ACCELERATED DARIBUTJON DEMONS'l%ATtON SYSTEM ACCESSION NBR:88 FACIL:50-244 Robert Emmet Gonna Nuclear Plan n
AUTH.NAME AUTHOR AFFILIATION MCNAMARA,A.E.
Rochester Gas
& Electric Corp.
KOBER,R.W.
Rochester Gas 8 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 01040478 DOC.DATE: 87/11/30 NOTARIZED: NO DOCKET t
U it 1 Rochester G
05000244
SUBJECT:
Monthly operating rept for Nov 1987.W/871211 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTRj ENCL J SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)-
05000244 D
RECIPIENT ID CODE/NAME PDl-3 LA STAHLE,C INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB NRR/PMAS/ILRB RGN1 EXTERNAL: DOE NE32 FULNER NRC PDR COPIES LTTR ENCL 1
0 1
0 1
1 2
2 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB NRR/DRE RPB
&~@
01 LPDR NSIC 1
1 1
1 1
1 1
1 D
-8 1
1 1
1 PU P p 8
COPIES LTTR ENCL 5
5
'A D
I" 8
I A,
D'OTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19
f~~j ~/++
hA
'b gf
~'"
'I c
~
".l l
~~
OPERhTING SThTUS OPERATIHG DATA REPORT DOCKET NO.
DhTE December ll 1987 COMPLETED BY Andrew E. McNamara TELFPHONE 315 524 Ginna Station 470
- 1. Unic Name:
R.E. 6INNA NUCLEAR POWER PLANT
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWc):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Elccn ical Rating (Nec MWe):
- 7. Maximum Dependable Capacity (Ncc MWe):
Notes The reactor power level was maintained at 100% for the entire report period, with one exception, detailed on page 4.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
- 9. Power Level to Which Rescricted, Ifhny (Net MWc)r
- 10. Reasons For Restrictions, If hny:
This Month Yr:to-Date Cumulative 720 8 016.00 7-270 0
10 764 007 3 615 605 100%
90.44%
90.44%
91.25%
- 11. Hours In Reporting Period
- 12. Number of Hours Reactor Was Ctitical 720
- 13. Reactor Reserve Shutdown Hours 0
- 14. Hours Generator On-Line
- 15. Unit Reserve Shucdown Hours
- 16. Gross Thermal Energy Gc.aerated (MWH)
- 17. Gross Electrical Energy Gencratcd (MWH) 396 653
- 19. Unit Scrvicc Factor
- 20. Unic hvailability Factor 100%
- 21. Unit Capacity Factor (Using MDC Nec) 103.98%
- 23. Unit Forced Outage Rate 0%
0%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Dace and Duration of Each):
Februa 5
1988 Annual R fu li 157 896.00 123 274.47 169 814 056 55 704 217 76.59 76.60%
72.70%
6.55%
- 25. If Shut Down ht End Of Rcport. Period, Escimaced Dace of Scarcup:
- 26. Units ln Test Status (Prior to Commercial Operation):
INITIhL.CRITIChLITY INITIhLELECTRICITY COMMERCIhL OPERhTION Forecast hchicvcd
- Cummulative Total. Comm 8801040478 871130.'
I
- PDR,
.ADOCK 05000244
.. DCD
"""ing January 1
1975 xcv. kg Ig.cs
I
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-2 UNIT G
DATE e
embe COMPLETED BY e
owe Plant 9
7 MONTH Novemb 87 TELEPHONE Andrew E.
cNamara Ext.
301 at Ginna DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2 ~
3 ~
4 ~
5 ~
6 ~
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 ~
18 ~
19 ~
20
'1
~
22 ~
7 ~
8 ~
9 ~
10
'2
~
13.
14
'5
~
16 ~
490 4
0 0
489 88 23
'4
'5.
26 ~
27 ~
28
'9
'0
~
31.
90 489 48 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
yt
REPORT MONTH pl 1)O(:Kl'.T NO.
~0 244
~
'INI'I'NhMI:
R.E. GINNA NUCLEAR POWER PLANT'NIT SHUTDOWN AND POWER REDUCTIONS
(:OMPLI'.'I'I'.I)IIY Andrew E.
McNamara I'I:LEPIIONI:
Ginna Stat/on Ho.
Date o e 4
DP 0 C0N De nc ca 8 ocu D
o L ~
> cx.'
IA D CS Licensee Event Report N
Ew N 0
~A C~ LrS 0C o<
E O
Cause 8 Corrective Action to Prevent Recurrence No outages or significant power reductions to report 1
F:
Forced S:
Scheduled htv. 4I$$
4$49 2
Reason:
h-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training gt License Examination F-hdministrative G&peracional Error (Explain)
)H)ther (Explain)
Method:
14lanua) 2-Manual Scram.
3-hutomatic Scram.
4-Other (Explain)
Fxhibit G - lnsuuccions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0)61)
Exhibit I - Same Source
N2QG&TIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 5-4 Gi a Nuc ea owe P a t e
mb 1
1 87 Ctyvc~~
Andrew E. McNamara 15 2 -4 4
EXT. 301 at Ginna
,MONTH Nov mber 7
The unit operated at 100% reactor power level for the ma)ority of the report period, with one minor exception:
On ll/13 the reactor power level was reduced to - 974 for a short period to perform a Periodic Test on the Auxiliary Feedwater System.
GINNA STATION MAINTENANCE REPORT
SUMMARY
NOVEMBER, 1987 During the month of November, routine maintenance and inspections were completed.
Major safety related work included:
a ~
b.
c ~
d ~
Aux. Bldg. Charcoal Filters - change out Repair Copper Line to Turbine Driven Aux.
FW Pump Test RV-283 - "C" Charging Pump Snubber Inspection per M-40 e.
Repair Heat Exchanger Tubing on "C" Safety In).
Pump f.
Repair
'!C" Standby Aux.
FW Cooling Unit go h.
k.
"C" Charging Pump Vari Drive - Trouble shoot and lubricate TSC Diysel << PT-12.5 Surveillance Security Diesel - Annual Maintenance MOV-4008 - MOVATS Testing Diesel Fire Pump Engine/Pump Maintenance Personnel/Equipment Air Lock PT-22.1/PT>>22.4 Surveillance
1 E'
~d <+i ROCHESTER GAS AND ELECTRIC CORPORATION
~ 89 EAST AVENUE, ROCHEST R. N.K 14649-0001 ROGER w. RABBER
.1CC PRKSIO&kT c~cc~wc ~covcno~
t &
~ ()
i-ci conc (o 5-'o 2700 GINNA STATION December ll, 1987 Director, Office of Management Information and Program Analysis U.S.
NUCLEAR REGULATORY COMMISSION Washington, DC. 20555 Sub) ect:
Monthly Report for November, 1987 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1987.
V truly yours, sp
&'ogerW. Kober RWK/eeh Attachments cc:
Mr. William T. Russell NRC (1)
P J
I'p