ML17261A178
| ML17261A178 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 04/11/1980 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17261A179 | List: |
| References | |
| TASK-02-02.B, TASK-2-2.B, TASK-RR 800401, NUDOCS 8004150459 | |
| Download: ML17261A178 (4) | |
Text
A
~
02 NRC PDR 08'CE 1,1 CORE PERF'R 14 REAC SFTY BR 16EEB'TS GROUP-LEADR 07 NSIC EXTERNAL: 03 LPDR 23 ACRS 1
1 16 16 1,
1 M
REGULATORY 8FORMATION DISTRIBUTION SYS 8 (RIDS)
ACCESS /ON NBR l 8004150459 DOC ~ DATE; 80/04/11 NOTARIZED:,',.NO,:,,
DOCKEl'ACIL:50-244 Robert Emmet Ginna Nuclear Planti Unit ii Rochester'G 05000244 AUTH.NAME AUTHOR OFF ILI ATI ON HHITEPP.LE Rachest'er Gas tt Electric Corp,
. REC IP ~ NAME.
REC.IPIENT AFFIL,IATION ff 2IEMANNP D ~ L ~
Operation@
Reactors Branch 2
SUBJECT:
Submi,tsinfo inresponse to NRC 790529 dra'ft eva'lvation of
~
$opic III~2'ionsite meteorological.mea'surements I
proar am.Forwards "Uoper Air Meteot eloqical Study."
DISTRIBUTION CODE'03BS,COPIES RECEIVED LTR 'NCL
'IZE"
Qg jf TITLE: SEP Topics w K NDTEB:~~0.'W fBX~+
O~ 'Dc '~+
'L C.M '. Q
~ V-lq'PPnINAMCW ~
3 ~ ~~~IN'AIRlf~
ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL.
ACTION:
19 BC ~~~ ~ g INTERNAI.
G FIt 1
1 0
SE BR 3
3 10 TA/EDO 1
1 13 ENGR BR 1
1 15 PLANT SYS BR 1
'1 17 EFFT TRT SYS 1
1
/PE gr~
piu Qo TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
1 1
I 4
~ ~>>,I 1'
'C
~
o V
~V erg I
h
~ lf, I
~ r o
ll
)t l
a W
~
a Im aa' m
a
~
'I I
)
'i v>>
I r>
I 1lt g*
1'Y l
iP ll a
I
~
I II t
I Il I
IIIIIIIII'I ll(illa'll LA
~ Oelkl lip, zz7 url iiszzrzz ROCHESTER GAS AND ELECTRIC CORPORATION o
S9 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE. JR.
VICE PRESIDENT TELEPHONE AREA CODE Tld 546-2700 April 11, 1980 Director of Nuclear Reactor Regulation Attention:
Mr. D. L. Ziemann, Chief Operating Reactor Branch 42 U.
S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
SEP To ic III-2.B Onsite Meterolo ical Measurements Pro ram Docket; No. 50-244 Gonna Nuclear Power Plant
Dear Mr. Ziemann:
The following information is being provided in response to the May 29, 1979 NRC draft evaluation of SEP Topic III-2.B (Ginna Onsite Meteorological Measurements Program).
Based upon our review of several site-specific factors, and regional meteorological
- data, we conclude that, appropriate estimates of atmospheric dispersion are obtainable without relocating the existing Ginna tower, or establishing a second tower farther inland.
Our rationale is provided below:
Elevated release conditions A plant effluent plume would behave as an elevated release only under conditions where wind speeds were very low and the plume from vents near the containment fascade escaped the building wakes.
Low winds (below three m.p.h.) occur less than 5% of the time from directions that would carry the plume over land.
Upper level measurements from the present.
tower would properly estimate wind speed direction and turbulence since the level is near any point of release and above the turbulent internal boundary layer (TIBL) that would exist.
We would propose to use an appropriate dispersion model incorporating TIBL effects to predict, ground level concentrations downwind based on knowledge of lake and air temperature, time of day, and wind speed.
No other data from another inland tower would significantly enhance the accuracy of such calculations.
POZS
/
ADD'$
400-/%~toit. Bg. I I
t N
n