Forwards Supplemental Rept to Dcrdr Final Summary Rept for Re Ginna Station. Rept Provides Clarification of Issues Delineated in SER & Describes Accelerated Schedule Effort
ML17261A550
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/14/1987
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Stahle C
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17261A551 List:
References
NUDOCS 8707220640
Download: ML17261A550 (3)


Text

REGULATORY ( RMATION DISTRIBUTION SYS I (RIDS)

E ACCESSION NBR 8707220640 DOC. DATE: 87/07/14 NOTARIZED: NO DOCKET 0 FAG IL: 50-244 Robert Emmet Ginna Nuc lear P AUTH. NAME AUTHOR AFFILIATION lant'nit ii Roc h ester G 05000244 KOBERi R. N. Rochester Gas h Electric Corp.

REC IP. NAME RECIPIENT AFFILlATION ST*HLER C. Document Control Branch (Document Control Desk)

SUBJECT:

Foreards supplemental rept to "Detailed Control Room Design Review.,z' rr DISTRIBUTION CO E: A003D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: QR/Licensing Submittal: Sup p I 1 to NUREG-0737(Gener i c Ltr 82-33)

NOTES: License Exp date in accordance with 10CFR2i 2. 109(9/19/72). 05000244 REC IP IENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 PD1-3 PD 7 7 STAHLEz C 1 INTERNAL: A MB 1 0 NRR/DLPG/HFB 1 FILE 01 1 RES DEPY GI 1 1 EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 16

~ IFJIÃ/j/ IIPiillll

'7iit"'~~r'~v~vvizizvr ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K f464g-pppI ROGER W. KOBER TCI,CPHONC VICC PIICSIOCNT CLECTIIICPIIOOVCTION ARCA COOK 7ld 546.2700 July 14, 1987 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Mr. Carl Stahle PWR Project Directorate No. 1 Washington, D.C. 20555

Subject:

Control Room Design Review Supplemental Report R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Stahle:

The Rochester Gas and Electric Corporation submitted the Summary Report for the Control Room Design Review program in December 1985. The responding Safety Evaluation Report delineated a number of issues which required clarification or schedule alteration.

The attached Control Room Design Review Supplemental Report provides clarification of those issues and describes the accel-erated schedule effort.

Ve truly yours,

,ye/

Roger W. Kober Attachment 8707220640 8707l4 PDR ADOCK 05000244 P , PDR t i