REGULA Y INFORMATION DISTRIBUTI YSTEM (RIDS)
ACCESSION NBR: 8712080304 DOC. DATE: 87/12/04 NOTARIZED:
NO DOCKET ¹ FACIL: 50-244 Robert Emmet Ginna Nuclear Planti Unit ii Rochester G
05000244 AUTH. NANE AUTHOR AFFILIATION KOBERz R. W.
Rochester Gas h Electric Corp.
REC IP. MANE RECIPIENT AFFILIATION STAHLEi C.
NRC No Detailed Affi liat ion Given
SUBJECT:
Advises that testing of IE Bulletin 85-003 valves anticipated to be completed eithin 60 days of startup from 1988 refueling outage or in Nag 1988. Final rqpt will be submitted eithin 60 days folloeing completion of tests.
DISTRIBUTION CODE:
IE11D COPIES RECEIVED: LTR
~ ENCL ~
SIZE:
TITLE: Bulletin Response (50 DKT)
NOTES: License Exp date in accordance with 10CFR2i 2. 109(9/19/72).
05000244 REC IP IENT ID CODE/NANE PD1-3 LA STAHLEi C COPIES LTTR ENCL RECIPIENT ID CODE/NANE PD1-3 PD COPIES LTTR ENCL INTERNAL: AEOD/DOA AEOD/DSP/TPAB NRR/DEST/ADS NRR/DOEA/EAB NRR/DREP/EPB
~'
02 RGN1 FILE 01 AEOD/DSP NRR/DEST/ADE NRR/DEST/NEB NRR/DOEA/GCB NRR/PNAS/ ILRB RES/DE/EIB EXTERNAL:
LPDR NSIC NRC PDR TOTAL NUNBER OF COPIES REQUIRED:
LTTR 19 ENCL
ROCHESTER" i-."
F NtT
~ W
'/
x 'oce 51iTC
,.>i MORAT'/ON, 89 EAS7 AVENUE ROCHESTER N Y 14649.0001 ROGLR V~.
~ a'
'ea pici<l ELECTR C M i~t SvwOr;C a",a out'>e 546.2700 December 4,
1987 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Mr. Carl Stahle PWR Project Directorate No.
1 Washington, D.C.
20555
Subject:
IE Bulletin 85-03, Safety-Related Motor Operated Valve Program R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Reference:
Letter from R.W. Kober (RG&E) to T.E. Murley (NRC) dated May 14,
- 1986, "IEB 85-03, 180 Day Response"
Dear Mr. Stahle:
The Reference provided our 180 day response to IEB 85-03.
In that response it was stated that we intended to complete the valve testing program within two years from the date of IEB 85-03; however, testing of valves that require a shutdown would not be completed until the spring 1988 refueling outage.
The Ginna valve testing program is patterned after the Callaway program and uses the methodology and equipment of MOVATS, Inc.
Since the 180 day response, the valve testing program has been significantly refined.
Implementation of the MOVATS method-ology is detailed and complex, and it has not been possible to complete testing of the IEB 85-03 valves that do not require shutdown conditions for testing within the two year window stated in IEB 85-03.
We believe, however, that this program will provide a significant improvement in our ability to demonstrate valve operability and will provide a sound basis for setting motor operated valves.
Based on our current schedule, it is anticipated that testing of the IEB 85-03 valves will be completed within 60 days of startup from the 1988 refueling outage or in May 1988 with our current outage schedule.
The final report will be submitted within 60 days following completion of valve testing.
871 2080304 87 2 204 P DR ADOC}( 05000244 G
PDR XE I/
i/g
If you have any questions about our valve test program to satisfy the IEB 85-03 requirements, please contact us.
Ver truly yours,
.p 4 Roger W. Kober