Forwards Supplemental Rept to Dcrdr Final Summary Rept for Re Ginna Station. Rept Provides Clarification of Issues Delineated in SER & Describes Accelerated Schedule Effort
ML17261A550
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/14/1987
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Stahle C
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17261A551 List:
References
NUDOCS 8707220640
Download: ML17261A550 (3)


Text

E ACCESSION NBR FAGIL: 50-244 AUTH. NAME KOBERi R. N.

REC IP. NAME ST*HLER C.

REGULATORY (

RMATION DISTRIBUTION SYS I (RIDS) 8707220640 DOC. DATE: 87/07/14 NOTARIZED:

NO DOCKET 0 Robert Emmet Ginna Nuc lear Plant'nit ii Roc h ester G

05000244 AUTHOR AFFILIATION Rochester Gas h Electric Corp.

RECIPIENT AFFILlATION Document Control Branch (Document Control Desk)

SUBJECT:

Foreards supplemental rept to "Detailed Control Room Design Review.,z' rr DISTRIBUTION CO E:

A003D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: QR/Licensing Submittal:

Sup p I 1 to NUREG-0737(Gener ic Ltr 82-33)

NOTES: License Exp date in accordance with 10CFR2i 2. 109(9/19/72).

05000244 REC IP IENT ID CODE/NAME PD1-3 LA STAHLEz C COPIES LTTR ENCL 1

1 REC IP IENT ID CODE/NAME PD1-3 PD COPIES LTTR ENCL 7

7 INTERNAL:

A FILE EIB MB 01 1

0 1

1 1

NRR/DLPG/HFB RES DEPY GI 1

1 1

EXTERNAL:

LPDR NSIC 1

1 1

NRC PDR 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 17 ENCL 16

IFJIÃ/j/

IIPiillll

~

'7iit"'~~r'~v~vvizizvr ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K f464g-pppI ROGER W. KOBER VICC PIICSIOCNT CLECTIIICPIIOOVCTION July 14, 1987 TCI,CPHONC ARCA COOK 7ld 546.2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Mr. Carl Stahle PWR Project Directorate No.

1 Washington, D.C.

20555

Subject:

Control Room Design Review Supplemental Report R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Stahle:

The Rochester Gas and Electric Corporation submitted the Summary Report for the Control Room Design Review program in December 1985.

The responding Safety Evaluation Report delineated a number of issues which required clarification or schedule alteration.

The attached Control Room Design Review Supplemental Report provides clarification of those issues and describes the accel-erated schedule effort.

Ve truly yours,

,ye/

Roger W. Kober Attachment 8707220640 8707l4 PDR ADOCK 05000244 P