Advises That Testing of IE Bulletin 85-003 Valves Anticipated to Be Completed within 60 Days of Startup from 1988 Refueling Outage or in May 1988.Final Rept Will Be Submitted within 60 Days Following Completion of Tests
ML17261A680
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/04/1987
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Stahle C
NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-85-003, IEB-85-3, NUDOCS 8712080304
Download: ML17261A680 (3)


Text

REGULA Y INFORMATION DISTRIBUTI YSTEM (RIDS)

ACCESSION NBR: 8712080304 DOC. DATE: 87/12/04 NOTARIZED: NO DOCKET ¹ FACIL: 50-244 Robert Emmet Ginna Nuclear Planti Unit ii Rochester G 05000244 AUTH. NANE AUTHOR AFFILIATION KOBERz R. W. Rochester Gas h Electric Corp.

REC IP. MANE RECIPIENT AFFILIATION STAHLEi C. NRC i No Detailed Aff liat ion Given

SUBJECT:

Advises that testing of IE Bulletin 85-003 valves anticipated to be completed eithin 60 days of startup from 1988 refueling outage or in Nag 1988. Final rqpt will be submitted eithin 60 days folloeing completion of tests.

DISTRIBUTION CODE: IE11D COPIES RECEIVED: LTR TITLE: Bulletin Response (50 DKT)

~ ENCL ~ SIZE:

NOTES: License Exp date in accordance with 10CFR2i 2. 109(9/19/72). 05000244 REC IP IENT COPIES RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/NANE LTTR ENCL PD1-3 LA PD1-3 PD STAHLEi C INTERNAL: AEOD/DOA AEOD/DSP AEOD/DSP/TPAB NRR/DEST/ADE NRR/DEST/ADS NRR/DEST/NEB NRR/DOEA/EAB NRR/DOEA/GCB

~' NRR/DREP/EPB RGN1 FILE 01 02 NRR/PNAS/ ILRB RES/DE/EIB EXTERNAL: LPDR NRC PDR NSIC TOTAL NUNBER OF COPIES REQUIRED: LTTR 19 ENCL

F NtT

~ W

'/ x 'oce 51iTC ROCHESTER" i-." ,.>i MORAT'/ON, 89 EAS7 AVENUE ROCHESTER N Y 14649.0001 ROGLR V~. a' pici<l

~

i~t SvwOr;C out'>e 546.2700

'ea ELECTR C M a",a December 4, 1987 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Mr. Carl Stahle PWR Project Directorate No. 1 Washington, D.C. 20555

Subject:

IE Bulletin 85-03, Safety-Related Motor Operated Valve Program R.E. Ginna Nuclear Power Plant Docket No. 50-244

Reference:

Letter from R.W. Kober (RG&E) to T.E. Murley (NRC) dated May 14, 1986, "IEB 85-03, 180 Day Response"

Dear Mr. Stahle:

The Reference provided our 180 day response to IEB 85-03.

In that response it was stated that we intended to complete the valve testing program within two years from the date of IEB 85-03; however, testing of valves that require a shutdown would not be completed until the spring 1988 refueling outage.

The Ginna valve testing program is patterned after the Callaway program and uses the methodology and equipment of MOVATS, Inc. Since the 180 day response, the valve testing program has been significantly refined. Implementation of the MOVATS method-ology is detailed and complex, and it complete testing of the IEB 85-03 valves that do not require has not been possible to shutdown conditions for testing within the two year window stated in IEB 85-03. We believe, however, that this program will provide a significant improvement in our ability to demonstrate valve operability and will provide a sound basis for setting motor operated valves. Based on our current schedule, that testing of the IEB 85-03 valves will be completed within 60 it is anticipated days of startup from the 1988 refueling outage or in May 1988 with our current outage schedule. The final report will be submitted within 60 days following completion of valve testing.

871 2080304 87 2 204 P DR A DOC}( 05000244 G PDR X E I/

i/g

If you have any questions about our valve test program to satisfy the IEB 85-03 requirements, please contact us.

Ver truly yours,

.p 4 Roger W. Kober