SUBJECT:

Responds to request for info re Tech Spec changes. Forwards dc single line diagramqmaint procedures M 38'.6 8

38,7E Revision 1

8 aperture cards of drawings SS 241 041

045, w/over size drawing,

~,~~~ +g DISTRIBUTION CODE:

AOOIS COPIES RECEIVED:LTR ENCL P SIZE:

TITLE: GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF'PERATING *LIC

+ a/ef%r W&W ~w&PPO+SCmwE~~Eleg++Mwmw~re(s)~~&

Iglrfalfayla WWPfwmWWWMPWt%PfWMWMP+II0&'Wfg&W&PsIWM&AIAwPWWI+i RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME" I.TTR ENCL ID CODE/NAME LTTR ENCL 7

ACTION:

05 BC 0/8% 2 t

INTERNAL: 01 12 LV 15 CORE PERF BR 17 ENGR BR 19 PLANT SYS BR 21 EFI T TRT SYS

.OELD 1

1 2

2 1

1 1

1 1

1 1

1 0

1 1

1 1

1 1

1 1

1 1

1 1

02 NRC PDR 14 TA/EDO 16 AD SYS/PROJ 18 REAC SFTY BR 20 EEB 22 BR INKMAN REGULATORY INFORMATION DISTRIBUTION S" STEM (RIDS) 0 ACCESS'fON NBR: 790820030b DOC ~ DATE: 79/08/10 NOTAR1 D:

NO DOCKET FACIL',50-244 Robert Emmet Ginna Nuclear Planti Unit li Rochester G

05000240 AUTH'AME AUTHOR AFFILIATION WHITE EL ~ D, Rochester Gas 8 Electric Corp.

REC IP ~ NAME RECIPIENT AFFILIATION Z IEMANNED, C, Operating Reactors Branch 2

EXTERNAL: 03 LPDR 23 ACRS 1

1 16 04 NSIC 1

1

2) ÃulGs REC ALICE ('(~J X 3 S//EP (g ys) pUG 2 397S A

(

SE,7 OF 8/'ZCHTRWF C8<bS - ~ W SH eR gy p~gggggg gKc5 $1~

@P Vl TOTAL NUMBER OF COPIES REQUIRED; LTTR ~

ENCL

~,

'/ I

~

////////////

///////

la/I

/////////////

///////////

sent(Ski zerzirz ROCHESTER GAS AND ELECTRIC CORPORATION o

, lOII'"

'j'lAPI 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.

VICE PRCSIOENT TELEPHONE.

ARCA COOK 7ld 546-2700 August 10, 1979 K.Nk~'!lÃPV.sp[g~yy Operating Reactors Branch No.

2 U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Technical Specification Changes for the Inclusion of Two 75 Amp Battery Chargers R.

E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Ziemann:

In response to a request for information from a member of the NRC Staff, Mr. Sang Rhow, the following letter and enclosures are submitted.

1.

Three copies and one aperature card of the dc single line (33013-756) diagram showing all four battery chargers, the transfer switch and the ac safeguards sources are enclosed.

2.

Maintenance procedures M-38.6 and M-38.7, Revision 1, are being enclosed.

A review of these procedures will show that separation between the two safeguards

trains, A and B, has been maintained on both the dc and the ac 480 volt systems, when the two 75 amp chargers are tied together.

In 1979, Revision 1 of these two procedures was written to corporate a key lock on the Battery Charger Tie Switch (1A1 to 1B1).

3.

Aperature card copies of drawings SS-201-041 through 045 are enclosed.

These drawings are the motor control center summary listings.

A review of these listings will show that the MCC units referenced on the dc single line diagram are supplied as follows:

MCC 1K is fed from MCC 1C, which is fed from safeguards bus 14, train A; and MCC 1J is fed from MCC 1D, which is fed from safeguards bus 16, train B.

I hope that the above information, drawings will answer all your questions pertaining to the Charger" technical specification change.

/

~

L.

D. Whi e, Jr.

qggsa oo

<YQ'nd procedures "75 Amp Battery PPuub~

S JET

@E.

E KIty)

XX IE.O (@OP)

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Otal ~ I~ ~ tI ttt I t +8+ n4 p$

a~Q.

RO S7.:-~.

GAS &~K:"ECTRIC CORPOR.

ON Gl iN iN " S7~7iOiN UiR l t GZ~)HA. S:>T:ON COVHOLLW COPY.'i~~.Gr~

PROCWM" NO.

M-38.6 RV.

NO.

1A BATTERY CHARGER MAINTENANCE OR REPAIR T:.~C.M R~

PORC 2/19/79 q/c a=sr:-i PRO~:.OR USE

~LQT Sb~ERLX~'iD>r'T NON-'3A

~ pt rgbv

":S PRGCHLM CON:~'S

M-38.6:1 M-38.6 lA BATTERY CHARGER MAINTENANCE OR REPAIR

1.0 PURPOSE

To provide the steps to maintain or repair the 1A battery charger.

2.0 REFERENCES

2.1 Westinghouse Rectomatic Self-regulating Battery Charger Instruction Book, I.B. 20-300-05, November 1, 1966.

2.2 2.2.1

/

2.2.2 2.2.3 2.2.4 Westinghouse Electric Corporation Prints.

Schematic Diagram jj3393D55.

Wiring Diagram j/3393D56.

Power Supply Regulator With Current Limit Controller Schematic j/880D771.

Power Supply Regulator With Current Limit Wiring Diagram j/880D772.

3 '

(.

~ 1

3.2 INITIALCONDITIONS

This procedure maybe done at any Plant condition.

Recommended spare parts are available for repair if needed.

3.3 Battery charger maybe energized for tests required to perform trouble shooting and verification of service operability with proper safety precautions being observed.

Steps in conjunction with this may be marked N/A.

3.4 The lAl battery charger is in service and capable of accepting rated charging capacity.

NOTE:

The 1Bl battery charger maybe transferred to the 1A battery system if needed for additional charge capacity as covered by steps in instructions.

3.5 Notify QC personnel before work commences.

4.0 PRECAUTIONS

Proper safety precautions shall be observed while taking test readings when the battery charger is in an energized state of operation.

The "A" and "B" battery systems are not to be tied together in any state of operation other than cold shutdown except when given direct p'ermission by the Plant Superintendent.

4.3 M-38.6:2 t

t

.'She 1Bl battery charger maybe transferred to the lA battery system as required by additional charging capacity desired or duration of 1A charger outage.

.4 When completing instructions, steps are to be completed in exact order or damage to battery chargers will occur.

4.5 Holds shall be placed as required in accordance with procedure A-36.

4.6 Any replacement parts installed shall be requisitioned in accordance with procedure QC-801.

5.0 INSTRUCTIONS

5.1 Permission has been received from the Shift Foreman to perform maintenance and/or repair of lA battery charger.

5.2 If Steps 5.3 thru 5.6 are to be completed, notify the Control Operator that a battery charger failure alarm will be received.

5.2.1 Obtain key to padlock on Battery Charger Tie 1Al to 1B1 switch in "A" Battery Room.

Shift Foreman Key Issue 5.3 Open the 1B1 battery charger 480 volt double throw disconnect (dual power feed from MCC 1J normal feed and MCC 1K emergency feed) in the lB battery room and place in the "Center - Off" Position.

OFF 5.4 Open and hold swith j/6 in the lB battery main fuse cabinet-Section g2.

5.5 Unlock padlock and close the IAl to lBl battery charger tie switch in the 1A battery room.

CLOSED 5.6 Close the 1B1 battery charger 480 volt double throw disconnect (dual power feed from MCC 1J - normal feed and MCC lK emergency feed) in the 1B battery room to the MCC 1K emergency feed.

CLOSED 5.7 NOTE:

The current may have to be balanced between the 1Al and 1Bl charger.

(To be done by electrician).

Notify the Control Operator that a battery charger failure alarm will be received.

5.8 Open and hold the 480 volt AC circuit breaker for the 1A battery charger on MCC 1C position 4HH HELD 5.9 Open and hold the AC circuit breaker on the 1A battery charger.

HELD

5. 10 Open and hold switch fjl (1A battery charger) in the 1A battery main DC distribution panel - Section I.

HELD Shift Foreman will accept markup if required and log same in Hold Book.

MARK UP RECEIVED

~

v v

m

'5

~12 -38.6:3

.perform maintenance and/or repair as necessary waav Westing-house Instruction Book IB-20-300-05 as guide line.

MAINTENANCE COMPlETE

.13 Release markup, if applicable.

MARKED OFF 5.14 5.15 5.16 5.17 5.18 Remove hold and turn switch jjl (lA battery charger) in 'the 1A battery main DC distribution panel - Section I to the "ON" position.

Remove hold and turn the AC circuit breaker on the 1A battery charger to the "ON" position.

Remove hold and turn the 480 volt AC circuit breaker for the 1A battery charger on MCC 1C position 4HH to the "ON" position.

If Steps 5.18 thru 5.21 are to be completed, notify the Control Operator that a battery charger failure alarm will be received.

Open the 1Bl battery charger 480 volt double-throw disconnect (dual power feed from MCC lJ - normal feed and MCC 1K - emer-gency feed) in the 1B battery room and place in the "Center-Off" position.

ON ON ON OFF 5.19

, %.19.1 Open the 1A1 to 1B1 battery charger tie switch in the 1A battery room and lock open.

lOCKED OPEN Return key to Shift Foreman for padlock on Battery Charger Tie 1A1 to 1B1 switch in "A" Battery Room.

Key Received by Shift Foreman 5.20 5.21 5.22 Remove hold and turn switch 7/6 in the lB battery main fuse cabinet - Section 2 to the "ON" position.

NOTE:

Charger currents may have to be balanced.

by electrician).

Complete list of maintenance performed, purchase order number of parts used - if any and attach to procedure.

Close the lBl battery charger 480 volt double-throw disconnect (dual power feed from MCC 1J - normal feed and MCC 1K emer-gency feed) in the 1B battery room to the MCC 1J normal position.

CLOSED (To be done ON COMPLETED BY:

DATE COMPLETED:

QC ENGINEER:

ELECTRICIAN FOREMAN:

SHIFT FOREMAN:

PORC REVIEW DATE:

H

~

~

ROC:"S~x=. G~

mtD ~"C RIC CORPORATION G~ilNA S7.~i

~ ON

>OCBUR"

'tO M-38.7 M7 XO 1B BATTERY CHARGER MAINTENANCE OR REPAIR T:-~iC' R~i=>>

PORC 2/19/79 Q/C R:"TZ:".>>

O.>

IONIA P=C.

<< '>>M

4

~ ~

M-38.7:1 M-38.7 lB BATTERY CHARGER MAINTENANCE OR REPAIR x.0 PURPOSE:

To provide the steps to maintain or repair the 1B battery charger.

2.0 REFERENCES

2.1 Westinghouse Rectomatic Self-regulating Battery Charger Instruction Book, I.B. 20-300-05, November 1, 1966.

2.2 2.2.1 2.2.2 2.2.3 Westinghouse Electric Corporation Prints.

Schematic Diagram

$/3393D55.

Wiring Diagram g3393D56.

Power Supply Regulator With Current Limit Controller Schematic J/880D771.

2.2 '

Power Supply Regulator With Current Limit Wiring Diagram i/880D772.

3.2 INITIALCONDITIONS

This procedure may be done at any Plant condition.

Recommended spare parts are available for repair if needed.

3.3 Battery charger may be energized for tests required to perform trouble shooting and verification of service operability with proper safety precautions being observed.

Steps in conjunction with this may be marked N/A.

3.4 The 1Bl battery charger is in service and capable of accepting rated charging capacity.

/

NOTE:

The lAl battery charge may be transferred to the lB battery system if needed for additional charge capacity as covered by steps in instructions.

3.5 Notify QC personnel before work commences.

4.0 PRECAUTIONS

4.1 Proper safety precautions shall be observed while taking test readings when the battery charger is in an energized state of operation.

The "A" and "B" battery systems are not to be tied together in any state of operation other than cold shutdown except when given direct permission by the Plant Superintendent.

~

I>>

4.3

~

M-38.7:2 The lAl battery charger may be transferred to the 1B battery system as requied by additional charging capacity desired or duration of 1B charger outage.

When completing instructions, steps are to be completed in exact order or damage to battery chargers will occur.

Holds shall be placed as required in accordance with procedure A-36.

4.6 Any replacement parts installed shall be requisitioned in accordance with procedure QC-801.

5.0 INSTRUCTIONS

5.1 Permission has been received from the Shift Foreman to perform maintenance and/or repair of 1B battery charger.

5.2 If Steps 5.3 thru 5.6 are to be completed, notify the Control Operator that a battery.charger failure alarm will be received.

5.2.1 Obtain key to padlock on Battery Charger Tie 1A1 to 1B1 switch in "A" Battery Room.

Shift Foreman Key Issue 5.3 Open the lAl battery charger 480 volt double throw disconnect (dual power feed from MCC 1K normal feed and MCC 1J emergency feed) in the lA battery room and place in the "Center - Off" Position.

OFF 5.4 Open and hold switch j/5 in the 1A battery main fuse cabinet-Section j/2.

5.5 Unlock padlock and close the lAl to 1Bl battery charger tie switch in the lA battery room.

CLOSED 5.6 Close the lA1 battery charger 480 volt double throw disconnect (dual power feed from MCC 1K - normal feed and MCC 1J emergency feed) in the 1A battery room to the MCC 1J emergency feed.

CLOSED NOTE:

The current may have to be balanced between the lA1 and 1B1 charger.

(To be done by electrician).

5.7 Notify the Control Operator that a battery charger failure alarm will be received.

5.8 Open and hold the 480 volt AC circuit breaker for the 1B battery charger on MCC 1D position 4 MM.

HELD 5.9 Open and hold the AC circuit breaker on the 1B battery charger.

HELD

5. 10 Open and hold switch jjl (lB battery charger) in the 1B battery main DC distribution panel Section I.

Shift Foreman will accept markup if required and log same in Hold Book.

MARK UP RECEIVED

M-38.7:3 5.12 Perform maintenance and/or repair as necessary with Westinghouse Instruction Book lB-20-300-05 as guide line.

NOTE:

See precaution 4.6.

MAINTENANCE COMPLETE Release markup, if applicable.

MARKED OFF 5.14 Remove hold and turn switch gl (1B battery charger) in the 1B battery main DC distribution panel - Section I to the "ON" position.

ON 5.15 5.16 5.17 5.18 Remove hold and turn the AC circuit breaker on the 1B battery charger to the "ON" position.

ON Remove hold and turn the 480 volt AC circuit breaker for the 1B battery charger on MCC 1D position 4MM to the "0¹'osition.

ON If Steps 5.18 thru 5.21 are to be completed, notify the Control Operator that a battery charger failure alarm will be received.

Open the lAl battery charge,480 volt double-throw disconnect (dual power feed from MCC 1K - normal feed and MCC lJ - emergency feed) in the lA battery room and place in the "Center-Off" position.

OFF 19 Open the lA1 to 1Bl battery charger tie switch in the lA battery room and lock open.

LOCKED OPEN Return key to Shift Foreman for padlock on battery charger Tie IA1 to 1B1 switch in "A" Battery Room.

Key Received by Shift Foreman 5.20 Remove hold and turn switch 7/5 in the 1A battery main fuse cabinet - Section 2 to the "ON" position.

ON 5.21 Close the lAl battery charger 480 volt double-throw disconnect (dual power feed from MCC lK normal feed and MCC 1J - emergency feed) in the lA battery room to the MCC 1K normal position.

CLOSED NOTE:

Charger currents may have to be balanced.

(To be done by electrician).

5.22 Complete list of maintenance performed, purchase order number of parts used - if any and attach to procedure.

COMPLETED BY:

DATE COMPLETED:

ELECTRICIAN FOREMAN:

SHIFT FOREMAN:

PORC REVIEW DATE:

O

~ 'SCRCEhJ H+E DC, DIST PNL IA DIES' C>>EN-I EEr DIST. PNL CON7ROL BD.- PNL

IEL, D.C. Df5r.

pNL. (SEE hJOTE-'2)

O fO AUX. BLDC. DC-DI5T PNL.(AI DIESEL

&ENJ I6 D(5T PNL 0

HP OR KVV FIJ5E WIRE.

SJ ZE SJZ.E WiRE SIZE F

SIZE WIRE Zg SIZE CIRC Ui T C I RCLJ IT C IRC.LJ I T

'22 E IGLOO IP 30 RECOhn(S(NER CONT. PNL IES IO I

DIE'5E I

IE5 CONT. pNL NOR,'ivI IO I

(hUX,ESLCJC.VENT O'TOTEM PIVL IND Kr>>>>DTO T

i P R

. lhivREJ-RT DIESEL IACONT. PNL EMLRC iO IO 2

tvlOTOR CONT. CTR. JO 3 GAS Ah(ALYZER CONT PNL. BW 10 4 4aov swcR. usus tc,(NoRM)

SPARE SPAC E'PACE.

SPAR E.

SPAC E 5PAC 6.

i 00 0

0 tel 0

5 4(5OV SWEGR BUS 14 (EtvfERC) 100 5PARE O

E22il 10 AUX. (5LDC DC hnAIN LUG 5 DNL>

200A 4/o O

DiESEL CEhJ iA DIST. PNL.

O IUIAIN D.C. D(ST.

PANEL I B

-211 DNL I A D(5T.

CONTRC}L BOARD - PNL I A C

I CONTRC}L I5D. PNL.

i e WIRE Eig ECo i 12 Fus Li SIZ FUSE WIRE Lip IZE SIZE Ct RCutr E9I FUx C(J ZS IE@2 WIRE SiZE HP 0 JR Kw CIRCUIT i4 OCB 767 C}CIS 751 30 X)

IO "iO E92 30 30

<< IO 30 53

<<IO X) 30

<<IC}

30 M "10 2

CONIT. BD. CTR-5ECT CIR.<<Z tH15 D)AG. SUPERCEDE5 WeST.

DW(

. N(. DT2X-C5I

>Re DRAWING NO JQB NO REV 35015-756 8

EIC 9 15 17 EEID3 19 BOARD PNL IA aEE wore-2 B CONTROL DC DI5T. PNL 1

22 12 21 t05 107 EZO I O

5CREI=N hJQUQE DC 0(5T. t)NL -

I ES E90 T27 E157 (28 E202 207 IO E-i49 5

E IA 7

aux BLDc, DC.

DIST. f:}NL. 15(

E213 E2I5 12 E232 E'Zi7 E 127 I4 COC-I 20 19 E23l ALjX.BLDG DC D15T, PNI

. IB 2I ICG J

~El@ 7

~E(r 8 tJPRti/IAL +REJV FEE 0 MCC Ig L(JVJT JK C202 E hJI E(rGfh(C Y TR/IJJJ5 jfg cJ

~Clop/ }-+SOV Fff9 SMI J TC H IVICC IT I/I I uhllr ZH CEJJTE R OFF zoot(

EII9T TERT CH/t Rf>>EP(

IJEJI 7SJFJ 480V PC}WER FEED htCC RD LlN(T +f48 E 205 AT ERY 3

(3 T

CHARGER 18 (5CIJJ(

TCJ BATTERY SROUN TUR(5. I5LCX. DC.

l5 DIST. PNL, 45EE NOTE-I )

V hnCB

-17 Ei77 E13 Eif Et/IrrE I 7r c H/t(;rpL tet 75 Jct E 186 E.

I SECTI ON - I E25 E249 Ei74 SECTION-2 CHARGER TIE 5W 2 POLE IOOAhJIP 2WV CIC.

Eh/Jf RC ElVCT TR/tli/5FER

+rtcJY FfED ~cao~ae ~

5VJ/tv'CH h/ICC (K 1E(1 Llhttf I 15frt

~C?OCJ CEhJTER bPP tJPRÃaa. JfSTJV FEED MCC IT Lt(VIT?HH I2 E-(9(

14, C14 I BATTERY IOI5CDNNECT f200 A 15w 250v 12OOA 1

I 8, //>>JAR s Jt 2 Ir/7r

~ 6!A/

CDNSTRUCTIDN HS PUctllT PREUMINARY NOT FOR CONSTRUCTION E70 BIDDING PURPOSES LIMITEDCONSTRUCTION:

AS NOTED ENG.

MANE'R RESP.

ENG.

ORAWN ev 0

ORIGINAL (25V BATTERY IF) 1050 AH ENGR.

RELEASED FOR DH pecrE>>TT CRI NhJA ROCHESTER GAS & ELECTRIC CORP, RGCNESTER NEW VGRK SCALE DINNA STATION - ELE( TFl lCAL O~e l leF Dl~C RAM 4 PAhlCL WRRC T'5 lZBV O.C.

DY5TEM SPAC E i>> IC}

JJ I O 5 CONT, BD, Rr SECT. CIR*2 4 COIUT. BD RT. 5Ecr, CIR<<3 "i0 5 4 KY 5vvC R. BUS I IA UY REUJJ "10 SPARE 7, LIV. RELAY CAE(. IA

'JO 8 RACK RLTR-2

'10 9 RACK 5Ie, I

<<I0

<<IQ I CJ RACK RAZ "iO Ji 10 13 SPAR~

"to 1

WG>>v CE<<pl C M

RJFJ

+IO (5 C~T.

BJJCJ, 4EEU@

tv@Dig.

(@ COPSDCEJ5AT DJ(EJUIJJ>>JL RALI I.

~

A'VC-I i'7 5PAR6.

E(4 RC5 OYER RE. MRIZATION IEJ 19 20 CCJ 40 NQ.IS BATTERY-IvlAIN FUSE CA(3(NET HP O GE FUSE'VIR E ZE QlZF CIRCUIT MAINS I 2OOA I

+ I B BATTE.RY C'LIARGER, 200 175 4/o

~ CJ00 M hrt MAIN DC l3IST PNL IB NO. IB BAT. MN. FUSE C SECT.I V

IJJ ir) 2-0 M

tIE NQ IA (%ATTER FU5E CAB.

TURe.l5LCK

. D.C. DIST. PNL 200 ZO 4/o SCREEhJ I-15E O.C. DIST.PNL I

36150 4/o

+ I ES I ESAT 7 E R;i C HARC>>ER NO. IPJ QAT MN. FLI5E CAI5 5ECT. 2 o

5CRE.EN k5E. D.C. DIST. PNL 4

SJAf HP OR KvU WtRE SIZE FUS CUIT FLJ5 CU C tRCUIT 4(SOV Swt R. (3us17 (E hnERC )

45ct Y SwGR BUS I(5 (.NORhn) ioo 5 '5 PACE DIE5E.L GEN. tA DIST. PNL

~ 'WIRE IZE SIZE HP F CLIP C.JRCUI T 10 I DIE5EI IA COhJT. DNL (NQRtn) 2 DIESEL I 13 CONT DhfL-(EMERC 30 SPARE.

4 5PJoJ-ZE SPACE AL(X. BLDG. D.C. DiST. PNL I A I Hg F

wiRE Z SIZE

>0 io 30 I 0 FUSE CUP C I RCLJ I T I

RECOhn I&INCR CONT PNL-IA DRLIhnivl INCR QTA CONT-PNL

~

REACTC}R TRiP &WC R, UNiT-I 10 DRCJJ>>J R

Y I

30 17 SPARE 19 p UX. ESLCJ

. 0 tsr. PN(..

I A.

4/o Iv(AINt.LLlC5 ONI V COCOA hnAJN TRANSP 5TA SERV. TRANSF." II 5TA-SERV-TJRAJ>>J5F. +12 CONT. BD ALARM SYSTEhn cohir ISD. crR, 5Eci CIR "I X) 30 "IO coNT. m. Rr. GEcT. ctR I

"fO 4KY 5WGR. BL(5 I IB UV. F(ELA U V. RELAY CAB. IES RAC< R LTR - I RACJ< SIA I Ja X) pO

<10 12 RACK RA2 hn0.4JJS'5 iNYERTER ~~ 9A j3 X3 IO UO X) 'ta 1Q 15 DJ>>>>J DE(>>JSlg S 15CJDS R

U RFLAr

<<(4 "iO 21 NO, IA.rsATTERv:- h/IAJhJ FUSE CABINET SJJJI NQ HP FIISE HW Up-OR CtfRCuir lvtAINS 12OC}A I7$

4/o I

<<IA FEJATiER,Y CJ-JCERG,ER 2

hnAIN 0(

DIST. phJL IA QQ) 2"3 h

No. IA. BAT. hnN. FUSE CA(3.~1,1 (EJ00 2 3 TIE-NO.IB BAT(ERY F'USC CAIS

4. TURB. E.JJIERG. BRC. OIL Ufs(P 5 'JIAI BATTEPLY cHARc ER 500 2-4/o 15O 4/o NO. I A, ISATI. MN. FUSE cA15. SEcr 2 2-IUI AUX BLDG. DC. DiST. PNL. iA WIRE 5IZE CIRCU I 1

NO hnQTC}R CONT. CTR IE MOTOR CONT. CTR, iC 5t UhnpS CONi. CAI5.

415OV SWOR. (SUS 14(Nown 4JSC}V SIP'. BUS IC<<(EhJIERC SPAR.C 40 i0 10 100 100 4/D MAIN(Luc 6 QNLv) 200A MAIhJ Dc. DIST, PNL. IA W!RE

> I ZE kg C I IRcu I 1

I DIESE,L GEhJ IA DIST. PANEL 2 h/IOTOR CONTROL CTR.

115 3

h/(OTDR, coNTRQL CTR II-I (GO 40 4 ROD DRIYE, hn-G5ET cotJT.

EXCiTATiON EQUIP. fEED

. BJE,

. Ta5T CAB.

4 TV>>V 5

~BJJ5 JJA NORJUI.

100 70 100 100 100 t00 t(M (00 4 NE.IU '5'Alii'R. BLJ5 I A JJORM Cij I

B Jr( E RJG>>

~

ip>>>>r BWC>>>>R. (SU%

i 3 HDQJ>>r( g 1

RMCJRCMI I I REEhJ LJSE, DI5T. Dh(L. 1A 100 100 TU<<tcei. DR. 4>>UJi FIVE, PUIUJ

'BT.

AD. VLV. 1 5T, a BKJ F'VY, PUJUJP JA D.C, QJL JUI 14 CONT BD.- LE'FT ORECTIC}N 15 INVERT'ER I A, 100 CEO 100 (Eso 00 tCQ 100 ICO 100 I

SPARE 2

Y C.EhJIERC

. LIGurJNG i0 i20 40 40 GO 40 CGO 40 FGO 50 1-fVOROC EN PNL, 4

I nOTOR CONT. CTR. IA(TURei. PUL 5

IU(GTOR CONT, CTR. IF SERY. PJLCC WATER TRE/STING, pNL 7

hnETER srop TEsr ISENCH O

(VIAtN D.C. DIST.

PNl, IA CJC}

15 CJO 40 SPARE 9

FIRE REI.AY PNL, 10 AC GG HrrETCJ-(QAJR COCrLE.

I I NUCLEAR SAhrtgLE PNL E21 EZC}

20 12 IO E22 E40 i00 iCO IO 12 AIR 'SIDE 5EAL OIL BJACKLIP I5 UR(5. OR. AUX.FW. OC.OIL PUMP 5

l4 SPARE hnAINS f LUGS CJNLY) 4OOA, LE24 E2C IO SCREEN LIousE D.c. DtST. PNt 1ri HP E30 E32 12 F

WIRE zE StzE CIRCu(T CUP E41 10 I

TRAVELLII>>J SCREEN

CONT, MOTOR CONT. CTR. ICJ SPARE C IJ=JCULATINrep WATER PLJM iA 1

40 8

90 2

15

(;.C i00 C

J F4C U LAP i P>>JC VVATER PLJ JUJ p VL 17 4/3CJ Y SVECGR. 5U5 IJS(EhlERC 4EESOV 5VVC R BUS 17 NORM)

>>5 PARE hnAINQ (LUG '5 ONLY ) 200A c

3 19 100 100 4/o 48OV lX)WER FEED IUICC 1C Ufi/IT 4HH IvlAihJ D.C. DI5T. PNL II5 ESATTERX E204.

QI5 5R WIRE Q-IARC E.R Bt ZE l

I /h I 5'0 A I-IP OR Kw CiRCU I T TQ BATTERY cRoUND ALARhn I EhnERG. L(CHTJNC CCJNT RM I KIJV iO (5EE NOTE -I )

V FIRE PLIMP ISOLATION VALVE DRJV JUJ-CR- 'BE.'T CDJ>>JTFJOL 10 (0

4o MOToR CQNTROL cENTER M 4o MOTOR CCJNTROL CENTER I K

~LJRJ5 DR-AUX. RSV. PUMP ALVIN CO 40 YAM IZISTI>52 100 100 CONT. BQ. -RICJ-IT SECTiOhJ FI4 A

4 JR'>>V ~$

QLJ5 I IE5 J>>JQRJUJ

~

100 100 io 4MCV 5'>>J=E 13 5 I

B SUORJUJ I SJE B 4JerOY 5VVG.R JBU5 l5 J>>IORJUJ I0()

100 100 100 II 12 SEer tohf 'l SECT IOhJ

~ 2 i00 5PAJRC S.C FW. PuhJIP ta D.C.OiL ULI ICO CGO NO.IA BATTERY Mi:lihJ FUQE CAES.

7.

KVA INVPFhTEJR II5 I CC} 100 100 Cco DIESEL GEN I B C}IST.

L IJE>>

TUR+ DR.

X. FW. pUMp Sr.

100 QO l7 5PARE ALIX.ISLDC<<, DC. DIST. PNE

. I et 4/o 2-350 h/IAINS (LUC'5 C>NLV}JEGCCLA f200 AMP BATTERY' 15CONNECT QWITCI-I 250 VOLT 1200 AMP f2'OLT 5ATTE IA IQ50 AH DATE NOTE-I A GROUND DETECTC}R I5 INCLUDED 1hJ EACH EJATTERY C'I-IARCER. Tl-Ie C ROUND DETECTOR AL~Rhn5 C}NLY.

NOTE-2 CONTRC}L 15C}ARD5 DI5TRI GUT I C)N PANELS ARE MOUNTED !ETERNALLY VYITHIN THE. IvfAIN CONTROL PANEL.