ll REGULATORY It RMATION DISTRIBUTION SYST (RIDS)
ACCESS')N NBR: 8106010405 DOC ~ DATE o 81/05/26 NNOTARIZED:
NO DOCKET FACIL':50-244 Robert Emmet Ginna Nuclear PlantE Unit 1E Rochester AUTH.NAME AOVHOR AFFILIATION MAIEREJ,ED Rochester Gas 8 Electric Corp.
RECIP ~ NAME RECIPIENT AFFILIATION CRUTCHFIELDPD ~
Operating Reactors Branch 5
~
g
SUBJECT:
Ad ises of delay in providing s'chedule for,upgradsngc batter y racks at facility.Addi time will.be r equired after end of spring outage. Design difficulties 8, lack of manpower have'ontributed to delays Battery rack upgrade expected by July DISTRIBUTION CODE:
AO3BS COPIES RECEIVED:LTR i
ENCI.Q SIZE: J.
TITLE: SEP Topics NOTES: 1 co'py:SEP Sects Ldr ~
05000244
'RECIPIFNT ID CODE/NAME ACTION!
CRUTCHF IELD 04 INTERNAL: A/D MATL8,QUAL43 HYD/GEO BR 10 N
02 FIL 01 COPIES LTTR EN L
REC IP IENT ID CODE/NAME CONT SYS A
07 I8E 06 OR ASSESS BR 11 SEP BR 12 COPIES LTTR ENCL 1
2 1
3 EXTERNAL: ACRS NSIC 14 05 16 1
1 LPDR 03 JUN 02 198g gf o
TOTAL NUMBER OF COPIES REQUIRED:
LTTR ENCL
l I.
!!!!!!!!'I'IS/8 AHD zzsggtis ewe t zuzzES 1!!I!!I!
ROCHESTER GAS AND ELECTRIC CORPORAT/ON rrE ~ rwlJAOrI' 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E.
MAIER VICE PRESIDENT TECEPHONE AREA CODE Tld 546-2700 May 26, 1981 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Battery Racks, SEP Topic III-6 R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Hr. Crutchfield:
In your letter dated January 7,
- 1981, you requested that we provide a schedule for upgrading the battery racks at Ginna.
By letter dated February 6,
1981 we indicated that the modification would be completed by the end of the Spring 1981 outage.
Based on the current, status of the modifi-
- cation, and the scheduled start-up date from the current
- outage, June 16, 1981, additional time will be required.
Several factors have contributed to this delay these factors include some design difficulties and a lack of manpower to complete both this modification and other modifications such as the fire detection system installation.
Ne expect to complete the battery rack upgrade by mid-July, 1981.
Very truly yours, (D r
Fl EI II F II
'I ff
~F
~
Er 0
F