Responds to Request for Info Re Tech Spec Changes.Forwards Dc Single Line Diagram,Maint Procedures M-38.6 & M-38.7, Revision 1 & Aperture Cards of Drawings SS-201-041 Through 045
ML17261A137
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/10/1979
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7908200346
Download: ML17261A137 (11)


Text

REGULATORY INFORMATION DISTRIBUTION S" STEM (RIDS) 0 ACCESS'fON NBR: 790820030b DOC ~ DATE: 79/08/10 NOTAR1 D: NO DOCKET FACIL',50-244 Robert Emmet Ginna Nuclear Planti Unit li Rochester G 05000240 AUTH'AME AUTHOR AFFILIATION WHITE EL ~ D, Rochester Gas 8 Electric Corp.

REC IP ~ NAME RECIPIENT AFFILIATION Z IEMANNE D, C, Operating Reactors Branch 2

SUBJECT:

Responds to request for info re Tech Spec changes. Forwards dc single line diagramqmaint procedures M 38'.6 8 38,7E Revision 1 8 aperture cards of drawings SS 241 041 045, w/over size drawing, ~,~~~ +g DISTRIBUTION CODE: AOOIS TITLE:

COPIES RECEIVED:LTR ENCL GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF'PERATING P SIZE:

  • LIC

+ a/ef%r W&W ~w&PPO+SCmwE~~Eleg++Mwmw~re(s)~~& Iglrfalfayla WWPfwmWWWMPWt%PfWMWMP+II0&'Wfg&W&PsIWM&AIAwPWWI+i RECIPIENT COPIES RECIPIENT COPIES ACTION:

ID CODE/NAME" 05 BC 0/8% 2 '

I.TTR ENCL 7

ID CODE/NAME LTTR ENCL t

INTERNAL: 01 1 1 02 NRC PDR 1 1 12 LV 2 2 14 TA/EDO 1 1 15 CORE PERF BR 1 1 16 AD SYS/PROJ 1 1 17 ENGR BR 1 1 18 REAC SFTY BR 1 1 19 PLANT SYS BR 1 20 EEB 1 1 21 EFI T TRT SYS 1 1 22 BR INKMAN 1 1

.OELD 1 0 EXTERNAL: 03 LPDR 1 1 04 NSIC 1 1 23 ACRS 16

2) ÃulGs REC ALICE ('(~J pUG 2 A 397S X 3 S//EP (g ys)

( SE,7 OF 8/'ZCHTRWF C8<bS - ~ W SH eR gy p~gggggg gKc5 $ 1~

@P TOTAL NUMBER OF COPIES REQUIRED; LTTR ~Vl ENCL

~,

'/ I

~

//////////// ///////

l a/I , lOII'"

///////////// ///////////

'j 'lAPI sent(Ski zerzirz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR. TELEPHONE.

VICE PRCSIOENT ARCA COOK 7ld 546-2700 August 10, 1979

...,..... K.Nk~'!lÃPV.sp[g~yy Operating Reactors Branch No. 2 U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Technical Specification Changes for the Inclusion of Two 75 Amp Battery Chargers R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Ziemann:

In response to a request for information from a member of the NRC Staff, Mr. Sang Rhow, the following letter and enclosures are submitted.

1. Three copies and one aperature card of the dc single line (33013-756) diagram showing all four battery chargers, the transfer switch and the ac safeguards sources are enclosed.
2. Maintenance procedures M-38.6 and M-38.7, Revision 1, are being enclosed. A review of these procedures will show that separation between the two safeguards trains, A and B, has been maintained on both the dc and the ac 480 volt systems, when the two 75 amp chargers are tied together. In 1979, Revision 1 of these two procedures was written to corporate a key lock on the Battery Charger Tie Switch (1A1 to 1B1).
3. Aperature card copies of drawings SS-201-041 through 045 are enclosed. These drawings are the motor control center summary listings. A review of these listings will show that the MCC units referenced on the dc single line diagram are supplied as follows: MCC 1K is fed from MCC 1C, which is fed from safeguards bus 14, train A; and MCC 1J is fed from MCC 1D, which is fed from safeguards bus 16, train B.

I hope that the above information, drawings procedures will answer all your questions pertaining to the "75 Amp Battery Charger" technical specification change.

PPuub~ S JET

@E. E KIty)

/ <YQ'ndXX

~ IE.O (@OP)

L. D. Whi e, Jr. ~ ~ ~ ~ ~ ~~ ~~ ~ ~ Otal I ~ ~ ~ t I ttt I t +8+ n4 p$ a~Q.

qggsa oo

Gl iN iN " S7~7iOiN UiR l t RO S7.:-~. GAS &~K:"ECTRIC CORPOR. ON GZ~)HA. S:>T:ON COVHOLLW COPY .'i~~.Gr~

PROCWM" NO. M-38.6 RV. NO.

1A BATTERY CHARGER MAINTENANCE OR REPAIR T:.~C.M R~

PORC 2/19/79 q/c a=sr:-i PRO~:.OR USE

~LQT Sb~ERLX~'iD>r'T NON-'3A ~ pt rgb v  :":S PRGCHLM CON:~'S

M-38.6:1 M-38.6 lA BATTERY CHARGER MAINTENANCE OR REPAIR

1.0 PURPOSE

To provide the steps to maintain or repair the 1A battery charger.

2.0 REFERENCES

2.1 Westinghouse Rectomatic Self-regulating Battery Charger Instruction Book, I.B. 20-300-05, November 1, 1966.

2.2 Westinghouse Electric Corporation Prints.

2.2.1 Schematic Diagram jj3393D55.

/

2.2.2 Wiring Diagram j/3393D56.

2.2.3 Power Supply Regulator With Current Limit Controller Schematic j/880D771.

2.2.4 Power Supply Regulator With Current Limit Wiring Diagram j/880D772.

3' INITIAL CONDITIONS:

( This procedure maybe done at any Plant condition.

. ~ 1 3.2 Recommended spare parts are available for repair if needed.

3.3 Battery charger maybe energized for tests required to perform trouble shooting and verification of service operability with proper safety precautions being observed. Steps in conjunction with this may be marked N/A.

3.4 The lAl battery charger is in service and capable of accepting rated charging capacity.

NOTE: The 1Bl battery charger maybe transferred to the 1A battery system if needed for additional charge capacity as covered by steps in instructions.

3.5 Notify QC personnel before work commences.

4.0 PRECAUTIONS

Proper safety precautions shall be observed while taking test readings when the battery charger is in an energized state of operation.

The "A" and "B" battery systems are not to be tied together in any state of operation other than cold shutdown except when given direct p'ermission by the Plant Superintendent.

4.3 .'She 1Bl t t battery charger maybe transferred to the lA battery system as required by additional charging capacity desired or M-38.6:2 duration of 1A charger outage.

.4 When completing instructions, steps are to be completed in exact order or damage to battery chargers will occur.

4.5 Holds shall be placed as required in accordance with procedure A-36.

4.6 Any replacement parts installed shall be requisitioned in accordance with procedure QC-801.

5.0 INSTRUCTIONS

5.1 Permission has been received from the Shift Foreman to perform maintenance and/or repair of lA battery charger.

5.2 If Steps 5.3 thru 5.6 are to be completed, notify the Control Operator that a battery charger failure alarm will be received.

5.2.1 Obtain key to padlock on Battery Charger Tie 1Al to 1B1 switch in "A" Battery Room.

Shift Foreman Key Issue 5.3 Open the 1B1 battery charger 480 volt double throw disconnect (dual power feed from MCC 1J normal feed and MCC 1K emergency feed) in the lB battery room and place in the "Center - Off" Position. OFF 5.4 Open and hold swith j/6 in the lB battery main fuse cabinet-Section g2.

5.5 Unlock padlock and close the IAl to lBl battery charger tie switch in the 1A battery room. CLOSED 5.6 Close the 1B1 battery charger 480 volt double throw disconnect (dual power feed from MCC 1J - normal feed and MCC lK emergency feed) in the 1B battery room to the MCC 1K emergency feed. CLOSED NOTE: The current may have to be balanced between the 1Al and 1Bl charger. (To be done by electrician).

5.7 Notify the Control Operator that a battery charger failure alarm will be received.

5.8 Open and hold the 480 volt AC circuit breaker for the 1A battery charger on MCC 1C position 4HH HELD 5.9 Open and hold the AC circuit breaker on the 1A battery charger. HELD

5. 10 Open and hold switch fjl (1A battery charger) in the 1A battery main DC distribution panel - Section I. HELD Shift Foreman Hold Book.

will accept markup if required and log same in MARK UP RECEIVED

~

'5 v v

~

12'-38.6:3 m

.perform maintenance house Instruction and/or repair as necessary waav Westing-Book IB-20-300-05 as guide line.

MAINTENANCE COMPlETE

.13 Release markup, if applicable. MARKED OFF 5.14 Remove hold and turn switch jjl (lA battery charger) in 'the 1A battery main DC distribution panel - Section I to the "ON" position. ON 5.15 Remove hold and turn the AC circuit breaker on the 1A battery charger to the "ON" position. ON 5.16 Remove hold and turn the 480 volt AC circuit breaker for the 1A battery charger on MCC 1C position 4HH to the "ON" position. ON 5.17 If Steps 5.18 thru 5.21 are to be completed, notify the Control Operator that a battery charger failure alarm will be received.

5.18 Open the 1Bl battery charger 480 volt double-throw disconnect (dual power feed from MCC lJ - normal feed and MCC 1K - emer-gency feed) in the 1B battery room and place in the "Center-Off" position. OFF 5.19 Open the 1A1 to 1B1 battery charger tie switch in the 1A battery room and lock open. lOCKED OPEN

,  %.19.1 Return key to Shift Foreman for padlock on Battery Charger Tie 1A1 to 1B1 switch in "A" Battery Room.

Key Received by Shift Foreman 5.20 Remove hold and turn switch 7/6 in the lB battery main fuse cabinet - Section 2 to the "ON" position. ON 5.21 Close the lBl battery charger 480 volt double-throw disconnect (dual power feed from MCC 1J - normal feed and MCC 1K emer-gency feed) in the 1B battery room to the MCC 1J normal position.

CLOSED NOTE: Charger currents may have to be balanced. (To be done by electrician).

5.22 Complete list of maintenance performed, purchase order number of parts used - if any and attach to procedure.

COMPLETED BY:

DATE COMPLETED:

QC ENGINEER:

ELECTRICIAN FOREMAN:

SHIFT FOREMAN:

PORC REVIEW DATE:

H

~

ROC:"S~x=. G~ mtD ~"C ~

RIC CORPORATION G~ilNA S7.~i ON

~

>OCBUR" 'tO M-38.7 M7 XO 1B BATTERY CHARGER MAINTENANCE OR REPAIR T:-~iC' R~i=>>

PORC 2/19/79 Q/C R:"TZ:".>>

O.> IONIA P=C.

<< '>>M

4

~~

M-38.7:1 M-38.7 lB BATTERY CHARGER MAINTENANCE OR REPAIR x.0 PURPOSE:

To provide the steps to maintain or repair the 1B battery charger.

2.0 REFERENCES

2.1 Westinghouse Rectomatic Self-regulating Battery Charger Instruction Book, I.B. 20-300-05, November 1, 1966.

2.2 Westinghouse Electric Corporation Prints.

2.2.1 Schematic Diagram $/3393D55.

2.2.2 Wiring Diagram g3393D56.

2.2.3 Power Supply Regulator With Current Limit Controller Schematic J/880D771.

2.2 ' Power Supply Regulator With Current Limit Wiring Diagram i/880D772.

INITIAL CONDITIONS:

This procedure may be done at any Plant condition.

3.2 Recommended spare parts are available for repair if needed.

3.3 Battery charger may be energized for tests required to perform trouble shooting and verification of service operability with proper safety precautions being observed. Steps in conjunction with this may be marked N/A.

3.4 The 1Bl battery charger is in service and capable of accepting rated charging capacity.

/

NOTE: The lAl battery charge may be transferred to the lB battery system if needed for additional charge capacity as covered by steps in instructions.

3.5 Notify QC personnel before work commences.

4.0 PRECAUTIONS

4.1 Proper safety precautions shall be observed while taking test readings when the battery charger is in an energized state of operation.

The "A" and "B" battery systems are not to be tied together in any state of operation other than cold shutdown except when given direct permission by the Plant Superintendent.

M-38.7:2

~ I>>

4.3 ~

The lAl battery charger may be transferred to the 1B battery system as requied by additional charging capacity desired or duration of 1B charger outage.

When completing instructions, steps are to be completed in exact order or damage to battery chargers will occur.

Holds shall be placed as required in accordance with procedure A-36.

4.6 Any replacement parts installed shall be requisitioned in accordance with procedure QC-801.

5.0 INSTRUCTIONS

5.1 Permission has been received from the Shift Foreman to perform maintenance and/or repair of 1B battery charger.

5.2 If Steps 5.3 thru 5.6 are to be completed, notify the Control Operator that a battery .charger failure alarm will be received.

5.2.1 Obtain key to padlock on Battery Charger Tie 1A1 to 1B1 switch in "A" Battery Room.

Shift Foreman Key Issue 5.3 Open the lAl battery charger 480 volt double throw disconnect (dual power feed from MCC 1K normal feed and MCC 1J emergency feed) in the lA battery room and place in the "Center - Off" Position. OFF 5.4 Open and hold switch j/5 in the 1A battery main fuse cabinet-Section j/2.

5.5 Unlock padlock and close the lAl to 1Bl battery charger tie switch in the lA battery room. CLOSED 5.6 Close the lA1 battery charger 480 volt double throw disconnect (dual power feed from MCC 1K - normal feed and MCC 1J emergency feed) in the 1A battery room to the MCC 1J emergency feed. CLOSED NOTE: The current may have to be balanced between the lA1 and 1B1 charger. (To be done by electrician).

5.7 Notify the Control Operator that a battery charger failure alarm will be received.

5.8 Open and hold the 480 volt AC circuit breaker for the 1B battery charger on MCC 1D position 4 MM. HELD 5.9 Open and hold the AC circuit breaker on the 1B battery charger. HELD

5. 10 Open and hold switch jjl (lB battery charger) in the 1B battery main DC distribution panel Section I.

Shift Foreman Hold Book.

will accept markup if required and log same in MARK UP RECEIVED

M-38.7:3 5.12 Perform maintenance and/or repair as necessary with Westinghouse Instruction Book lB-20-300-05 as guide line.

NOTE: See precaution 4.6.

MAINTENANCE COMPLETE Release markup, if applicable. MARKED OFF 5.14 Remove hold and turn switch gl (1B battery charger) in the 1B battery main DC distribution panel - Section I to the "ON" position. ON 5.15 Remove hold and turn the AC circuit breaker on the 1B battery charger to the "ON" position. ON 5.16 Remove hold and turn the 480 volt AC circuit breaker for the 1B battery charger on MCC 1D position 4MM to the "0¹'osition. ON 5.17 If Steps 5.18 thru 5.21 are to be completed, notify the Control Operator that a battery charger failure alarm will be received.

5.18 Open the lAl battery charge,480 volt double-throw disconnect (dual power feed from MCC 1K - normal feed and MCC lJ - emergency feed) in the lA battery room and place in the "Center-Off" position.

OFF 19 Open the lA1 to 1Bl battery charger tie switch in the lA battery room and lock open. LOCKED OPEN Return key to Shift Foreman for padlock on battery charger Tie IA1 to 1B1 switch in "A" Battery Room.

Key Received by Shift Foreman 5.20 Remove hold and turn switch 7/5 in the 1A battery main fuse cabinet - Section 2 to the "ON" position. ON 5.21 Close the lAl battery charger 480 volt double-throw disconnect (dual power feed from MCC lK normal feed and MCC 1J - emergency feed) in the lA battery room to the MCC 1K normal position. CLOSED NOTE: Charger currents may have to be balanced. (To be done by electrician).

5.22 Complete list of maintenance performed, purchase order number of parts used - if any and attach to procedure.

COMPLETED BY:

DATE COMPLETED:

ELECTRICIAN FOREMAN:

SHIFT FOREMAN:

PORC REVIEW DATE:

H+E DC, AUX. BLDC. DC- CON7ROL BD.- PNL IEL, D.C. Df5r. DIESEL &ENJ I 6 O~ 'SCRCEhJ O fO pNL. (SEE hJOTE-'2) D(5T PNL CIRC Ui T FIJ5E WIRE.

0 DIES' C RCLJ IT I

C>>EN- I EEr DIST. PNL HP OR F WiRE SIZE SIZE C IRC.LJ I T IP Zg WIRE SIZE DIST PNL IA E IGLOO DI5T PNL.(AI

'22 SJ ZE SJZ.E KVV IO DI E'5E IE5 CONT. pNL NOR,'ivI 30 IO I (hUX,ESLCJC .VENT O'TOTEM PIVL IND RECOhn(S(NER CONT. PNL IES I I Kr>>>>DTO T iP R lhiv REJ-IO DIESEL IA CONT. PNL EMLRC iO 2 tvlOTOR CONT. CTR. JO RT 3 GAS Ah(ALYZER CONT PNL. BW 10 SPAR E. 4 4aov swcR. usus tc,(NoRM) i 00 0 SPARE 5 4(5OV SWEGR BUS 14 (EtvfERC) 100 0 SPAC SPAC E E22il tel 5PARE E'PACE. 5PAC 6.

hnAIN LUG 5 DNL> 200A 4/o DiESEL CEhJ iA O AUX.

10 (5L DC DC -211 O IUIAIN D.C. D(ST. 0 O DIST. PNL. D(5T. DNL I A PANEL B I C I ECo 12 Eig i CONTRC}L I5D. PNL. i e CONTRC}L BOARD - PNL A I E9I FUSE WIRE Ct RCutr Fus WIRE HP FUx WIRE IE@2 i4 Lip IZE SIZE CIRCUIT 0 JR Li SIZ C(J ZS SiZE E92 30 X) IO Kw OCB 767 "iO C}CIS 751 EIC 9 15 i>> hnAJN TRANSP 30 30 << IO I SPARE 2 CONIT. BD. CTR-5ECT CIR.<<Z IC}

LIGurJNG i0 5TA SERV. TRANSF." II 30 53 <<IO 2 Y C.EhJIERC .

5 CONT, BD, Rr SECT. CIR*2 JJ I O i20 40 17 X) 30 1-fVOROC EN PNL, 4 COIUT. BD RT. 5Ecr, CIR<<3 "i0 5TA- SERV- TJRAJ>>J5F. +12 <<IC}

40 EID3 E

5 4 KY 5vvC R. BUS I IA UY REUJJ CONT. BD ALARM SYSTEhn 30 M "10 4 I nOTOR CONT. CTR. IA(TURei. PUL GO 40 19 SPARE "10 cohir ISD. crR, 5Eci CIR "I X) 30 "IO 5 IU(GTOR CONT, CTR. IF SERY. PJLCC t05 107 "fO WATER TRE/STING, pNL CGO 40 7, LIV. RELAY CAE(. IA 'JO coNT. m. Rr. GEcT. ctR I (VIAtN D.C. DIST. B CONTROL BOARD PNL IA 22 12 8 RACK RLTR-2 '10

<<I 0 4KY 5WGR. BL(5 I IB UV. F(ELA 7 hnETER srop TEsr ISENCH SPARE FGO CJC}

50 15 O PNl, AI DC DI5T. PNL aEE wore-2 21 9 RACK 5Ie, I 40 EZC} E21 EZO I

<<IQ Ja U V. RELAY CAB. IES 9 FIRE REI.AY PNL, CJO 1 5CREI=N hJQUQE DC RACK RAZ HrrETCJ-(QAJR COCrLE. E90 I CJ "iO Ji 10 12 RAC < R LTR RACJ< SIA I

- I X) pO <10 10 AC I I GG NUCLEAR SAhrtgLE PNL 20 12 IO E22 E40 T27 O 0(5T. t) NL ES- I AIR 'SIDE 5EAL OIL BJACKLIP IO i00 iCO E157 SPAR~ "to RACK RA2 j3 X3 IO 12 13 1 . WG>>v CE<<pl C M RJFJ +IO hn0.4JJS'5 iNYERTER ~~ 9A UO X) 'ta I5 UR(5. OR. AUX.FW. OC.OIL PUMP l4 SPARE 5

(28 C~T. BJJCJ, 4EEU@ tv@Dig. 15 1Q E202 (5 hnAINS f LUGS CJNLY) 4OOA, LE24

(@

i'7 COPSDCEJ5AT I.

5PAR6.

~ DJ(EJUIJJ>>JL RALI A'VC- I E(4 RFLA r DJ>>>>J DE(>>JSlg S 15CJDS R U <<(4 E2C 207 E-i49 5

"iO IO IO aux BLDc, DC.

IEJ RC5 OYER RE. MRIZATION IA E

7 DIST. f:}NL. 15(

19 SCREEN LIousE D.c. DtST. PNt E30 E32 E213 12 20 12 1ri HP F WIRE E232 21 CIRCu(T CUP zE StzE E2I5 E'Zi7 E 127 E41 I4 CCJ 40 10 I TRAVELLII>>J SCREEN CONT, MOTOR CONT. CTR. ICJ 40 8 15 SPARE C IJ=JCULATINrep WATER PLJM iA 90 2 COC- I NQ.IS BATTERY- IvlAIN FUSE CA(3(NET NO, IA .rsATTERv:- h/IAJhJ FUSE CABINET 1 17 C F4C U LAP i P>>JC VVATER PLJ JUJ p (;.C i00 HP FIISE J

HP FUSE'VI R E VL CIRCUIT O GE SJJJI CtfRCuir OR HW Up- 4/3CJ Y SVECGR. 5U5 IJS(EhlERC c 3 19 20 E23l ZE Ql ZF NQ 100 19 ALjX. BLDG DC 5VVC R BUS 17 NORM)

MAINS I 2OOA lvtAINS 12OC}A 4EESOV D15T, PNI . IB

<<IA FEJATiER,Y CJ-JCERG,ER I7$ 4/o >>5 PARE 100 2I  !

200 175 4/o

+IB BATTE.RY C'LIARGER,

~ ~El@ 7 I

I QQ) 2" 3 hnAINQ (LUG '5 ONLY ) 200A 4/o tJPRti/IAL +REJV FEE 0 ICG J V MAIN DC l3IST PNL IB CJ00 M hrt 2 hnAIN 0( DIST. phJL IA h MCC Ig L(JVJT JK IJJ 2- 0 No. IA. BAT. hnN. FUSE CA(3.~1,1 480V PC}WER FEED ~E(r 8 ir) NO. IB BAT. MN. FUSE C SECT.I M 48OV lX)WER FEED C202 E hJI E(r Gf h(C Y +f48 tIE NQ IA (%ATTER FU5E CAB. TIE-NO.IB BAT(ERY F'USC CAIS (EJ00 2 3 IUICC 1C Ufi/I T 4HH TR/IJJJ5 jfg cJ ~Clop/ }- +SOVITFff9 htCC RD LlN(T 3

4. TURB. E.JJIERG. BRC . OIL Ufs(P 500 2- 4/o SMI J TC H IVICC ERY TURe.l5LCK D.C. DIST. PNL . IvlAihJ D.C. DI5T. PNL II5 I/I I uhllr ZH E 205 (3ATT 200 ZO 4/o 5 'JIAI BATTEPLY cHARc ER 15O 4/o ESATTERX E204. CHARGER SCREEhJ I-15E O.C. DIST.PNL I I-I P Q-IARC E.R CEJJTE R OFF zoot(

5R CiRCU T I WIRE 18 (5CIJJ(

+ I ES I ESAT 7 E R;i C H ARC>> ER 36150 4/o 2-QI5 OR Bt ZE I /h I 5'0 A EII9T TERT TCJ BATTERY SROUN NO. I A, ISATI. MN. FUSE cA15. SEcr 2 Kw l CH/t Rf>>EP( TUR(5. I5LCX . DC.

NO. IPJ QAT MN. FLI5E CAI5 5ECT. 2 IUI RM iO TQ BATTERY cRoUND ALARhn IJEJI 7SJFJ l5 DIST. PNL, I EhnERG. L(CHTJNC CCJNT I KIJV

-I ) V (5EE NOTE 45EE NOTE- I )

AUX BLDG. DC. DiST. PNL. iA FIRE PLIMP ISOLATION VALVE V o 4 SJAf 5CRE.EN k5E. D.C. DIST. PNL C tRCUIT HP OR CU KvU FLJ5 FUS WtRE CUIT SIZE NO CIRCU I 1 WIRE 5IZE DRJV MOToR CQNTROL cENTER JUJ-CR- 'BE.'T MOTOR CCJNTROL CENTER I K CDJ>>JTFJOL (0

M 4o 4o 10 hnCB Ei77

-17 hnQTC}R CONT. CTR IE 4(SOV Swt R. (3us17 (E hnERC ) ~LJRJ5 DR-AUX. RSV. PUMP CO 40 ioo MOTOR CONT. CTR, iC 40 ALVIN E13 45ct Y SwGR BUS I(5 (.NORhn) i0 Eif 5t UhnpS CONi. CAI5. 10 415OV SWOR. (SUS 14(Nown YAM IZISTI>52 BQ. -RICJ-IT SECTiOhJ 100 100 FI4 Et/I r rE 7 r I

E 186 SIP'. BUS IC<<(EhJIERC 100 CONT.

A c H/t(;rpL E. I 5 '5 PACE 4JSC}V SPAR.C 100 io 4 JR'>>V II 4MCV

~$

5'>>J=E 13 QLJ5 5 I I IE5 B

J>>JQRJUJ SUORJUJ

~

100 100 0() 100 SEer tohf 'l E249 tet 75 Jct E25 SECTI ON - I Ei74 SJE B MAIN(Luc 6 QNLv) 200A 4/D I I

4JerOY 5VVG.R JBU5 l5 J>>IORJUJ SECTION-2 12 100 100 SECT IOhJ 2

~

5PAJRC i00 CHARGER TIE 5W NO.IA BATTERY 2 POLE IOOAhJIP I2 Dc. DIST, PNL. IA S.C FW. PuhJIP ta D.C.OiL ULI ICO CGO Mi:lihJ FUQE CAES. 2WV CIC. Eh/Jf RC ElV CT TR/t li/5 FER DIE5E.L GEN. tA DIST. PNL MAIhJ

~

C.JRCUI T HP F CLIP

~IZE

'WIRE SIZE CI IRcu I 1

kg W!RE

> I ZE INVPFhTEJR II5 IJE>> DIESEL GEN I B C}IST.

X. FW. pUMp Sr.

L 7.

KVA CC} 100I 100 Cco

+rtcJY Ff ED ~cao~ae h/ICC Llhttf (K

I 15frt ~C?OCJ 5VJ/tv'CH 1E(1 CEhJTER bPP E-(9(

C14 14, DIESE,L GEhJ IA DIST. PANEL l7 TUR+ DR. 100 QO tJPRÃaa. JfSTJV FEED 10 MCC IT Lt(V IT?HH I DIE5EI IA COhJT. DNL (NQRtn) I 5PARE BATTERY 2 h/IOTOR CONTROL CTR. 115 I

2 DIESEL I 13 CONT DhfL-(EMERC 30 4/o 40 ALIX. ISLDC<<, DC . DIST. PNE et IOI5CDNNECT 3 h/(OTDR, coNTRQL CTR II-I (GO .I SPARE. h/IAINS (LUC'5 C>NLV}JEGCCLA 2-350 f200 A 15w 250v 4 ROD DRIYE, hn-G5ET cotJT. f200 AMP 4 5PJoJ-ZE 12OOA BATTERY' 15CONNECT 8, //>>JAR fEED CDNSTRUCTIDN HS PUctllT

~

1 SPACE EXCiTATiON EQUIP. QWITCI-I 250 VOLT s Jt 2 Ir/7r BJE, . Ta5T CAB. 100 70 LIMITED CONSTRUCTION: AS NOTED I

1200 AMP DH 6!A/

4 TV>>V 5 ~BJJ5 JJA NORJUI. 100 100 PREUMINARY NOT FOR CONSTRUCTION 0 ORIGINAL E70 4 NE.IU '5'Alii'R. BLJ5 I A JJORM E RJG>>

Cij 100 t00 BIDDING PURPOSES B Jr( ORAWN RESP. ENG.

ip>>>>rRMCJRCMI I ~

(SU% i 3 HDQJ>>r( MANE'R AL(X. BLDG. D.C. DiST. PNL I A I BWC>>>>R. g t(M (00 ev ENG.

(25V BATTERY 1

100 100 ENGR. IF)

C I RCLJ I T Hg FUSE F wiRE I I REEhJ LJSE, DI5T. Dh(L. 1A TU<<tcei. DR. 4>>UJi FIVE, PUIUJ 'BT. NOTE-I A GROUND DETECTC}R I5 INCLUDED 1hJ EACH f2'OLT 5ATTE DATE RELEASED FOR 1050 AH pecrE>>TT CRI NhJA ROCHESTER GAS & ELECTRIC CORP, RGCNESTER NEW VGRK 100 CEO CUP Z SIZE AD. VLV. 1 EJATTERY C'I-IARCER. Tl-Ie C ROUND DETECTOR IA IQ50 AH SCALE 5T, a BKJ F'VY, PUJUJP JA D.C, 100 (Eso I RECOhn I&INCR CONT PNL- IA >0 io QJL JUI AL~Rhn5 C}NLY. DINNA STATION - ELE( TFl lCAL 00 tCQ DRLIhnivl INCR QTA CONT- PNL ~ 30 I 0 14 CONT BD.- LE'FT ORECTIC}N NOTE-2 CONT RC}L 15C}ARD5 DI5T RI GUT I C) N PANELS ARE O~e leF Dl~C RAM 4 PAhlCL l

INVERT'ER A, 100 ICO MOUNTED !ETERNALLY VYITHIN THE. IvfAIN CONTROL TRiP &WC R, UNiT-I 10 15 WRRC T'5 I

REACTC}R R Y 100 DRCJJ>>J I