ML17261A796

From kanterella
Jump to navigation Jump to search
Forwards Rev 14 to QA Program for Station Operation.Rev Involves Changes in Mgt,Engineering & Station Organization
ML17261A796
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/21/1988
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Stahle C
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17261A797 List:
References
NUDOCS 8901030407
Download: ML17261A796 (8)


Text

gC CE1ZRATED D1STKBUTION DEMONIST'RATION SYFI'KM REGULATOR@NFORMATZON DISTRIBUTION TEM (RIDE)

ACCESSION NBR:8901030407 DOC.DATE: 88/12/21 NOTARIZED: NO DOCKET FACIL:50-244'Robert Emmet Ginha Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION J STAHLE,C. Document Control Branch (Docum t Control Desk)

SUBJECT:

Forwards Rev 14 to QA program for station operation.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR / ENCL + SIZE:

TITLE: OR Submittal: General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL. ID CODE/NAME LTTR ENCL PD1-3 LA 1 0 PD1-3 PD 2 2 STAHLE,C 1 1 h INTERNAL: ARM/DAF/LFMB 1 0 NRR/DEST/ADS 1 1 NRR/DEST/CEB 8H 1 1 8D 7E'RR/DEST/ESB 1 1 NRR/DEST/MTB 9H 1 NRR/DEST/RSB 8E NRR/DEST/SICB NRR/PMAS/ILRB12 1

1 1

1 1

NRR/DOEA/TSB UB ll

-ABSTRACT 1

1 1

1 1

1 OGC/HDS2 1 0 REG FI E 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 g~l +QfZ/$ 4 Pf /0 / / R I

PgyoA <><~

S h

D NOXE K) ALL "RIDS" RECZPIENIS:

S PIZASE HELP US 'IO REDUCE HASTE! CXRZKCT THE DOQ3MENT CCjNTROL DESK RXN Pl-37 (EXT. 20079) TO ELIMINM!E YOUR MHE PKH DIPIVGBVZIQN LISTS HZt DOCtlMEMZS YOU DGNFT SEED)

TOTAL NUMBER OF COPIES REQUIRED:. LTTR 20 ENCL 17 1

~t ~

IHi3I/

'lEÃi

'l'gV IIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 i

TELEPHONE AREA CODE December 21, 1988 7I6 Q MI 0 II>~

546.2700 U.S. Nuclear Regulatory Commission Document Control Desk ATTN: Mr. Carl Stahle PWR Project Director No. 1

SUBJECT:

Submittal. of Quality Assurance Program R. E. Ginna Nuclear Power Plant Docket Number 50-244

Dear Mr. Stahle:

Xn accordance with 50.54 of 10CFR Part: 50, enclosed is revision 14 to the Quality Assurance Program for Station Operation. The revision involves changes in the RGGE management, Engineering and Ginna Station organizations. The consolidation of the Quality Assurance and Ginna Quality Control organizations also recently occurred. The chart of the new Quality Assurance/Quality Control department has been inserted among the other organization charts.

The management organization. chart reflects the revised corporate structure being implemented during 1988 with the retirement of the Chairman of the Board. and the President. With the elimination of the Senior Vice President, Production and Engineering, position, responsibility for the overall direction of quality, assurance policy is assigned to the President. The new position, of Vice President,.Production. and Engineering has assumed those other responsibilities of the former Senior Vice President position which include the corporate responsibilities for operation of Ginna Station in accordance with applicable regulatory requirements. The newly established Director, Quality Assurance/Quality Control has assumed responsibility for establishing the. overall Quality Assurance Program. ln addition to reporting to the President, this new position is responsible for advising the Vice President, Production and Engineering on 8902030407 881221 PDR ADQCK 05000244 PNU

~I I'

l a t

h I'k l

quality matters and for the routine reporting to the Nuclear Safety Audit and Review Board on audit activities. The Manager Quality Assurance and Manager Nuclear Assurance, previously reporting to the Chief Engineer and to the Superintendent Nuclear Production respectively, now report to the Director, Quality Assurance/Quality Control. The Senior Vice President and Controller who formerly reported to the President is now reporting to the Chairman of the Board. The other changes are relatively minor and include title changes.

Engineering changes include the removal of the Quality Assurance function to the newly created. department. The Quality Services Coordinator function, has been reassigned to the Manager, Divisional Services. The Quality Services Coordinator will retain. those quality support functions while relinquishing the independent QC functions at General Maintenance to the Quality Assurance/Quality Control Department. The Manager Divisional Services has also acquired the Ginna Central Records responsibility that was formerly assigned to the Nuclear Assurance group. The functions under the former Director, Engineering Services have been divided into separate Nuclear Engineering Services and General Engineering Services, each supervised by a Director. Within the Nuclear Engineering Services Group the Electrical Engineering Design and the Electrical Engineering Services groups have combined under a single manager. The Structural and the Construction Engineering group have also been consolidated under a single manager.

The changes at Ginna Station include the title change of the Superintendent to the Plant Manager, Ginna Station. The Superintendent, Ginna Production is a new position, that reports to the Plant Manager and. has responsibility for operations, health physics and chemistry, refueling, results and tests, and.

operations assessment. The Superintendent, Ginna Support Services position has assumed some different responsibilities.

In lieu of refueling and test activities as well as administra-tive services, this position is responsible for modification support, maintenance and fire protection. The Administrative Services Manager, the newly established Corrective Action Coordinator, Director, Outage Planning, and Safety Coordinator positions are reporting directly to the Plant Manager, Ginna Station.

The new Quality Assurance/Quality Control department organization is illustrated in Figure 2-2. The responsibilities of the Quality Assurance and Quality Control groups, subsequent to consolidation remain largely unchanged. One minor change will involve the shifting of the General Maintenance quality control responsibility to the Quality. Control group of the new depart-ment.

Other changes being made in the 'Ginna Quality Assurance Program submittal are described below for each applicable criteria description:

3 Section 4 Procurement Control

~ The responsibility for the review of Ginna procurement documents for spare or replacement parts to'etermine similarity, compatibility and acceptance criteria of the original design is reassigned from Quality Control to Ginna Administrative Services. Quality Control will retain the review responsibility for the adequacy of the quality requirements.

Section 5 Instructions Procedures and Drawin s

~ The responsibility for preparation of quality control inspection procedures changes from Ginna Station and. General Maintenance to the Quality Assurance/Quality Control department.

Section 6 Document Control

~ Title of the quality group procedures manual changed from Quality Assurance to Quality Assurance/Quality Control.

~ Approval of the Quality Assurance/Quality Control procedures changed from the Manager, Quality Assurance to the Director, Quality Assurance/Quality Control.

Section 7 Control of Purchased Material E

~

i ment and Services Clarification that Quality Control is responsible for performing receipt inspection at General Maintenance as well as Ginna Station.

Section 9 Control of S ecial Processes

~ None other than Group title clarifications: Quality Assurance and Quality Control to Quality Assurance/Quality Control and Materials Engineering to Materials Engineering and Inspection Services.

Section 10 Ins ection Control

~ Changed. responsibility for assuring adequate inspection requirements are included in General Maintenance procedures from the Quality Services Coordinator to the Manager, Nuclear Assurance.

Section 14 Ins ection Test and 0 eratin Status

~ Responsibility for establishing the procedures for im-plementing the inspection status sheets during inservice inspection has changed. from Ginna Quality Control, to Materials Engineering and Inspection Services.

Section 15 Nonconformin Materials Parts and Com onents

~ Changed approval responsibility from Senior Vice President to Vice President, Production and Engineering for those "Use-As-Is" nonconformances which also deviate from a Design Criteria requirement.

Section 16 Correction Action

~ Stop work authority at General Maintenance changed from the Quality Services Coordinator to Quality Control supervision.

Classified distribution of CAR summary reports from that of Senior Vice President to the Vice President, Production and Engineering and departmental supervision.

Added Research and Science to the off-site groups for which the Manager, Quality has authority to stop work. Formerly this was assigned to the Quality Services Coordinator position.

Section 17 ualit Assurance Records

~ Changed the responsibility for retention and maintenance of, plant records maintained at Ginna Station to Engineering.

Section 18 Audits

~ Senior management recipient of audit reports changed from the Senior Vice President to the Vice President, Production and Engineering.

Table 1 -1 Tables of De artmental Im lementin Procedures Revised to reflect the changes described for the 18 sections.

Table 18-1 Audit List

~ List of activities audited at each department revised.

the changes described for the 18 sections. to'eflect Miscellaneous

~ Where applicable in the various sections the Superintendent, Ginna Station title changed. to Plant Manager, Ginna Station.

Where applicable in the various sections, title change of Quality Assurance, of Quality Control, or of Quality Assurance and Quality Control changed to Quality Assurance/

Quality Control.

~ Typographical and editorial changes incorporated throughout the document where deemed, appropriate.

All changes from previous revision 13 are identified with a vertical line in the left hand. margin of each page. Each page will be identified. as xevision 14 since the entire document was reprinted in lieu of only the revised pages.

Tables and. figures which have been completely 'revised are shown by a revision level (14) at the bottom of the page and by reference in the index, page ii.

This revision is also removing the Introduction section as its purpose and usefulness are no longer warranted.

These changes will'notreduce the effectiveness of the Ginna Station Quality Assurance Program nor reduce any of 'our previous.

commitments.

Very truly .yours,

,1 Robert C. Neer dy General Manager, N lear Production RCMNcemh069 Enclosures xc: C. Marschall, Senor President Inspector Region 1