Forwards QA Program Info Per 810224 Request.Discusses Transfer of Welding & Nondestructive Exam Engineer Responsibilities & Deletion of Revision 7,Figure 4.2-2,of Util QA Program
ML17258A984
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/23/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8104280545
Download: ML17258A984 (13)


Text

REGULATOR NFORMA'TION.DISTRIBUT"ION TEM (RIDS)

ACCESSION NBR:8104280545 DOC ~ DATE: 81/Orl/23 NOTARIZED; NO FACIC:50 240 Robert Emmet Ginna Nucl e'er Planti Unit li Rochester G

AOTH ~ NAME

'UTHOR AFFILlATION MAIER~J,E ~

Rochester Gas 8 Electric Corp ~

RECiP. NAG,.

RECIPIENT AFFILIATION CROTCHFIELOiD ~

Operating Reactor's Branch 5

SUBJECT:

Forwards QA pr ogram info per 810220 request, Discusses transfer of welding E nondestructive exam engineer responsibilities Il deletion of Revision 7iFigure 0.2 2<of'til QA program.

DOCKET ¹ O50002erl DISTRIBUTION CODE Q002S COPIES RECEIVED ~ LTR ENCL TITLE:'Quality Assurance Dist'

'for 'Amdt to 'Report NOTES: 1 copy:SEP Sect.

Ldr.

SIZEe 05000244 ACTION:

RECIPIENT ro CODk/NAME, SNAIDEAiR ~

COPIES L.TTR ENCI 1

RECIPIENT ID CODk/NAME COPIES LTTA ENCL INTERNAI.': ASL'AP ARC PDR RES 09 03 10 1

1 1

1 1

ASLB QA J

F IL 0rl 01 1

0 2

2 2

EXTERNALS ACRS 11 16 16 LPDR 1

1 Q7 QS TOTAL NUMBERS OF COPIES REQUIRED:

LTTR P8 ENCL

4 II N

h pl

0 IiiIiIiiiI iIiiIiIii zizijgzi uzi'iiiii~Euw ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, rZ'..;,-'OCHESTER, N.Y. 14649 JOHN E.

MAIER VICE PRESIDENT OJ

<<K.

I:II"-'-

P,I'PP71983~-

u S NIICISARRIDE iI COhVAISSON r

TELE0HONK AREA CODE 7I5 546-2700 April 23, 1981 Director of Nuclear Regulation Attn:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch I5 U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Quality Assurance Program R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

In response to your request for additional information dated February 24, 1981, the enclosed response is provided.

Very truly yours, Enclosure

if

Transferrin the res onsibilities of the Weldin and NDE En ineer from the Qualit Assurance Grou to General Maintenance Group After careful reconsideration of the concerns regarding the impact of the Welding and NDE Engineer reassignment we have again concluded that the reassignment enhances the Ginna Quality Assurance Program without impacting necessary independence from cost and schedule activities.

This conclusion is based upon the role of General Maintenance Department in Ginna maintenance activities.

General Maintenance has no direct responsibility for safety-related maintenance activities at Ginna Station.

General Maintenance functions primarily as a source of corporate support services for the various production departments performing maintenance.

In addition, they provide limited non-safety-related construction and building maintenance services.

The Ginna Station Superintendent retains direct responsibility for the control of activities associated with maintenance, modifications and related independent quality verifi-cations at Ginna.

A shi ft of the Welding and NDE Engineer from the Quality Assurance Group to General Maintenance within the Engineering Department does not impact the Ginna Station responsibilities.

l H

h E

During Ginna outage periods the Level III functions performed by Welding and NDE Engineers and related control of the NDE technicians are shifted to Ginna Station under the functional control of the Ginna Station QC Engineer.

This is similar to the functional control exercised by the Ginna Station QC Engineer over contracted examination agencies.

Therefore, control of nondestructive examination activities at Ginna Station is at all times by a designated independent organization.

Forming the new Materials Engineering

Group, which has no direct responsibility for cost and schedule, has enhanced the Ginna quality assurance program as well as other corporate programs.

This has been accom-plished through the refinement of existing examination programs while optimizing use of materials-oriented personnel to establish testing and analysis capabilities.

In addition, previous interface problems have been corrected with the consolidation of the Welding and NDE Engineer into the same organization as the technicians who are involved in conducting welder training and nondestructive examinations.

0

Revision 7 deleted Fi ure IV.2-2 "Rochester Gas S

Electric Cor oration QA Or anization" from the QA Pro ram descri tion As in previous revisions, the Quality Assurance Organization with its reporting relationship is shown in the Corporate Organization Chart Figure IV.2-1.

A description of the responsibilities of the Corporation's Manager Quality Assurance and assigned staff is described on pages IV-5 and IV-6 with appropriate reference to Figure IV.2-1.

Elimination of two of the four functions (i.e. Welding and MDE Engineer and Quality Assurance Engineer Construction having Sterling Project Responsibility) resulted in a Figure IV.2-2 which was basically redundant with the organization as depicted on Figure IV.2-'1.

The responsibilities of the Quality Assurance Organization, as pertaining to review, audit and source inspection continues to be described in pages IV-5 and IV-6 in sufficient detail.

In addition, Supplement IV provides a description, on pages IV-7 and IV-8, of the Ginna Station Quality Control Engineer and General Maintenance Quality Control Coordinator responsibilities associated with their assigned quality assurance functions.

These functions continue to be shown on Figures IV.2-1 IV.2-3 and IV~ 2-4

~

r r

Ik II I

ll

'g 4

kt I

r 4

4 4

1' I

Il h

f I 4

~

t 4

F' II

!I 4

~

rh I

'I I"

II I

II

Discuss the Si nificance of Deletin the "En ineer" Block Under the "Qualit Control En ineer" Block from The deletion, which occurred during changes to incorporate the positions of Shift Technical Advisor and Technical Assistant for Operational Assessment is being remedied by the re-insertion of the "Engineer(s)"

block as shown on the attached Figure.

The attached Figure IV.2-3 is to replace that which was provided with the November submittal.

0 II ~

ROCHESTER GAS /tQ E'LECTRIC CORPORATION GINNA STA'IICII OIIGANIZATION I

SUPERI NTEIQEttt ASSISfANT SUPER INTEtQENT TRAINING COORO I tlATOR TECNIIICAL ASSISTANT FOR OPERATI0'QL ASSESS'CENT ENGINEERS H

I Ul SUPERV I SCR CHENISTRY AQ HEALTH PHYSICS OPERA IONS ENGINEER SRO FIRE PROTECTION MAINTENANCE AIQ SAFETY COOROo ENGINEER OFFICE SIPERYISCR TECIVIICAL ENGINEER QUALITY COtiTROL ENGINEER

~

CHEN IS'f HEALTH PHYSIC I STS OPERAT IOIIS SUPERVISOR SRO HhtER IALS COORD ItlATOR fS INTENtUCE SUPERV I SOR I 4C SUP ERVISOR NUCLEAR EIIGINEER RESULTS 4 IEST SUPERVISOR j

ERG IIIEER(S)

CHENISIRY TECICIICIANS RAG IATIOI PROTECT IOII TECttttlCIANS SHIFt SUPERVISOR I/SH IFf;'RO r

HEAO 00tttROL OPERATOR I/SHIFT RO S TOCKROOH NAINTENAtCE FOREttttl F ITIERS HECHANICS HMQYIm fSC AliO ELECTRIC FOREt'Ett TECttNIClhttS 4 REPA IRHEN ELECTRICIAt5 TECHIIICIANS TECHIIICIANS SHIFT TECtct ICAL PDVISOR ~

I/SNIFt

'0 8

}" I REPORT ltQ

WVIIAIICATION

'STA VAT BE EltltER SAD OA IIAYE BS DECAEE.

S'lA IS REOUIIIIO ONLY BURIN'I P(VER OPERATIONr CONTROL CPERATOR I/SIII FT RO AUXILIARY OPERAIOR 2/SHIP'f Figure lV.2-3

'April 1981