REGULATO INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR ~ 8107080324 DOC ~ OATEN'1/06/30 NOTARIZED:
NO DOCKET ¹ FACIE<:50 244 Robert Emmet Ginna Nuclear Plant~ Unit 1'i Rocfiester G
05000244 AUTH ~ AAME AUTHOR AFFILIATION MAIERp8, E, Rochester Gas 8 Electr ic Cor p.
REClP ~ NAMEII RECIPIENT AFFILIATION CRUTCHFIELD~D, Operating Reactor"s Branch 5
SUBJECT:
For'wards assessment of SEP Topic II 4'i "Settlement'f Foundations 8'uried Equipmenti" in response to 'NAC 810417 1 tr.
DISTRIBUTION CODEi:
A035S COPIES RECE'IVED:LTR ENCL SIZE:
TITL t:
S Topi cs NOTES:1 copy:SEP Sects Ldr ~
05000244 RECIPIENT IO CODE/NAME ACTION:
ORB ¹5 BC 04 INTERNAL'/DiMATL8QUALi13 AYO/GEO, BH
'10.
NRC PDR 02",
o1 COPIES LTTR ENCL "7
7' 1
2 2
1 i
1 RECIPIENT ID CODE/NAME, CONT SYS A
07 I8E (f6 OR ASSESS BR 11 SEP BR P
COPIES LTTA" ENCL 1
1 2
2.
1 3
EXTERNALS ACRS AsIc 14 0g<
16 16 1
'1 LPDR NTIS 03 1
1 TOTAL NUMBER OF COP IES REQUIRED ~
L'TTR ENCL"
I, ti "ii, g f' e'> ~
gg "r
't f
fg e'
pal 0 f III
~0 ~
~ s~ (
f gpss' "il FV
~~
}
N, M
U f
b
)>
4 R>V' n,r
< l
~
e ll
// ZIS/81II I IIIIIIIIIII I
AHD /
uzi uutzrru'OCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N.Y. t4649 JOHN E. MAIER VICE PRES I OBIT TEI.KRHONC AREA COOL TID 546.2700 June 30, 1981 Director of Nuclear Reactor Regulation Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555 mif(~'Q/
'oj
Subject:
SEP Topic II-4.F, Settlement of and Buried Equipment R.
E. Ginna Nuclear Power Plant Docket No. 50-244 Foundations
Dear Mr. Crutchfield:
Attached is Rochester Gas and Electric assessment of SEP Topic II-4.F, "Settlement of Foundations and Buried Equipment."
The format for this assessment was derived from the NRC staff's assessment of this topic for the Palisades plant, transmitted by letter dated April 17, 1981 from Dennis M. Crutchfield, NRC, to David P.
- Hoffman, Consumers Power Company.
Very truly yours, Jo n E. Maier Attachment p,,
~~
j8107080324 810630 PDR ADOCK 05000244)
P PDR
I, C
r I
.rr~ q
~ I J
Attachment SEP Safety Topic Evaluation R.
E. Ginna Nuclear Power Plant Topic II-4.F Settlement of Foundations and Buried Equipment Introduction The purpose of this safety topic review is to ensure that safety-related structures,
- systems, and components are adequately protected against excessive settlement of foundations.
Included in this topic is a review of information relative to existing settlement
- data, geotechnical soil properties at the site, and the ground water table.
Using current criteria as a basis, the effect of existing settlement, if any, and the possibility of future settlement on safety-related structures, is evaluated.
Current Review Criteria The current review criteria for this specific topic assessment are:
1.
Standard Review Plan Section 2.5.4 2.
Related Safet To ics and Interface 1.
II-3.A, Hydrologic Description 2.
II-4, Geology and Seismology 3.
III-1, Classification of Structures,
- Systems, and Components Evaluation A geological reconnaissance of the general area surrounding the Ginna site was first performed in 1964-1965.
A total of 18 test borings were initially drilled throughout the site to depths ranging from 40 to 100 feet beneath the ground surface.
This information is provided in Reference 1.
Subsequent to the initial environmental studies, seven additional borings were drilled to depths between 35 and 90 feet in the reactor area for a supplementary foundation study, and nine borings were drilled for the intake and discharge tunnels.
These borings extended from the shore to a distance of about 3,000 feet into Lake Ontario.
This information is provided in References 2 and 3.
Finally, a major investigation concerning minor bedrock faulting encountered near the Ginna Station, transmitted by letter dated April 19, 1974, is described in Reference 4.
The site lies within the Erie-Ontario lowland physiographic province which is characterized by an erosional topography of low relief modified by glacial features.
The land rises gradually to the south where it meets the Appalachian Uplands at the Portage Escarpment.
Geologic formations in the region include Lower and Middle Paleozoic sediments overlying the pre-Cambrian basement rocks.
The pre-Cambrian surface dips to the south at approximately 60 feet per mile with local variations.
The youngest formation occurring at the site is the Queenston formation of Upper Ordovician Age.
The Queenston is roughly 1,000 feet thick in this area and overlies approximately 80 feet of Oswego sandstone, approximately 600 feet of Lorraine shales and probably less than 30 feet of Potsdam sandstone.
The pre-Cambrian surface is roughly 2,600 to 2,700 feet deep at the site.
The major nuclear station structures are supported in the Queenston Formation or atop a thin layer of natural or compacted granular soils immediately above the bedrock.
The Queenston Formation, which is generally found at depths of 30 to 40 feet, is composed of alternating strata of thinly to thickly bedded,
- dense, fine grained sandstone, silty sandstone, and sandy siltstone, with occasional thin beds of fissile shale.
Bedding is essentially horizontal with occasional cross-bedding and shaly partings.
Prior to construction of the plant foundations, the soil overburden (30 to 40 feet of glacial drift) was removed.
The exposed rock surface was observed to be similar to that examined in nearby outcrops.
Bedding was horizontal and occasional cross-bedding and shaly partings were evident.
A pattern of vertical joints of limited vertical extent was evident in the outcorping rock, particularly along the lake shore side of the excavation.
The observed joints continued to depths of from 20 to 30 feet from the top of the rock, but no evidence of movement along the joints was found.
Excavations to various depths were made in the soil to accommodate buried equipment.
In any instance when unsuitable material was encountered, that material was fully excavated, replaced with select granular bedding material, and fully com-pacted.
The equipment was then encased in concrete, and back-filled with select material.
All excavation, structural placement and backfilling procedures were performed in accordance with specifications which were to ensure that settlement would be minimized.
No settlement has been observed in areas where buried equipment was installed in accordance with this procedure in over 10 years of plant operation.
Groundwater level data were submitted as part of SEP Topics II-3.A, II-3.B, II-3.B.1, II-3.C, and III-3.A, by letter from John E. Maier, RG6E, to Dennis M. Crutchfield, NRC, dated May 1, 1981.
A design basis ground water level of 250.0 feet msl was specified for the major Ginna structures.
ll
)I II II
Conclusions No specific information relative to total and differential settlement is available.
However, there has been no evidence of any such settlement since the plant was constructed.
Based on an inspection of the plant, coupled with experience showing no observable settlement to date, it can be concluded that, even though settlement analysis as described in SRP Section 2.5.4 has not been documented, the settlement of foundations and buried equipment will not be a safety problem of concern.
References 1.
Rochester Gas and Electric Brookwood Nuclear Station Unit 1 (now called R.
E. Ginna),
- PSAR, Volume 1 and Appendix D to Volume 1.
2.
3.
Rochester Gas and Electric "Environmental Report," Volume 1, August 1972, Section 2.4 and Appendix A.
Rochester Gas and Electric "Final Facility Description and Safety Analysis Report,"
Volume 1, Chapter 2.
4 Geologic and Geophysical Investigations, Ginna Site, by Dames and Moore.
5.
6.
Standard Review Plan, Section 2.S.4 7.
Letter, John E. Maier, RGGE, to Mr. Dennis M. Crutchfield, NRCg SEP Topics II-3'g II 3 'g II 3 ~ B ~ lg II 3 Cg III 3 'g dated May 1, 1981.
D U'