ML17261A119

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-009/01T-0 & 79-010/01T-0
Date released: 04/30/2018 Download: ML17261A119


LER 79-010/01T-0 on 790420:routine Sample of Boric Acid Storage Tanks Showed Less than 12%.Reactor Power Reduction Started.Caused by Possible Backflow of Makeup Water.Check Valve Replaced
ML17261A121
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1979
From: Peck C
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML17261A121 (4)
LER 79-009/01T-0 on 790416:routine Sample of Boron Boric Acid Tank Showed 11.8%.Reactor Power Reduction Started. Caused by Possible Backflow of Makeup Water.Check Valve Replaced
ML17261A120
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1979
From: Peck C
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML17261A120 (4)
Forwards LERs 79-009/01T-0 & 79-010/01T-0
ML17261A118
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1979
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML17261A118 (2)