APPENDIX A NOTICE OF VIOLATION Rochester Gas and Electric Company R.
E. Ginna Nuclear Power Plant License No.
DPR-18 Docket No. 50-244 As a result of an inspection conducted on January 12-16, 1981 and in accordance with Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:
10 CFR 50, Appendix B, Criterion V states in part, "Activities affecting quality shall be prescribed by...procedures...of type appropriate to the circumstances...".
Quality Assurance Manual Ginna Station, Section No. 1, Quality Assurance
- Program, states in part, "2.3.a (Ginna Station Responsibility to) Establish written procedures to control the performance of quality affecting activities...
"3.2. 1 The quality assurance program shall be documented in...the imple-menting quality assurance/administrative procedures...
"3.2.3.g (This manual...conforms to...)
NRC Regulatory Guide 1.39, Revision 2, (9/77)
'Housekeeping Requirements for Water-Cooled Nuclear Power Plants'."
Regulatory Guide 1.39 requires conformance to the requirements of ANSI N45.2.3-
- 1973, "Housekeeping During the Construction Phase of Nuclear Power Plants."
Contrary to the above, plant procedures had not been issued implementing the housekeeping and cleanliness requirements of many portions of ANSI N45
~ 2.3.
This is a Severity Level Y Violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Rochester Gas and Electric Company is hereby required to submit to this office, within twenty-five days of the date of this notice, a written statement or explanation in reply, including:
(1) admission or deni-'f the alleged violations; (2) the corrective steps which have been taken and the results achieved; (3) corrective steps which will be
Appendix A
~
~
taken to avoid further violations; and (4) the date when full compliance will be achieved.
'lJnder the authority of Section 182 of the Atomic Energy Act of 1954, as
- amended, this response shall be submitted under oath or affirmation.
Dated mR ~~ $81 Eld J.
Brunner, Chief Rea tor Operations and Nuclear Support Branch
'