 AFW-114 F A VT-3 1 LADDER REQUIRED.

GUIDE F1;00 2- C S-381-270, SH. 114( REV. 3 860, 860 3- F1.10, .30, .40 4-508380 AFW-113 F.A VT.3 1 S-381-270, SH. 113, REV. 3 GUIDE F1.00 2. C F1.10, .30, .40 860, 860 3-4.

508390 AFW-112 F-A VT.3 1- S-381-270, SH. 112, REV. 4 GUIDE, F1.00 2 F1.10, .30, .40 860, 860 3-4 86 - INSIG: NO PAINT AT PIPE TO GUIDE COHTACI'REA . ACCEPT -SJD.

508400 AFW-111 F-A VT-3 1 S-381-270I SH. 111( REV. 3 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3.

4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UHIT 1 PAGE: 111 REVISIOH: 0 IHSERVICE 'INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS IHSPECTION IHTERVAL PLAN STATUS STDBY AUX FW FRM PEN 123 - AUX FW PUMP D I SECOND THIRD I FIRST'ONE NUMBER: ASME PER I CO PERICO PERIOD I SEC. XI I I

SUMMARY

EXAMINATION AREA CATGY NDE I OUTAGE- I INSTRUCTIONS NUMBER IDEHT IF ICATION ITEM NO METH i 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK**

PLANT LINE: 3A-FWB-902-B FIG NO C-25 508410 AFW.110 F-A VT-3 1 S.381-270, SH. 110, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4-

PLANT LINE: 3A-FW8-902.8 FIG NO C-22 508420 AFW-109 F-A VT-3 1 S 381-270, SH. 109, REV. 2 GUIDE F1.00 2. C F1.10, .30, .40 860, 860 3-4 508430 AF'W-108 F-A VT-3 1 S-381-270, SH. 108, REV. 2 GUIDE F1.00 2- F1.10, .30, .40 860, 860 3.

4-86 - IHSIG: PAINT MISSING FROM UNDERSIDE OF ANGLE IRON - ACCEPT - MJS.

508435 AFW.121 F-A VT.3 1 S-381-270, SH. 121, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3 .

4-87 - INSIG:CRACK IH WALL AT GUIDE ANCHOR BOLT - ACCEPT - CJF.

508440 AFW-107 0-e VT.3 1 S-381-270, SH ~ 107, REV. 2 GUIDE - IWA D2.20 2- C 860, 860 3- X 4- X 88 - VT-1 ON WELDS-OK- TS.

508445 AFW-107 F-A VT-3 1 S-381-270, SH. 107, REV. 2 GUIDE F1.00 2 . F1.10, .30, .40 860, 860 3- X 4- X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UHIT 1 PAGE: 112 REVI S ION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONEHI'S INSPECTION INTERVAL PLAN SI'ATUS STDBY AUX FW FRM PEH 123 AUX FW PUMP 0 I FIRST SECOND THIRD I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I

SUMMARY

EXAMINATION AREA CATGY HDE I


OUTAGE--- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK**

PLANT LINE: 3A-FWB-902-B FIG NO C-22 508450 AFW-106 F-A VT-3 1 S-381-270, SH. 106, REV. 2 GUIDE F1.00 2. C F1.10, .30, .40

--C60( 860 3-4 .

508460 AFW.123 F A VT-3 1 S-381 270( SH. '123, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4-

PLAHT LIHE OUTCV FIG NO C-22 508470 AFW.117 AUG. VT-3 1 IH ADDITION - DO VISUAL EXAM ANCHOR XSCR 2. C ON ATTACHMENT WELDS. THESE 860, 860 3. X EXAMINATIONS ARE NOT REOUIRED 4- X BY CODE.

87 VT ON WELDS - OK. - CJF.

PLANT LIHE: 3C-F'W8.902 FIG HO C-23 508480 AFW 105 F A VT.3 1 S-381-270( SH. 105, REV. 3 GUIDE F1.00 2 C f1.10, .30, .40 860, 860 3-4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POMER STATION UNIT 1 PAGE: 113 REVISION: 0 INSERVICE, INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECT ION INTERVAL PLAN STATUS TURBINE DRIVEH AUX. FU PUMP SUCTION I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I

SUMMARY

EXAHINATIOH AREA CATGY NDE -OUTAGE INSTRUCTIONS NUMBER IDENT I F I CAT I OH ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 **CALI BRAT ION BLOCK**

PLANT LINE: 4A-SWO-125-1B FIG NO C-16 508500 AFU.01 AUG. VT.3 1- IHS. THESE EXAMINATIONS ARE RIGID RESTRAINT - U BOLT XSCR 2- C NOT REQUIRED BY CODE.

420, 420 3- X S-382-352) SH. 1, REV. 1 4-88 - IHSIG: LIGHT RUST-ACCEPT-KK 508510 AFU-02 AUG. VT-3 1 INS. THESE EXAMIHATIONS ARE RIGID RESTRAINT XSCR 2- C NOT REQUIRED BY CODE.

420, 420 3- X S-382-352, SH. 2, REV. 1 4-508520 AFU 03 AUG. Vl' 1 INS. THESE EXAMINATIONS ARE MECHANICAL SNUBBER XSCR 2- C HOT REQUIRED BY CODE.

420, 420 3- X S-382-352, SH. 3, REV. 1 4

88 - SNUBBER SERIAL ¹ IS 20925 AHD HAS A SETTING OF 24 AT A TENT OF 69 BEGS F. NOREC:-ACCEPT-JQ.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 114 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS A 1L B MOTOR DRIVEN AUX. FW PUMP SUCTION I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I I SUMHARY EXAMINATION AREA CATGY NDE I OUTAGE I INSTRUCTIONS NUHBER IDENT I F I CATION ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 I *"CALIBRATION BLOCK**

PLANT LINE: 4D.CD.150-1 FIG NO C-33 508600 SWU.284 AUG. VT-3 1- INS. THESE EXAHINATIONS ARE RIGID RESTRAIHT XSCR 2- C HOT REQUIRED BY CODE.

420, 420 3- X S-382-358, SH. 284, REV. 1 4 X 508610 SWU-285 AUG. VT-3 1 INS. THESE EXAMINATIONS ARE RIGID RESTRAINT XSCR 2- C NOT REQUIRED BY CCOE.

420, 420 3- X S-382 358, SH. 285, REV. 1 4 - X PLANT LINE: 4C.CD-150-1 FIG NO C-33 508620 SWU.286 AUG. VT.3 1 INS. THESE EXAMINATIONS ARE U.BOLT XSCR 2 C NOT REQUIRED BY CODE.

401, 401 3 - - X S.382-358, SH. 286, REV. 1 4 - - X 508630 SWU-287 AUG. VT-3 IHS. THESE EXAMIHATIONS ARE RIGID RESTRAINT XSCR 2- C NOT REQUIRED BY CODE.

420, 420 3- X S-382-358I SH. 2871 REV. 1 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 115 REVISION: 0 INSERVICE'NSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION IHTERVAL PLAN STATUS STDBY AUX. FW SW SUPPLY TO SAFW PUMP C I FIRST SECOND THIRD ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I I

SUMMARY

EXAHINATION AREA CATGY NDE OUTAGE I INSTRUCTIONS NUMBER IDENTIFICATION ITEH HO METH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 4A-FWB-152-A FIG NO C-26 508700 SW-95 F-C VT-3 1 S-381-264, SH. 95, REV. 3 RIGID RESTRAINT F3.00 2- F3.10, .30, .40 340, 0340 3-4-

86 - INSIG: STICK-ON PAPER I.D. TAG . ACCEPT - JO.

508705 SW-96 F-A VT-3 1 INS.

GUIDE F1.00 2- C - - S-381-264, SH. 96, REV. 2 340, D340 3. F1.10, .30, .40 4 .

508710 SW-97 F-A VT-3 1 INS.

GUIDE F1.00 2 . C S-381 264I SH. 97I REV. 3 340, D340 3 . F1.10, .30, .40 4

508715 SW.98 F-A VT-3 1 INS.

GUIDE F1.00 2. C S-381-264, SH. 98, REV. 2 340, D340 3 . F1.10, .30, .40 4-508720 SW-99 F-A VT-3 1 S-381-264, SH. 99, REV. 2 GUIDE F1.00 2 . F1.10, .30, .40 340, D340 3.

4-86 - INSIG: BASE PLATE - 1/16" SHIM SOUTHWEST CORNER. PAPER I.D. TAG - ACCEPT CJF.

508725 SW-100 F A VT-3 1 INS.

GUIDE F1.00 2. C S-381 264, SH. 100i REV. 2 340, 0340 3- F1.10, .30, .40 4 .

DATE: 06/02/89 ROBERT ED GINNA NUCLEAR POWER STATIOH UNIT 1 PAGE: 116 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPOHENTS INSPECTIOH INTERVAL PLAN STATUS STDBY AUX. FW SW SUPPLY TO SAFW PUHP C I F IRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. Xi I SUHHARY EXAHIHATION AREA CATGY NDE I OUTAGE I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO NETH I 1 2 3 1 2 3 4 1 2 3 I

  • ICALI BRAT ION BLOCK*"

PLANT LINE: 4A-FM8-152-A FIG NO C 26 508730 SW-101 F-C VT-3 1- INS.

RIGID HANGER F3.00 2 C S.381-264, SH. 101, REV. 2 340, D340 3- F3 '0, .30, .40 4-508735 SW-102 F-C VT.3 1- INS.

RIGID HANGER-U BOLT F3.00 2- C S-381-264I SH. 102, REV. 4 340, C340 3- F3.10, .30, .40 4-508740 SW-103 GUIDE 360, C360 F-A F1.00 VT-3 1 2-3-

-'-381-264, SH. 103, REV. 4 F1.10, .30, .40 4

86 - INSIG: NO I.D. TAG - ACCEPT - JO.

508745 SW.104 F-A VT-3 1 INS.

GUIDE F1.00 2- C S.381-264( SH. 104, REV. 3 360, C360 3- F1.10, .30, .40 4 .

87 - INSIG: INSULATION ON PIPE - ACCEPT - CJF.

508750 SW-105 D-8 VT-3 1- BINOCULARS, SPOT LIGHT GUIDE - IWA D2.20 2- C S.381 264, SH. 105, REV. 3 360, C360 3 - X 4 - X 88 VT-1 PERFORHED ACCEPT.-GB ~

508753 SW- 105 F-A VT-3 1 S 381 264, SH. 105, REV. 3 GUIDE F1.00 2- F1.10, .30, .40 360, C360 =3. X

4. X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 117 REVISION: 0 INSERV ICE" INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INI'ERVAL PLAN STATUS STDBY AUX. FW SW SUPPLY TO SAFW PUMP C I FIRST SECOND 'HIRD I ZONE HUHBER: ASME I PERICO PERICO PERICO SEC. XI I I SUHHARY EXAMINATION AREA CATGY NDE -OUTAGE- INSTRUCTIONS NUHBER I DENT I F ICATION ITEH NO METH I 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK*~

PLANT LINE: 4A-FWB-152-A FIG NO C 26 508755 SW-106 F-A VT-3 1- INS.

GUIDE F1.00 2- C S.381-264, SH. 106, REV. 3 360, C360 3- F1.10, .30, .40 4

508760 SW-107 F-A VT-3 1 BINOCULARS.

GUIDE F1.00 2- S-381-264, SH. 107, REV. 3 360, C360 3- F1.10, .30, .40 4 - - ~-

8 6 - INSIG: COMPONENT RUSTED - ACCEPT - JO. BINOCULARS USED FOR EXAH.

508765 SW-108 F-A VT-3 1 IHS.

GUIDE F1.00 2 . C S-381-264, SH. 108, REV. 2 360, C360 3- F1.10, .30, .40 4-508770 SW-109 F-A VT-3 1 INS. BINOCULARS, SPOT LIGHT GUIDE F1.00 2- C S 381-264i SH. 1091 REV. 2 360, C360 3- F1.10, .30, .40 4

508775 SW-110 F-A VT-3 1 INS.

GUIDE F1.00 2- C S 381-264, SH. 110, REV. 2 360, 0372 3- F1.10, .30, .40 4-508780 SW-111 O-B VT-3 1 BINOCULARS GUIDE - IWA 02.20 2- C S-381-264, SH. 111, REV. 2 360, D372 3- X 4- X 86 - V'I-1. LIM: WELDS ON LUGS NOT EXAMINED DUE TO GUIDE LOCATION. LUGS IN PLACE. REHOVE VT-1 FROM PLAN - MJS. BINOCULARS USED FOR VT-3 EXAM.

DATE: 06/02/89 ROBERT E. GINHA HUCLEAR POWER STATION UNIT 1 PAGE: 118 REVI SION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPOHENTS INSPECTION IHTERVAL PLAN STATUS STDBY AUX. FW SW SUPPLY TO SAFW PUMP C I FIRST 'ECOND THIRD I ZOHE NUMBER:" ASME I PERICO PERICO PERICO SEC. XI I I

SUMMARY

EXAMINATION AREA CATGY NDE I OUTAGE I INSTRUCT IONS NUMBER IDENTIFICATIOH ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 4A-F'W8.152-A FIG NO C-26 508783 SW-111 F-A VT.3 1- S.381-264, SH. 111, REV. 2 GUIDE F1.00 2- F1.10, .30, .40 360, D372 3 . X X

508785 SW-112 F-A VT-3 1 IHS.

GUIDE F1.00 2- C S-381-264( SH. 112, REV. 2 360, 0372 3- F1.10, .30, .40 4

508790 SW.117 0-B VT-3 1 INS ~

ANCHOR - IWA D2.20 2 C S.381-264( SH. 117, REV. 2 860, 860 3 X 4 X 88 - VT-1 ON WELDS.OK; INSIG:"OTHER" VT-3(0"-1/8"GAP BETWEEN COHCREATE 8 BASE PLATE. HO DEFORMATION OR DETERIORATIOH OF SUPPORT NOTED. ACCEPT. GB.

508793 SW.117 F-A VT.3 1 S.381-264, SH. 117, REV. 2 ANCMOR F1.00 2. F1.10, .30, .40 860, 860 3 X 4 X 508795 SW-118 F-A VT-3 1- INS.

GUIDE - RIGID HANGER F1.00 2- C S-381-264, SH ~ 118, REV. 1 860, 860 3- F1.10, 30, .40

~

4 508800 SW.119 F A VT-3 1 S-381-264) SH. 119, REV. 1 GUIDE F1.00 2- F1.10, .30, .40 860, 860 3" 4-

~

86 INSIG: NO PAINT OH GUIDE - ACCEPT - SJD.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POMER STATION UNIT 1 PAGE: 119 REVISION: 0 INSERVICE IHSPECI'ION PROGRAH PLAN CLASS 3 COHPONENTS INSPECT ION INTERVAL PLAN SI'ATUS S'TDBY AUX. FW SW SUPPLY TO SAFW PUMP C I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I I SUHHARY EXAMINATION AREA CATGY NDE OUTAGE I INSTRUCTIONS NUHBER IDENTIFICATION ITEN NO NETH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK**

PLANT LINE: 4A-FW8-152-A FIG ND C 26 508805 SW.120 F-A VT-3 1- INS.

GUIDE F1.00 2- C S.381.264, SH. 120, REV. 1 860, 860 3- F1.10, .30, .40 4-87 - INSIG:LIGHT RUST OH GUIDE ACCEPT CJF.

508810 SW-121 F-A VT-3 1 INS GUIDE F1.00 2- C S-381-264, SH. 121( REV. 1 860, 860 3- F1.10, .30, .40 4-PLANT LINE: 4A-FW8-152-A FIG NO C.28 508815 SM.122 D-B VT-3 1 INS.

GUIDE - IWA 02.20 2- C S.381-264, SH. 122, REV. 1 860, 860 3- X 4- X 508817 SW.122 F-A VT-3 1 INS.

GUIDE F1.00 2- S-381-264, SH. 122, REV. 1 860, 860 3. X F1.10, .30, .40 4- X 508820 SM-123 F A VT-3 1 S-381-264, SH. 123( REV. 1 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4-

86 - IHSIG: NO PAINT ON UNDERSIDE OF ANGLE IRON - ACCEPT . SJD.

508825 SM.124 F-A VT.3 1 INS.

GUIDE F1.00 2 . C S-381-264, SH. 124, REV. 1 860, 860 3- F1.10, .30, .40 4.

87 - INSIG:LIGHT RUST ON GUIDE - ACCEPT - CJF.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE'20 REVISION: 0 INSERVICE IHSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS STDBY AUX. FW S'W SUPPLY TO SAFW PUMP C I FIRST SECOHD THIRD ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I SUHHARY EXAMINATION AREA CATGY NDE OUTAGE I INSTRUCTIONS HUHBER IDENTIFICATION ITEN NO NETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK~*

PLANT LINE: 4A-FM8.152-A FIG HO C-28 508830 SW-125 F-A VT-3 1 IHS.

GUIDE F1.00 2- C S 381 264'H 125'EV 1 860, 860 3- F1.10, .30, .40 4

88 IHSIG: LIGHT SURFACE RUST THROUGHOUT-ACCEPT. GB.

508835 SW-126 F-A VT-3 1 S-381-264, SH. 126, REV. 1 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4 508840 SM-127 F-A VT-3 1 S-381-264, SH. 127, REV. 1 GUIDE F1.00 2. C F1.10, .30, .40 860, 860 3-4-

86 IHSIG: GUIDE BRACKET NOI'AIN'IED OH UHDERSIDE OF ANGLE IRON - ACCEPT - SJD.

508845 SW-128 D-B VT-3 1 S-381-264i SH. 128( REV. 1 GUIDE IWA D2.20 2- C 860, 860 3- - X 4 - - X 87 - VT ON 'MELDS OK.- CJF.

508847 SM.128 F-A VT-3 1 S.381-264, SH. 128, REV. 1 GUIDE F1.00 2- F1.10, .30, .40 860, 860 3 - - X 4 - - X 508850 SW.129 F-A VT-3 1 S-381-264, SH. 129, REV. 1 GUIDE F'1.00 2. C F1.10, .30, .40 860, 860 3.

4-88 - INSIG: 1'U'I FLUSH MITH BOLT-ACCEPT.-GB.

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 121 REV I S ION: 0 IHSERV ICE 'INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STOBY AUX. F'W SW SUPPLY TO SAFW PUMP 0 I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERICO PERICO PERIOD SEC. XI I I

SUMMARY

EXAMINATION AREA CATGY NDE 0 U T A G E - - - - - - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK"*

PLANT LINE: 4A-FWB-152-8 FIG NO C-27 508860 SW-88 D-8 VT-3 1 INS.

GUIDE - IWA D2.20 2- S.381-264( SH. 88, REV. 3 360, A360 3 X 4 X 86 - VT-1: IHSIG: COMPONENT AND WELD RUSTED - ACCEPT - JO.

508863 SW-88 F-A VT-3 1 IHS.

F1.00 2- S 381 264( SH 88@ REV 3 360, A360 3 X F1.10, .30, .40 4 X 508865 SW.89 F-A VT-3 1 INS.

GUIDE F1.00 2- C S 381 264 i SH ~ 89 i REV 2 360, A360 3- F1.10, .30, .40 4-508870 SW-90 D.B VT-3 1 INS.

GUIDE - IWA 02.20 2- C - S.381-264, SH. 90i REV. 2 360, 8360 3 - - X 4 - - X 88 - VT-1 PERFORMED-ACCEPT. ; IHSIG: MINOR RUST -ACCEPT. RAL.

508873 SW-90 F-A VT-3 1 IHS.

GUIDE F1.00 2- S-381.264, SH. 90, REV. 2 360, 8360 3 - - X F1.10, .30, .40 4 - - X 508875 SW-91 F-A VT-3 1 IHS.

GUIDE RIGID HANGER F1.00 2- C S-381-264, SH. 91, REV. 3 360, 8360 3- F1.10, .30, .40 4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 122 REVI S ION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONEHTS INSPECTION INTERVAL PLAN STATUS STDBY AUX. FW SW SUPPLY TO SAFW PUMP 0 FIRST SECOND THIRD ZONE NUHBER: ASHE I

I PERIOD PERIOD PERIOD I' I

SEC. XI I SUHHARY EXAHINATION AREA CATGY NDE I

- - OUTAGE- I INSTRUCTIONS NUHBER IDEHTIFICATION ITEN NO NETH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK**

PLANT LINE: 4A-FWB-152-B FIG NO C-27 508880'W.92 F.C VT-3 1 S-381-264, SH. 92, REV. 2 RIGID HANGER F3.00 2- C F3.10, .30, .40 360, 0360 3-4 86 INSIG: LIGHT RUST IN,SOHE AREAS - ACCEPT - KK.

508885 SW-113 F-C VT-3 1 S-381-264, SH. 113, REV. 2 RIGID RESTRAINT F3.00 2 F3.10, .30, .40 360, D360 3 .

4-86 - INSIG: LIGH'I RUST IN SOHE AREAS - ACCEPT - KK~

508890 SW-93 F-A VT-3 1 INS., HEED: 7 1/2 VOLT GUIDE F1.00 2- C LANTERN AND BINOCULARS.

360, 0360 3- S-381-264, SH. 93, REV. 2 4- F1.10, .30, .40 88 - INSIG: REHOTE LIHITED EXAH. PERFORHEDI AREAS EXAHINED-ACCEPTED..RAL.

508895 S'W-94 F-A VT.3 1 INS.

RIGID HANGER F1.00 2- 0 C - R S-381-264, SH. 94, REV. 2 360, D371 3 . F1.10, .30, .40 4

87 - REJECTED IN 1986 ON T/C 86.430. REPAIRED ON T/C 87-861 8 NCR G87-035. ACCEPT - GB.

508900 SW-116 0 8 VT-3 1 INS ~

ANCHOR - IWA D2.20 2- C S.381 264, SH. 116, REV. 1 860, 860 3- X 4- X 86 - VT 1: INSIG: RUST ON 'WELD. GRIND HARKS OH WEST SIDE OF SADDLE. - ACCEPT - JO.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 123 REVISION: 0 INSERVICE,INSPECTIOH PROGRAM PLAH CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STDBY AUX. FW SW SUPPLY TO SAFW PUMP D I FIRST SECOND THIRD ZONE NUMBER: ASME I PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA SEC. XI CATGY NDE I

I

--OUTAGE --.-. I I IHSTRUCT IONS NUHBER IDENT IF ICATION ITEH NO METH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK"*

PLANT LINE: 4A-FWB-152-8 FIG NO C-27 508903 SW.116 F-A VT-3 1 INS.

ANCHOR F1.00 2- S-381-264, SH. 116, REV. 1 860, 860 3- X F'1.10, .30, .40 4- X 508905 SW-147 F-A VT-3 1 INS.

GUIDE F1.00 2- C S-381-264, SH. 147, REV. 1 860, 860 3 . F1.10, .30, .40 50891 0 SW-146 F-A VT-3 1 INS.

GUIDE F1.00 C S-381-264( SH. 146, REV. 2 860, 860 F1.10,. 30, .40 508915 SW-145 F-A VT-3 1 INS GUIDE F1.00 2- C S-381-264, SH. 145) REV. 1 860, 860 3- F1. 10, .30, .40 4-508920 SW-144 F-A VT-3 1 S-381-264, SH. 144, REV. 1 GUIDE F1.00 2- F1.10, .30, .40 860, 860 3-4 PLANT LINE: 4A-FW8-152.B FIG NO C-28 508925 SW-143 F.A VT-3 1 INS.

GUIDE F1.00 2- C S-381-264, SH. 143( REV. 1 860, 860 3- F1.10, .30, .40 4-87 - REJ:LOOSE WASHER - T/C 87 812. REJ: EXAM AFTER REPAIR ON T/C - BOLT TURNS IN CONCRETE. NCR G87-076. OTHER:

USE AS IS PER M.P LILLEY 3/2/87.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 124 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS STDBY AUX. FW SW SUPPLY TO SAFW PUMP D I FIRST SECOND ~ THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I I SUHHARY EXAHINATION AREA CATGY HDE I -OUTAGE- I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO NETH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK*>>

PLANT LINE: 4A-FWB-152-B FIG HO C.28 508930 SW-142 D-B VT-3 1 INS.

GUIDE - IWA D2.20 2- C - S-381-264, SH. 142i REV. 1

'60, 860 3 ~

X X

88 - INSIG: VT-1,LIGHT SURFACE RUST ON IHTEGRAL WELOS-ACCEPT GB.

508933 SW-142 F-A VT-3 1 INS.

GUIDE F1.00 2- S-381-264, SH. 142, REV. 1 860, 860 3- X F1.10, .30, .40 4- X 508935 SW-141 F-A VT-3 '1 INS

'UIDE F1.00 2- C S.381-264, SH. 141, REV. 1 860, 860 3- F1.10, .30, .40 4-508940 SW-136 F-A VT.3 1 S-381-264( SH. 136, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4-

508945 SW-137 F-A VT-3 1 S-381-264, SH. 137, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3-4 508950 SW-138 F A VT-3 1 S-381-264, SH. 138, REV. 2 GUIDE F1.00 2- C F1.10, .30, .40 860, 860 3 X 4 X 508955 SW-139 0-B VT-3 S-381-264, SH. 139, REV.

GUIDE - IWA D2.20 2- C 860, 860 3 . X 4 . X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 125 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS STDBY AUX. FW SW SUPPLY TO SAFW PUMP 0 I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I

- I

SUMMARY

EXAMIHAT I ON AREA CATGY NDE I

- - - 0 U T A G E - - - - - - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK**

PLANT LINE: 4A-FWB-152-B FIG HO C-28 508958 SW-139 F-A VT-3 1 S-381-264( SH. 139, REV.

GUIDE F1.00 2- F1.10, .30, .40 860, 860 3. X 4 - X

'%(AtJya 508960 SW-140 F A VT.3 1 S.381.264, SH. 140, REV.

GUIDE F1.00 2- F1.10, .30, .40 860, 860 3 .

4-86 - IHSIG: WEST LEG BOLT NOT THREADED THROUGH HUT. FUNCTIONALLY OK - NO OEGRADATIOH - ACCEPT - MJS.

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 126 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COHPONENTS INSPECTION INTERVAL PLAN STATUS SAFW PUMPS C 8 0 SUCTION CROSSOVER I FIRST SECOHD THIRD I ZONE NUHBER:- ASHE I PERIOD PERIOD PER I CO I SEC ~ XI I I

SUMMARY

EXAHIHAT I ON AREA CATGY NDE I --OUTAGE- I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO METH / 1 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK**

PLANT LINE: 48-FWB-152 FIG NO C-29 508970 SW.130 F-A VT-3 1 S-381-264, SH. 130, REV. 2 GUIDE F1.00 2- F1 ~ 10, .30, .40 860, 860 3.

4 86 .. INSIG: RUST UNDER INSULATION AT SUPPORT ON PIPE ACCEPT CJF.

508975 SW-131 D-B VT.3 1- INS.

GUiDE - IWA 02.20 2- C S-381-264, SH. 131, REV. 1 860, 860 3- X 4 - X 87 - VT ON WELDS - OK.- CJF.

508977 SW-131 F-A VT-3 1 INS.

GUIDE F1.00 2- S-381-264i SH 131,

~ REV. 1 860, 860 3 - X F1.10, .30, .40 4 - X 508980 SW.132 F-A VT-3 1 INS.

GUIDE F1 ~ 00 2- C S-381-264, SH ~ 132, REV. 1 860, 860 3. F1.10, .30, .40 4-508985 SW-133 D-8 VT-3 1 INS.

ANCHOR . IWA 02.20 2- C S-381-264( SH. 133( REV. 1 860, 860 3- X 4- X 508987 SW-133 F.A VT.3 1 S-381-264, SH. 133, REV. 1 AHCHOR F1.00 2- F1.10, .30, .40 860, 860 3. X 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 127 REVISION: 0 INSERVICE ilNSPECTION PROGRAH PLAN CLASS 3 COMPOHEHTS INSPECTION INTERVAL PLAN STATUS SAFW PUMPS C 8 0 SUCTION CROSSOVER I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI e-i I SUMHARY EXAMINATION AREA CATGY NDE I -OUTAGE I INSTRUCTIONS HUMBER IDENT IF ICATIOH ITEH NO METH f 1 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIONBLOCK**

PLANT LINE: 4B-FWB-152 FIG NO C-29 508990 SW.134 0.8 VT-3 1 INS.

GUIDE - IWA D2.20 2- C S-381-264I SH. 134, REV. 1 860, 860 3- X 4- X 86 - VT-1:REJ: ARC STRIKE NEXT TO PIPE LUG. T/C 86 310. VT 1 REEXM: ARC STRIKE REPAIRED. VT-1: INSIG: GRIND MARKS NORTH SIDE OF LUG, UNDERCUT LESS THAN 1/64" DEEP. - ACCEPT - JO. PT: ADDED EXAM OF ARC STRIKE REPAIR.

508993 SW-134 F A VT-3 1 S.381-264, SH. 134, REV. 1 GUIDE F1.00 2 . F1 ~ 10 ~ ~ 30r ~ 40 860, 860 3- X 4- X 508995 SW-135 F-A VT-3 1 INS.

GUIDE F1.00 2- C S-381.264, SH. 135, REV. 1 860, 860 3- F1.10, .30, .40 4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION WHIT 1 PAGE: 128 REVI SION: 0 IHSERVICE INSPECTION PROGRAH PLAN CLASS 3 COMPONENTS IHSPECTION INTERVAL PLAN STATUS MAIN STEAH SUPPLY TO AUX FW PUMP TURBINE I FIRST SECOND THIRD I ZONE NUHBER: 'SME I PERIOD PERIOD PERIOD SEC. XI I SUHHARY EXAHINATION AREA CATGY NDE - 0 U T A G E - - - - - - I INSTRUCTIONS I

NUHBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 6C-MS-600-1 FIG NO C-32 509000 MSU.62 D-B VT-3 1- INS.

RIGID SUPPORT - IWA D2.20 2. C EXAMINE WITH MSU-63 ¹ 509010 420, 420 3- X S-382-350, SH. 62, REV. 1 4- X 88 - VT-1 ON WELD -OK-TS.

509005 HSU.62 F.A VT.3 1 S-382-350, SN. 62, REV. 1 RIGID SUPPORT F1.00 2- F1.10, .30, .40 420, 420 3- X 4- X 509010 MSU-63 D-8 VT-3 1 INS.

AHCHOR IWA 02.20 2- C EXAMINE WITH MSU-62 ¹ 509000 420, 420 3 - X S-382-350I SH. 63I REV. 1 4 . X 88 - VT-1 OH 'WELD -OK-TS.

509015 MSU-63 F.B VT.3 1 S 382-350, SH. 63, REV. 1 ANCHOR F2.00 2- F2.20, .30, .40 420, 420 3. X 4- X 509020 HSU-64 D-B VT-3 1- I NS.

RIGID RESTRAINT IWA D2.20 2- C S-382-350( SH. 64( REV. 1 420, 420 3- X 4- X 509025 MSU 64 F A VT-3 1 S.382.350( SH. 64I REV. 1 RIGID RESTRAINT F1.00 2 . F1.10, .30, .40 420, 420 3- X 4 X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 129 REVI SIGH: 0 INSERVICE 'INSPECTION PROGRAH PLAN CLASS 3 COMPONENTS INSPECT ION IN'IERVAL PLAN STATUS HAIN STEAM SUPPLY TO AUX FW PUMP TURBINE I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI I I

SUMMARY

EXAHINATION AREA CATGY NDE - - 0 U T A 0 E - - - . - - I INSTRUCTIONS I

NUMBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 4 1 2 3 I "*CALIBRATION BLOCK**

PLANT LINE: 6B MS 600.1 FIG NO C-32 509030 MSU.65 D 8 VI'-3 1 INS.

VARIABLE(SPRING) - IWA D2.40 2- S-382-350, SH. 65, REV. 1 420, 420 3-4 509035 HSU-65 F-C VT-3 S.382-350, SH. 65, REV. 1 SPRING F3.00 2 . F1. 10, .30, .40, .50 420, 420 3-509040 MSU.66 D-8 VT-3 1 IHS., HEED LADDER GUIDE - IllA D2.20 2- C EXAMINE WITH AFU 77 ¹ 505770 420, 420 3 - X S-382-350, SH. 66, REV. 1 4 - X 88 VT-1 ON WELD-OK-KK.

509045 MSU.66 F-A VT-3 1 S-382-350( SH. 66) REV. 1 GUIDE F1.00 2 . F1.10, .30, .40 420, 420 3 - X

4. X 509050 MSU.67 D 8 VI'-3 1- INS. NEED LADDER GUIDE - IWA D2 ~ 20 2. C S-382-350, SH. 67, REV. 1 420, 420 3- X 4- X 88 - VT-1 ON WELD-OK-KK.

509055 MSU-67 F.A VT.3 1 S-382 350, SH. 67, REV. 1 GUIDE F1.00 2- F1.10, .30, .40 420, 420 3- X 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER Si'ATION UNIT 1 PAGE: 130 REVI S I OH: 0 INSERVICE INSPECTIOH PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS MAIN STEAM SUPPLY TO AUX FW PUMP TURBINE I F IRST SECOND THIRD I ZONE NUHBER: ASHE SEC.

CATGY Xi,NDE I

I I

PERIOD PERIOD

-OUTAGE------

PERIOD I

I INSTRUCTIONS ITEH NO HETH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK"*

4 PLANT LINE: 6B-HS-600.1 FIG NO C-32 509060 HSU-68 F-C VT-3 1- INS.

RIGID RESTRAINT F3.00 2- C S-382-350( SH. 68, REV. 1 450, 450 3- F3. 10, .30, .40 4-509070 MSU 69 F-C VT-3 1 INS. RUNS THROUGH WALL.

RIGID RESTRAINT F3.00 2 . C S-382-350( SH. 69I REV.

450, 450 3- F3.10, .30, .40 4-88 - EXAHINED EHDS OF STRUT. STRUI'ODY INSIDE WALL ACCEPT.-CJF.

509080 MSU-70 0-8 VT-3 1 INS.

GUIDE - IWA D2.20 2. C S-382.350, SH. 70( REV. 1 450, 450 3- X 4 X 509085 MSU-70 F-A VT-3 1 S-382-350, SH. 70, REV. 1 GUIDE F1 ~ 00 2- F1.10, .30, .40 450, 450 3- X 4- X 509090 HSU-71 0-8 VI'-3 1 IHS.

GUIDE I WA D2.20 2 . C S-382-350, SH. 71, REV. 0 450, 450 3 - X 4 - X 88 - VT-1 PERFORMED ON WELD-ACCEPTEO CJF.

509095 MSU.71 F-A VT-3 1 S-382-350, SH. 71, REV. 0 GUIDE F1.00 2- F1.10, .30, .40 450, 450 3 - X 4 - X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 131 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS MAIN STEAM SUPPLY TO AUX FW PUMP TURBINE I FIRST SECOND THIRD ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD I SUMHARY EXAHIHAT ION AREA SEC. XI CATGY 'NDE I

/

- - - - - - 0 U T A G E ------I k I

INSTRUCTIONS NUMBER IDENT IF I CATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I

    • GALI BRAT ION BLOCK*"

PLANT LINE: 6B-MS-600-1 FIG NO C.32 509100 HSU-72 F C VT-3 1- INS.

HECHANICAL SNUBBER F3.00 2- C S-382-350, SH. 72, REV. 1 450, 450 3- F3.10, .30, .40, .50 4-509110 MSU.73 D-8 VT-3 1 INS.

GUIDE - I'WA 02.20 2- C S-382-350( SH. 73, REV. 1 450, 450 3- X 4- X 88 VT-1 PERFORMED -ACCEPT. I INSIG: CORROSION / LIGHT RUST BENEATH STRUT TUBES.-ACCEPT. GB.

509115 MSU-73 F-A VT-3 1 S.382-350, SM. 73( REV. 1 GUIDE F1.00 2- F1.10, .30, '.40 450, 450 3- X 4 X 509120 MSU.74 F-C VT-3 1 IHS.

MECHANICAL SNUBBER F3.00 2 . C S 382-350I SH. 74I REV. 1 450, 450 3- F3. 10, .30, .40, .50 4

509130 HSU.75 F-C VT-3 1 INS.

HECHANICAL SNUBBER F3.00 2- C S-382-350) SH. 75, REV. 1 450, 450 3 . F3. 10, .30, .40, .50 4

88 SHUBBER SERIAL ¹ IS 8030 WITH A SETTING OF 1 7/8" AT A TEMP. OF 306 DEG.F.

PLANT LINE: 6C-MS-600.1 FIG NO C-32 509140 HSU-76 F-C VT-3 1 INS.

RIGID RESTRAINT F3.00 2- C S-382-350( SH. 76, REV. 1 450, 450 3. F3. 10, .30, .40 i 4a-

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 132 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STA'TUS MAIN STEAM SUPPLY TO AUX FW PUMP TURBINE I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PER I OO I SEC. XI I I

SUMMARY

EXAHINATION AREA CATGY NDE I

- OUTAGE- INSTRUCTIONS NUMBER IDENTIFICATION ITEH HO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE 6A-MS.600-1 FIG NO C-32 509150 HSU-77 D-8 VT-3 1- INS.

GUIDE I WA D2.20 2 . C S-382.350, SH. 77, REV. 1 450, 450 3 - X 4 - X 88 - VT-1 PERFORMED ON WELD-ACCEPTED.CJF.

509155 MSU-77 F-A VT-3 1 S-382-350, SH. 77, REV. 1 GUIDE F1.00 2- F1.10, .30, .40 450, 450 3. X 4 X 509160 MSU.78 0 8 VT-3 1 INS.

MECHANICAL SNUBBER - IWA 02.50 2- C S.382-350, SH. 78, REV. 1 420, 420 3 . X 4 X 509165 MSU.78 F-C VI'-3 1 S-382 350, SH. 78, REV. 1 MECHANICAL SNUBBER F3.00 2- F1.10, .30, .40, .50 420, 420 3- X 4- X 509170 MSU.79 F-C VT-3 1 INS.

VARIABLE(SPRING) F3.00 2- C S 382 350, SH. 79, REV.

450, 450 3- F3.10, .30, .40, .50 4 .

88 SPRING CAN NO. 582 WITH SETTIHG OF 482 ¹ AT A TEMP. OF 300 DEG. F..

509180 MSU-80 F-C VT-3 1 IHS MECHANICAL SNUBBER F3.00 2 . C S-382.350, SN. 80, RFV. 1 420, 420 3- Fl.10, .30, .40, .50 4-

Qi, PAGE: 133 DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COHPONENTS INSPECTIOH INTERVAL PLAN STATUS HAIN STEAH SUPPLY TO AUX FW PUHP TURBINE I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I I CATGY NDE OUTAGE I INSTRUCTIONS ITEH NO NETH I 1 2 3 1 2 3 4 1 2 3 I ~*CALIBRATION BLOCK**

PLANT LINE: 6A-HS 600.1 FIG NO C-32 509190 HSU.81 F-A VT-3 1 I HS.

GUIDE F1.00 2- C S-382-350, SH. 81, REV. 1 450, 450 3- F1.10, .30, .40 4-88 VT-1 PERFORHED ON WELD-ACCEPTED CJF.

509200 MSU-82 F-C Vr-3 INS.

HECNANICAL SNUBBER F3.00 2- C S.382-350, SH. 82, REV. 1 420, 420 3- F3 '0, .30, .40, .50 4

509210 MSU.83 0-B VT-3 INS.

GUIDE IWA D2.20 1

2 -'. C S-382-350, SH. 83( REV. 1 450, 450 3- X 4 X 88 VT-1 PERFORHED ON 'MELD-ACCEPTED-CJF 509215 MSU.83 F-A VT-3 1 S-382 350, SH. 83, REV. 1 GUIDE F1.00 2. F1.10, .30, .40 450, 450 3- X 4- X 509220 HSU-84 D-8 VT-3 1 INS.

HECHANICAL SNUBBER - IWA D2.20 2- C S-382-350I SH. 84I REV. 1 450, 450 3. - X 4 - . X 509225 HSU-84 F-C VI'-3 1 S-382-350, SH. 84, REV. 1 SNUBBER F3.00 2- F1.10, .30, .40, .50 450, 450 3 - - X 4 - - X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PSIER STATION UNIT 1 PAGE: 134 REVI SIGH: 0 INSERVICE INSPECTION PROGRAH PLAN CLASS 3 COMPONENTS INSPECI'ION INTERVAL PLAN STATUS HAIN STEAM SUPPLY TO AUX FN PUMP TURBIN I FIRST SECOND THIRD ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI I

SUMMARY

EXAMIHAT I ON AREA CATGY HDE - 0 U T A G E - - - - - I INSTRUCTIOHS I

NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 i **CALIBRATION BLOCK**

PLANT LINE: 6A-MS-600-1 FIG NO C-32 509230 MSU-85 F-C VT-3 1- INS.

MECHAHICAL SNUBBER F3.00 2- C S-382-350, SH. 85, REV. 1 450, 450 3- F3.10, .30, 40, .50 4-88 - SNUBBER SERIAL ¹ IS 10074 'IJITH A SETTING OF 3 1/4" AT A TEHP. OF 250 DEG. F..

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 135 REVISION: 0 IHSERVICE 'INSPECTION PROGRAM PLAN CLASS 3 COMPOHENI'S IHSPECTION INTERVAL PLAN STATUS AUX FW PUMP A FLOW COHTROL BYPASS I FIRST SECOND THIRD ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI I CATGY NDE I

- 0 U T A G E - - - - - - I INSTRUCTIONS ITEM HO METH i 1 2 3 1 23 4 1 2 3 **CALIBRATIONBLOCK**

PLANT LINE: 2A-FW7-900-1A FIG HO C-1G 510010 AFU-134 F.C VT-3 1 DRA'WINGS DO NOT EXIST.

F3.00 2-3-

4-510020 AFU-136 F.C VT-3 1 DRAWIHGS DO NOT EXIST.

F3.00 2-3-

4-PLANT LINE: 2B FW7-900-1A FIG NO C.1G 510030 AFU.59 F C VT-3 1 DRAWINGS DO HOT EXIST.

F3.00 2-3-

4-510040 AFU-60 F-C VT-3 1- DRAWINGS 00 HOT EXIST.

F3.00 2-3-

4-510050 AFU.133 F-C VT-3 1 DRAWIHGS DO HOI'XIST.

F3.00 2-3-

4-510060 AFU.140 F-C VT-3 1 DRAWINGS DO HOT EXIST.

F3.00 2-3-

4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 'PAGE: 136 REVISION: 0 INSERVICE INSPECTION PICTOGRAM PLAN CLASS 3 COMPONENTS INSPECTION INTERVAL PLAN STATUS AUX FW PUMP B FLOW CONTROL BYPASS I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. XI - I I

CATGY HDE - - - 0 U T A G E - - - - - - IHSTRUCTIOHS I I ITEN HO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 2A-FW7-900.1B FIG NO C-1H 510070 AFU-128 F C VT-3 1 DRA'WINGS DO NOT EXIST.

F3.00 2-3-

4-510080 AFU.129 F-C VT-3 1- DRAWINGS 00 NOT EXIST.

F3.00 2-3-

4 PLANT LINE: 2B-FW7-900-18 FIG NO C.1H 510090 AFU-57 F.C VT-3 1- DRAWINGS DO NOT EXIS1' F3.00 2-3-

4-510100 AFU.58 F.C VT-3 1 DRAWIHGS DO HO'I EXIS1'.

F3.00 2-3-

4 510110 AFU.127 F C VT-3 1 DRAWINGS DO NOT EXIST.

F3.00 2 .

3-4-

OQ P Z I Iee 3Q C-1A g

~e' 3'REF)

~

' EL

~

' 267.6'998 I xs qg Q

W g

Fl o

O

~ AFU S4F CONT. ON ~

jl K AFU 69G C-1D CONT. ON DYS.

C-361-352 SHT. 5

~ ~

3H-FW7-900-1 5A-FW7-900-1 P4, RED.

AFU 61F 3H-FW7-900-1 0< lUBNE MVEN AUXIUART

~ 450 FEEDWATER PUMP, ' ~

K AFU HG AFU 71F 507m C-18 QA>

'q

~

m ~

~

C7 eeu eXe> ~

AFU 62R AFU 66F U

K a

8 U U) 5A-FW7-900-1

)Pi C7 V) 5R O X 27

~ INSULATION

$I 8I

~

I m AFU 111H

+)99H AFU 106S

~

EL 271~'~ . ~ AFU 51S AFII 1235 AFU 52H

~ AFV 122S (AFU

\

AFU 120F AFU I'150 AFU 500 gI S2 1212'OHT.

K

~ @ASS 3

~

ON ARJ 107F 3 FW; CONT. ON 900-1: C-1G AFU 106G AFU 113G flANGE 3 900/ WA.

ORIFICE FLANGE CONT. OH C-1D FLOOR'FU ~

~ ~

11' ~ 265.5'FU

~

AFU 49G 115G AFU 16F 5 X3

~

AF~

p, 4357 (REF.)

5 r COHT. ON C-1G ORIFICE W.M.

~ 5A-FW7-900-1 FlAHGE X3 3A-FW-900-1 A

~ V

> EL 255.6' (REF)

CONT. ON AUI6UARY FEED WATER PUMP A

~ C-l INSULATION

EL 265.5'FU 75H 5C-FW7-900-1 AFU 78S . ~ '5'3 5 WPI.

ORIFICE FLANGE

~

14 F.W. TO 5 X3 STEAM REO. AFU 96f 0 GENERATOR CLASS 3 0

4M2

. 'FU 78F 0

4r .

AFU 74F AFU 73F

~

~~ 8-10A OH 1'ONT AFU-97S

+QQA% 2

~

AFU 79G ~

QA C-'I ~ 4M6 AFV 95F

+

AFU QWG AFU 93G EL

~

~

~

AFU 90A 271'HSULATIOH

~ ~ ~

l m 5"

og 3A-FW/-900-5B f-o F.V/. UHE QMN ARJ 1020 5LI 5 EL 275'~ EL 28KS'4 O

g AFV 103M CONT, OH I

~

010A

  • CLASS 2 CONT. ON ~

. EXEMPT C-1F X

AFV 24F AFV 26R 3 B.W.

COHH,

,f ARJ 504S AFU 1000 ~

AFU 101H EL rl AFU 27F Pl O

O U

z 0 271'NSULATION I5 OR I

O O

A Pl

EL 269.5' 3O-FW7-900-1 AFU 47G 3E-FWT-900-1 CONT. ON ~

C-1E

'380 Qo

/CONT. 'ON AFU 39G C

1EgB

~ ~

~

. AFU 36F ~ EL 269.25'FU 41F 35G '4

~4'FU ARI 37U EL 255.6'ONT.

ON C-'IA 3'.1IV.

CONN.

~ . INSULATION

'Vq O CONT. Oi'I q4I W 3C-F67-900-1 C-1D R

AFU 32G AFU 34H

~

AFU 31H ~ ~

'W/-900-1 CONT. ON C-ID 0<

3C-FW7-900-1 Rl Pl O

EL 1'W.

0 4309 O

0 CONT. ON C-1F 259.75'NSULATION M

x A

Pl Al

(

ni

Q AFU 21F

~~

GEE I cn AFU 20F 3Q EL AFU 19F

~ CONT. ON 271'FU AFU 12F ARJ ISF

~ C-'IC

~

11S~ x. 10

~

3I 1'

~~

ARJ ARl 100 EW'B 0

3 WA. ARJ 17F f, o W gj CONT. ON C-1H AFU 16F yn n

W O AFU 90 ~ 3l 3A-FW7-900-1 B ARJ 15F CONT. ON C-1E I

V~ 4200 1 S.W.

CONN.

5~ OC O

I Qo CONT. ON C-1H o 2 S.W.

o n 0 K

o U ~0~

V) n OTOR IJRNEN AUXIUARY FEEUWAEER PUMP B Pl INSUIA1ION CONT. ON

EL 265.75'ONT.

OH C-1A

/I- AFU 60G

~2 X 1-1/2 REDUQNG COUPUHG 4486

.75 NOH NUCLEAR 0

~ 44%

2 X 1-1/2 REDUQNG COUPUHG AFUmG> '. g 44!2 28-FW7-900-1 A COIIT. OH C-lA 2A-FWT-900-1 A TO AUXQARY 2B-FW7-900-1h FEED WAlER PUMP A 2 X 1-1/2 REDUQHG COUPUHG

~

AFU 136R NON-NUCLEAR

~

IHSULAllON

IOPO g I I CONT. OH C-1F .

~ .'M AFU 57G ~ ll 2" X 1-1/2 REDUCING COUPUHG 44P

.75'ON 2 X 1-1/2 REDUCINQ COUPUHG HUClEAR

~

28-FW7-9OO-1 8

~

COHT. ON C-1F 2A-FW7-900-18

~

TO AUXUARY FEED WATER PUMP 8 2 X 1-1/2 REDUCINQ COUPUHG I""

AFU 129R

~ NON-HVIXEAR INSULATION

w w w w w 07 Q

~ CCU 880 72%A

~ CCU 87F 10A-AC5-152 8A-AC5-152 77JA CCU 89F

~ EL 272.8

~ EL

'IO' 281.750'08-ACS-152 EL 281.750'l4' 10 r

~

REDUCING ELBOW 2702 ~ EL COMPONENT COOUNG 292'UTLET PUMP CONT. OH C-8 A 1 TO COMPOHENT COOuHG SURGE TANK 7248 I

8 X 10

~ 7238

~

REDuaNG ELBOW 10D-ACS-152 EL 272.8'CU 88F 14 X 10 ~

RED. COMPONENT COOUHG OUILET PUMP 8 EL 273.854' 88-AC5-152 1'-ACS-152

~l EMERGENCY COOuNG X 10 COHN. RED.

a C

K COMPONENT EXCHG. 8 EL 278.5'4 EL 283.7SO'EAT g

10C-ACS-152 COMPOHENT COOUHG HEAT EXCHG. A EL 273.750'HSULATION

CONT. OH I CCU 178F a

~EL 291'CU 249'B-AC6-552 17IF ON ISI-L603 CONT. OH ISI-L604 K~ CCU 1799 CCU 5800 CCU 12111 CCU 172G + CLASS 3 CCU 176R

'Y r 'XEMPT CCU 173F CCU

+g 57m>

23aS'ONT.

EEC.

r EI-g r CONT. OH 255'CCU C-e EL NOH REGEN.

CCU 175F HX. 181S OUTLET fa EL MLS'CU 6E-AC6-152 CCU 106F 2718 CCU 105R

~

111G NOH REGEN.

PC 4gJf HX.

I 2722 OUTLET 29 CCU 110G I

qccc 1922 f EL 250.16T CCU 107R CCU 1090 CCU 508R~

6 239.25'76 EL CCU ICCU ~ 6 xi REO.

~M( I 6 X6 X4" REOUCING TEE CCU 101R INSULACION

~ MWM aW 10G-AC5-1 52 10 X 'l4

>~2 >>)- Z: REDUCNG ElBOW CCU 1455 NB-AC5-152 RE5tDUAL CCU 146G HEAT EXCH. A N XH X10 REDUGNG TEE EL 2&f.4'CU

~a H7G CCU 143F 2532'EAT 422 p

CCU EXCH. 8 10L-AC5-1 52 EL 253.2'EL m.e'0F-AC5-1 E5 261' 52 X14 X6 REDUCtNG 1EE 5252 CCV-136F CCV-137G W~

~ CCU 141F CCU 2505 14 X 10 0O CONT. ON r WALL C-3 g

CI O

0 WALL CONT. ON C-7 2703 ~ ~1C=ACC 152

~ 73%A Cl O O

E g

8 O 14 X14 r I X 10 COllPRKNT COOLP.(G HEAT EXCH. 8 CQlPONENT COOLtNG EL 283.750' 735A HEAT EXCH. A EL 273.750'SULA'RON Pl

S>P)

C22 C2207 222 L I II II7i 6A-AC6-152 5 8A-AC6-152 TO PENS. 124, 127 8c 128 8A-AC6-152 CONT. ON EL 261' C-9

~

p8 X8 X4" X6'EDUCING ly REDUCING TEE I

o~%

ELBOW CONT. ON C-9 I

QA PEN. 130

~ t55-AM~152 g, o 814

$5 CLASS 3 PEN. 131 ~

CLASS 3 CCU 155F 2726 ~

I TO PENS. 124, 125 dc 126 EXEMPT 6A-AC6-152 l

~ 2724 CCU 1517 CCU 236F~

8 X4 CONT. OH 14 X 14 X 8

~ C-4 REDUCIHG TEE 8" X8 X3 28 ~7368 6 o OC I + EL 261' 725A + ~~

CCU 229F 8 REDUCING TEE O

I CCU 152F EL 261'CU CCU 230F

~8 X8 X6 REDUCING TEE O

O O

I

z. 151F

~ CCU 231F "1

0 p

I p

y5 88 AC6-152 EL 258~

NR 14 X14 X8 REDUCING TEE lNSVLATlOH QD C

51 I ~

~ ~ t

~ ~

~ t ~

~ ~ t

~ t O

~ t

~ ~

~ t'

~

~ . ~

~ ~ ~

Ql

C2)L CONT. ON CCU 1627

~ II766B Q) cp EL 253.75' B

r ]I K

~CCU 1270 CCU 163F

~ 780B CCU EL 129h FLOOR

~ 760A EL 257.750'1q

~ CCU 161A CCU 164A CCU 128G cP III 250.750'C-AC6-1 250.750'LOOR

~ EL 249' CONT. OH C-8 52 0 iL 24949'L CCU 130R 6G-AC6-152 CCU 131R EL 8

p CCU 218R 249.49'0 I

>C O 219R O

O 3U

'z 248.740'CU I BA U)

I /0 V)

EVAP.

lNTAKE BA EVAP.

lHTAKE mR EL

~B- 266.760.

INSULAilON g

TQ REACIQR SUPPORT EL 26gt lQ REACTOR SUPPORT 6 xe w r 6xea COOLER LOOP h

~

REDUCING TEE REDUCDIG TEE

~6 r X4 PIPE RED.

w cwaves ~6 X4 RED.

$0 WA!L CCU 17h CCU 1R +

6F-AC6-1 52 6

CLASS 3 CLASS 2 CLASS 2 131 L25'EIL

/ CONT. ON C-5 PEN. 130 C-5

~EL 2$ tBBI INSULA11ON

~EL 258~

NOTE: AU. PIPING SHOWN

~

IS SAFETY CLASS 3 SWU 186R 6E-SWO-1 25-9 jmP)' NOTE: DIMENSIONS GIVEN EL 261 775' ~

FOR REFERENCE ONLY y 4ISEA SW 187G SW 178F

~ SW 1'-SWO-125-9 g

188F 4 SWII 1772 G

~ HEAT EXCH.

SPENT FUEL 0 j~~ 179G SW180U I m EAE W o g gCIS z EL EL 256' 260.828'357 PIT

~>>

2S2'J ~

~ SW 181G SWU 182U

~ 'K SWU 1S3G IEI 9 4620 OPEN ENDED ~

N g EL MEL 265' COMPONENT COOUNG HEAT EXOL IJ EL 283.750'W 20 X 14q~ .. ~-

K

~ SW 159G SW 176F

~ ~

9'W 161R ~ 868S EL SWU 185U 254'CH SWU 163F ~ SWU 158R Q

qH W

SWU 182F ~ SW 1'L 291 SW 157G aq O '~ 489 SW 155R 4 U

~

I . hma 200-SWO-125-9 2 A 'g. Swu ISSE C7 COOLANT

/ +g +

SISI ISSU CW 174F EL muSO'ISCHARGE HEAT EXIL II OPEN ENDED COMPONENT COOUNG n

EL 273.750'654 HEAT EXCJL A SW 173F W . ~SW 152R TO DEER CREEK

~ SW 1510 SW 150G SWU 149R S.W. DISCHARGE SW 148'OMPONENT COOUN0 BURIED FROM MS "A HEAT EXCH.

I g POINT TD DISCHARGE CANAL INSULATION

hl SIR~ ~ ~ CSI + SWU 120S 14-SWO-125-9

~'L EL 27L5' 6-. 256.5'WU 121F

-~ SWU 20QR SC-SYO-125-9

~

SIS IIS SIS CSS SWU 208R 14-'SWO-125-9 6 SWU 122G SSU 0 783B o@% '617A

~

' +~ . + 18A-SWO-125-0 / SWU SNj 1230 12',~/ P SWU 126U

~ SNJ 127G

$5 R

FLOOR HEAT

~

EX'.. A.

+ 8 X 14~

~ 20A-SWO-125-9 SIIU 2'l66

~

~

~SR,'

g g SNj 128R SWU 207G XK.

SWU 2m ~ .c

. SWU 215U ~ . ~ W. HEADER BURlED

~ KI FROM THllS PONT

~

DIESEL GENERATOR 20 X18 RED.

SWU 211G SWU 21'O ROOLI; EL 2S2' ~

+'>> 20A-SWO-1 25-0 Q

F 46188

~

141-SWO-125-9 SNj 189G

~

SWU 203G

+

20 X 'l6 EL ELBOW

'69'

~

265.3'610 8I +

6696 U. SSLS

~

~

~

~

~ 20 X16

~ EL 264250' RED SWU 190G SWU 201F

~ SWU 193R ~

3I K

~ EL 262.4'ALL SRU 2929 S.W. HEADER RlED 14 FROM %OS PONT EL TO DlESEL GEHERATOR A5 SWU 192G COOUNG

'B 2LL9'OMPONENT ROOM. 256L5'EDUCNG

'RR ~

HEAT EXCH.

I K

SWU 191R SRU 1969~ '

E SRU 196R +

--~r 3K 20B-SWO-125-9 IIR SWU 1990 Ig SWU 107R SRII 196R gl 14(-SWO-125-0 20B-SW0-125-9 m 4793 EL

~ ~

TO DIESEL GENERATOR WATER C00lER 1h pl' 108-STENO 125-9 eC, 4 EXEMPT

~

~ ~

~

14 X 10 RED.~ EL EL 266.5' 8 X4 4

26M'XEMPT EXEMPT o)% RED.

1 o

m ~ e ggs e TO DIESEL GENERATOR Ia o '

e SWU 249G bc R WATER COOlER 18 8 X4 RED.

108-SWO-125-9 wm 4813 K DIESEL GEIL

~8 X4 RED.

18 X WALL 14'ED.

1 EXEMPT S.W. HEADER TO SCREEN HOUSE C-g CLASS 3 (8uRIED)

'47eeeee: BG-SWO-125-9 O

~ee xie RDCR. FLANGE ]- SNJ 252F 10 X6 O ClEAR RED. ee70 2

(8URIED) p SWU 251F O

O 1 O

~

INSUlAIION 4762

55o Q 8D-SWO-125-9B 10A-SWO-125-9B 14J-SWO-1 25-9B I ~cLcoco

~ EO 14 X 10 o 10 X 10' 8 RED.

REDUCING TEE Io ~o 10 X8 / SWU 294G SWU 292F gg RED.

~ SWU 295R

@P SWU 291F

~ ~

SVV 29SF EI 265'WU

SWU 312F ~

311F

~ PhV 293F 4524J

~ EL 263' 4644 4630 4629

~ CLASS 2 SWU 297F SWU 298F j ~

~

4561 4643 ~ ~

SWU 299F g)

O I

TO PEN. 323 TO PEN. 315 TO PEN. 311

~ SWU 308H 6"

CONT. ON i 4562 SWU 309H Cf CA 8E-SWO-125-9B 8F-Sly-1 25-9B l 3 EXEMPT/

i 4624B C3 CO SG-SW0-1 25-9B 5

A TO QR DISCHARGE CANAL Rn

~ ' ' 'NSULATION

X m

S W.SUPPLY CONT. ON N '. ~

SWU-261 F OWG. C-13 QA EL 265' SWU-263 F SWU-259F SWU-262F 0 SWU-260F 4813 basso

. ~

SWU-256F SWU-257G rrr NON NUCLEAR SWU-258G S.SUPPLY

.NOT REQUIRED

~ 'NSULATlON

~ ~ ~ ~ QWW EL 263.25' CONT. ON pi' C-168 4614 ~ 4626 II 16 X 14 160-Sly-125-9 4A-SWD-1 25-1 8 3620 ~ , rr EXEMPT 7

20B-SW0-1 25-9

~

246'WU SWU SWU

%iV 326F 329F 330F SSS 3645 AFU 1R AFU 03S 16C-SWD-125-9 (EL SWU 334F QF err. ON 20 X 16 RED.

SWU 314F v

O L EXEMPT SWU 315G SWU 3160

~

J 4w

$O I 0)

/ SWU 325S SWU 324F 16

/ SWU 323e B SIW 3225 0 / SWU 326F CONT. ON C-168 W

4 O 20 X 20 X 16 KE

/ Kl SSII 32IF REDUCNG

+Jg 208-SWD-125-9 . 16C-SWD-125-9 1J 319F SWU 316F A 16 16 X 14" SW 317F z REDUQNG lEE IR Ig w ~ ~ ~ ~ ~ ~ NSULQON

~ \ ~ ~

I m

~ ~ ~

OH-SWO-1 25-9

'p o O ~

p SWU 351F CONT. OH C-16B ROD HANGER 1

SWU 347F 4799S SWU 348F O SWU 349F

~4 EXEMPT O

~6 X4 A

z 6 X4 4 EXEMPT TO A.C. WNER CHRLER 1B

~ ~ . ~ ~ ~ ~

INSVLAllON

BH S'W-125M 14E-SWO-125-9 PP'F/R SH-SWO-125-9 2

'-16A RDCR SWU 346F ~

SWU 345F ~

. REDUQNG KE SWU 344F SWU 342F 14E-SWO-125-9

~ ~

F.

SA-SW0-125-9 SWU SWU 370H 369F

~ .'

. SWU 343F 1' .

C-16 ClASS 3 4756 4642 CVBS 2

~

14e X )4e Be ~

IIECCCIIIC IEE SWU 341F 14 X 14 X 8 SC-Sly-125-9 ' rE REDUQNG TEE CLASS 3

. ~ 464S 88-SWO-1 25-9 48 .

CLASS 2 I 0 1

14 X14 X8 REDUQNG KE

~ QASS V)

CONT, ON ... J ~

B-29C rr

~

EL 283.25' SWU 3S7F SWU 339F O

O PEN. 316 J 4627

~ SAU 338F O CONT. ON 8-298 II CCSE 4631

~ SWU 336G n CONT. ON 8-29A SWU 337F I )5 z CONT. ON C-16 CONT. OA 8H-SViO-125-9, B-29 EL 246"i 3C, 0

~ ~ ~ ~ ~ ~ ~

SNSULQON

El EL 255'609 254,6'.W.

PUMP

~ 4501 DISCHARGE

'II ~~

14 X 12

~ ~

Q N7500 RK N747C H742R Shm FLOOR 8-SW0-125-9 4601 pe H743R + ~

4605 W

4602 H7380 14.

~ N746R CA Ql FLOOR IV39G N737G N7360 JONT 14A-SW0-125-9

~

~ H744R N730C EL 254.6' H745R 4604

~

+ '-

4603 4607 4611 14B-SW0-125-9 N

~

N729C 0

~ '7310 4608 4611A + ~

20' 20' N7350 14 N741G ~

REDUCNC TEE 14C-SViO-125-9 20 140-SW0-125-9 W ~

~

~ ~

4N, 20A-SlhO-125-9 N75NN 4

20B SWO-125 9 N e

'727G 20 S.W. HEADER EL FROM THIS PONT 245'URIED TO IXESEL GENERATOR ~ ~ ~ - ~ ~ ~

BLDG. INSULATION

4 EXEMPT~

6 X4 4799YI r 6" X6 X4 ~

269'IN 3

Y EL 4 EXEMPT SWU 385F 26!L5'799V TO AC WATER CHltJZR 1B EL SWU 389G .I SYAj 390G 6B-SW0-1 25-9 SWU 391F EL 267'r 4799X

~ EL 262.8'WU 392G CONT. ON C-14 QA EL 258.901'

~

'NSULA7iOh

~ ~

I

~~

U II

NOTEI AIL PIPING SHOTIN LS SAFETY CLASS 2 NOTE: DIMENSIONS GIVEN FOR REFERENCE ONLY CLASS 2.EXEMPT CONT. ON AFW 3IH AYiF 305 g 8-12 q 1h FEED WATER HEADER TO S/G A AFW 180 j ~ AFW 17G AFW 16G

~ AFW 14S a mus' C-21 i ~ - ~ ~ ~ ~

JHSULAllON C

cere AFW 72U

~ EL 284046'LASS WAU.

2 EXEMPT EL eee.cele 9704A

> er epe eeu pp AFN 7ee

~ AFW 51C PEN. 119 AFW 52G

~

EL 291.013'FW

~ AFW 82C AFW 83G 90C

~ WALL AFW 91C

~ AFYl 89G

~ ~ 9731 EL 266423'L AFW 87A AFW 92C 27L271' ~~ CONT. OH 3A-BC-902-A 0-23 INSULAllON

SAFW PNlP C D)SCHARQE EL 9700A G3 PI 482 4r 274.435'OHT.

971 5A 9735

~ 1SSS-/ Kt 9713A AFU 1520 1-1/2 3/4 X RED.

3 X1 1/2 RED.

SAFETY CLASS 3 CONT. DOWNSIREAM 3A-FWB-902-A TO FLOW ORFICE SAflY 9710A OH C-25 PIDIP 'D DISCHARGE AFW 1590 ARI 157A ~

ABI 18511~

3/+" X 1-'I/2 RED.

3 X 'l-l/2 REL SAFE% CLASS 3 CONT. DOWIISlREAM TO FLOlV ORIFICE 3A-FW8-902-9 AFU 171A

~

'SuLATIOII

B 277492'FW 98G 9712B AFW 990 EL g CONT. ON y

Q-21 AFW 1MQ 277092'703h AFW 1040 AFW 101A

~ AFW 102G 9702C 97020 AFW 105G 8 273338'

~ ~

INSMON

COHT. OH 8-14 14" FEEDWAKR HEADER S/G ~

EL 289$

09'LASS 2 EXEMPT 97068 1l K

~~ AFW '12G A.W 13H l AFW 10H AFW 11S AFW 33 q

PBL 123

~H~'.CONY.0-25 ON g

~ ~ ~ ~ ~

Q

)Q AFW 57G AFW 610

. AFW 62G

~ AFW 566

~

EL 2QL2RP AFW 550 I

I CGA%i;.ON

%r AFW 660 C-2+ Rt AFW 679 AFW 51G 97028 A AFW 650 AFW 680 AFW PFFA '125 AFW 69G 540 9725 g AFW 4e AFW 769 PJ 11'FW CLASS 3 ~ AFW 510 3A-~2-B I

~3 V) 3A-FW8-902-B AFW 116h Ul EL 289.675

~

111G OC AFW 115G I K AFW 'l190 AFW 1199 g 9755 I ~

~g CONT. ON IR II ON N EL nun'ONT.

~ 6 ' fNSULhllON

QQ a ~ ~

I 8 '28L250'WU 540 4 R SWU 5390 4R SWU 538C 4R

~ ~ ~

0

~ ~

~

SWU 541C 4R Nhhh + SWU Q7G 4R SWU 542F ~ ..

SW 108G SW 105C

~

~ l

~ ~ ~

SW 107C

~

SW 1040

~ 3l

.. 2 ~

y SW 1080 SW 109C SW 110C

. ~ W SW 121C SW 111B

. ~ ~ SW '120C SW 112C

~

4 CONT'N SW 119G SW 117A SW 118C 4 R ~ ~ ~ ~ ~ ~ tNSNA'RON

SW890 kR 4h Rh8-152M SW910aR ~ ~ ~

SN 92F SW 1480 SW 1470 SW 1'Idh 14 SERVlCK

~ ~

SW 11

WhlER SW 'I450 l SW 880 4 R SW 9JC dI R

~

~

~

~

~ SN 1440 EL 289.168' 0

~ ~ ~

' ' ' IIISUlAIIOH

~ ~ ~ ~ ~

SW 122G EL 293.660'

@5 CONT'N SAFEIY C-26 9630A 9720A/8 9707A/8

.y 3I K 9708A/8 NON 9627A SW 1222 SAFETY SW 129G CLASS 3 K EL 287.166'741 971 2A/8 SW 124G KI CONT. ON CONT. ON 14SG fP EL 289.749'W C-29 9711A

~~ SYI 128G SW 127G Pl NOT NO SW 125G SSSOS

$ QK 9709A 96278

~ 9629A SAFW j

SW 142G SW 14OC 9742 4 HOT INSULATED PUMP SUCIION C

SW 1410 971 6A 4A-FWB-152-A E CONT. ON C-29 SW 126G

~

EL Pl 9744

~

1 2 NOT NO. 287.166'A-FWB-152-8 OC 4W %r ~

97118 97098 3l K

+ SYI 139G SW 138G SW 136G ~96298 II!

Ig 5 HOT INSULATED l EL 272.417'7168 SAFW PUMP SUCllON D

SW 137G

gC I

sw 38G

$ 8 ~ ~

Q 1.5A-FW8-152-A 0I0 n 1-1/2 gg 9 SW 37G + 3K 1-1/2 COMP ONEHT EXEMPT COOUNC ROOM UNIT 1A

~ HO LD.

SW '132C

~ ~

~ SW 30C SW 31G SW 32G COMPONENT COOUNC ROOM UNIT 18 1-1/2 SW 131C ~

3I

$I 9041 WALL E CD SW 133A 2 OC 1000 + 4~

~ 98318 NOlE O

I 8

g NOTE:

43-FW8-152 SUPPORT LS IHIEGRAL WI% COOUNC UNIT 001000 > ,

INSULATION SUPPORT SlRUCllJRE ~ ~

NON NUCLEAR M 19R II 15U 0

II 180 R

p NO I.D.

QA 1-1/2 M 16R O

O C7 Pl O

X 0

0 (A

O NOTE:

NOTE:

ALL PIPING SHOWN IS NOH NUCLEAR DIMENSIONS ARE APPROMMA'IIONS 10 BE USED FOR REFERENCE ONLY M 9R I ~ ~ ~ ' I'ISULA)ON

CLASS 2 CLASS 3

/we~

rr r'z MSU 65M 6A<<MS-600-1 1-1/2 CLASS 2 CLASS 3 8 26~~ rr S.K CNN. MSU 75M MSU o

8888 ~A V 1-1/2 R 30 MAIN STEAM HEADER g

EL 287'v S.W.

COIIN.

MSU 61G CONT. OH 8-QA H ~X 68-MS-600- I 888 BIII

~ - 6A-MS-600-1 ~

. IIIU 88I IL 889.8' 30 MAIN STEAM HEADER CONT. OH 8-10

~

K MSU 730

. 68-M~00-1 VT 35058 7't!

MSU 77G MSU 67G 0) 0 888 888~ ~6C-MS-600-1 ~

~ MSU 66F 0 6 B.W. CAP mme

~

I AIDaUARY FEEDWATER PUMP INLET O 3652~. ~ MSU 69F X SU 62F 6 X6 X3 REDUCOIG TEE

~

MSU 64C MSU 71G

~ EL 2708 MSU 72H 0 6Q-MS-600-1 MSU 63F 257.3' 0 El Cg gn 01 8 8.8I CIP INSULATION

CONT. OH C-1A 4029 WATER COOIEO 4095 BEARNG HOUSE AU)CLIARY 4A-CO-'150-1A FEEOWAKR

~

)0 PUMP 1A 4A-CO-150-1B 4C-CO-1 50-1

'015 AUXIUARY

~CONT. ON 4093 FEED WAlER C-1F 4027 PUMP 1A

~ FLOOR g i'U)OUARY RSl 2MF~~~~ FEED WATER PUMP 1B

.6A-SW-125-1 A

~

~

402S FLOOR SA-CD-150-1 4O-CO-150-1 g < ae msu 4A-SW-125-1 A EL 250'0 WAAR COOIED SAFETY CLASS 3 0 BEARN0 HOUSE AUXIUARY FEED WATER SERVICE WAAR CONT. OH BIBING TO INST.

g'>OPS 2054 C-16 PUMP 1B JS-SW-125-5A

2758 3E-AC-1 52 260.75'CU EL 47G 269.4'L 244.1'EDUQHG ELBOW z tat EL 260.75'L 757A ~ 4 X3 B!0 WAU.

REDUQHG ELBOW ccu 5Z ~

EL 247.5'CU 51U CLASS 4-XS 2

~

( )

~ CCU 58U EL 241.75' PEIL 'I28 gt /

~EL 2584'HSULATlON

10-Year Inservice Examination Program Plan Table For High Energy Piping Nelds INTRODUCTION This e;<amination plan table establishes the third 10-year interval inservice e:<amination program for High Energy Piping at Ginna Station.

The program incorporates the requirements of the current revision of Appendix B, "Ginna Station Inservice Inspection Pr ogram for the 1990-1999 Interval" of the Ginna Quality Assurance Manual.

The inservice inspection program for High Energy Pipingoutside of containment, as established in Rochester Gas and Electric Corporation's Report "Effect of Postulated Pipe Breaks Outside The Containment Building", dated October 291972, provides for the e:<amination of all circumferential butt welds at design break locations and at discontinuity locations where a failure would result in unacceptable consequences.

his inspection program consists of volumetric examinations, surface and visual examinations of these welds. These types of examinations are used to detect any change in condition or flaw in advance of a potential failure. Surveillance of these welds by the

'nspection program, provides assurance that the design basis or consequential Main Steam or Feedwater breaks will not occur.

During each period of the ten-year interval. the inspection plan provides for examination of all welds at design basis break locations.

Once per Interval, al l consequential break locations will also be examined at locations where a weld would result in unacceptable consquences.

The tables of this plan list all the welds by category and system ~

page 1 of 2

The welds included in the plan are:

(1) Main Steam Loop A Outside CV Design Basis Break (2) Nain Steam Loop B Outside CV. Design Basis Break (3) Nain Steam Turbine Building Design Basis Break (4) Feedwater Turbine Building Design Basis Break (5) Feedwater Loop A -'utside CV Design Basis Break (6) Feedwater Loop B Outside CV Design Basis Break I

(7) Nain Steam Loop A Outside CV Consequential Break (8) Main Steam Loop B Outside CV Consequential Break

('P) Main Steam Turbine Building Consequential Break (10) Feedwater Turbine Building Consequential Break (11) Feedwater Loop A Outside CV Consequential'reak (12) Feedwater Loop B Outside CV Consequential Break At the end of the design and consequential weld break locations in the tables, another list'ng of component supports on the systems noted above is presented. These "non-class" component supports shall be

'isually examined once per interval. The associated isometric High Energy drawings are found af ter the weld and component support tables.

page 2 of 2

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POW'ER STATION UNIT 1 PAGE: 1 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN HIGH ENERGY SYSTEH COMPONENTS INSPECTION INTERVAL PLAN STATUS HAIN STEAM LOOP A OU'fSIDE CV I FIRST SECOND THIRD I ZONE NUMBER: ASHE PERIOD PERIOD PERIOD I SEC ~ XI - I I

SUHHARY EXAMINATION AREA CATGY NDE OUTAGE - I INSTRUCTIONS NUHBER IDEN'f IF ICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I ~*CALIBRATION BLOCK*"

DESIGN BREAK LOCS. 30A-MS-600-1A FIG NO NE-1 200005 D APPEN-B VT-1 1 C - - C C - INS. CLASS 2 WELD PIPE-TO.ELBOW PEN. 401 XSCR RT 2 - C C 100, 128 HT 3X - - X X 4 X - - X X 87 -VT:INSIG:LIGHT RUST, PITS, CLAMP HARKS,ARC STRIKES REMOVED BY BLENDING - ACCEPT . KK. Mt: IN S I 0: SEVERAL SURFACE SCABS REMOVED BY BLEND INC ACCEPT KK RT SLAG 2 SPOTS 0 55 1 /4 ( +1 /1 6) HED POROS 8 61 1 /4) 63 1 /8y 70 3/8 NACSLI 3/2/82 2 00010 D1 APPEN-B VT-1 1 C - - C C INS. CLASS 2 WELD ELBOW TO PIPE XSCR RT 2 - - C C 100, 128 HT 3X - . X X 4 X X X 87 .VT:INSIG:LIGHT RUST, GRIND MARKS,U/C FROM FIT.UP LUGS,ARC STRIKES. REMOVED BY BLENDING.ACCEPT-KK. RI': NACSLI 3/2/82.

200015 F1 APPEN B VT-1 1 C C C WALL THICKNESS 1.25" DIAMETER ELBOW.TO-PIPE XSCR RT 2- - C C C 30" PENETRAHETER 20 SHIH .0625 100, 128 HT 3. X X X INS. SCF. CLASS 2 WFLD 4 - X X X 85 . Rt INSIG: SLAG 1/4" LONG AT 16" 8 3/16" LONG AT 79". POROSITY AT 75",80" & 84" . ACCEPT - AEC NO CHANGE IN THIS

'WELD SINCE LAST INSPECTION 3/30/78.

88 - HT 8 Vt-1,NORECI-ACCEPT. RT,NOREC; 20-30(30.40(50-60(60-70,90-0. RT, INSIGI10-20,SLAG 11"- 11 3/16" IND. 3/16" LG.;40 50,SLUGS OFF FILH(SHOT IN SAME ORDER IN PROCESS)g 70-80, SPO'f POROSITY 975; 80.90, SPOI'OROSITY ol85. N/C SINCE LAST INSP.'85 DESIGN BREAK LOCS. 36-HS-600-1 FIG NO NE.1A 200020 L1 APPENBVT-1 1 C - - - . C C INS.

REDUCER TO TEE XSCR RT 2 - - C C C 450, 450 HT 3- X . - . X - X 4 - X X X 84 Rt:SPOT OF SLAG 0"(3.25"(8.25" POROSITY AT 44".PREP MARK AT 70"-71".BURN TNRU FILLED AT 81.5. SLAG 93.5" 93.625"SLAG SPOT 98.25".NO APPAREN'f CNGE IN COHO. OF WELD SINCE LASt INSP. 2-19-79. MT:LIMITED AREA 6"-5"-84 PIPE RESTRAINT.

DATE: 06/02/89 ROBERT E. GIHHA HUCLEAR PONER STATION UNIT 1 PAGE: 2 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEM COMPONENTS INSPECTION INTERVAL PLAN STATUS MAIN STEAM TURBINE BUILDING I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERICO SEC. XI I I

SUMMARY

EXAMIHAT ION AREA CATGY NDE - -OUTAGE- - - - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO METH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK~~

DESIGN BREAK LOCS. 36.MS.600-1 FIG NO NE-7 200025 L2 APPEN-2 VI I 1 C C C IHS.

2-TEE-TO-PIPE 450, 450 XSCR Ml'-

RT 4-X C

X C C X

X X X 86 - VT-1:IHSIG: 1/64" X(1/4",1/24 DIA.) CLAHP MARKS Q 58-3/4" 78-3/4" 8 884 - ACCEPt .KK. RT:INSIG: SLAG SPOTS 1/16" AT 35" AND 54". NACSLI 3/5/82.

DATE: 06/02/89 ROBERT ED GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 3 REVISIOH: 0 INSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEM COHPONEHTS INSPECTION INTERVAL PLAN STATUS MAIN STEAM LOOP B OU'ISIDE CV I FIRST SECOND THIRD ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI - I I

SUMMARY

EXAHINATION AREA CATGY NDE - - - - - - 0 U' A G E - - I INSTRUCTIONS NUMBER IDENTIF ICATJOH ITEM NO HETH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK>>>>

DESIGN BREAK LOCS. 30B.MS-600-1B FIG NO NE-2A 200030 D APPEN-8 VT 1 1 C - - C C INS. CLASS 2 MELO PIPE-TO-ELBOW PEH. 402 XSCR RT 2 - - C - C C 100, 128 MT 3X - - X X 4 X X X 85 - RT - INSIG: 1/8>> SLAG At 6-1/2>>, POROSITY At 65(( S/U 53" TO 55"( 60-1/2", AND AT 70.1/2". NO APPARENT CHANGE SINCE LAST INSPECTION 2/16/82 ~

87 - VT:IHSIG:U/C 9 21(1/64 X 3/4)(46(1/64 DP.)PIT 9 42(1/8 DIA X 1/64 OP.)GRIND HARK 9 37-40(1/32) Rt: SLAG 1/8 9 4 1/2. SPOT SLAG 9 88-1/2. DROP TNRU 8 79-3/4. NACSLI 1/16/82.

200035 H1 APPEN B VT-1 1 C C C INS. CLASS 2 'WELD PIPE-TO-ELBOW XSCR RT 2 C C 100, 128 HT 3. X X X 4 . X X X 85 - Rt - NO APPARENT CHANGE SINCE LAST INSPECI'ION 3/29/78.

88 -VT-1, INSIG;GR.MARKS 12-13"CCW FM.LO 1" AWAY FROH EDGE OF WELD,ACCEP'T.-CORROSIOH-JO. Mt(NOREC)LIM.GUIDE ATTACH..5"FH WELD.RT<NOREC)0-10( 10-20,50-60(60.70,80 90,90 0: 20.30830.40 ROLL MARKS(40-50 SLUG MISSING. 70-80(SLIGN'I H20 MARK.N/C SINCE LAST EXAH.

200040 J1 APPEN 8VT-1 1 C - - - C C - INS. CLASS 2 WELD PIPE-TO-ELBOW XSCR RT 2- C C 480, 480 MT 3 - X X X 4 - X X X 84 - Rt:POROSITY 66.75" (72" NO APPARENT CHANGE IH THE CONDITION OF I'HIS WELD SINCE LAST INSPECtlON 11-03-80.

88 . VT-1, INSIG; U/C 8 43.75" ON LINE-UP LUG.(.25X.06X.03)-ACCEPT-KK MT(NOREC;-ACCEPT-SJD.

RTINORECI'0-10,10-20(50-60,60-70,70.80(80.90 890-0. RT, INSIGI20-30(EUC 23"-30>>EDGE OF WELD) 30.40" EUC 30.40"EDGE OF WELD, 40-50 EUC 40-45"EDGE OF WELD DESIGN BREAK LOCS. 36-MS-600-1 FIG NO NE-2 200045 P1 APPEH-8 VT-1 1 C C C INS.

REDUCER-TO-TEE XSCR RI' C C C 450, 450 HT 3 X X X 4 X X X 86 - Vt-1:REJ: ARC STRIKE. VT.1 REEXM:RE-EXAM OF ARC STRIKE REPAIR. VT 1 REEXH:INSIG:

CLAHP HARK AND SHALLOW FORGIHG LAP - ACCEPT - GB. Rt: NACSLI 2/12/82.

DATE: 06/02/89 ROBERT. E. GINNA NUCLEAR PONER STATIOH UNIT 1 PAGE: 4 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN HIGH ENERGY SYSTEH COHPONENI'S INSPECTION INTERVAL PLAN STATUS FEEDWATER TURBINE BUILDIHG I FIRST SECOHD THIRD I ZONE NUMBER: ASHE I PERIOD PERICO PERIOD SEC. XI I I SUMHARY EXAHIHATION AREA CATGY NDE I

- OUTAGE - I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO NETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK

'ESIGN BREAK LOGS. 20-FH-900.1 FIG NO HE-6 200050 M3 APPEN-8 VT-1 1 C C C" INS.

PIPE-TO TEE XSCR RT 2- C C 450, 450 HT 3- X X 4- X X 86 - VT-I:INSIG: TOOL HARK 1/32" X I/84 DIA 0 51-5/8" TO 51-3/4", LIGHT RUSI' ACCEP'I - KK. ~

RT: SPOT POROS 0 12-1/2"( INTERHITT. SLAG 9 304,32" 8 34-1/2")SPSLAG 9 42" (48" 50" 8 62" ACCEPT-KK

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: '

REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN HIGH ENERGY SYSTEH COMPONENTS INSPECTION INTERVAL PLAN STATUS FEEDWATER LOOP A OUTSIDE CV I FIRST SECOHD THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. Xi I I SUHHARY EXAMINATION AREA CATGY NDE - - OUTAGE - - I INS'IRUCTIONS I

NUHBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIOHBLOCK**

DESIGH BREAK LOCS. 20-F'W-900-1 FIG NO HE-5 200055 H4 APPEH B Vt-1 1 C C C INS.

TEE-TO.REDUCER XSCR RT 2- C C C 660, 660 HT 3- X X X 4- X X X 86 - Vt-1:INSIG: PITS 1/64" DEEP 0 1-1/2" TO 2" & 3" TO 3-1/4", LIGHT RUST - ACCEPT - KK. RT: NACSLI 3/21/82.

200060 O'I APPEH 8 VT-1 1 C C C IHS - REHOVE 4" FROM EACH S!DE ELBOW-TO PIPE XSCR RT 2- - C C R C OF 'WELD CENTERLINE.

660, 660 MT 3- X X X 4 - X X X 85 RT IHSIG: POROSITY AT 14" - ACCEPT .AEC. HO CHANGE IN THIS WELD SINCE LAST INSPECTION 11/10/80.

88 - ITEH RESCHEDULED FOR 1989,2ND INTERVAL 9TH OUTAGE; IHACCESSABLE.

200065 U2 APPEN-B VT-1 1 C C C INS - REMOVE 4" FROH EACH SIDE PIPE-TO ELBOW XSCR RT 2- C R C OF 'WELD CEN'IERLINE.

660, 660 Ht 3 - X X X 4 . X X X 85 . RT IHSIG: SUCK-UP - 25" TO 26": SLAG 1/16" LOHG AT 31" AND 0" - ACCEPT - AEC NO CHANGE IH THE CONDITION OF THIS 'WELD SINCE LAST INSPECTION 11/10/80.

88 - ITEH RESCHEDULED FOR 1989, 2ND IN'IERVAL 9TH OUTAGE; INACCESSABLE.

DESIGN BREAK LOCS. 14A-FW-900-1A FIG NO HE-3 200070 AA APPEN.B Vt-1 1 C C C I HS.

PIPE-TO PIPE XSCR RT 2 C C C 480, 480 MT 3X X X 4 X X X 87 - VT,RT,HT:OtHER: THIS IS HOT A PIPE - TO - PIPE WELD. THIS IS A PIPE TO ANCHOR WELD. SEE SUHMARY ¹ 091900 FOR PIPE - TO - PIPE WELD. REHOVE FROH PLAN - MJS.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATIOH UNIT 1 PAGE: 6 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN HIGH ENERGY SYSTEH COMPONEH'IS INSPECTION INTERVAL PLAN STATUS FEEDWATER LOOP B OUTSIDE CV I FIRST SECOND THIRD I ZONE HUMBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I I

SUMMARY

EXAMINATION AREA CatCV NOE - - - - - - OUTAGE - - - - - - I IHSTRUCTIONS NUMBER IDENT IF I CATION ITEH HO METH I 1 2 3 1 2 3 4 1 2 3 I *"CALIBRATION BLOCK">>

DESIGN BREAK LOCS. 20.FW.900.1 FIG NO HE-5 200075 A1 APPEN.B Vt-1 1 C C C INS.

TEE-TO-REDUCER XSCR RT 2- C C 660, 660 MT 3- X X 4- X X 86 - VT-1:INSIG: LIGHT RUST - ACCEPT - KK. Rt: NACSLI 3/21/81 200080 F4 APPEN-8 Vt 1 1 C C C INS.

ELBOW.TO.PIPE XSCR RT 2 C C C 660, 660 HT 3 X X X 4 X X X 87 - Rt:INSIG: DROP THRU AT 35-1/8. HACSLI 4/19/77.

DESIGN BREAK LOCS. 14B-FW-900-1A FIG NO HE-4 200085 N APPEH B VT-1 1 C C C INS. CLASS 2 WELD 3994 VALVE-TO.ELBOW XSCR RT 2 C C C 450, 450 Mt 3- X X X 4 - X X X 85 . RT.OTHER: POROS AT 24N ACCPT-AEC. SIDEWALL LACK OF FUSION 3N.9", 9N-11" IAT 36" & 36".42" REJECT - AEC. REPAIR RE EXAMS: Pl' ROOI'ASS( V'I & MT WELD.RT- IHSIG: DROP THRU AT 0" ( IUC AT 12"-144 & 36". ROOT GEOM CHG At 36". NEW BASELINE ON WELD.

88 -VT-1 & Mt; HOREC.-ACCEPT..SJD. RT, IHSIG;0.9,DROP THRU Q 1",POR. Q 4 3/8",SPOt SLAG Q3.5",9.18; 18-27".CONCAVITY 20 TO 27") 27-36"-CONCAVE 27 TO 28.5",IUC 28.5 TO 33 Q 34 TO 34 3/84. 36 0; IUC & IRREGULAR ROOT PASS.

200090 V APPEN-B Vt-1 1 C C C INS. CLASS 2 WELD ELBOW.TO.PIPE PEN. 404 XSCR Rt 2 C C C 100, 128 MT' X X X 4 X X X 87 -VT:INSIG:SCATTERED PITS=1/8 & 1/16 DEEP Q 13,21,30,33,42,& 45. FIT.UP LUG U/C Q 21 & 43. LIGHT RUST ACCEPT JO. RT: NACSLI 4/9/80

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER S'IATIOH UNIT 1 PAGE: 7 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEM COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS MAIN STEAH LOOP A OUTSIDE CV I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI SUHMARY EXAHIHATION AREA CATGY NDE I

- OUTAGE - - - -- I I INSTRUCTIONS NUHBER IDENTIFICATION ITEM NO HETH 1 2 3 1 2 3 4 1 2 3 <<" CALIBRATION BLOCK*>>

I CONSEOUEHTIAL BREAK LOC. 30A MS 600-1A FIG NO HE-1 200100 D2 APPEN-8 VT-1 1 C INS. CLASS 2 WELD PIPE-TO ELBOW XSCR RT 2- C 480, 480 HT 3- X 4 X 88 - HT & VT-1(NOREC; RT,NOREC120 304&90 0".RT, INSIG(0-10", INTERHIT.ECU.;10.20", INTERMIT.EUC. 130 40, 40.50(LONG. SEAM Q40" (50 60" INTERMIT.EUC 52 60")60-70" i INTERMIT.EUC &H20 SPOT Q64";70-80" ( INTERMIT. EUC & BLEND Q 70.;80 90" IHTERHIT.EUC.,N/C SIHCE INSP.

200105 D3 APPEH 8 VI'-1 1 - C INS. CLASS 2 WELD 2-ELBOW-TO.PIPE 480, 480 XSCR Hl'-

RT 4-C X

X 88 .MT,NOREC;VT-I, INSIG;ARCSTRIKE REMOVED. BLENDING,APPROX.1/32"REMOVED. RT,HOREC;20-30,30.40,60-70, 70.80,90-0.

RT ~ INSIGIG 10 ~ POR Q3 & INTERMIT EUC 5 10 10 20iPOR Q16 5 IN GROUND AREA 40 50/50 60 ARTIFACTS ON FILM Q47/48 80 90 INTERHIT EUC 84-90,N/C SLI 200110 E APPEH 8 VT-1 1 C IHS. CLASS 2 'WELD PIPE-TO-ELBOW XSCR RT 2- C 480, 480 MT 3 X 4- X 200115 E1 APPEN-8 VT-1 1 C INS. CLASS 2 WELD ELBOW-TO ELBOW XSCR RT 2- C 480, 480 MT 3 X 4 X 200120 E2 APPEN 8 VT-1 1 C INS. CLASS 2 WELD ELBOW-TO PIPE XSCR RT 2 . - C 480, 480 HT 3X 4 X 200125 F APPEN-8 VT-1 1- C INS. CLASS 2 'WELD PIPE-TO.ELBOW XSCR RT 2. - C 480, 480 MT 3- X 4- X

DATE: 06/02/89 ROBERI'. GINNA NUCLEAR POWER STATIOH UNIT 1 PAGE: 8 REVI 8 ION: 0 IHSERVICE INSPECTIOH PROGRAH PLAN HIGH EHERGY SYSTEM COHPONEHI'S INSPECTION INTERVAL PLAN STATUS HAIN STEAH LOOP A OUTSIDE CV I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI - I I

SUHHARY EXAHIHATIOH AREA CATGY HDE I

- OUTAGE - - - - - I INSTRUCI'IOHS NUHBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK*"

CONSEOUENTIAL BREAK LOC. 30A.HS.600-1A FIG NO HE-1 200130 G APPEN-8 VT-1 1 C INS. CLASS 2 WELD PIPE-TO-TEE XSCR RT 2 - - C 450, 450 HT 3- X 4 - X 200135 GI APPEN-8 VT-1 1 - - - - - C INS. CLASS 2 'WELD TEE-TO-CAP XSCR RT 2 - - C ~

450, 450 HT 3- - X 4 - - X 200140 G2 APPEH-8 VT 1 1

- - - - - C INS. CLASS 2 WELD TEE-TO PIPE XSCR RT 2 - C 450, 450 HT 3- - X 4 - . X 200145 H APPEN 8 VT-1 1 C INS. CLASS 2 WELD PIPE-TO.VALVE 3517 XSCR R'T 2 . C 450, 450 HT 3. X 4- X 84 - RT:SLAG 35.9375"-36". SLAG SPOT 41.75". THIS WELD HAS A BACKING RING. NO APPAREN'I CHANGE IN THE CONDITION OF THIS MELD SINCE LAST INSPECTION 04-01-80.

200150 J APPEH B VT-1 1 C INS. CLASS 2 WELD 3517 VALVE-TO-PIPE XSCR RT 2- C 450, 450 HT 3- X 4 X 84 - RT:"J" FELL OFF-SCRATCHED OH FILH. SPOT OF SLAG AT 44.754, 44.54. THIS MELDHAS A BACKING RING. NO APPARENT CHANGE IN tHE CONDITIOH OF THIS WELD SINCE LAST INSPECTION 02.18.76.

200155 K APPEN-8 VT-1 1 C INS. CLASS 2 WELD PIPE-TO-VALVE 3519 XSCR RT 2 - - C 450, 450 HT 3- - - - X 4- X 84 - RT:SLAG AT 1.25-1.5,23.23.0625 27 27 0625i31 ~ 25 31 4375i32 32 0625i27 625i30 42 25 42 5 ~ 56 125 56 1875 76 76 1875i84 84 1875 & 88 125 POROSITY AT 13.20.75,40.75,59,62,63.5,64,75,78,8 83.CLSR POR AT 41.75,49.5,53.THIS WD HAS A BK RG.NOCHG 2-18-76.

DATE: 06/02/89 ROBERT E. GIHNA HUCLEAR POWER STATION UNIT 1 PAGE: 9 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEH COMPONENTS IHSPECTION INTERVAL PLAN STATUS MAIN STEAM LOOP A OUTSIDE CV I FIRST SECOND THIRD I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI - I I

SUHHARY EXAHINATION AREA CATGY NDE I OUTAGE I IHSTRUCTIOHS NUMBER IDEHT IF ICATION ITEH NO HETH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK*"

CONSEOUENTIAL BREAK LOC. 30A-HS-600-1A FIG NO NE-1A 200160 L APPEN B VT-1 1 C INS.

35'19 VALVE-TO REDUCER XSCR RT 2 - - C 450, 450 MT 3 X 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 10 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAH HIGH ENERGY SYSTEM COMPONEH'IS INSPECTION INTERVAL PLAN STATUS MAIN STEAM LOOP B OUTSIDE CV I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I

- I SUMHARY EXAHINATIOH AREA CATGY NDE - - - - - - 0 U T A G E - - - - - - I INSTRUCTIOHS NUMBER IDEN'TIFICATIOH ITEM HO METH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

CONSEDUEHTIAL BREAK LOC. 30B.MS.600-1B FIG NO H -2A 200165 01 APPEH-B VT-1 1 C INS. CLASS 2 WELD ELBOW.TO-PIPE XSCR RT 2 C 100, 128 MT 3- X 4- X 200170 D2 APPEN 8 VT-1 1 - - C IHS. CLASS 2 WELD PIPE-TO.ELBOW XSCR RT 2- C 100, 128 HT 3- X 4- X 200175 E APPEN-8 VT-1 1- C INS. CLASS 2 WELD ELBOW.TO.PIPE XSCR RT 2- - C 100, 128 HT 3 X 4 X 200180 J APPEH-8 VT-1 1 - . - C INS. CLASS 2 WELD ELBOW-TO-PIPE XSCR RT 2 - - C 100, 129 MT 3X 4 X 200185 K APPEN B VT-1 1 - - - C INS. CLASS 2 WELD ELBOW-TO PIPE XSCR RT 2 - . C 480, 480 MT 3- X 4 - X 200190 L APPEH-B VT 1 1 - - - - C INS. CLASS 2 WELD PIPE-TO TEE XSCR RT 2 - - C 450, 450 MT 3. X 4 - X CONSEOUENTIAL BREAK I.OC. 30B.MS 600 18 FIG NO NE-2 200195 L1 APPEN 8 VT 1 I - - - C INS. CLASS 2 'WELD TEE-TO CAP XSCR R'I 2 . - C 450, 450 MT 3- . X 4 - - X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 11 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN HIGH ENERGY SYSTEM COMPONEHl'S INSPECTIOH INTERVAL PLAN STATUS MAIN STEAM LOOP 8 OUl'SIDE CV I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD

SUMMARY

EXAHINATION AREA SEC. XI CATGY NDE I

I

- -OUTAGE ------I I INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

CONSEDUENTIAL BREAK LOC. 308-MS-600-1B FIG NO NE.2 200200 L2 APPEH-8 VT 1 1- C INS. CLASS 2 'WELD TEE-TO PIPE XSCR RT 2 - - C 450, 450 MT 3. - X 4 - - X 200205 M APPEN.B VT-1 1 C IHS. CLASS 2 WELD PIPE-TO-VALVE 3516 XSCR RT 2- C 450, 450 HT 3- X 4- X 84 . VT:L-53.75,54.75 LN UP LUG REMV.GRND.FLSH..ACCP.RT:SLAG 27"-27.25"SLAG 54"-54.25" 2"TRANSV.IND.AT

~

52.754, 1.25"TRANSV. IND.AT53.75" BOTH DUE TO LN-UP LUG REHV.SLAG SPTS.AT 90.5"& 91.25".THIS WD.NASA BACKING RING. NO APPARENT CHANGE SINCE 4-2-80.

200210 H APPEN-B VT.1 C INS. CLASS 2 WELD 3516 VALVE-TO PIPE XSCR RT 2- C 450, 450 HT 3- X 4- X 84 VT:TACK WELD ACCEPT. RT:POROSITY AT 12.5" SLAG AT 52"-52.0625". NO APPAREHT CHANGE IN THE COND-IT!ON OF WELD SIHCE LAST INSPECTION 04-04-80.

200215 0 APPEN B VT-1 1 C INS. CLASS 2 W'ELD PIPE-TO-VALVE 3518 XSCR RT 2 - - - C 450, 450 MT 3- - - X 4 X 84 - RT:POROSITY AT 7.5",8" (10". CLUSTER POROSITY AT 40". POROSITY AT 44",45" AND 52". SLAG AT 62"- 62.0625. NO APPARENT CHAHGE IH THE CONDITIOH OF THIS WELD SINCE LAST INSPECTION 04.01-80.

200220 P APPEN-8 VT-1 1 C INS ~

3518 VALVE-TO REDUCER XSCR Rl' C 450, 450 MT 3- X 4- X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 12 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN HIGH EHERGY STSTEM COMPONENTS INSPECTION INTERVAL PLAN STATUS MAIN STEAM TURBINE BUILDING I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC ~ XI I I

SUMMARY

EXAMINATION AREA CATGY NDE - OUTAGE- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO HETH I 1 2 3 1 2 3 4 1 2 3 *~CALIBRATION BLOCK**

CONSEOUENTIAL BREAK LOC. 36.MS-600-1 FIG HO NE-7 200225 L4 APPEN-B VT 1 1 C IHS.

CAP-TO-PIPE XSCR RT 2- C 660, A660 MT 3- X 4 X CONSEOUENTIAL BREAK LOC. 24A MS 600 1A FIG NO HE-7A 200230 A APPEN-B VT-1 1 - - C INS.

TEE-TO-PIPE XSCR RT 2- ~ C 660, A660 MT 3. X 4- X 200235 B PIPE-TO-ELBOW 660, A660 APPEN-8 VT-1 XSCR RT MT 3 1

2 ..

X C

C INS.

4 X 200240 81 APPEN B VT-1 1- C IHS.

ELBOW-TO-PIPE XSCR RT 2 - - C 660, A660 IIT 3- X 4 - X 200245 C1 APPEN-B VT-1 1 C IHS.

PIPE-TO.ELBOW XSCR RT 2 - - C 660, A660 MT 3. X 4 - X 200250 0 APPEND 8 VT-1 1 INS.

ELBOW-TO PIPE XSCR RT 2 - - C 660, A660 MT 3 - - X

4. - X 200255 01 APPEH B VT 1 1 - C INS.

PIPE TO-ELBOW XSCR RT 2 - - C 660, A660 MT 3- - X 4- . X

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STAI'ION UNIT 1 PAGE: 13 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN HIGH EHERGY SYSTEM COMPONEHTS INSPECTION INTERVAL PLAN STATUS HAIN STEAM TURBINE BUILDING I FIRST SECOHD THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I

SUMMARY

EXAMINATION AREA CATGY NDE - 0 U T A G E - - - - - - I INSTRUCTIONS I

NUHBER IDEHT IF ICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOH BLOCK**

CONSEOUENTIAL BREAK LOC. 24B.MS-600.1B FIG NO NE 7A 200260 A APPEH B VT-1 C I NS.

'TEE-TO PIPE XSCR RT 2- C 660, A660 HT 3- X 4- X 84 - RT:SPOT OF SLAG AT 27" 34" 34.25" 34.754-34.875" 41" 81".81.125" 86.125"-86.25"8 89".THIS WELD HAS A BK.RG.

NOTE:I.D. ON FILM READS HS1001M-S/8 "0". THERE IS NO APPARENT CHANGE IN THE CONDITION 'OF THIS 'WELD SINCE LAST INSPECTION 11-05-80.

200265 B APPEN-B VT-1 1 C INS.

PIPE-TO ELBOW XSCR RT 2 - - - C 660, A660 MT 3- X 4- X 84 VT: ARC StRIKE-ACCEPT. R't:POROSITY AT 25",27". SPOT SLAG 42",SLAG 43.5"-43.75". SPOT OF SLAG 55.5",56.5". SUCK UP 67.25"-68.5".POROSITY AT 66.73", AND 73.5" THERE IS NO APPARENT CHANGE IH THE

~ CONDITION OF 'tHIS WELD SINCE LAST IHSPECTIOH 04-01-80.

200270 81 APPEH.B VT-1 1 C INS.

ELBOW TO PIPE XSCR Rt 2- C 660, A660 HT 3- X 4- X 85 Rt INSIG: SPOTS OF POROSITY AT 7 1/2", 40", 64-1/2", 69" AND 71" - ACCEPT - AEC NO CHANGE IH THE CONDITIOH OF THIS WELD SINCE LAST INSPECTION 11/6/80.

200275 C APPEH-B VT-1 1 C INS.

PIPE-TO ELBOW XSCR RT 2- C 660, A660 MT 3- X 4 . X 85 - RT INSIG: SPOl'OROS AT 'IS"( POROS AT 31", HEAVY ROO'I 37" - 43"( IHl'ERHAL UNDERCUI'4" 60" AND 60" TO 63"-

ACCEPT - AEC. NO CHANGE IH THIS WELD SINCE LAST INSPECTION 11/6/80.

200280 C1 APPEN.B Vt-1 1 C INS. ROLLING SCAFFOLD ELBOW TO PIPE XSCR RT 2- C 660, A660 Mt 3- X 4- X 86 . VT-1:INSIG: GRIND MARKS, HIGH WELD CROWN 3/4" LONG . - JO.

ACCEPT Rt: NACSLI 3/18/82.

DATE: 06/02/89 ROBERI'. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 14 REVISION: 0 IHSERVICE INSPECTIOH PROGRAM PLAH HIGH ENERGY SYSTEM COMPONENTS INSPECTION INTERVAL PLAN STATUS MAIN STEAM TURBINE BUILDING I F IRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERICO PERICO SEC. XI I I

SUMMARY

EXAHI NATION AREA CATCY NDE - - - 0 U T A C E - - - - - - I INSTRUCTIONS NUHBER IDENT IF ICATION ITEM NO HETH I 1 2 3 1 2 3 4 1 2 3 I *"CALIBRATIONBLOCK**

CONSEOU NTIAL BREAK LOC. 24B-MS-600-1B FIG NO HE-7A 200285 D APPEN 8 VT-1 1 C INS. ROLLING SCAFFOLD PIPE-TO.ELBOW XSCR RT 2- C C 660, A660 MT 3- X 4- X 0 86 - VT-1:INSIG: GOUCE 1/32" DEEP( LIGHT GRIND MARKS - ACCEP'I -JO. RT:INSIC: SLAG SPOTS 9 19" 19 1/2" 37-1/2",46-1/2"(2 SPOTS) 8 72". HACSLI 3/82

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 15 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN HIGH EHERGY SYSTEH COHPONEHTS INSPECTION INTERVAL PLAN STATUS FEEDWA'TER TURBINE BUILDING I FIRST SECOHD THIRD I ZOHE NUHBER: ASHE PERIOD PERIOD PERIOD j SEC XI I I SUHHARY EXAHINATIOH AREA CATGY NDE I

- OUTAGE I INSTRUCTIONS NUNBER IDENT IF I CATION ITEN HO METH I 1 2 3 1 2 3 4 1 2 3 I <<<<CALIBRATION BLOCK<<<<

CONSEOUEN'TIAL BREAK LOC. 20-FW-900-1 FIG NO NE-6 200290 J APPEH B VT-1 1 INS.

ELBOW-TO.PIPE XSCR RT 2-660, A660 HT 3-4-

200295 K1 APPEH-B VT-1 1 INS.

PIPE-TO.ELBOW XSCR RT 2-660, A660 HT 3X 4 X 200300 L APPEH 8 VT-1 1- C INS.

ELBOW-TO.PIPE XSCR RT 2 - - C 660, A660 H'I 3- X 4 - X 200305 L1 PIPE-TO ELBOW APPEN-8 VT-1 XSCR RT 1

2

. C

.. C INS.

660, A660 MT 3 - X 4 - . X 200310 H APPEH 8 VT-1 1 C I HS.

ELBOW-TO-PIPE XSCR RT 2- C 660, A660 O'I 3- X 4 X 84 - RT:SLAG AT 1" SPOT. SLAG SPOT 43.375". NO APPARENT CHANGE IN THIS WELD SINCE LAST INSPECTION 04-12-80.

200315 H1 APPEN-B VT-1 1 C IHS.

PIPE-TO.ELBOW XSCR RT 2 . C 660, A660 MT 3. X 4- X 85 - R'I INSIG: SLAG 1/4" LONG AT 32<< - ACCEPT - AEC NO CHANGE IN THE CONDITION OF THIS WELD SINCE LAST INSPECTION 11/10/80.

DATE: 06/02/89 ROBERT E ~ GINNA NUCLEAR POWER STATION UNIT 1 PAGE: '16 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN HIGH ENERGY SYSTEM COMPONENTS INSPECTIOH INTERVAL PLAN STATUS FEED'WATER TURBINE BUILDING I FIRST SECOND THIRD ZONE NUHBER: ASME I PERIOD PERIOD PERIOD SEC ~ XI I I SUHHARY EXAHIHA'TION AREA CATGY NDE OUTAGE I INSTRUCTIONS NUHBER IDENT IF I CATION ITEM NO METH I 1 2 3 1 2 3 4 I 2 3 I **CALIBRATIONBLOCK*"

CONSEOUENTIAL BREAK LOC. 20-FW.900.1 FIG NO NE-6 200320 M2 APPEH-8 VT-1 1 - ~ C INS.

ELBOW.TO-PIPE XSCR RT 2 - - C 660, A660 MT 3- X 4- X CONSEOUENT AL BREAK LOC. B-FW.900-1 FIG NO NE-6 200325 A APPEH.B VT-1 1 C INS.

8-IH. BRANCH CONNECTION XSCR RT 2. C 660, A660 MT 3- X 4- X 87 HT:INSIG: TEMPORARY ATTACHHENTS REHOVED AT 13 1/2" - ACCEPT -TS. THIS BRANCH CONNECTION CAHNOT BE RADIOGRAPHED. REHOVE RT FRCM PLAN - MJS.

200330 8 APPEN.B VT-I 1 - C INS.

BRANCH CONNECTION-TO ELBOW XSCR RT 2- R C 660, A660 MT 3- X 4- X 0

88 OTHERl WATER IN LINE, CANNOI'XAMINE. RESCHEDULE TO 2ND INTERVAL 9TM CUTAGE, 1989.

200335 C APPEH-8 VT 1 1 C INS.

ELBOW-TO.PIPE XSCR RT 2- C 660, A660 HT 3- X 4- X 200340 D APPEN-B VT-1 1 C INS.

PIPE-TO ELBOW XSCR RT 2 - - C 660, A660 MT 3 X 4 X 200345 E APPEH-8 VT-1 1 . C INS.

ELBOW.TO PIPE XSCR RT 2 - - C 660, A660 MT 3- X 4 - X

DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR POWER STATION UNIT 1 PAGE: 17 REVISION: 0 INSERVICE INSPECtlON PROGRAH PLAN HIGH ENERGY SYSTEH COHPOHENTS INSPECTION INTERVAL PLAN STATUS FEEDWATER TURBINE BUILDING I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC'I SUHHARY EXAHIHATION AREA CATGY NDE I

I

- - - - 0 U T A G E - - - - -- I INSTRUCTIONS HUHBER IDENTIF ICATION ITEN NO NETH I 2 3 1 2 3 4 1 2 3 I <<*CALIBRATION BLOCK**

CONSEOUENTIAL BREAK LOC. 8-F'W-900-1 FIG NO HE-6 200350 F APPEHBVT-1 1 - - - . C INS.

PIPE-TO.ELBOW XSCR RT 2 - - C 660, A660 Ht 3- . X 4 - - X 200355 G APPEN-B VT.1 C INS.

ELBOW TO-PIPE XSCR Rt 2- C 660, A660 Ht 3- X 4- X 84 Rt: SPOT OF SLAG AT 7". NO APPARENT CHANGE IH THE CONDITION OF THIS WELD SINCE LAST INSPECTION 11-10-80.

200360 H APPEH-B Vt-1 1 C IHS.

PIPE TO-VALVE XSCR RT 2- C 660, A660 HT 3- X 4 . X 85 - RT INSIG: POROSITY AT 6" TO 7" 7", 10" 13" ( 20" TO 21" 26" TO 27" - ACCEPT - AEC- HO CHANGE IN THE CONDITIOH OF THIS 'WELD SINCE LAST INSPECTION 11/6/80.

DATE: 06/02/89 ROBERT E ~ GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 18 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN HIGH EHERGY SYSTEH COMPONENTS INSPECTION INTERVAL PLAN STATUS FEEDWATER LOOP A OUTSIDE CV I FIRST SECOHD THIRD I ZONE NUHBER: ASHE I PERICO PERIOD PERIOD SEC. XI I I SUMHARY EXAMIHATION AREA CATGY NDE - - - - - OUTAGE - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO HETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

CONS OU NTIAL BREA OC. 14A.FW.900-1A FIG NO NE-5 200365 T2 APPEH-B VT-1 1 - C INS.

PIPE-TO ELBOW XSCR RT 2- R C 660, A660 Mt 3- X 4 X 88 - ITEM RESCHEDULED FOR 1989. 2ND IHTERVAL 9TH OUTAGE; IHACCESSABLE.

200370 T3 APPEH-8 Vt-1 1 . C INS.

ELBOW-TO PIPE XSCR RT 2 R C 660, A660 Mt 3- X 4- X 88 . ITEH RESCHEDULED FOR 1989, 2ND INTERVAL 9tH OU'TACE; IHACCESSABLE.

200375 U7 APPEH-8 VT-1 1 - C INS.

ELBOW.TO-PIPE XSCR RT 2- R C 660, A660 M'I 3- X 4- X 88 - ITEM RESCHEDULED FOR 1989, 2ND INTERVAL 3RD OUTAGEI INACCESSABLE CONSEOUENTIAL BREAK LOC. 14A-FW.900-1A FIG NO NE-3 200380 U5 APPEH B VT-'I 1 - C I NS.

PIPE-TO ELBOW XSCR RT 2- R C 480, 480 HT 3- X 4- X 88 . Mt, OTHER; RESTRICTED YOKE ACCESS. RT, OTHER; WATER IH LINE CANNOT RT, RESCHEDULE TO 2ND INTERVAL 9TH OUTAGE 1989.

200385 U6 APPEH 8 VT-1 1 - C INS.

ELBOW TO ELBOW XSCR RT 2- R C 480, 480 MT 3- X 4 X 88 - OTHER; WATER IN LINE, CANHOt RT. RESCHEDULE TO 2ND. INTERVAL 9'IH OUTAGE 1989.

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POHER STATION UNIT 1 PAGE: 19 REVISION: 0 IHSERVICE IHSPECT ION PROGRAH PLAN HIGH ENERGY SYSTEH COMPONENTS INSPECTIOH INTERVAL PLAN STATUS FEEDHATER LOOP A OUTSIDE CV I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. Xl - I I

SUMHARY EXAHINATION AREA CATGY HDE OUTAGE I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK**

CONSEOUENTIAL BREAK LOC. 14A-FN-900-1A FIG NO HE-3 200390 V APPEH-B Vl'-1 1 IHS.

ELBDH-TO PIPE XSCR RT 2-480, 480 HT 3 - ~

4 200395 VA APPEH B'T-1 1 C IHS.

PIPE-TO-FLANGE XSCR RT 2- C 480, 480 MT 3- X 4- X 87 - HT:LIH:CLAMP RESTRICTS YOKE ROTATION. RT:POROSE 0 4,16 1/2,42 3/4, SLAG 9 3 5/8-3 3/4, 16 1/2-16 9/16.

SLAG(NOT IN LIHE) 9 43-43 1/8,45-45 1/8. INTERMITTENT SUCK BACK 0 0-14.

200400 VB APPEH-8 VT-1 1 C IHS.

PIPE-TO FLANGE XSCR RT 2- C 480, 480 MT 3- X 4- X 88 VT 1/INSIGIGR MARK+1/32 FH 5/8 C MISE 1 5/8 LG ACCEPT MTglNSIGIGR HARK(V'I) Ri'HSIG BACKING RING 0"-11",11"-224 & 224-33", ROLLER MARKS ON FILM. 33.0+I NOREC:.

200405 V1 APPEH 8 VT 1 1 C IHS.

PIPE-TO-PIPE XSCR RT 2- C 480, 480 HT 3- X 4 X 200410 V2 APPEH B VT-1 1 C INS.

PIPE-TO-PIPE XSCR RT 2 - - C 480, 480 MT 3X 4 X 200415 V2A APPEH-B VT-1 1- C I HS.

PIPE-TO FLANGE XSCR RT 2- - C C 480, 480 HT 3- X 4 - X 84 - RT: SPO'I OF SLAG (.0625") AT 23. SPOT OF SLAG (.0625") AT 19.5. NO APPARENTCHANGE IH 'THE COND. ITION OF THIS HELD SINCE LAST INSPECTIOH 05-12-77.

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER S'TATIOH UNIT 1 PAGE: 20 REV I SION: 0 IHSERVICE INSPECTION PROGRAH PLAN HIGH ENERGY SYSTEH COHPONEHTS IHSPECT I ON INTERVAL PLAN SI'ATUS FEEDWATER LOOP A OUTSIDE CV I FIRST SECOND THIRD I ZONE NUMBER:. ASME I PERICO PERIOD PERIOD I SEC. XI I I SUMHARY EXAMINATION AREA CATGY HDE - - - - - OUTAGE - ~ INSTRUCTIONS I

NUMBER IDENT IF I CATION ITEM HO METH i 1 2 3 1 2 3 4 1 2 3 *~CALIBRATION BLOCK**

CONSEOUEHTIAL BREAK LOC. 14A-F'W 900 1A FIG NO NE-3 200420 V28 FLANGE-TO PIPE 480, 480 APPEH 8 VT-1 XSCR RT MI' 2

3 -

C X

INS.

4 - - X 200425 W APPEH.B VT-1 1 - - - C INS.

PIPE-TO.VALVE 3993 XSCR RT 2 - - C 480, 480 MT 3X 4 X 200430 X APPEH-8 VT-1 1- C INS.

3993 VALVE-TO.PIPE XSCR RT 2- - C.

480, 480 HT 3 - X 4 - X 200435 Y APPEH.B VT-1 1 - - - - - C I HS.

PIPE-TO.VALVE 3995 XSCR RT 2 - - C 480, 480 MT 3- - X 4 - - X 200440 Z APPEN.B VT.1 1 C IHS.

3995 VALVE-TO.PIPE XSCR RT 2- C 480, 480 MT 3. X 4- X 84 RT SLAG AT 19 25 t 19 5 AND 20 625 SPOT OF SLAG AT 21 ~ 38'6 75 NO APPAREH'I CHANGE IH THE COND IT ION OF THIS WELD SINCE LAST INSPECTION 11-09.80.

200445 21 APPEH-8 VT-1 1 C INS.

PIPE TO.ELBOW XSCR Rr 2- C 480, 480 MT 3- X 4- X 85 - RESTRICTIOH: 1-1/2" U -BOLTS ON EACH SIDE OF WELD. SPACING BETWEEN U-BOLTS IS 20". BOTI'OM 15" NO ACCESS. VT-1 8 MT RESTRICTED/ NO RT.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER StATIOH UNIT 1 PAGE: 21 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEM COMPONENTS INSPECTION INTERVAL PLAN STATUS FEEDHATER LOOP A OUtSIDE CV I FIRST SECOHD THIRD I ZONE HUHBER: ASME I PERICO PERIOD PERIOD I SEC. XI - I I

SUMHARY EXAMINATIOH AREA CATGY NDE - - - - OUTAGE - - - I IHSTRUCTIONS HUHBER IDEN'I IF ICATION ITEH HO METH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

CONSEOUEHTIAL BREAK LOC. 14A-FU.900-1A FIG NO HE 3 200450 22 APPEN-8 VT-1 1 C INS.

ELBN-TO PIPE XSCR RT 2- C 480, 480 HT 3- X 4- X 85 - H'I IHSIG: 5/8" X 1/16" PORE - ACCEPT CJF. RT INSIG: POROS AT 3", INTERNAL UNDERCUT 04 TO 9" NO CHANGE IN THE CONDITION OF THIS VELD SIHCE LAST INSPECTION 11/9/80.

200455 23 APPEN B VT-1 1 C INS.

PIPE-TO ELBOU XSCR Rt 2 - C 480, 480 Ht 3 X 4- X 86 . VT-1:INSIG: GOUGES AHD GRIHD MARKS ACCEPT JO. R'I: NACSLI 4/18/82.

200460 24 APPEH-B Vt-1 1 I NS.

ELBOH TO PIPE XSCR RT 2- C 480, .480 Ht 3- X 4- X 86 Vt 1'REJ'OUGES & ARC STRIKES VT 1(MT REEXAM'E EXAM OF REPAIRS, INSIG;GOUGE & GRIND HARKS RT: POROSIT'Y AT 0,35" AND 41" TO 0. SLAG 1/16" AT 16-1/2" & 17.1/24. SLAG 1/8" AT 21-1/2". NACSLI 4/18/82.

DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR POWER STATION UNIT 1 PAGE: 22 REVI SION: 0 INSERVICE INSPECTION PROGRAH PLAN HIGH EHERGY SYS'IEH COMPOHEHTS INSPECTION INTERVAL PLAN STATUS FEEDWATER LOOP B OUTSIDE CV I FIRST SECOND THIRD I ZOHE HUNBER: ASHE I PERICO PERIOD PERIOD SEC. XI I I SUNNARY EXAHINATIOH AREA CATGY NDE I OUTAGE I I HSTRUCT I ONS NUNBER IDENTIFICATION ITEH HO NETH I 1 2 3 1 2 3 4 1 2 3 I

<<*CALI BRAT IOH BLOCK">>

COHSEOUENTIA BREA OC. 14B-FW.900-1B FIG HO HE-5 200465 F3 APPEH 8 VT-1 1 C INS.

PIPE-TO.ELBOW XSCR RT 2- C 480, 480 HT 3- X 4- X 87 - Rl: SLAG 18 1/2 TO 18 3/4 ( 2 SPOTS) NACSLI 2/20/74.

200470 FS APPEH 8 VT 1 1 C IHS.

ELBOW-TO-PIPE XSCR RT 2- C 450, 450 HT 3. X 4- X 87 - Rl: IHTERHITlEHl'UC 0 TO 9. DROP THRU 21 1/2 TO 22, 0 42. POROS 0 32, SUCKBACK 0 33.

200475 F1 APPEN.B VT-1 1 C IHS.

PIPE-10 PIPE XSCR Rl 2 . C 480, 480 Hl 3 X 4 X 87 - Vl',HT:LIH:GUIDE FWU-30 OBSTRUClS VIEW 8-15,29-26 ACCEPI'CJF. R'I:POROS 0 2 1/2,5 3/4,23 1/4,22,40 1/2 ~ IHTERHITT. SUCKBACK.SLAG 8 27 1/8,38.38 1/4,37 1/2. DROP THRU 0 41 NACSLI 2/17/74.

200480 F2 APPEN-8 VT.1 1 C IHS.

PIPE-lO ELBOW XSCR RT 2- C 480, 480 Hl 3 X 4 X 87 - RT: POROSITY 0 6,17,27 TO 36(RAHDOH SPOTS>,36 TO O,SLAG 0 43 3/4. NACSLI 3/13/74.

200485 G APPEN-B VT ~ 1 1 C IHS.

ELBOW TO PIPE XSCR RT 2- C 480, 480 HT 3- X 4 X 87 - RT: SUCKBACK 0 12 3/4 TO 13, 16 TO 18, 9 31 3/4. INlERNITTEHT SUCKBACK 18 TO 27.

DATE: 06/02/89 ROBERT ED GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 23 REVISION: 0 INSERVICE IHSPECTION PROGRAH PLAN HIGH ENERGY SYSTEM COMPONENTS INSPECTION INTERVAL PLAN STATUS FEEDWATER LOOP B OUTSIDE CV I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI

SUMMARY

EXAHIHAT I OH AREA CATGY NDE I

- - - - - 0 U T A 0 E - - - -- I I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO METH 1 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIONBLOCK"*

CONSEOUENTIAL BREAK LOC. 14B-FW-900-1B FIG NO HE-5 200490 G2 APPEH B VT-1 1 C INS.

PIPE-TO-ELBOW XSCR RT 2- C 480, 480 MT 3 X 4 X 87 . Ri: ARTIFACT AT 13. SCRATCH AT 34 1/2. HACSLI 7/12/74.

200495 01 APPEN.B VT-1 1 C

'- INS.

ELBOW-TO-PIPE XSCR RT 2 C 480, 480 HT 3- X 4- X 87 RT:IHSIG: POROSITY SPOT AT 18>> HACSLI 2/16/74.

200500 G3 APPEN-B Vi-1 1 C INS.

PIPE-TO-ELBOW XSCR RT 2- C 450, 450 HT 3 . X 4- X 87 . Ri: POROSITY AT 24. SCRATCHES AT 16, 20, & 36. NACSLI 2/12/74.

CONSEOUENTIAL BREAK LOC. 14B-FW-900-1B FIG NO HE-4 200505 04 APPEH-8 Vi-1 1 - C IHS.

ELBOW TO PIPE XSCR RT 2 C 450, 450 HT 3 X 4 X 88 -Vi-1 & HT NOREC RT ~ IHSIGI 0 11 CO U/C)ARTIFACT 0 5 i3 i6 &9 SPOT) WATER ROLL HARKS 0 75 (4 ,7 & 10 25>>.

11>> 22>> OD U/C 11>> TO 22>>. 22>>.33<< SPOT POR. 0 32" & ID U/C 22>>T033<<. 33>>-0<<, OO U/C 33>>.0>>. NO APPARENT CHAHGE SIHCE LAST IHSP.'74.

200510 H APPEN-8 VT-1 I - C INS.

PIPE-TO PIPE XSCR RT 2- R C 450, 450 H'I 3- X 4- X 88 - VT-1 & MT,HOREC; RT,OI'HER; RESCHEDULE 'IO 2ND INTERVAL, 9TH OUTAGE 1989 TO VERIFY/CONFIRM WELD IDENTIFICATION.

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 24 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEM COMPONENTS IHSPECTIOH INTERVAL PLAN STATUS FEEDWATER LOOP B OUTSIDE CV I FIRST SECOHD THIRD I 20NE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI I

- I

SUMMARY

EXAMIHAT I OH AREA CATGY NDE I

- - - - OUTAGE - - - - - I INSTRUCTIONS NUMBER IDENT IF I CAT I OH ITEM NO METH 1 2 3 1 2 3 4 1 2 3 I *~CALIBRATION BLOCK**

CONSEQUENTIAL BREAK LOC. 14B-FW-900-1B FIG HO HE-4 200515 HA APPEH.B VT-1 1 - - C INS.

PIPE-TO FLAHGE XSCR RT 2- C 450, 450 MT 3- X 4 X 200520 HB APPEH.B VT-1 1- C I HS.

FLAHGE-TO PIPE XSCR RT 2 - C C 450, 450 MT 3- X 4 - X 200525 H1 APPEH.B VT-1 1 C INS.

PIPE-TO PIPE XSCR RT 2- C 450, 450 M'I 3- X 4- X 200530 H2 APPEH-8 VT 1 1 - - - C INS.

PIPE-TO.PIPE XSCR RT 2 - C 450, 450 MT 3X 4 X 200535 H2A APPEH 8VT-1 1. - - - - C INS.

PIPE-TO-FLAHGE XSCR RT 2 - - C 450, 450 MT 3. - X 4 . - X 200540 H28 APPEH-B VT-1 1 C IHS.

FLANGE-TO.PIPE XSCR RT 2 . C 450, 450 MT 3. X 4- X 84 . RT:SLAG AT 2" (5.75")8.25",12"& 14".SLAG AT 16.25",17.375",194(23"(W .18754XL .25")(25.754(26". CROWN PREP GEOM 30 5 TO 30 ~ SLAG 32 5 ~ 33 25 g 34 625 8 34 75 SLAG 35 25 36 8 43 POROS I TY 36 5 SK ~ BK 34 25 TO 35 ~ 25 NO APPARENT CHANGE SINCE 05-12-77.

DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR POWER STATION UNIT 1 PAGE: 25 REVISION: 0 IHSERVICE IHSPECTION PROGRAH PLAN HIGH ENERGY SYSTEH COMPOHEHTS INSPECTION INTERVAL PLAN STATUS FEEDWATER LOOP B OUTSIDE CV I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERICO PERIOD SEC. XI I I SUHHARY EXANINATIOH AREA CATGY NDE - - - 0 U T A G E - - - - - - I INSTRUCTIONS I

HUHBER IDENTIFICATION ITEH NO HETH 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIONBLOCK**

COHSEOUEHTIAL BREAK LOC. 14B-F'W-900-1B FIG NO HE-4 200545 J APPEH 8 VT-1 1 C INS.

PIPE-TO PIPE XSCR RT 2 - - C 450, 450 MT 3 X 4 X 200550 K APPEN-8 VT-1 1 C INS.

PIPE-TO-VALVE 3992 XSCR RT 2 - C 450, 450 Ht 3. X 4 - X 200555 L 3992 VALVE-TO PIPE 450, 450 APPEH-8 XSCR Vt-1 RT Ml' 2

3 .

C X

IHS. CLASS 2 WELD 4 . - X 200560 M APPEH-B VT-1 1 C INS. CLASS 2 WELD PIPE-TO-VALVE 3994 XSCR RT 2 C 450, 450 Ht 3- X 4 X 84 - RT: THIS WELD HAS A BACKING RING. SPOT OF SLAG AT 23.25". NO APPARENI'HAHGE IN CONDITION OF THIS 'WELD SINCE LAST INSPECTION 04-10-80.

200565 N'I ELBOW-TO.PIPE 450 XSCR Rl'-

APPEH-8 VT-1 H'f 1

C C INS. CLASS 2 'WELD 450, 3 X 4- X 85 . 0'fHER: RESTRICTION . L 0) 30" TO 38" - SNUBBER WELDED OVER WELD. THERE HAS BEEN HO CHANGE IH THE CONDITION OF THIS 'WELD SINCE LAST INSPECTION 11/10/80.

200570 0 APPEN 8 Vf-1 1 C INS. CLASS 2 WELD PIPE-TO.ELBOW XSCR Rt 2- C 480, 480 HT 3- X 4- X 85 - VT OTHER: A/S FROH L-0 AT 21-3/4"( 33" & 33-1/4" . REJECT -WSG. VT - RE-EXAM A/S REHOVED ACCEP'I - WSG. H'f OTHER: 1/16" DIA PORE - ACCEPI'JF. Rf IHSIG: SLAG 1/16" AT 9". POROS 20"-25",A'l 30", 34", 37", 8 38" .ACCEPT - AEC.

HACSl.l 11/10/80

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 26 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEM COMPOHENTS IHSPECTION INTERVAL PLAN STATUS FEEDWATER LOOP 8 OUTSIDE CV I FIRSt SECOND THIRD ZONE HUHBER: ASHE I PERIOD PERICO PERIOD SEC ~ XI I I

SUMMARY

EXAMINATION AREA CATGY NDE I OUTAGE I INSTRUCI'IOHS NUHBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 4 1 2 3 I <<<<CALIBRATION BLOCK"*

CONSEOUENTIAL BREAK LOC. 14B-FW.900-18 FIG NO HE-4 200575 01 APPEN-8 VT-1 1 C IHS. SCAFFOLD CLASS 2 WELD ELBOW-TO.PIPE XSCR RT 2-480, 480 HT 3- X 4 X 86 - VT-1:INSIG: LIGHT RUST - ACCEPT - KK.

200580 P APPEN.B VT-1 1 C IHS. SCAFFOLD CLASS 2 WELD PIPE-TO.ELBOW XSCR RT 2- C 100, 128 MT 3 X 4- X 86 - VT-1:INSIG: GOUGES 8 GRIND HARKS, LIGHt RUST - ACCEPT -JO. Rt:INSIG: I.D.

UNDERCUI'0" TO 41-1/2" HEAVY SUCK.UP 38" TO 41". ACCEPT - MJS. HACSLI 5/13/81. MT:LIM: NO Ht YOKE CLEARANCE 16" tO 29" ACCEPT - MJS.

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POHER STATION UNIT 1 PAGE: 27 REVI SIGH: 0

  • INSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEM COMPONENTS INSPECTION IHTERVAL PLAN STATUS MAIN STEAM I FIRST SECOND THIRD I 2OHE NUMBER: ASME I PER!CO PERIOD PERIOD SEC. XI I I

SUMMARY

EXAMIHATI ON AREA CA'TGY NDE I OUTAGE I INSTRUCTIONS NUMBER IDENT IF I CAT I OH ITEM HO METH I 2 3 1 2 3 4 1 2 3 I *"CALIBRATION BLOCK**

PLANT LINE: 36-MS-600-1 FIG HO HE-7 201000 MSU-35 APPEN-8 VT-3 1 INS.

ANCHOR XSCR 2 100, 128 3X 4 X 201020 S1 APPEH 8 VT-3 1 INS.

RIGID HANGER XSCR 2-100, 128 3- X 4 - X 201040 S2 APPEH-8 VT-3 1 IHS.

RIGID HANGER XSCR 2 100, 128 3 - - X 4 . - X 201050 S3 APPEN 8 VT-3 1 IHS.

RIGID HANGER XSCR 2-100, 128 3 . X 4 X 201060 S4 APPEN.B VT-3 1- INS.

RIGID HANGER XSCR 2-100, 128 3- X 4- X PLANT LINE: 24A-MS-600-1A FIG HO HE-7A 201100 S5 APPEH-8 VT-3 1 IHS.

VARIABLE SPRING XSCR 2-100, 128 3- X 4 ~

X 201120 S6 APPEN-8 V'I-3 'I INS.

VARIABLE SPRING XSCR 2-100, 128 3- X 4 X

DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR PRIER STATION UNIT 1 PAGE: 28 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYS'lEM COMPONENTS INSPECTION INTERVAL PLAN STATUS MAIN STEAH I FIRST SECOND THIRD I ZONE NUHBER: ASHE J PERIOD PERIOD PERIOD I SEC ~ Xl I I SUHMARY EXAMINATION AREA CATGY NDE I -OUTAGE I INSTRUCTIONS NUHBER IDENT IF ICATION ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIOHBLOCK"*

PLAHT LINE: 24A-HS-600.1A FIG NO NE-7A 201140 S7 APPEN-B VT-3 1 IHS ~

HYDRAULIC SNUBBER XSCR 2-100, 128 3- X 4- X 201160 SB APPEH-B VT-3 1 INS.

VARIABLE SPRING XSCR 2-100, 128 3- X 4- X 201180 S9 APPEH.B Vi'-3 1 INS.

VARIABLE SPRING XSCR 2-100, 128 3- X 4- X 201200 S10 APPEH.B VT-3 1 IHS.

HYDRAULIC SNUBBER XSCR 2-

'IOO, 128 3 X 4 X 201220 S11 APPEN-8 VT-3 1 INS.

VARIABLE SPRIHG XSCR 2.

100, 128 3. X

4. X 201240 S12 APPEN-8 VT-3 1 I HS.

VARIABLE SPRING XSCR 2-100, 128 3- - X 4- X 201260 S13 APPEH-8 VT-3 1 IHS.

RIGID HANGER XSCR 2-100, 128 3- X 4- X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 29 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN HIGH EHERGY SYSTEH COMPONENTS INSPECTION IHTERVAL PLAN STATUS MAIN STEAM I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI ~ - I I

SUMMARY

EXAHIHATION AREA CATGY HDE I 0 U T A 0 E I IHSTRUCI'IOHS NUHBER IDENT IF I CATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I

~*CALIBRATION BLOCK*"

PLANT LINE: 24A.MS.600-1A FIG HO HE-7A 201280 S14 APPEH.B VT-3 INS.

RIGID HANGER XSCR 2-100, 128 3- X 4- X PLANT LINE: 24B-MS.600.1B FIG NO HE-7A 201300, S15 APPEN B VT 3 1 INS.

VARIABLE SPRIHG XSCR 2-100, 128 3- X 4- X 201320 S16 APPEN 8 VT-3 1 INS.

VARIABLE SPRING XSCR 2-100, 128 3- X 4 X 201340 S17 APPEH B VT-3 1 INS.

HYDRAULIC SNUBBER XSCR 2-100, 128 3. X 4- X 201360 S18 APPEH-B VT-3 1- INS.

VARIABLE SPRING XSCR 2-100, 128 3 . X 4- X 201380 S19 APPEH-8 VT-3 1 INS.

VARIABLE SPRIHG XSCR 2-100, 128 3- X 4- X 201400 S20 APPEN-8 VT-3 1 INS.

HYDRAULIC SNUBBER XSCR 2-100, 128 3 X 4 X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 30 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEM COMPONENTS INSPECTION INTERVAL PLAN STATUS MAIN STEAM I FIRST SECOND THIRD ZONE HUHBER: ASHE I PERICO PERIOD PERIOD SEC. XI I

SUMMARY

EXAHIHATION AREA CATGY NDE I 0 U T A G E I INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH 1 2 3 1 2 3 4 1 2 3 i **CALIBRATIONBLOCK**

PLANT LINE: 24B.MS.600-1B FIG NO HE-7A 201420 821 APPEH-8 VT-3 1 INS.

VARIABLE SPRING XSCR , 2-100, 128 3- X 4 - X 201440 822 APPEH.B VT-3 1 IHS.

VARIABLE SPRIHG XSCR . 2-100, 128 3. - X 4 - - X 201460 S23 APPEH-8 VT-3 1 INS.

RIGID HANGER XSCR 2 - . ~

100, 128 3- X 4 X 201480 824 APPEH-8 VT 3 1 INS.

RIGID HANGER XSCR 2 .

100, 128 3- X 4- X

DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR PONER STATION UNIT 1 PAGE: 31 REV I S ION: 0 INSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEH COMPONENTS INSPECTION INTERVAL PLAN STATUS FEEDUATER I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. Xi I SUHMARY EXAHIHAT ION AREA CATGY HDE - - - - - - OUTAGE - I INSTRUCTIONS I

NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK>>>>

PLANT LINE: 14A-FlJ-900-1A FIG NO HE-3 201500 FW-16 APPEH B VT-3 1 IHS.

VARIABLE SPRING XSCR 2.

100, 128 3- X 4- X 201520 F W-17 APPEH-8 VT-3 1 INS.

HECHAHICAL SNUBBER XSCR 2-100, 128 3- X 4- X 201540 FW.18 APPEH-B VT-3 1 INS.

MECHANICAL SNUBBER XSCR 2-100, 128 3- X 4- X 201560 FW.19 APPEH-8 VT 3 1 IHS ~

VARIABLE SPRING XSCR 2-100, 128 3- X 4- X PLANT LINE: 14A-FIJ.900-1A FIG NO HE-5 201580 FIAI.20 APPEH.B VT-3 1 INS.

MECHANICAL SHUBBER XSCR 2-100, 128 3- X 4- X 201600 FW-21 APPEN-8 VT-3 1 IHS.

HECHANICAL SHUBBER XSCR 2-100, 128 3X 4 X 201620 FW-22 APPEN.B VI'-3 1 INS.

VARIABLE SPRING XSCR 2 100, 128 3. X 4 - X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POMER STATION UNIT 1 PAGE: 32 REVISION: 0 IHSERVICE IHSPECTION PROGRAH PLAN HIGH EHERGT STSTEH COHPOHEHTS INSPECTION INTERVAL PLAN STATUS

~FEEDMAYE I FIRST SECOND THIRD I ZOHE HUHBER: ASNE I PERIOO PERIOO PERICO I SEC. XI I

- I SWART EXAHIHATION AREA CATGY NOE OUTAGE I INSTRUCTIOHS HUHBER I DENT IF I CATION ITEM HO HETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK*>>

PLANT LIHE: 14A-FN.900.1A FIG NO HE-5 201640 FW-23 APPEN-8 VT-3 1 INS.

NECHANICAL SNUBBER XSCR 2-100, 128 3-4-

201660 FW-24 APPEN B VT-3 1 INS.

HECHANICAL SNUBBER XSCR 2-100, 128 3. X 4- X 201680 F W-25 APPEH-8 VT-3 1 IHS.

VARIABLE SPRING XSCR 2-100, 128 3- X 4 X 201700 FW-26 APPEN.B VT-3 1 IHS.

VARIABLE SPRING XSCR 2.

100, 128 3- X 4- X 201720 F W-27 APPEH.B VT-3 1 INS.

GUI 0E XSCR 2-100, 128 3- X 4- X 201740 FW.28 APPEN.B VT.3 1 IHS.

ANCHOR XSCR 2-100, 128 3 . X 4 X ~

PLANT LINE: 14B-FM 900 1B FIG NO HE-4 201800 FW.41 APPEN-8 VT.3 1- IHS.

VARIABLE SPRING XSCR 2-100, 128 3- X 4- X

pi DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR PONER STATION UNIT 1 PAGE: 33 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEM COMPOHEN'IS INSPECTION INTERVAL PLAN STATUS FEEDNATER I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERICO PER I CO I SEC ~ XI I

'I

SUMMARY

EXAMINATION AREA CATGY HDE - - - - - OUTAGE I INSTRUCTIONS I

NUMBER IDENT IF ICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIOHBLOCK"*

PLANT LINE: 14B-FU-900-18 FIG HO HE-4 201820 FW.40 APPEN-8 VT-3 1 INS.

HYDRAULIC SHUBBER XSCR 2-100, 128 3- X 4 X 201840 F W.39 APPEH-B VT-3 1 INS.

HYDRAULIC SNUBBER XSCR 2-100, 128 3X 4 X 201860 F W.38 APPEN-8 VT-3 1 INS.

MECHANICAL SNUBBER XSCR 2-100, 128 3 - X 4 - X 201880 FW-37 APPEN-8 VT-3 1 IHS.

VARIABLE SPRING XSCR 2-100, 128 3 - - X 4 - - X 201900 FW.36 APPEH-8 Vr-3 INS.

RIGID RESTRAINT XSCR 2.

100, 128 3- X

4. X 201920 FW.35 APPEN-8 VT-3 1 IHS.

VARIABLE SPRING XSCR 2.

100, 128 3- X 4- X 201940 F W-34 APPEN-8 VT-3 1 IHS.

RIGID REESTRAIHT XSCR 2 .

100, 128 3- X

4. X

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POUER STATION UNIT 1 PAGE: 34 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN HIGH ENERGY SYSTEM COMPOHEHTS INSPECTION INTERVAL PL'AH STATUS FEEDUATER I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI I I SUMHARY EXAMINATION AREA CATGY NDE I

- - OUTAGE - - - - - - I INSTRUCT I OHS NUHBER IDENT IF ICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: 14B-F'N-900-1B FIG NO HE-5 201960 F W.32 APPEH.B VT-3 1 IHS.

HYDRAULIC SNUBBER XSCR 2-100, 128 3- X 4- X 201980 F W-33 APPEN-8 VT-3 1 INS.

HYDRAULIC SNUBBER XSCR 2-100, 128 3- X 4- X 202000 F W.31 APPEN 8 V'I-3 1 IHS.

VARIABLE SPRING XSCR 2 100, 128 3. X 4- X 202020 FW.30 APPEN-8 VT-3 IHS.

GUIDE XSCR 2

'100, 128 3-4-

202040 FW.29 APPEN-B VT-3 1 IHS.

GUIDE XSCR 2-100, 128 3 X 4 X PLANT LINE: 20-FU-900-1 FIG HO HE-6 202100 S25 APPEH.B VT 3 1 IHS.

VARIABLE SPRING XSCR 2-100, 128 3- X 4 - X 202120 826 APPEN 8 VT 3 1 IHS.

'ARIABLE SPRING XSCR 2-100, 128 3 . X 4- X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POHER STATION UNIT I PAGE: 35 REVISION: 0 IHSERVICE INSPECTION PROGRAN PLAN HIGH ENERGY SYSTEN COHPOHEH'IS INSPECT IOH INTERVAL PLAN STATUS FEEDHATER I FIRST SECOND THIRD ZONE NUHBER: ASHE I PERICO PERIOD PERIOD SEC. XI I SUHHARY EXAMINATION AREA CATGY HDE OUTAGE - - - I IHSTRUCTIOHS NUHBER IDENTIFICATIOH ITEN HO NETH I 1 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIONBLOCK>>"

PLANT LINE: 20-FM.900.1 FIG NO HE.6 202140 S27 APPEH-B VT-3 1- INS.

VARIABLE SPRING XSCR 2-100, 128 3- X 4- X 202160 S28 APPEN-8 VI'-3 1 INS.

VARIABLE SPRING XSCR 2-100, 128 3 . X 4- X 202180 S29 APPEH-8 VI'-3 1 IHS.

VARIABLE SPRING XSCR 2-100, 128 3- X 4- X 202200 S30 APPEH-B VT-3 1 I HS.

VARIABLE SPRING XSCR 2-100, 128 3- X 4 X 202220 S31 APPEH.B VT-3 1 INS.

VARIABLE SPRING XSCR 2 100, 128 3 . X 4- X 202240 S32 APPEN 8 VT-3 1 INS.

ANCHOR XSCR 2 100, 128 3- X 4- X PLANT LINE: 8-FW-900-1 FIG NO HE-6 202300 S35 APPEN.B VT-3 1- INS.

RIGID HANGER XSCR 2-100, 128 3 . X 4- X

DATE: 06/02/89 ROBERT E. GIHHA NUCLEAR PONER STATION UNIT 1 PAGE: 36 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN HIGH ENERGY SYSTEH COMPONENTS INSPECTION INTERVAL PLAN STATUS FEEDWATER I FIRST SECOND THIRD ZONE NUHBER: ASME I PERIOD PERIOD PERIOD SEC ~ XI I

- I

SUMMARY

EXAHINATIOH AREA CATGY NDE - - - - - OUTAGE - - - - I INSTRUCT IONS NUMBER IDENT IF I CATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATION BLOCK**

PLANT LINE: B.FIJ.900-1 FIG NO HE.6 202320 S36 APPEN.B VT-3 1- INS.

RIGID HANGER XSCR 2-100, 128 3 . X 4 X 202340 S37 APPEH.B VT 3 1 INS.

RIGID HANGER XSCR 2-100, 128 3. X 4 X 202360 S38 APPEH 8 VT-3 1 INS.

GUIDE XSCR 2.

100, 128 3- X 4- X

<<~

30A-EL1 30A-E MMI 33G

. ~

30A-E1A 44N W~ 'SU 30A-E1L1 30A-D2L2 30A-D3

~

30A-D2 30A-E2 ~

~

30A&2L1 SGA-SI 30A-FL1

~MSU 313 45S~

~

kSU

' 30A-D1 MSU IGM

~

MSU 48S MSU ESM 30AMl2

~

SGA-DSI 30A-FA 30A-PS-A 0

EL 311'DA-FS

~ 30A-FB

~3455

\ 30A-FC CONT. ON ~3447B 8-8 g ~~ 30A-FD 30A-G 30A-02 (IIEF) 30A-01 (REF)

CONT. ON HE-1A WSULAZON

~ rr r ~

~ ~

'I9 SL

~ ~

~ ~ ~.

Oi:

I tV

NON-CLASS - CLASS 2 (REF.)

TO ATMOSPHERE 85~58 558-r 308-0 3516

~

6F~BC4h 308-NA 5585 6E-L3-8C3A 3510 308-BWB 308-BWA 3510 3512

~ 68-L2-BC2C MSU 75M 308-M 308-13-805 60-L3-BCSA 3514 6A-L2-BClC

~ 55515 308-L3-8C4 6A-L2-BC18A 308-13-8C3 6A-L2-801 8 MSU 340 3504 308-LA 308-L3-8C2 I

6C-L3-BC1A 308-L3-BC1 308-L3 l

~ 308-L (ae) 6A-L2-BClA I

p 558-51 308-L2-BC1 A CONT. ONg MSU 32M

~ 'NSULAT10N

I7 crk~arxl 308-JlL1

~ ~

f MSU 3IM MSU 30S

$ V IB 30!I-K j4ilII-'OIT.

g)% Pa 30B-IL,I MSU 29M IN1ERMEDIATE BLDO.

FACADE fp ~

~

~

MSU 28S 308-KS 308-K3

~

~ MSU 27M 308-K4 300-L WALL CON7. ON 308-Ll 3~

~

30B -HIL2 308-HlLl HE-2 ON K

8-8 MSU SSII

'SU MSU MSU 19M~

23S 2'SU

'SU 4Q Cl 308-PS-h EL.

31%3'EN. MSU IBM~ ~

' 300 MSU 210 M

gl 308-DL1 18M

. ~

308-G a 300-SS-B~ 17S

~

. ~

~

MB-01 MSU 110 ~ ~

308-E MSU 13M 308-D2~

INSUIA'RON 308-D2L1 EL 313.1

c V

14 -QOOf FWU 19S NON CLASS W.RIFF. FLG FwU CLASS 2 IIIGH ENERGY PIPING 16'2~M I

I I

14A-FW-QOOMA 16S 14A~QOO-1h l

4ll1 . W. 5993 L~OOP I Y Z4

~ t' ZAB Z3 Z1A 4OQQE 286.6'WU FWU 15

~ 269.6'WU EL 14 re <<a PS-B (ae) g CONT. ON B-12 EL ~ . ~ . INSMON

~ ~ ~ ~ ~ ~ +p CONT. ON HE-5 TURBINE BUILDING ~

~ ~n II'3 (REF.)

FWU 34F 35S EL 304.2'WU 01 gism

~O FWU H

38F 148-FW-900-18 0 r INTERMEDIATE BLDG FACADE pg ~ HB 7a G4

/ ~ FWU Hl 37S PhiV 46F

$9 WALL FWU 47M I ~499 4 Nl 8 FWU 41S r K K 4000D NIA

~ EL 3045'

~

428~3

' Pl M FWU 42M 39924 FWU 48M MA ~

. 3994 Nl FWU 49F t 'hU NON-CLASS ClASS 2 N2C FNI MF PS-8 (REF)

COiT.

8-13 ON R ', PS-A 3994A

~

~ + ~ S 53G

&V 52H 4' 9944 MO T

++

4 U2 FWU 59F

~ ~

~ne MF RIIU 58F U

148-FW-900-18 LOOP 8 ~ . ~ ~ . ~ INSULA"IION

~ ~ ~ ~ QWW Q

'H6 14A-FW-900-1 A 148-F2 14A-U

~

~

14A-l2 FFFl 22H FNI-MG 14A-FW-900-1 A gpss '

14A-U3

'.p 14A-U4

~RN 26M 148-01 . ~ 148-F1 RN 21M

+ 148-02 RN 20M 14A-Uj

~~

~

14A-Tl 14A-T CONT. ON ALL

~ C CONl ON HE>>6 22-Ml 148-F5 ~

EL 14 X 12 8987 RED 148-F3 ~

265'6 20-M2 ii CONT. ON HE-3 FWU 27G 8 R 14A-R

~

4269 12

' .14 X 14 RED.

X 20 I

(REF) 2DFW-900-1

~ $ gI 14A-P2 3965 I ~22-Ti 14A-P2 (REF)

I 14A-P 2DA1

~

~

~

20 X14

~

RED.

14B-C 42ZO ~ 12 X 1$

RED..

148-8 3966 148-P 148-F4 148-E EL IR 148-F RN-29G L R 265'NSULA110N

20-J 20-H1 20-G1 20-FW-900-1 y 20-G 8

~N 20 8 20-G2 S

20 Kl MAIN RDL

~

8-B ~ ~

. 20-FW-900-1 FEED WAlER 8 0 8-D r 8 20-Ll 8 8 8-FW-900-1 8

~ 9S070 TO CONDENSER HOlWELL 18 20 81 20-M2 8-F 2DM3 (OUTSIDE CONTAINMENT CONT. ON IN lURBINE BUILDING)

HE-5 FEED WAlER FEED WATER LOOP A LOOP 8 INSULATION

Pl R01 2-3532 36-L4 3540 PC 24A-A'I (REF) 24B-Al CONT. ON (REF)

HE-lA RN'112-351 9 (REF.)

36-MS-600-1 (REF;)

36-Ll (REF) RN112-351 8 (REF)

MSU 35A (REF.)

g CONT. ON 30B-P (REF;)

INSULAllON

~

2 4A-F 24A-E

~

(OUTSIDE CONTAINMENT IH TURBINE BUILDING) 24A-Dl 24A-MS-600-1A  : 24A-G ~

24A-Cl

'181 A-3544 24A-D2 FLOOR

~ 248-El ~ S 24A-C 248-E ~ ~ ~ 248-F 181 A-3545 TURBINE MAIN STOP VALVES

~ 8 24A-Bl 248-8

~ 248-Dl 248 81

~ 248-MS-600-1 8

', ~

' 248-8 248-A1 rr rr

+r 24A-A ~~err 24A-A1 248-A

~

r r CONT. ON HE-7 r 36-MS-600-1 IHSULAllOH

FWU 22S RN 41S FWU 21H PN 20H FllU 288 FWU 489

~

PN 18H...

FWU 19S

~

FWU 39S 4396V FWU 37S 20 4275

~

3987A RN 38S ~ Qe PN 33H RN 32H 3983 RN 270 4 R 3985A 3987. FVg 31S QA 4273 MAIN 3982 FEED WAlER t

le+ ~

. 4 4369 ~

4365 39M

( .

984 3g84 A

~ RN 28A 3986A

~

. RN 38S

)42 437O 4398

~ FWU 290 6A' CLASS 2

<9507n RN In ~

35S r 42783 FWU 448~ RN 46F HO FWU

+4278 36F QA 4279

~p FWU 47H

'I. 3992 398 4A FWU 28H t 42~81 8 . '4274 8283 3993A 4012 3994 ~

FWU 16H RN 39H 3gg3

~ '28~5

~ 3993A NOH-SAFElY RN 41S RN 14F

. ~ CtASS RN 49f 4011 3995 HIGH ENERGY Pgg. 404 ..fh r ~

4M8$

'651 3995A RN 59F ~~g RN 51H PN 54F

~ <<9

$ 4899 RNMF PN 55F PEH. 403 RN 56F FWU 57H

10-Year Inservice Inspection Program Plan Table

' For System Pressure Tests INTRODUCTION This examination plan table establishes the third 10-year interval a

inservice examination program "for System Pressure Tests at Binna 1

'I Station.

This program incorporates the requirements of the current revision of Appendix 8, "Binna Station Inservice Inspection Program for the 1990-1'799 Interval" of the Ginna Duali ty Assurance Nanual.

The tables of the System Pressure Tests contain the schedules of

'he tests to be conducted in accordance with Article IWA-5000 of Section XI. They are separated according to major systems 'and subdivided to list the areas ( loops) which are to be isolated and pressure tested or visually examined for leakage. The areas included are:

(1) Hydrostatic Tests, Class 1 (2) Hydrostatic Tests, Class 2 (3) Hydrostatic Tests, Class 3 (4) Leakage Examinations, Class 1,2 Hydrostatic/Pneumatic examinations shall be performed once per interval while the Leakage examination shall be performed once per I

period. At the end of the tables for System Pressure Tests and Leakage Examinations, PAID boundary drawings appear for both types of examinations to reflect the scope and to insure coverage for this page 1 of 1

DATE: 06/02/89 ROBERl'. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 1 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN SYSTEH PRESSURE TEST INSPECTION INTERVAL PLAH STATUS HYDROSTATIC TESTS CLASS 2 I FIRST SECOND THIRD J ZONE NUHBER: ASHE I PERIOD PERICO PERIOD SEC. XI - I I

SUHHARY EXAHIHATI ON AREA CATGY NDE - OUTAGE - I INSTRUCTIONS NUHBER IDENT IF ICATION ITEM HO HETH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE. '**** FIG NO 300100 RSSP-15.10 RHR SYSTEH LOW C.H VT.2 1- C SEE SUHMARY ¹ 351000 FOR 3RD PRESSURE SYSTEH HYDRO EXAM IWC5222 2 . C INTERVAL.

000, 000 3.

4-79 INTERVAL 1 PERIOD 2 EXAHINATIOH WAS COMPLETED IN 79. SCHEDULED FOR 89 TO COINSIDE WITH CORE UNLOAD.

300200 RSSP.15.20 A.B KOTLEG SAHPLE C-H VT-2 C SEE SUHHARY ¹ 352000 FOR 3RD LINE SYS'EM HYDRO EXAH IWC5222 2- C INTERVAL.

000, 000 3-4 88 - VT 2,NOREC; S/R 88-0261.

301000 RSSP.15.1 SI/CV SPRAY SUCTION C.H VT-2 1 C SEE SUHHARY ¹ 351100 FOR 3RD (NAOH)PIPING SYS HYDRO EXAH IWC5222 2- C C INTERVAL.

I 3 .

4-301100 RSSP 15.11 RHR SYSTEM HI C-H VT-2 1 C SEE

SUMMARY

¹ 351100 FOR 3RD PRESSURE SYSTEM HYDRO EXAH IWC5222 2- C IN1'ERVAL.

000, 000 3-4 .

79 INTERVAL 1 PERIOD 2 EXAMIHATION 'WAS COMPLETED IN 79. SCHEDULED FOR 89 TO COINSIDE WITH CORE UNLOAD.

301200 RSSP 15.12 A F B S/G F'W PIPING C H VT-2 1 C SEE

SUMMARY

¹ 351200 FOR 3RD SYSTEH HYDRO EXAM IWC5222 2 - - C C INTERVAL.

3 4

301300 RSSP-15.13 ACCUMULATOR "B" LOO C.H VT.2 1 C SEE SUHHARY ¹ 351300 FOR 3RD SYSTEM HYDRO EXAH IWC5222 2 C IN'IERVAL.

000, 000 3 4-

DATE: 06/02/89 REV I SIGH: 0 ROBERT E. GINNA NUCLEAR TEST'AGE:

POWER STATION UNIT INSERVICE INSPECTION PROGRAM PLAN SYSTEH PRESSURE 1 2 INSPECTION INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 2 I FIRST SECOND THIRD ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAHINATI ON AREA CATGY NOE I

I

- - OUTAGE -- I INSTRUCTIONS NUHBER IDENTJF ICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I *>>CALIBRATION BLOCK>>>>

PLANT LINE: *>>>>* FIG NO 301400 RSSP-15.14 ACCUMULATOR "A" LOO C H VT 2 C SEE SUHMARY ¹ 351400 FOR 3RD SYSTEH HYDRO EXAM IWC5222 2- C INTERVAL.

000, 000 3-4-

301500 RSSP.15.15 "A" BORIC ACID STOR C.H VT.2 1 C - SEE

SUMMARY

¹ 351500 FOR 3RD TANK SYSTEH HYDRO EXAH IWC5222 2 . C IHTERVAL.

3-4 301600 RSSP-15.16>>B" BORIC ACID STOR C.H VT.2 1 C SEE

SUMMARY

¹ 351600 FOR 3RD TANK SYSTEH HYDRO EXAH IWC5222 2- INTERVAL.

3-4-

301700 RSSP-15.17 VOLUME CONTROL TANK C-H VT-2 1 C SEE SUMHARY ¹ 351700 FOR 3RD SYSTEH HYDRO EXAM IWC5222 2 . C INTERVAL.

3 4

301800 RSSP.15.18 PRESSURIZER LIOUID C H VT-2 1 C SEE SUMHARY ¹ 351800 FOR 3RD SAMPLELIN SYSTEM HYDRO EXAM IWC5222 2 C INTERVAL.

000, 000 3.

4-88 - S/R 88-310.

301900 RSSP-15.19 PRESSURIZER STEAH C H VT-2 1 C SEE

SUMMARY

¹ 351900 FOR 3RD SPACE SAMPLE SYS HYDRO EXAH IWC5222 2- C - INTERVAL.

000 I 000 3-4 88 S/R 88.0637.

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 3 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN SYSTEH PRESSURE TEST IHSPECTION INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 2 I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI - I I

SUMHARY EXAHIHAT I ON AREA CATGY NDE I


.OUTAGE- I INSTRUCTIONS NUMBER IDENTIFICATION ITEM HO HETH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: **** FIG NO 302000 RSSP-15.2 RC COOLANT LETDOWN C-H VT-2 1 - - - - C DELETED 3-22-89 600 PSIG SYSTEH HYDRO EXAH IWC5222 2 - - C 3-4 .

302100 RSSP-15.21 WASTE GAS SYS. 'WITH C H VT-2 1 C THIS PROCEDURE 'WAS CLASSIFIED NITROGEN SYSTEH HYDRO EXAH IWC5222 2 R C INCORRECTLY, SEE SUMHARY NO.

000, 000 3- 321200 FOR RSSP-13.21. (SEE ¹ 4 FOR 3RD INTERVAL) 302500 RSSP-15.25 REFUELING 'WATER CH VT2 1 SEE

SUMMARY

¹ 352500 FOR 3RD STORAGE TANK IWC5222 2 C IH'TERVAL.

000, 000 3-4-

302600 RSSP.15.26 A & 8 CHARCOAL C-H VI'-2 1 SEE

SUMMARY

¹ 352600 FOR 3RD FILTER DOUSING IWC5222 2- C INTERVAL.

000, 000 3-4.

302700 RSSP.15.27 POST ACCIDENT C.H VT-2 SEE SUMHARY ¹ 352700 FOR 3RO SAHPLE SYSTEH IWC5222 2- C INTERVAL.

000, 000 3-4-

302800 RSSP-15.28 NITROGEN ACCUMULATO C.H Vt-2 1 SEE SUHMARY ¹ 352800 FOR 3RD A 8 B LOW ANO HIGH PRESSURE IWC5222 2- C INTERVAL.

000, 000 3 .

303000 RSSP-15.3 RC COOLAN'I LETDOWN C-H VT-2 1 - - - C DELETED.

150 PSIG SYSTEH HYDRO EXAM IWC5222 2 . - - C 3-4-

84 - EXAMINATION IS INTERVAL 2 PERIOD 1 HAKE UP

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER S'TATION UNIT 1 PAGE: 4 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN SYSTEH PRESSURE TEST IHSPECTION INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 2 I FIRST SECOHD THIRD I ZONE NUHBER: ASHE I PERICO PERIOD PERIOD SEC. XI I

- I SUHHARY EXAHINATION AREA CATGY NDE - 0 U T A 0 E INSTRUCTIONS I I NUHBER IDENTIFICATION ITEH NO HETH 1 2 3 4 1 2 3 <<*CALIBRATION BLOCK""

PLANT L NE: *~~>> FIG NO 304000 RSSP-15.4 CV SPRAY DISCHARGE C-H VT-2 C SEE SUMHARY ¹ 350400 FOR 3RD PIPING SYSTEM HYDRO EXAH IWC5222 2- C C INTERVAL.

3-4-

305000 RSSP-15.5 SPRAY ADDITIVE TANK C-H VT-2 1 C SEE SUMMARZ ¹ 350500 FOR 3RD CONNECTION SYSTEH HYDRO EXA I'WC5222 2- C INI'ERVAL.

3-4-

306000 RSSP-15.6 SI DISCHARGE PIPING C.H VT.2 1 - C SEE SUHMARY ¹ 350600 FOR 3RD SYSTEM HYDRO EXAM IWC5222 2- C C INTERVAL.

3 4-307000 RSSP-15.7 CHARGIHG PUHPS DISCH C-H VT-2 1 C REHOVE LEAD FROM PULSE DAMPEN-LARGE PIPING SYS HZDRO EXAM IWC5222 2 C C ER. PUHP HANIFOLDS NEED TO BE I 3 . REMOVED. SEE

SUMMARY

¹ 350700 4- FOR 3RD INTERVAL.

308000 RSSP-15.8 CHARGING PUHP SUCTIO C.H V'f.2 1 C SEE SUHHARZ ¹ 350800 FOR 3RD (NO VC'I) SYSTEM HYDRO EXAM IWC5222 2 . C C INTERVAL.

3-4-

309000 RSSP-15.9 RHR - SUCTION C-H VT-2 1 SEE SUHHARY ¹ 3509'IO 8 350920 DISCHARGE STOP VALVES (700 IWC5222 2 C FOR 3RD INTERVAL.

SERIES) 3-4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 5 REVI S ION: 0 IHSERVICE INSPECTION PROGRAM PLAN SYSTEM PRESSURE TEST INSPECTION INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 3 I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PER ICO PERIOD PERIOD I SEC. XI I I

SUHMARY EXAHINATION AREA CATGY NDE OUTAGE I IHSTRUCTIONS HUMBER IDENT IF I CAT I OH ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: >>>>>>>> FIG NO 311010 RSSP-13.10.1 CCW INSIDE CV>>B>> 0-A VT-2 1 SEE

SUMMARY

¹ 361010 FOR 3RD RCP SYSTEM HYDRO EXAM I'WD5223 2- C INTERVAL.

000, 000 3-4-

79 - INTERVAL 1 PERICO 2 EXAHINATION WAS COMPLETED IN 79. SCHEDULED FOR 89 TO COINSIOE WITH CORE UNLOAD.

311020 RSSP-13.10.2 CCW. INSIDE CV "A" O.A Vt.2 1 C SEE

SUMMARY

¹ 361020 FOR 3RD RCP SYSTEM HYDRO EXAM IWD5223 2- C INTERVAL.

000, 000 3-4 79 . INTERVAL 1 PERIOD 2 EXAMINATION WAS COMPLETED IN 79. SCHEDULED FOR 89 TO COINSIDE 'WITH CORE UNLOAD.

311030 RSSP-13.10.3 CCW IH CV EXCESS 0 A VT-2 1 C SEE

SUMMARY

¹ 361030 FOR 3RD LETDOWN HX SYS. HYDRO EXAM IWD5223 2 C - C INTERVAL.

3-4-

79 INTERVAL 1 PERIOD 2 EXAMIHATION WAS COMPLETED IH 79. SCHEDULED FOR 89 TO COINSIDE WITH CORE UNLOAD.

311040 RSSP.13.10.4 CCW-IH CV RC SUP- D-A VT-2 1 C SEE

SUMMARY

¹ 361040 FOR 3RD PORT COOLER SYS. HYDRO EXAH I'WD5223 2- R C C INTERVAL.

000, 000 3 .

4-79 - INTERVAL 1 PERIOD 2 EXAMINATION WAS COMPLETED IN 79. SCHEDULED FOR 89 TO COINSIDE WITH CORE UNLOAD.

87 TO BE PERFORHEO AT A LATER DATE. RESCHEDULE FOR 1988 A I & 0 . JJG.

88 . S/R 88-0408.

311100 RSSP 13.11 "A" GAS DECAY 'TANK D.A Vt-2 1 C SEE

SUMMARY

¹ 361100 FOR 3RD SYSTEH HYDRO EXAH IWD5223 2- C INTERVAL.

3-4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER STATIOH UNIT 1 PAGE: 6 REVISION: 0 INSERVICE. INSPECTION PROGRAH PLAN SYSTEH PRESSURE TEST INSPECTION INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 3 I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERICO SEC. XI I

SUMMARY

EXAHIHAT ION AREA CATGY NDE I


OUTAGE--- -

I I INSTRUCTIONS NUMBER IDENT IF ICATION ITEH HO METH I 1 2 3 1 2 3 4 1 2 3 I "*CALIBRATION BLOCK*"

PLANT LINE: ~*~>> FIG NO 311200 RSSP-13.12 "84 GAS DECAY TANK D-A VT 2 1- C SEE SUHHARY 3 361200 FOR 3RD SYSTEH HYDRO EXAM IlJD5223 2- C INTERVAL.

3-4-

311300 RSSP-13.13 "C" GAS DECAY tANK 0 A Vt 2 1 C SEE SUMHARY ¹ 361300 FOR 3RD SYSTEH HYDRO EXAM I'405223 2 C INTERVAL.

3.

4 311310 RSSP-13.1 BORIC ACID AND D-B Vt 2 1 SEE

SUMMARY

¹ 360100 FOR 3RD BLENDER SYS'IEH HYDRO EXAH IUD5223 2- R C C INTERVAL.

000, 000 3-4-

87 - H'YORO NOT PERFORHED.REPLACEHEHT CONTROLLED ON E'MR-3092. TO BE SCHEDULED EACH YEAR UNTIL ENR IS COHPLETED.SUBSEOUENT HYDROS MILL BE SCHEDULED FROH COMPLETION OF EARLY PHASE OF REPLACEHENT

- JJG.

88 S/R 88 0667. SEE RSSP-13.1 311400 RSSP.13.14 "0" GAS DECAY TANK D A VT-2 1 C . SEE SUHMARY ¹ 361400 FOR 3RD SYSTEH HYDRO EXAM I'I85223 2 . C INTERVAL.

I 3-4-

311500 RSSP-13.15 SPENT FUEL PIT D.C VT-2 1 C SEE

SUMMARY

¹ 361500 FOR 3RD LEAKAGE SYSTEM HYDRO EXAM IM)5223 2- C R INTERVAL.

3-4-

87 NCR 087 026 UNDER EVALUATION. REEXAM: LEAKAGE HEASURED AT 442.5 CC/MIN,.1169 GAL/HIN. NCR DISPOSITIONED ACCEPTABLE - JJG. 3/27/87 312000 RSSP 13.2 LETDONN 8 PURIFICA- D-A VT-2 1- SEE

SUMMARY

¹ 360200 FOR 3RD TION SYSTEH HYDRO EXAM IW05223 2 . - C INTERVAL.

I 3-4.

p.

DATE: 06/02/89 REVISION: 0 ROBERT E. GINNA NUCLEAR POWER TESI'AGE:

STATION UNIT INSERVICE INSPECTION PROGRAH PLAN SYSTEH PRESSURE 1 7 IHSPECTION INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 3 I FIRSI'ECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI I I SUMHARY EXAHINATI ON AREA CATGY NDE 0 U T A 0 E - - - - - - I INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 4 1 2 3 I

  • "CALIBRATION BLOCK>>"

PLANT LINE: **** FIG NO 313000 RSSP-13.3 WASTE HOLDUP TAHK 0-e Vr-2 1- C SEE SUHHARY ¹ 360300 FOR 3RD AREA SYSTEH HYDRO EXAM IWD5223 2. - C INTERVAL.

3.

4-314000 RSSP 13.4 SUHP TANK PUHP AREA 0 B VT 2 1 SEE SUHMARY ¹ 360400 FOR 3RD SYSTEH HYDRO EXAH IWD5223 2 - - C INTERVAL.

3-4-

315000 RSSP.13.5 SPENT RESIN Sl'ORAGE D-B VT.2 1 C SEE SUMHARY ¹ 360500 FOR 3RD TANKS SYSTEH HYDRO EXAH IWO5223 2- C INTERVAL.

3-4 316000 RSSP 13.6 AFW PUMPS DISCHARGE 0 B VT-2 1 C SEE SUHHARY ¹ 360600 FOR 3RD PIPING SYSTEH HYDRO EXAM IWD5223 2 . C INTERVAL.

3.

4-317000 RSSP 13 ~ 7 HOLD UP TANKS PIPING D-B VT-2 1 C SEE SUHMARY ¹ 360700 FOR 3RD SYSTEM HYDRO EXAH IWD5223 2- R C - C INTERVAL.

3 4

86 . EXAHINATION NOT COMPLETED IN '86 A I 8 0. RESCHEDULE TO '87 A I 8 0 - JJG 4/3/86 319000 RSSP 13.9 CCW OUTSIDE CONTAIN- O.B Vl'-2 1 INT. 1,PER.2 HYDRO COMPLETED HEHT SYSTEM HYDRO EXAH IW05223 2 . C 79'. HOVED TO OUTAGE 9 FOR

%00, 000 3- CORE UNLOAD. SEE SUMHARY ¹ 4- 360900 FOR 3RD INTERVAL.

79 - INTERVAL 1 PERIOD 2 EXAHINATION WAS COMPLETED IN 79. SCHEDULED FOR 89 TO COINSIDE WITH CORE UNLOAD.

DATE: 06jI02/89 REVISION: 0 ROBERT E. GINNA NUCLEAR POWER TESI'AGE:

STATION UNIT INSERVICE INSPECTION PROGRAH PLAN SYSI'EH PRESSURE 1 8 INSPECTION INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 3 I FIRST SECOND THIRD J ZONE NUHBER: ASHE I PERIOD PERICO PERIOD SEC. XI I I SUHHARY EXAHIHAT I ON AREA CATGY NDE I

- - - - - OUTAGE - - - - I INSTRUCI'IONS NUMBER IDENTIFICATION ITEH NO HETH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK"*

PLANl'INE **** FIG NO 320010 RSSP-13.16 "A4 CVCS HOLD.UP D-8 Vl'-2 1 SEE SUMHARY 3 361600 FOR 3RD TANK SYSTEH HYDRO EXAH IWD5223 2 - - C C IHTERVAL.

3.

4-82 - FIRST HYDRO 320020 RSSP-13. 17 "8" CVCS HOLD-UP 0 8 VT-2 I SEE SUMHARY ¹ 361700 FOR 3RD TANK SYSTEM HYDRO EXAM IWD5223 2 - - C C INTERVAL.

3-4 82 - FIRS'I HYDRO 320030 RSSP-13.18 "C" CVCS NOLO.UP 0-B VT-2 1 SEE

SUMMARY

¹ 361800 FOR 3RD TANK SYSTEH HYDRO EXAH IWD5223 2 - . C C INTERVAL.

3-4-

82 - FIRST HYDRO ASHE HYDROSTATIC TESTING FOR CLASS 8 AHD C COMPONENTS ADOPTED IN 1973. INTERVALS CHANGED 'IO COINCIDE WITH CLASS A COHPOHENTS. HYDROS CONDUCTED IN 1980,81 AND 82 HAVE BEEN PLACED IN THE SECOND IN'IERVAL FIRSI'ERIOD DUE TO SHIFT.

321000 RSSP.13.19 STATIC HEAD OF SUHP 0-B VT-2 1 SEE SUHHARY ¹ 361900 FOR 3RD TANK SYSTEM HYDRO EXAH IWD5223 2 . . C INTERVAL.

3 .

4 .

321100 RSSP.13.20 STATIC HEAD OF WAST O.B Vl'-2 1 SEE

SUMMARY

¹ 362000 FOR 3RD HOLD.UP TANK IWD5223 2- C INTERVAL.

3-4 321200 RSSP 13.21 PNEUHATIC TEST D.A VT.2 1 . SEE SUHHARY ¹ 362100 FOR 3RD WASTE GAS SYSTEH IWD5223 2. C INTERVAL.

3-4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 9 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN SYSTEM PRESSURE TEST IHSPECT ION IHTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 3 I FIRST SECOHD THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. XI -

I I

SUMMARY

EXAMINATION AREA CATGY NDE - - - - 0 U T A G E - - - - - - INSTRUCTIONS I I NUMBER IDENTIFICATION, ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I *"CALIBRAT I OH BLOCK""

PLANT LINE: **** FIG NO 321300 RSSP-13.22 AUXILIARY FEEDWATER D C VT 2 1 SEE SUMHARY ¹ 362200 FOR 3RD LOW PRESSURE HYDRO EXAM IW05223 2- C INTERVAL.

3-4 .

321400 RSSP 13.23 STANDBY AUXILIARY D C VT-2 1 SEE

SUMMARY

¹ 362300 FOR 3RD FEEDWATER HIGH PRESS. HYDRO IW05223 2- C INTERVAL.

3-4-

321500 RSSP 13.24 STANDBY AUXILIARY 0-B VT-2 SEE SUMHARY ¹ 362400 FOR 3RD FEEDWATER LOW PRESS. HYDRO IWD5223 2 C INTERVAL.

3.

4-321600 RSSP-13.25 STATIC HEAD( C.C.'W. D B VT-2 1 SEE

SUMMARY

¹ 362500 FOR 3RD SURGE TANK HYDRO IW05223 2- C IN'IERVAL.

3 4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR PONER STATION UNIT 1 PAGE: 10 REVISIOH: 0 INSERVICE INSPECTION PROGRAM PLAN SYSTEM PRESSURE TEST INSPECTION INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 1 I FIRST SECOND THIRD I ZONE NUHBER: ASHE l PERIOD PERIOD PERIOD I SEC. XI -

I SUMHARY EXAHINATION AREA CATGY NDE I -OUTAGE- - - - - - I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO METH i 1 2 3 1 2 3 4 1 2 3 I ~*CALIBRATION BLOCK**

PLANT LINE:"*~* FIG NO 330000 PT-7 B.P VT-2 1 C C C C C - C C C SEE

SUMMARY

¹ 340000 FOR 3RD REACTOR COOLAH'I SYSTEM IQB5222 2 . C IHTERVAL.

000, 000 3-PLANT LINE: RCS FIG NO 340000 PT-7 B-P VT-2 1 . ~ SEE

SUMMARY

¹ 330000 REACTOR COOLANT SYSTEM INC5222 2 .

000, 000 3. X 4- X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 11 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN SYSTEH PRESSURE TEST INSPECTIOH INTERVAL PLAN Sl'ATUS HYDROSTATIC TESTS CLASS I FIRST SECOND THIRD I ZOHE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI I I SUHMARY EXAMIHATI ON AREA CAT GY NDE I -OUTAGE INSTRUCTIONS NUHBER'DENTIFICATION ITEM NO HETH 1 2 3 'I 2 3 4 1 2 3 **CALIBRATIONBLOCK~~

PLANT LINE:**** FIG NO 350000 RSSP-15.1 SI/CS CH VT2 1 SEE

SUMMARY

¹ 301000. FOR 1ST SUCTION PIPIHG WITH NAOH IWC5222 2 & 2ND INTERVAL IHFORHATION.

000, 000 3- X 4- X 350400 RSSP 15.4 CONTAINMENT C-H Vt-2 1 SEE

SUMMARY

¹ 304000. FOR 1ST SPRAY DISCHARGE PIPING I'WC5222 2- & 2ND INTERVAL INFORMATION.

000, 000 3- X 4 X 350500 RSSP 15.5 SPRAY C-H VT-2 1 ~ SEE SUMHARY ¹ 305000. FOR 1ST ADDITIVE TANK & CONNECTIOHS IWC5222 2- & 2ND IHtERVAL INFORMATION.

000, 000 3 . X 4- X 350600 RSSP-15.6 SAFETY C-H VT-2 I SEE

SUMMARY

¹ 306000. FOR IST INJECTION DISCHARGE PIPING IWC5222 2 & 2ND IHTERVAL INFORHATION.

000, 000 3 - . - - - - . X 4 X 350700 RSSP-15.7 CHARGING C H Vl'-2 1 SEE

SUMMARY

¹ 307000. FOR 1ST PUMPS DISCHARGE PIPING IWC5222 2- & 2ND INtERVAL IHFORMAtlON.

000, 000 3- X X

350800 RSSP.15.8 CHARGING C.H VT-2 1 SEE SUMHARY ¹ 308000. FOR 1st PUHPS SUCTION EXCLUDING VCT IWC5222 2- & 2HD INTERVAL INFORMATION.

000, 000 3- X 4- X 350910 RSSP-15.9.1 RHR C-H VT.2 1 SEE

SUMMARY

¹ 309000. FOR lSI' SUCTION STOP VALVES 700 & 701 IWC5222 2 . 2ND INTERVAL INFORHATION.

000, 000 3- X 4 X

DATE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 12 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN SYSTEM PRESSURE ZEST INSPECTIOH INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 2 I FIRSI'ECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. XI -

I I

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - OUTAGE - - I INSTRUCTIONS HUMBER IDENT I F I CAT ION ITEH NO METH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK"*

PLANT LINE:**** FIG NO 350920 RSSP.15.9.2 RHR C-H VT-2 1 SEE

SUMMARY

¹ 309000. FOR 1SZ SUCTION STOP VALVES 720 & 721 IWC5222 2- & 2ND INTERVAL INFORMATION.

000, 000 3 . X 4 . X 351000 RSSP 15.10 RHR C.H VT.2 1 SEE SUMHARY ¹ 300100. FOR IST SYSTEM.LOW PRESSURE IWC5222 2- & 2ND INTERVAL IHFORMAZION.

000, 000 3- X 4 X 351100 RSSP 15.11 RHR C-H Vt.2 SEE

SUMMARY

¹ 301100. FOR 1st SYSTEM-HIGH PRESSURE IWC5222 2- 8 2ND IH'IERVAL INFORHAtlON.

000, 000 3 .

4 .

351200 RSSP-15.12 A 8 B C H VT-2 1 SEE

SUMMARY

¹ 301200. FOR 1ST S/G FW SECONDARY PIPING IWC5222 2- & 2ND INTERVAL INFORMATION.

000, 000 3 - - X 4 - - X 351300 RSSP-15.13 ACCUMULATOR CH VT2 1 SEE SUHMARY ¹ 301300. FOR ISZ "B" LOOP IWC5222 2 8 2HD INTERVAL IHFORMAI'IOH.

000, 000 3- X 4- X 351400 RSSP-15.14 ACCUMULATOR C.H Vt-2 1 SEE SUMHARY ¹ 301400. FOR 1ST 4A" LOOP I'WC5222 2- & 2ND INTERVAL INFORMATION.

000, 000 3- X 4 X 351500 RSSP-15.15 "A" BORIC C-H VT-2 1- SEE SUMHARY ¹ 301500. FOR 1ST ACID STORAGE TANK-STATIC HEAD IWC5222 2 . 8 2ND INTERVAL INFORHATIOH.

ZEST 3. X 000, 000 4 X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 13 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN SYSI'EM PRESSURE TESt INSPECTION INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 2 I FIRST SECOND THIRD I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. Xl I SUMHARY EXAHINATIOH AREA CATGY NDE I

- OUTAGE - - I IHSTRUCTIOHS NUMBER IDENT IF ICATION ITEH NO HETH 1 2 3. 1 2 3 4 1 2 3 **CALIBRATIONBLOCK*"

PLANT LINE:**** FIG NO 351600 RSSP-15.16 "B4 BORIC C-H VT-2 1 SEE SUHHARY ¹ 301600. FOR 1ST ACID STORAGE TANK-STAT!C HEAD IWC5222 2- & 2ND INTERVAL INFORHATION.

TEST 3- X 000, 000 4- X 351700 RSSP-15. 17 VOLUHE C-H Vl'-2 1 SEE

SUMMARY

¹ 301700. FOR 1ST CONTROL TANK IWC5222 2- & 2HD INTERVAL INFORHATIOH.

000, 000 3- X 4- ~ X 351800 RSSP 15.18 PRESSURIZER C H Vt-2 1 SEE SUMHARY ¹ 301800. FOR 1ST LIOUID SAMPLE LINE IWC5222 2 & 2NO INTERVAL INFORMATION.

000, 000 3 . X 4 X 351900 RSSP-15.19 PRESSURIZER C-H VT-2 1- SEE SUHMARY ¹ 301900. FOR 1SI' STEAM SPACE SAMPLE LINE IWC5222 2- 2ND INTERVAL INFORMATION.

000, 000 3- X 4- X 352000 RSSP-15.20 A - 8 CH VT2 1 SEE SUMHARY ¹ 301000. FOR 1st HOTLEG SAMPLE LINE IWC5222 2- & 2ND INTERVAL INFORMATION.

000, 000 3- X 4- X 352500 RSSP 15.25 STATIC C-H VT.Z 1 SEE

SUMMARY

¹ 302500. FOR 1St HEAD-REFULIHG WATER STORAGE IWC5222 2- & 2ND INTERVAL INFORMATION.

TANK 3- X 000, 000 4 X 352600 RSSP-'15.26 A & 8 C.H VT-2 1 SEE SUHMARY ¹ 302600. FOR 1ST CHARCOAL FILTER DOUSING I'WC5222 2- & 2ND INTERVAL INFORHATION.

000, 000 3- X 4- X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 14 REVISION: 0 IHSERVICE IHSPECTION PROGRAM PLAN SYSTEH PRESSURE TEST INSPECTION IHTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 2 I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERICO PERIOD I SEC. XI

SUMMARY

EXAHINATION AREA CATGY NDE I

I

- OUTAGE -- I I INSTRUCTIONS NUMBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 *"CALIBRATION BLOCK*"

PLANT LINE:~*** FIG NO 352700 RSSP ~ 15.27 POST C-H VT-2 SEE

SUMMARY

¹ 302700. FOR 1ST ACCIDENT SAMPLE SYSTEH IWC5222 2 & 2ND INTERVAL INFORMATION.

000, 000 3 . X 4 X 352800 RSSP.15.28 NITROGEN ACCUM. C.H VT 2 1 SEE

SUMMARY

¹ 302800. FOR 1ST A & B, LOW & HIGH PRESS. IWC5222 2- & 2ND INTERVAL INFORMATION.

000, 000 3- X 4 X 355000 CONTAINMEHT C-H VT.2 1 . OPEN FLOW PATH TEST.

SPRAY RINGS IWC5222 2 .

000, 000 3- X 4 . X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 15 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN SYSTEH PRESSURE TEST INSPECTION INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 3 I FIRST SECOND THIRD ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC ~ XI I I

SUMMARY

EXAHIHATION AREA CATGY NDE - OUTAGE - - I INSTRUCTIONS I

NUMBER IDENTIFICATION ITEH NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE:**** FIG NO 360100 RSSP-13.1 BORIC 0-B VT-2 I SEE

SUMMARY

¹ 311310. FOR 1ST ACID 8 BLENDER SYSTEM IWD5223 2- & 2ND INTERVAL INFORMATION.

000, 000 3- X 4- X 360200 RSSP-13.2 CVCS D-A VT-2 1 SEE

SUMMARY

¹ 312000. FOR 1ST LETDOWN & PURIFICATION SYSTEH IW05223 2- 8 2NO INTERVAL INFORMATION.

000, 000 3 - - X 4 - - X 360300 RSSP 13.3 'WASTE D-B VT-2 1 SEE SUHMARY ¹ 313000 'OR 1S'I HOLD-UP TANK (WDS) IWD5223 2 . & 2ND INTERVAL IHFORMA'IION.

000, 000 3- X 4- X 360400 RSSP-13.4 SUHP TANK 0-B VT-2 I SEE SUHMARY ¹ 314000. FOR 1SI' PUHP AREA IWDS) IWD5223 2- 2ND INTERVAL INFORHATION.

000, 000 3. X 4 X 360500 RSSP-13.5 SPENT D-B VT-2 1 SEE

SUMMARY

¹ 315000. FOR 1ST RESIN STORAGE TANKS & IW05223 2- 8 2ND INTERVAL INFORHAT'ION.

DISCHARGE SYSTEM 3 . X 000, 000 4- X 360600 RSSP-13.6 AUX FW D.B VT-2 1 SEE

SUMMARY

¹ 316000. FOR 1SI' PUMPS DISCHARGE PIPING IWD5223 2 . 2ND INTERVAL IHFORMA'TION.

000, 000 3- X X

360700 RSSP-13.7 HOLD-UP D-B VT-2 1 SEE SUHMARY ¹ 317000. FOR 1ST TANKS PIPHG SYSTEM IWD5223 2. & 2ND INTERVAL INFORHATION.

000, 000 3- X 4- X

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR POWER STATION UNIT 1 PAGE: 16 REVISION: 0 INSERVICE IHSPECT ION PROGRAM PLAN SYSTEH PRESSURE TEST INSPECTION INTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 3 I FIRST SECOND THIRD ZONE NUMBER: ASME I PERICO i PERIOD PER I CO SEC. XI

SUMMARY

EXAMIHATION AREA CATGY NDE I

I

- - - - - 0 U T A G E - - -- I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK"*

PLANT LINE:**** FIG NO 360900 RSSP-13.9 COHPOHENT D.B VT-2 1- SEE SUHMARY ¹ 319000. FOR 1ST COOLING WATER (CCW) OUTSIDE IWD5223 2- 8 2NO INTERVAL INFORHATION.

CONTAINHENT 3- X 000, 000 4 X 36'l010 RSSP-13.10.1 CCW D.A VT.2 1 SEE SUHMARY ¹ 311010. FOR 1ST INSIDE CV "B" RCP IWD5223 2- & 2ND INTERVAL INFORMATION.

000, 000 3 . X

4. X 361020 RSSP.13.10.2 CCW D A VT-2 1 SEE

SUMMARY

¹ 311020. FOR 1ST INSIDE CV "A" RCP IWD5223 2 & 2ND INTERVAL INFORMATION.

000, 000 3-4 361030 RSSP-13.10.3 CCW 0-A VT-2 1 SEE

SUMMARY

¹ 311030. fOR 1ST IN CV EXCESS LETDOWN HEAT IWD5223 2- 8 2ND INTERVAL INFORMATION.

EXCHANGER 3 X 000, 000 4 X 361040 RSSP-13.10.4 CCW D-A VT.2 1 SEE

SUMMARY

¹ 311040. FOR iS'I IN CV REACTOR SUPPORI'OOLERS IWD5223 2 & 2HD INTERVAL IHFORHATION.

000, 000 3- - . - X 4 X 361100 RSSP.13.11 "A" GAS D A VT-2 1 SEE

SUMMARY

¹ 311100. FOR 1SI' DECAY 'TANK I'405223 2 . 2ND INTERVAL INFORMATION.

000, 000 3- X X

361200 RSSP.13.12 "B" GAS DA VT2 1 SEE

SUMMARY

¹ 311200. FOR 1ST DECAY TAHK IWD5223 2 . 8 2ND INTERVAL INFORHATION.

000, 000 3. X 4- X

DATE: 06g02I89 REVI SION: 0 ROBERT TEST'AGE:

E. GINNA NUCLEAR PIER STATION UNIT INSERVICE INSPECTION PROGRAH PLAN, SYSTEM PRESSURE 1 17 INSPECT IOH IHTERVAL PLAN STATUS HYDROSTATIC TESTS CLASS 3 I FIRST SECOND THIRD I ZONE NUHBER: ASHE PERIOD PERIOD PERIOD I SEC. XI I OUTAGE - - - -

SUMMARY

EXAHIHATION AREA NUMBER IDENTIFICATION CATGY HDE ITEM HO METH I

I 1 2 3 234123 I INSTRUCTIONS

    • CALIBRATIONBLOCK"*

PLANT LINE:~*** FIG NO 361300 RSSP-13.13 "C4 GAS 0-A VT-2 1 SEE SUMHARY ¹ 311300. FOR 1ST DECAY TANK IND5223 2- & 2ND INTERVAL INFORHATION.

000, 000 3- X 4- X 361400 RSSP 13.14 "0" GAS D-A VT-2 1 SEE

SUMMARY

¹ 311400. FOR IST DECAY TANK IWD5223 2- & 2ND INTERVAL INFORMATION.

000, 000 3- X 4- X 361500 RSSP.13.15 SPENT D-C VT.2 1 SEE

SUMMARY

¹ 311500 'OR 1S'I FUEL PIT LEAKAGE SYSTEH IUD5223 2 . & 2ND IH'IERVAL INFORMATION.

000, 000 3- X 4- X 361600 RSSP-13.16 "A" CVCS 0 B VT-2 1 SEE SUMHARY ¹ 320010. FOR 1SI' HOLD-UP TANK IlJ05223 2- 2ND INTERVAL INFORMATION.

000, 000 3 X 4 X 361700 RSSP-13.17 48" CVCS D.B VT-2 1 SEE

SUMMARY

¹ 320020. FOR 1ST HOLD.UP TAHK ll$5223 2 & 2ND INTERVAL INFORMAI'ION.

000, 000 3 X 4 X 361800 RSSP-13.18 "C" CVCS D.B Vl'-2 1 SEE

SUMMARY

¹ 320030. FOR 1SI' HOLD-UP TANK IND5223 2- 2ND INTERVAL INFORHATION.

000, 000 3X 4 X 361900 RSSP-13.19 SUHP O.B VT-2 1 SEE SUMHARY ¹ 321000. FOR 1ST TANK STATIC HEAD TEST IM)5223 2- & 2ND INTERVAL IHFORMATION.

000, 000 3 X 4 X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER StATION UNIT 1 PAGE: 18 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN SYSTEH PRESSURE TEST INSPECTION INTERVAL PLAN STATUS HYDROSI'ATIC TESTS CLASS 3 I FIRST SECOND THIRD I ZONE NUMBER: ASHE I PER ICO PERIOD PERICO I SEC. XI I

- I SUHHARY EXAHINATION AREA CATGY NDE -OUTAGE- - - I INSTRUCTIONS NUHBER IDENtlFICATION ITEH NO HETH i 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK"*

PLANI'INE:**** FIG NO 362000 RSSP-13.20 WASTE 0-B VT.2 1 SEE SUMHARY ¹ 321100. FOR 1ST HOLD-UP TANK STATIC HEAD TEST IWD5223 2- & 2ND INTERVAL INFORMATION.

000, 000 3. X 4- X 362100 RSSP-13.21 PNEUHAT IC D-A VT-2 1- SEE SUHHARY ¹ 321200. FOR 1ST TESI'AS'IE GAS SYSTEH IWD5223 2 & 2ND INTERVAL INFORHATION.

000, 000 3- X 4- X 362200 RSSP-13.22 AUXILIARY D-C VT-2 1 SEE

SUMMARY

¹ 321300. FOR 1ST FEEDWATER LOW PRESSURE HYDRO IWD5223 2- & 2ND INTERVAL INFORMATION.

000, 000 3- X 4- X 362300 RSSP-13.23 STANDBY D.C VT-2 1-

SUMMARY

¹ 321400. FOR 1ST AUX FEEDWATER HIGH PRESSURE HYDRO IWD5223 2 3-X'EE X

& 2ND INTERVAL INFORMATION.

000, 000 4 362400 RSSP-13.24 STANDBY D.B VT-2 1- SEE

SUMMARY

¹ 321500. FOR 'IST AUX FEEDWATER LOW PRESSURE IWD5223 2- & 2ND INTERVAL INFORHA'IION.

HYDRO 3- X 000, 000 4- X 362500 RSSP-13.25 CCW D.B VT-2 1- SEE SUHHARY ¹ 321600. FOR 1ST SURGE TANK STATIC HEAD TEST IWD5223 2- & 2ND INTERVAL INFORMATION.

000, 000 3- X 4- X

DATE: 06/02/89 ROBERt E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 19 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN SYSTEM PRESSURE TEST INSPECTION INTERVAL PLAN STATUS LEAKAGE EXAMINATIONS CLASS 1 2 3 I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERICO PERICO SEC. XI -

SUMHARY EXAHINAI'ION AREA CATGY NDE I

I -OUTAGE-. - - -- I I INSTRUCTIONS NUHBER IDENtlFICATION ITEH NO HETH 1 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIONBLOCK**

PLANT LINE: *~~~ FIG NO L101 400100 HAIN STEAM INSIDE CONT. C-H VT-2 1 C C C C C C C C C SEE SUMHARY ¹ 411100 FOR 3RD HAIN STEAM IWC5221 2 C C C C C INTERVAL.

102, 3-4-

400105 MAIN STEAM OUTSIDE CONT. C-H Vt-2 1 C C C C C C C C C SEE SUMHARY ¹ 411200 FOR 3RD HAIN STEAH IWC522'I 2 C C C C C INTERVAL.

102, 105 3-I 4-PLANT LINE: ***" FIG NO L103 400110 HAIH STEAM TO TDAFWP D-8 Vt 2 1 SEE,SUHMARY ¹ 411300 FOR 3RD MAIN STEAM IWD5221 2 . C C INTERVAL.

3-4-

PLANT LINE: **"* FIG NO L104 400115 MAIN STEAM HIGH ENERGY Vt-2 1 C C C C C C C C C SEE SUMHARY ¹ 411400 FOR 3RD HAIN STEAM 2 C C C C C INTERVAL.

3 .

4-PLANt LINE: ***" FIG NO L201 400200 HAIN FEEDWATER INSIDE CONT. C.H Vt-2 1 SEE SUHHARY ¹ 411500 FOR 3RD FEEDWATER AND STAND. BY I'WC5221 2 C C INTERVAL.

202, 3-4-

400205 HAIN FEEDWATER OUTSIDE CONI'. C.H VT.2 1 C C C C C C C C C SEE SUMHARY ¹ 411600 FOR 3RD MAIN FEEDWATER IWC5221 2 C C C C C INTERVAL.

202 3-4

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATIOH UHIT 1 PAGE: 20 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN SYSTEM PRESSURE TEST INSPECT'ION IHTERVAL PLAN STATUS LEAKAGE EXAMINATIONS CLASS 1 2 3 I FIRST SECOND THIRD I ZONE NUMBER: ASME I PERIOD PERIOD PERIOD SEC. XI I

- I

SUMMARY

EXAMINATION AREA CATGY NDE I OUTAGE I INSTRUCTIOHS NUHBER IDENTIFICATION ITEH NO HETH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK""

PLANT LINE: **** FIG NO SEE 4D0210 AUXILIARY FEEDWATER HOTOR ORIV D.B VT-2 1 FIG. NUHBERS L201,L202,L203, AUXILIARY FEEDWATER IWD5221 2- C C L207,L219. SEE

SUMMARY

¹ INSTR, 3- 411700 & 411800 FOR 3RD 4- IHTERVAL.

400215 AUXILIARY FEED'WATER TURB. ORIV D-8 VT-2 1 FIG. NUMBERS L201,L202,L203, AUXILIARY FEEDWATER IWD5221 2 - . - C C - - L207,L219. SEE

SUMMARY

¹ INSTR, 3- 411900 FOR 3RD INTERVAL.

4 PLANT LINE: **** FIG NO L208 400220 STAHDBY AUX. FW INS. COH'I. D.B VT.2 1 SEE

SUMMARY

¹ 412000 & 412100 STANDBY AUX. FEEDWATER IWD5221 2- C C FOR 3RD INTERVAL.

209, 3-4-

PLANT LINE: *~** FIG NO L210 400225 STANDBY AUX. FW OUTSIDE CONT. D-8 VT.2 1 SEE

SUMMARY

¹ 412000 & 412'IDO STANDBY AUX. FEEDWATER IWD5221 2 . C C FOR 3RD INTERVAL.

TNRU ,L217 3-4-

PLANT LINE: **** FIG NO L218 400230 MAIN FEEDWATER HIGH ENERGY VT.2 1 C C C C C C C C C SEE SUMHARY ¹ 412200 FOR 3RD MAIN FEEDWATER 2C C C C C INTERVAL.

3-4 PLANT LINE: ~~~~ FIG NO L301 400300 STEAM GEN. SLOWDOWN INS. CONT. C.H VT.2 1 SEE

SUMMARY

¹ 412300 FOR 3RD STEAH GENERATOR BLOWDOWN IWC5221 2 C C C INTERVAL.

302, 3-4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 21 REVISION: 0 IHSERVICE INSPECTION PROGRAH PLAN SYSTEH PRESSURE TEST INSPECTION INTERVAL PLAN STATUS I.EAKAGE EXAHINATIONS CLASS 1 2 3 I FIRST SECOHO THIRD I ZONE NUHBER: ASHE I PERICO PERIOD PERIOD I SEC. XI I I SUHHARY EXAHINATION AREA CATGY NDE - - - - - - 0 U T A G E- I INSTRUCTIONS NUHBER IDENT IF I CAT I OH ITEH NO METH 1 2 3 1 2 3 4 1 2 3 I

    • CALIBRATIONBLOCK**

PLANT LINE: ***~ FIG NO L302 400305 STEAH GEH. BLOWDOWN OUT. CONT. C H V'T.2 1 SEE

SUMMARY

¹ 412400 FOR 3RD STEAH GENERATOR BLeaOWN IWC5221 2 - C C C INTERVAL.

I 3-4-

85 - THIS EXAHINATION WAS PERFORMED AS PART OF SUMHARY ¹ 400300 ~

PLANT LINE: ***>> FIG NO L407 400400 SAFETY INJ. INS. CONT. C-H Vt-2 1 SEE SUMHARY ¹ 412500 TO 412900 SAFETY INJECTION IWC5221 2- - C C C FOR 3RD INTERVAL.

408, 409 3-4.

85-87 . SI DISCHARGE EXAMINED DURING HYDRO(RSSP 15.17). ACCUMULATORS AND BALANCE OF SYSTEH WILL BE EXAHINED WHEN PRESSURIZED FOR START-UP OF PT-2. 1 - JJG.

PLANT LINE: **~* FIG NO L404 400405 SAFETY INJECTION OUTSIDE CONT. C.H VT.2 1 SEE SUHMARY ¹ 412500 TO 412900 SAFETY INJECTION IWC5221 2 - - R C C FOR 3RD INTERVAL.

405 I 406 3 .

87 . EX-1: Si PUMPS "8" & "C" (5/12/87) ~ EX-2: Sl PUMP "A" PUMP CASING AND DISCHARGE (5/18/87). EXAMINATION WILL CONSISt OF PIPIHG BETWEEN Sl PUHPS & DISCHARGE CHECK VALVES. BALAHCE OF SYSTEM HYDROED UNDER RSSP 15.6 - JJG 3/5/87 PLANt LINE: **** FIG NO L401 400410 CONTAINHEHT SPRAY C-H VT-2 1 SEE

SUMMARY

¹ 413000 & 413100 CONI'AINHEHT SPRAY I WC5221 2 C 0 C C FOR 3RD INTERVAL.

402, 403 3-4-

85 REJ: LEAKAGE THROUGH BODY 'IO COVER WELD ON CHECK VALVE 847B. HCR 85-202 & NDE Vl'EPORT ¹851273REHAINDER OF LINE-NO RECORDABLE INDICATIONS. REPAIR & REEXAMINE ONLY VALVE 8478.

86 - VALVE 8478 REPAIRED. Pt EXAH 86M2033 - NO RECORDABLE INDICATIONS. VT-2 EXAM PERFORHED IN PT-3.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STAT'ION UNIT 1 PAGE: 22 REVISION: 0 INSERVICE INSPECTION PROGRAH PLAN SYSTEM PRESSURE TEST INSPECTION INTERVAL PLAN STATUS LEAKAGE EXAHINATIONS CLASS 1 2 3 I FIRST SECOND THIRD I ZONE NUHBER: ASME I PERIOD PERIOD PERIOD I SEC. XI I I

SUMMARY

EXAHINATI OH AREA CATGY NDE - - 0 U T A G E - I INSTRUCTIONS I

NUMBER IDENTIFICATION ITEH NO METH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK*"

PLANT LINE: **** FIG NO L501 400500 RESIDUAL HEA'T REHOVAL INS. CON C-H VT-2 1 SEE SUHMARY ¹ 413200 TO 413500 RESIDUAL HEAT REHOVAL IWC5221 2- C C FOR 3RD INTERVAL.

L502 , 3-4 88 - S/R 88-0731 PLANT LINE: ***" FIG NO L503 400505 RESIDUAL HEAT REMOVAL OUI'. CON C N VT 2 1 SEE

SUMMARY

¹ 413200 TO 413500 RESIDUAL HEAT REHOVAL IWC5221 2 - - C C C FOR 3RD INTERVAL.

TNRU ,L507 3.

4-85 - EXAMINATION WAS PERFORHED AS PART OF SUMHARY ¹ 400500.

88 . S/R 88-0732.

PLANT LINE: *~~* FIG NO L612 400600 AUXILIARY COOLING INS. CONT. D B VT-2 1 SEE

SUMMARY

¹ 413600 FOR 3RD AUXILIARY COOLING IW05221 2 - - C - C C - IHTERVAL.

TMRU ,L617 3-4 85 INSIDE CONTAINHENT PORTION COMPLETED ON THIS SUHHARY NUMBER. OUTSIDE CONTAINMEH'I PORTION TO BE COMPLETED IN '86 AIBO ON SUMHARY ¹ 400605. - JG.

88 - S/R 88-0707 PLANT LINE: **** FIG NO L601 400605 AUXILIARY COOLING OUTSIDE CONT D B VT-2 1 SEE

SUMMARY

¹ 413700 FOR 3RD AUXILIARY COOLING IWD5221 2 - - C 0 C C INTERVAL.

THRU ,L611 3-85 - PARTIAL EXAMINATIONS PERFORMED - BALANCE TO BE COHPLETED IN '86 AIBO. REJ: EXAMINE 1.A CONTAINMENT SPRAY PUMP BEARING COVER - NCR 85-201.

86 - V'I:REJ: LEAK FOUND ON COHPONENT COOLING FLANGE 1-A CON'TAINHENI'PRAY PUHP. NCR 85-201. REPAIR ON EH-608.

PT: COUPLIHG TO PIPE AHD PIPE TO.ELBOW 'WELDS AFTER REPAIR ON EM.608/NCR 85-201. VT-2 AFTER REPAIRS ACCEPTABLE. JJG

DATE: 06/02/89 ROBERT E. GIHNA NUCLEAR PINER Sl'ATION UNIT 1 PAGE: 23 REVISION: 0. INSERVICE INSPECTION PROGRAM PLAN SYSTEM PRESSURE TEST INSPECTION INTERVAL PLAN STATUS I.EAKAGE EXAMINATIONS CLASS 1 2 3 I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI I I SUMHARY EXAMINATION AREA CATGY NDE I

- - OUTAGE- I INSTRUCI'IONS 3 2 3 4 2 3 ~ CALIBRATION BLOCK*

NUHBER IDENTIFICATION ITEH NO METH I 2 1 1 PLANT LINE: **** FIG NO L710 INTERVALED 400700 SERVICE MATER IHS. CONT. D-A VT-2 1 SEE SUMHARY ¹ 413900 FOR 3RD SERVICE MATER IN05221 2- C C THRU ,L716 3-4-

88 - S/R 88 0707 PLANT LINE: **"* FIG NO L701 400705 SERVICE WATER OUTSIDE CONT. 0-A VT-2 1 . SEE

SUMMARY

¹ 413900 FOR 3RD SERVICE HATER IWD5221 2 - . C C C INTERVAL.

'TNRU ,L711 3.

4-85 EXAMINATION 'MAS PERFORMED AS PART OF

SUMMARY

¹ 400700.

PLAN'I LINE: **"~ FIG NO L901 400800 CNEHICAL VOLUME CONTROL D-A VT-2 1 SEE

SUMMARY

¹ 414800 FOR 3RO HOLD-UP TANKS AND PIPING IWC5221 2- - C - - C C INTERVAL.

908, 3-4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 24 REVISION: 0 IHSERVICE INSPECTION PROGRAM PLAN SYSTEM PRESSURE TEST INSPECTiON IHTERVAL PLAN STATUS LEAKAGE EXAMINATIONS 1 2 3 I FIRST SECOND THIRD I ZOHE NUMBER: ASME I PERIOD PERIOD 'ERIOD I SEC. XI I I SUHHARY EXAHINATION AREA CATGY HDE I OUTAGE-- iNSTRUCTIONS NUHBER IDEN'llF ICATION ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK"*

PLANT LINE: **** FIG NO SEE 400805 CHEMICAL VOLUHE CON'IROL C.H VT-2 1 FIG NUMBERS- L909 TNRU L917, CHARGING 8 LETDOWN OUT CONT I'WC5221 2. - C C C L923,L924,L927,L929,L930. SEE INSTR, 3.

SUMMARY

II 414600 FOR 3RD 4- INTERVAL.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 25 REVISION: 0 INSERVICE IHSPEC'T ION PROGRAH PLAN SYSTEH PRESSURE TEST INSPECTION INTERVAL PLAH STATUS LEAKAGE EXAMINATIONS CLASS 1 2 3 I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PERIOD SEC. XI -

I I SUHHARY EXAHINATI ON AREA CATGY NDE -OUTAGE. INSTRUCTIONS NUHBER IDENT IF I CAT I OH ITEM NO HETH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK**

PLANT LINE: <<~** FIG NO L916 400810 CHEHICAL VOLUME CONTROL C-H VT-2 1 SEE SUMHARY ¹ 41460 & 414700 CHARGING & LETDOWH INS.CONT IWC5221 2- - C C C FOR 3RD INTERVAL.

932, 3-4 .

PLANT LINE: "**" FIG NO L901 400815 CHEMICAL VOLUME CONTROL C.H VT-2 1 SEE SUHHARY ¹ 414600 & 414700 SEAL WATER PIPING IHS. CONT IWC5221 2- C FOR 3RD INTERVAL.

THRU ,L908 3-4-

PLANT LINE: *"*" FIG NO L925 400820 CVCS,BA STORAGE TAHKS & PIPING C-H VT.2 1 SEE

SUMMARY

¹ 414800 FOR 3RD CHEMICAL VOLUME CONTROL I'WC5221 2 - - C - - C C INTERVAL.

926 I 928 3-PLANT LINE: **** FIG NO L933 400825 CHEHICAL VOLUHE CONTROL C.H VT.2 1- SEE

SUMMARY

¹ 414900 FOR 3RD BORIC ACID EVAP. DEMIN. IWC5221 2- C - - C C INTERVAL.

3-4-

PLANT LINE: **"* FIG NO L1001 400900 OVERPRESS PROTECTION INS.COH'j. C-H VT 2 1 SEE

SUMMARY

¹ 414400 FOR 3RD OVERPRESSURE PROTECTION IWC5221 2- C C C INTERVAL.

THRU ,L1004 3-4-

PLANT LINE: "*** FIG NO L1101 401000 SAMPLING SYSTEH BP VT2 1 SEE

SUMMARY

¹ 415000 FOR 3RD SAHPLIHG SYSTEH I'WB5221 2- . C C C INTERVAL.

3-4-

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UHIT 1 PAGE: 26 REVISION: 0 INSERVICE INSPECTIOH PROGRAH PLAN SYSTEH PRESSURE TEST INSPECTION IHTERVAL PLAN STATUS LEAKAGE EXAMINATIONS CLASS 1 2 3 I FIRST SECOND THIRD I ZONE HUNGER: ASHE I PERIOD PERICO PERIOD I SEC. XI I I SUHHARY EXAHINATION AREA CATGY NDE . OUTAGE- I INSTRUCTIONS NUHBER IDENTIFICATION ITEH NO HFTH 1 2 3 1 2 3 4 1 2 3 *"CALIBRATION BLOCK**

PLANT LINE: *~~* FIG NO L1201 401100 DIESEL GENERATORS D 8 VI'-2 1 SEE

SUMMARY

3 415100 & 415200 DIESEL GENERATORS IWD5221 2 - - C C C FOR 3RD INTERVAL.

TNRU ,L1206 3-4 PLAN'I LINE: **** FIG NO 402000 PT-7 HYDRO TEST OF REACTOR C.S 8-P Vt-2 1 C C C C C C C C C SEE

SUMMARY

¹ 411000 FOR 3RD

& LEAKAGE OF CONTAINM'T SYS IWB5221 2 C C C C C C C C C INTERVAL.

000, 000 3.

4-88 - S/R 88 0766.

PLANT LINE: RCS FIG NO L.43 411000 Pt-7 HYDRO OF RE & OR C.S. &, 8-P Vt-2 1-

SUMMARY

¹ 402000 FOR 1ST &

LEAKAGE OF CONTAINMENT SYSTEM 000, 000 IWB5221 2 3X X X X X X X X X X"'EE X

2ND INTERVAL INFORMATION.

NDE800 43. DR'WG. L 43A TO G.

4 X X X X X X X X X PLANT LINE: MS FIG NO 411100 MAINSTEAM IHSIDE CH VT2 1 SEE SUMHARY ¹ 400100 FOR 1ST &

CONTAIHHENt IWC522'I 2- 2ND INTERVAL INFORHAT ION.

000, 000 3 - X X X NDEBDO 1. DRWG. L 1.

4 - X X X 411200 MAINSTEAH OUTSIDE C H VT.2 1 SEE

SUMMARY

¹ 400105 FOR 1ST &

COHI'A I HM EN'I IWC5221 2- 2ND INTERVAL INFORMATION.

000, 000 3. X X X NDE800-2. ORWG. L.2.

4- X X X 411300 MA INSTEAH TO D.B VT.2 SEE

SUMMARY

¹ 400110 FOR 1st &

TDAFWP I WD5221 2- 2ND INTERVAL INFORMATION.

000, 000 3 - X X X - NDEBDD-4. DRWG. L 4.

4 - X X X

0 DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT IHSERVICE IHSPECtlON PROGRAM PLAN 1 PAGE: 27 REVISION: 0 SYSTEM PRESSURE TEST INSPECTION INTERVAL PLAN STATUS LEAKAGE EXAMINATIONS CLASS 1 2 3 I FIRST SECOND THIRD I ZONE NUHBER: ASHE I PERIOD PERIOD PER I OO SEC. XI I I SUHMARY EXAMINATION AREA CATGY HDE I OUTAGE I INSTRUCTIONS HUHBER IDENTIFICATION ITEH HO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANI'INE: MS FIG NO 411400 MAINSTEAM HIGH VT-2 1 SEE SUHMARY ¹ 400115 FOR 1st &

ENERGY 2- 2ND INTERVAL IHFORHA'IION.

000; 000 3 - X X X HDEBOO 3. DRWG. L-3A/38.

4 . X X X PLANT LINE: FW FIG NO 411500 FEEDWATER INSIDE C-H VT-2 1 SEE

SUMMARY

¹ 400200 FOR 1ST &

CONI'AINMENT I WC5221 2 2ND INTERVAL IHFORHATION~

000, 000 3- X X X NDE800 5. DRWG. L-5.

4 - X X X 411600 FEEDWATER OUTSIDE C-H VT-2 1 SEE SUMHARY ¹ 400205 FOR 1ST &

CONTAINHENT IWC5221 2- 2ND INTERVAL INFORMATIOH.

000, 000 3 - X X X NDE800-6. DR'WG. L-6.

4 - X X X PLANT LINE: AUX FW FIG NO 411700 AUXILIARY FEEDWATER O.B VT.2 1 SEE

SUMMARY

¹ 400210 FOR 1st &

"A" PUHP IWD5221 2- 2ND INTERVAL IHFORMATION.

000, 000 3 - X X X NDEBOO-8. DRWE L BA/88 4 . X X X

¹

'11800 AUXILIARY FEEDWATER D-B VT.2 1 SEE

SUMMARY

400210 FOR 1ST &

+Bii PUHP IWD5221 2- 2ND INTERVAL INFORHAT ION.

000, 000 3 - X X X NDE800.9. ORWG. L-9A/98.

4 - X X X 411900 AUXILIARY FEEDWATER D-8 Vl'-2 1 SEE SUMHARY ¹ 400215 FOR 1ST &

TURBINE DRIVEN IWD5221 2- 2ND INTERVAL INFORHATION.

000, 000 3 - X X X NDEBDO. 10. DRWG. L-10A/10B.

4 - X X X

DAZE: 06/02/89 ROBERT E. GINHA NUCLEAR POWER STATION UNIT 1 PAGE: 28 REVISIOH: 0 IHSERVICE INSPEC'ZION PROGRAM PLAN SYSTEM PRESSURE TEST INSPECTION INTERVAL PLAN STATUS LEALAGE EXAMINATIONS CLASS 1 2 3 I FIRST SECOND THIRD j ZONE NUMBER: ASME I PERIOD PERIOD PERIOD I SEC'I

SUMMARY

EXAMINATION AREA CATGY NDE I

I

- - - - - 0 U T A G E - - - -- I I INSTRUCTIONS NUHBER IDENZIFICATIOH ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATIOHBLOCK**

PLANT LINE: AUX FW FIG NO 412000 STANDBY AUXILIARY FEEDWATER D-8 VT-2 1 SEE

SUMMARY

¹ 400220 FOR 1ST &

PUMP iiCii I W05221 2- 2ND INTERVAL IHFORMATIOH.

000, 000 3 - X X X NDE800-11. DRWG. I.-11A/118.

4 - X X X 412100 STANDBY AUXILIARY FEEDWATER D-8 VT-2 1 SEE

SUMMARY

¹ 400220 & 400225 PUMP "D" IWD5221 2- FOR 1ST & 2ND INTERVAL 000, 000 3 X X X INFORMATION. NDE800-12.

4- X X X DRWG. L-12A/128.

PLANT LINE: FW F10 NO 412200 FEEDWATER VT-2 1 SEE

SUMMARY

¹ 400230 FOR'1ST &

HIGH ENERGY 2- 2ND INTERVAL INFORMATION.

000, 000 3- X X X HDE800.7. DRWG. L-7.

4- X X X PLANT LINE: SG BD FIG NO 412300 STEAM GEN SLOWDOWN C-H VT-2 1 ~ SEE

SUMMARY

¹ 400300 FOR 1ST &

INSIDE IWC5221 2- 2HD IN'ZERVAL INFORMATION.

3.

CONTAINMEHl'00, 000 X X X NDEBOO 13. DRWG. L-13.

4. X X X 412400 STEAM GEH SLOWDOWN OUTSIDE CONTAINMENT 000, 000 C-H IWC5221 VT.2 1 2-3.

4 -

X X

.. ~ X X

X X

SEE

SUMMARY

NDE800 14.

¹ 400305 2HD INTERVAL INFORMATION.

DRWG. L FOR 1ST &

14.

PLANT LINE: Sl FIG NO 412500 SAFETY IHJECZIOH "A" PUMP C-H VT-2 1 SEE

SUMMARY

¹ 400400 & 400405 IN/OUT CONTAINMENT IWC5221 2. FOR 1ST & 2ND INTERVAL 000, 000 3- X X X INFORMATION. NDE800-15.

4 - X X X DRWG. L-15.

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 29 REVISION: 0 INSERVICE INSPECTION PROGRAM PLAN SYSTEH PRESSURE TES'T INSPECTION INTERVAL PLAN STATUS LEAKAGE EXAMINATIONS CLASS 1 2 3 I F IRST SECOND THIRD I ZONE NUMBER: ASHE I PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE I

I

- OUTAGE -- I INSTRUCTIONS NUMBER IDEN'IIFICATION ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: SI FIG NO 412600 SAFETY IHJECI'ION 48" PUHP C.H VI'-2 1- SEE

SUMMARY

¹ 400400 & 400405 IN/OUT CONTAINMENT IWC5221 2- FOR 1ST & 2ND INTERVAL 000, 000 3- X X X INFORMATION. NDE800-16.

4 - X X X DRWG. L-16.

412700 SAFETY INJECTION "C" PUHP C-H VT-2 1 SEE SUMHARY ¹ 400400 & 400405 OUTSIDE CONTAINHENT IWC5221 2 FOR 1ST & 2ND INTERVAL 000, 000 3 - X X X IHFORMATION. NDE800 17.

4 - X X X DRWG. L 17.

412800 SAFETY INJECTION C.H VT-2 1 SEE SUMHARY ¹ 400400 & 400405 ACCUMULATOR 1 IWC5221 2- FOR 1ST & 2HD INTERVAL 000, 000 3 - X X X INFORMATION. NDE800-18.

4 - X X X DRWG. L-18.

412900 SAFETY INJECTION C.H VT.2 1 SEE

SUMMARY

¹ 400400 & 400405 ACCUMULATOR 2 IWC5221 2 . FOR 181' 2ND INTERVAL 000, 000 3 - X X X IHFORMATIOH. NDE800-19.

4 - X X X DRUG. L 19.

PLANT LINE: CS FIG NO 413000 COHTAINHENT SPRAY CH V'l2 1 SEE SUHMARY ¹ 400410 FOR 1ST &

& NOAH SYS. A PUHP I'WC5 221 2- 2ND INTERVAL INFORMATION.

000, 000 3- X X X NDE800.20. DRWG. L-20.

4 - X X X 413100 CONTA INHENT SPRAY C.H Vi'-2 1 SEE SUHHARY ¹ 400410 FOR 1ST &

& NOAH SYS. B PUMP IWC5221 2- 2ND INTERVAL INFORHATION.

000, 000 3 - X X X NDE800 21. DRWG. L-21.

4 - X X X PLANT LIME: RHR FIG NO 413200 RHR LOW PRESSURE C-H VT-2 1 SEE

SUMMARY

¹ 400500 & 400505 4A" PUMP I WC5221 2 FOR 1ST & 2ND INTERVAL 000, 000 3 - X X - - X INFORMATION. NDE800 22.

4 - X X X DRWG. L 22.

DATE: 06/02/89 REVISION: 0 ROBERT E. GINNA NUCLEAR POWER TESI'AGE:

STATION UNIT INSERVICE INSPECTION PROGRAM PLAN SYSTEM PRESSURE 1 30 INSPECTION INTERVAL PLAN STATUS LEAKAGE EXAHINATIONS CLASS 1 2 3 I F IRST SECOND THIRD I ZONE NUHBER: ASME I PER I CO PERIOD PERIOD I SEC. XI I

- I SUHMARY EXAHINATI ON AREA CATGY HDE -OUTAGE. - - I INSTRUCTIONS NUHBER IDENT IF ICATION ITEM NO METH i 1 2 3 1 2 3 4 1 2 3 **CALIBRATIONBLOCK"*

PLANT LINE: RHR FIG NO 413300 RNR LOW PRESSURE C.H VT.2 1 SEE

SUMMARY

¹ 400500 & 400505 "8" PUMP IWC5221 2- FOR 1ST & 2ND IN'TERVAL 000, 000 3- X X X INFORMATION. NDE800 23.

4 - X X X DRWG. L-23.

413400 RHR "A" C-H VT-2 1 SEE

SUMMARY

¹ 400500 & 400505 IWC5221 2- FOR 1ST & 2ND INTERVAL 000, 000 3. X X X IHFORHATION. NDE800.24.

4 X X X DRWG. L-24A/24B/24C.

413500 RHR "B4 C.H VT.2 1 SEE

SUMMARY

¹ 400500 & 400505 IWC5221 2. FOR 1ST & 2ND INTERVAL 000, 000 3. X X X IHFORHATION. NDE800-25.

4 - X X X DRWG. L-25.

PLANT LINE: AC FIG NO 413600 AUX COOLING INSIDE D.B VT.2 1- SEE SUMHARY ¹ 400600 FOR 1ST &

CONTAINMENT IW05221 2. 2ND INTERVAL INFORMATION.

000, 000 3- X X X NDE800-26. DRWG. L 26.

4. X - ~ X X 413700 AUX COOL ING OUTSIDE 0 8 VT-2 1- SEE

SUMMARY

¹ 400605 FOR 1ST &

CONTAINMEHT IWD5221 2 . 2ND INTERVAL INFORMATION.

000, 000 3- X X X HDE800-27. DRWG. L.27A TO

4. X X X 27E.

PLANI'INE: RWST FIG NO 413800 REFUELING WA'TER C H VT-2 1 NDE800.28. DRWG. L-28A TO STORAGE TANK & PIPING IWC5221 2 ~ 280.

000, 000 3. X X X

4. X X X

DATE: 06/02/89 ROBERT ED GINNA NUCLEAR POWER STATION WHIT 1 PAGE: 31 REViSION: 0 INSERVICE INSPECTION PROGRAH PLAN SYSTEH PRESSURE TEST INSPECTION INTERVAL PLAN STATUS LEAKAGE EXAMINATIONS CLASS 1 2 3 I FIRST'ECOND THIRD ZONE NUHBER: ASME I PERIOD PERIOD PERIOD SEC. XI I

SUMMARY

EXAMIHAT ION AREA CATGY NDE OUTAGE- INSTRUCTIONS NUHBER IDENT I F I CAT I OH ITEM HO HETH I 1 2 3 1 2 3 4 1 2 3 **CALIBRATION BLOCK**

PLAHT LINE: SW FIG NO 413900 SERVICE WATER 0-A VT-2 1 SEE

SUMMARY

¹ 400700 FOR 1ST &

INSIDE COHTAINMENI'00, IWD5221 2 2ND INTERVAL INFORMATION.

000 3 - X X X NDE800.29. ORWG. L-29.

4 - X X X 414000 SERVICE 'WATER D-A VT-2 1 SEE SUMHARY ¹ 400705 FOR 1ST &

OUTSIDE CON'TAINHENT IW0 5221 2 2ND INTERVAL INFORMATION.

000, 000 3 - X X X NDE800-30. DRWG. L-30A TO 4 - X X X 30C.

414100 SERVICE WATER TO D.A VT.2 1- NDE800-31. DRWG. L-31.

AUX FW PUMP 4A" IWD5221 2 000, 000 3 - X X X

4. X X X 414200 SERVICE WATER TO 0-A VT-2 1 NDE800-32. DRWG. L-32.

AUX F'W PUHP "8" IWD5221 000, 000 3. X X X 4- X X X 414300 SERVICE WATER TO D A VT-2 1 HDE800.33. ORWG. L.33.

TDAFWP IWD5221 2 000, 000 3- X X X 4 - X X X PLANT LINE: RCSOP FIG NO 414400 RCS OVERPRESSURE C.H VT.2 1 SEE SUMHARY ¹ 400900 FOR 1ST &

PROTECTION "A" IWC5221 2- 2ND INTERVAL INFORMATION.

000, 000 3 - X X X NDEBOO-34. DRWG. 34A/34B.

4 - X X X 414500 RCS OVERPRESSURE C H VT.2 1 NDEBOO-35. DRWG. L-35A/358.

PROTECTION "B" IWC5221 2 000, 000 3 - X X X 4 . X X X

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 32 REVISIOH: 0 IHSERVICE INSPECTION PROGRAM PLAN SYSTEM PRESSURE TEST INSPECTION INTERVAL PLAN STATUS LEAKAGE EXAMINATIONS C ASS 1 2 3 I FIRST SECOHO THIRD I ZOHE NUHBER: ASME I PERIOD PERIOD PERIOD SEC. XI I I SUHHARY EXAMINATION AREA CATGY NDE OUTAGE I INSTRUCTIONS NUHBER IDENI'I F ICATION ITEM HO METH 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIONBLOCK**

PLANT LINE: CVCS FIG NO 414600 CHARGING & SEAL WATER C-H V'I 2 1 SEE

SUMMARY

¹ 400815 FOR 1SI' FROM PUHPS (IN/OUT CV) IWC5221 2- 2ND INTERVAL INFORMATION.

000, 000 3 - X X X NOE800-36. DRWG. L-36.

4 - X X X 414700 LETDOWN SYSTEH C-H VT-2 1 SEE SUMHARY ¹ 400810 FOR 1ST &

IN/OUT CONTAINMENT IWC5221 ' . 2ND INTERVAL IHFORHATION.

000, 000 3 ~ X - . X X HDE800-37. DRWG. L-37A TO 4 - X X X 37D.

414800 HOLD UP TANKS IOH EXCHANGERS C-H VT 2 1 SEE SUMHARY ¹ 400820 FOR 1ST &

GAS STRIPPER IWC5221 2 . 2ND INTERVAL INFORMATION.

000, 000 3 - X X X - NDE800-38. DRWG. L 38A/388.

4 - X X X 414900 BORIC ACID TANKS & C.H VT-2 1 SEE

SUMMARY

¹ 400825 FOR 1ST &

PIPING IWC5221 2. 2HD IHTERVAL INFORMATION.

000, 000 3- X X X HDE800.39. DRWG. 39A/398.

4 - X X X PLANT LINE: NPASS FIG NO 415000 NUCLEAR & POST ACCIDENT B.P VT.2 1 SEE

SUMMARY

¹ 401000 FOR 1ST &

SAMPLING SYSTEH IWB5221 2 2HD INTERVAL INFORMATION.

000, 000 3. X X X HDEBOO-40. ORWG. L-40A/408.

4 . X X X PLANT LINE: OG FIG NO 415100 DIESEL GEN. "A" O.B VT.2 1 SEE

SUMMARY

¹ 401100 FOR 1ST &

IWD5221 2- 2ND IN'IERVAL IHFORHATION.

000, 000 3. X X - X HDE800 41. DRUG. L 41A/418.

4 - X X X'

DATE: 06/02/89 ROBERT E. GINNA NUCLEAR POWER STATION UNIT 1 PAGE: 33 REVISION: 0 IHSERVICE IHSPECTION PROGRAM PLAN SYSTEM PRESSURE TEST INSPECTION INTERVAL PLAN STATUS LEAKAGE EXAMINATIONS CLASS 1 2 3 I FIRST SECOND THIRD 2ONE NUHBER: ASHE I PERIOD PERIOD PERIOD I SEC. XI - I I

SUHMARY EXAMINATION AREA CATGY NDE I OUTAGE I INSTRUCTIONS NUHBER IDENT IF ICATION ITEH NO HETH I 1 2 3 1 2 3 4 1 2 3 I **CALIBRATIOHBLOCK**

PLANT LINE: OG FIG NO 415200 DIESEL GEN. "84 D-B VT.2 1- SEE SUMHARY ¹ 401100 FOR 1ST St IWD5221 2. 2NO INTERVAL INFORMATION.

000, 000 3- X X X NDE800.42. DRWG. L-42A/42B.

4 - X X X PLANT LINE: CSR FIG NO 415300 CONTAINMENT C H VT.2 1 OPEN FLOW PATH TEST.

SPRAY RINGS IWD5222 2- NDE800 44. DRWG. L-44.

000, 000 3 - X X X 4 - X X X PLAN'I LINE: WGS FIG NO 415400 WASTE DISPOSAL D.B VT-2 1 NDE800.45. DRWG. L-45.

GAS IWD5221 2.

000, 000 3 - X X X 4 . X X X