Informs That Containment Tendon Surveillance Program & Testing Schedule Revised,Based on 810603 Telcon W/Nrc. Proposed Program Includes Testing of 18 tendons.Lift-off Testing Will Occur During Wk of 810713
ML17258B162
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/01/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8107080347
Download: ML17258B162 (6)


Text

REGULAtTO INFORMATION DISTRIBUTION %STEM (RIDS)'CCESSION NBR:8107080347 DOC ~ DATE0 81/07/01 NOTARIZED:

NO DOCKET FACIL':50 244 Robert Emmet Ginna Nuclear Planti Unit 1i Rochester G

05000244 AUTH',NAME AUTHOR AFFILIATION MAIEREJ ~ E ~

RocheSterI Gas" 8 Ele'ctric Corp REC IP ~ NAMEI RECIPIENT AFFILIATION'RUTCHFIELD<D

~

Opet ating Reactors Br anch 5

SUBJECT:

" Informs that containment" tendon surve'il lance program~

L testing schedule~i evisedibased on 810603 telcon w/NRC, Proposed program includes testing of 18 tendons, Lift off testing will occur during wk of 810713.

DISTRISUTION CODE:

AOOIS COPIES RECEIYED:LTR $

ENCI-Q

. SIZE"'

TITLE;: General Distr ibution forE after, Issuance of Operating License NOTES: 1 copy:SEP Sect~

Ldr ~

05000244 RECIPIENT ID CODE/NAMEt ACTION!

ORB ¹5 BC 04 INTERNAL" D/DIRrHUM FAC08 IE,Ef 06'ELDil RAD ASMT, BR COPIES LTTR EN

'13 1

RECIPIENT ID CODE/NAME DIRg DIV OF LIC NRC PDR 02'~SS SS BR 10 G

F II 01 COPIES LTTR ENCL EXTERNAL%

ACRS NSIC 09.

05.

16 1

1 LPDR NTIS

'03 0

TOTAL NUMBER OF COPIES REQUIRED LTTR ENCL 9

Ih I

/

II

'j h

Ihh) f f 3

'I P

ah'I'ler Why(h <hth ~hq

~ I wW e

h

~

I

~

h h'he hhW

'I Wh '(

I h

0'hh(r~ Wg h 'I rh I

Ih )

, I I

'I ~ I $

h('h(I thh f~,

((

kh(

If W

'1wh h

h fh f IW

r,:,::j

~//lIII' f//IW

~

'///////7//// '/mszrz

<<uz8Z

/////////////

'TATE ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER, N.Y, l4649 JOHN E.

MA IER VICE'RES IDENT TELEPHONE AREA COOK Tld 546.2700 July 1, 1981 pI I (~(g Director of Nuclear Reactor Regulation Attention:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Containment Tendon Surveillance Program R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

Our letter dated April 29, 1981 described the containment tendon surveillance program planned to begin this month.

This letter revises that program and the testing schedule based on the conference call held between our staffs on June 3, 1981.

The proposed program included testing of 14 tendons.

At the request of your staff, tendons 63, 74, and two other, randomly selected tendons have been added to the program.

We have selected tendons 21 and 125 to be added to the test program, bringing the

.total number of tendons to be tested to 18.

As agreed with your staff, if the lift-offforce for any tendon is less than 60%

GUTS, the two adjacent tendons will be tested.

After the tendon surveillance tests, we will continue our program of monitoring four tendons with load cells.

The tendon wire tests currently being performed at Lehigh University are scheduled to continue until early 1982.

We are reviewing whether sufficient data will be available by August 1981 to draw conclusions regarding wire relaxation properties.

A report will be submitted to you as soon as possible following completion of the various test programs and evaluation of the results.

goo/

,/o

,8107080347 Si070i IPDR ADOCK 05000244 I

'P PDR,I

t bt 1

l:f IP I'

ROCHESTER GAS AND ELECTRIC CORP.

DATE July 1, 19 81 Mr. Dennis M ~ Crutch field SHEET NO.

It is currently anticipated that the lift-offtesting will occur during the week of July 13, 1981.

We will inform your staff and our Resident Inspector if that schedule changes.

Very truly yours, J.