Responds to NRC Re Emergency Procedures & Training for Station Blackout Events.Procedures & Training Programs Will Be Implemented by End of First Refueling Outage After 820101 Per NUREG-0737,Item I.C.1
ML17258B149
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/25/1981
From: Maier D
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.C.1, TASK-TM GL-81-04, GL-81-4, NUDOCS 8106300280
Download: ML17258B149 (3)


Text

REGULATORY ORMATION DISTRIBUTION SY i (RIDS)

ACCESSION NBR:8106300280 DOC ~ DATEi 81/06/25 NOTARIZED:

NO DOCKET FACIL':50 244 Robert Emmet Ginna Nuclear PlantP Unit 1P Rocheste'r" G*

05000244 AUTH'AME'UTHOR AFFILIATION MAIERiD,MD Rochester Gas

& Electric Corp;

.RECIP,NAMEf RECIPIENT AFFILIATION CRUTCHF IELD P D ~

Operating Reactors Branch 5

SUBJECT Responds" to NRC 810225 ltr re emergency procedures training for station-blackout events, Procedures

& training programs will be implemented by end of first refueling, outage af ter 820101 per NUREG 0737'tem INC+1 ~

DISTRIBUTION CODE'OISS COPIES RECEIVED:LTR J 'NCL( Q SIZE:

ITLE~:

Onsite Emergency Power Systems NOTES:1 copy:SEP Sect.

Ldr.

05000244 RECIPIENT ID CODE/NAME!

ACTION:'RB N5 BC" 04 COPIES LTTR ENCL RECIPIENT ID CODE/NAME COPIES LTTR'NCL" INTERNAL: AEOD I &Ei NRC PDR

~ F LE EXTERNAL: ACRS LPDR 06>>

0 2'."

BR 12I 01.

16 03>>

1 I

1 1

1 16 1

I&C SYS BR 09 MPA 18 OELD 17 POWER SYS BR 14 INPOgJ ~ STARNES NSIC" 05

'guL 0 6 198~

~7 0

TOTAL NUMBER OF COPIES REQUIRED:

LTTR pd ENCL>>l p

t r>> f

i/I'M/ //////////

!!!!!/"'!!!izzzsz ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E.

MA IF.R VICE PRESIDENT June 25, 1981 TCLCPHONE AREA cOOC 7I/I 546-2700 I

Director of Nuclear Reactor Regulation Attention:

Mr. Dennis Yi. Crutch field, (h ief Operating Reactors Branch No.

5 U.S. Nuclear Regulatory Commission Wash ington, D.C.

20555 ef

""~~8 198)~

4h NIICIERE EIC+.

COh+ISSyq-

Subject:

Emergency Procedures and Training for Station Blackout Events R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Hr. Crutch field:

This letter is in response to a letter dated February 25, 1981 from Hr. Darrel Eiserhut regarding Emergency Procedures and Training for Station Blackout Events (Generic Letter 81-04).

In reviewing Ginna Station's operating procedures to determine plant capability to mitigate a station blackout event, Emergency Procedure E-4, Station Blackout Operation, was assessed.

'Ihis procedure specifies operator actions and precautions necessary to mitigate a loss of all offsite AC but assumes onsite AC power is available via either diesel generator.

In response to Generic Letter 81-04, the Westinghouse Owners Group (WOG) submitted its plans to prepare procedure guidelines for a loss of all AC in letter OG-56 dated April 9, 1981 from Robert W. Jurgensen to D.G.

Eiserhut.

As described in that letter, the procedure guideline will be submitted to the NRC by Septemb'er 1, 1981.

A training seminar will be held on or about October 1,

1981 to provide detailed discussion of the developed guideline with WOG util,ity procedure and training personnel.

Based on the WOG schedule, emergency procedures for a loss of a11 AC will be developed, and training programs will be implemented by the end of the first refueling outage after January 1,

1982 as specified in the impleIIIentation schedule of NUREG 0737, Item I.C.1.

Very Truly Yours,