Provides Status Re Tendon Monitoring Program at Facility. Three Remaining Tendons Will Be Monitored.Cell 93 Will Be Installed Prior to June 1981 Surveillance Program
ML17258A957
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/10/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8104150371
Download: ML17258A957 (6)


Text

REOULATORQINPORMATION DISTRIBUTION SQITEM (kIDS)

ACCESSION NBR:8104150371 DOC,DATE': 81/04/10 NOTARIZED:

NO DOCKEtl FACIL 50-244 Robert Emmet Ginna Nuclear PlantP Unit ii Rocheste'r G

05000244 AUTH INANE" AUTHOR AFFILIATION MAIERJJ ~ E ~

Rochester Gas 8 Ele'ctric Corp.

RECIP ~ NAME>>

RECIPZENT AFFILIATION CRUTCHF IELDED ~

Operating Reactors Branch 5

SUBJECT!: Provides status re tendon monitoring program at facility'hree remaining tendons will be monitored. Cell 93 will be installed prior to June 1981 surveillance

program, DISTRIBUTION CODE AOOIS, COPIES RECEIVED:LTR 4 ENCL> Q SIZE:

TITLE': General Distribution for af ter>> Issuance', of Operating License-NOTES:1 copy:SEP Sect; Ldr.

05000244 RECIPIENT ID CODE/NAME>>

ACT'ION:'RUTCHFIELD 04 INTERNAL ! D/DIR'P HUM FAC 0 8 I8,E",

0 l>>'ELD 11 RAD ASMT BR COPIES LTTR ENCL 13 13 RECIPIENT ID CODE/NAME DIRgDIV OF LIC-NRC PDR '2 OR ASSESS BR 10 01 COPIES'TTR ENCL EXTERNAL: ACRS NSIC 09 05 16 1

1 LPDR 03 APR 16 198t TOTAL NUMBER OF COP IES REQUIRED $

LTTR l4 ENCL

0 ll 1

llP',

I i

I h

4 t

I'I 1

f/gKSFSE l I/SZJF

> '/~IIjrj'IZZZ

/I!(s/AF i szzN ROCHESTER GAS AND ELECTRIC CORPORATION o

A TOAKI

..I

~f ilAll j 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E.

MAIER VICE PRESIDENT TEEEPHONE AREA CODE Tl6 546 2700 April 10, 1981 Director of Nuclear Reactor Regulation Attention:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 U.

S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Containment Tendon Monitoring Program R.

E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

This letter explains the current status of the tendon moni-toring program at Ginna Station as described in our letter dated February 13, 1981.

Four load cells were scheduled to be put, in operation to record the force levels existing in tendons 13, 53, 93 and 133.

On March 13, 1981, after regaging and reinstalling load cell no.

13, all four cells were calibrated in place with a calibrated stressing rod which had been instrumented with a strain gage.

Load cell no.

53 was found to be inoperable and was removed and sent to Brewer Engineering Laboratories.

It had been determined that the strain gages in the load cell were damaged due to infiltration of moisture and filler grease into the wire leads.

Load cell no.

93 was recently disconnected from the data logger after it too was found not to be functioning properly.

It is believed that this cell has experienced the same problem as cell no.

53 after recording low ground readings.

Pool SA SXO4>5O5Il P

0 1

'l C

A

ROCHESTER GAS AND ELECTRIC CORP.

April 10, 1981 her.

Dennis N. Crutchfield SHEET NO.

Upon receipt and reinstallation of cell no.

53, we plan to remove cell no.

93 and send it to Brewer Engineering Laboratories for repairs.

The plant will be in its annual refueling shutdown when cell no.

93 is returned and limitations on manpower will make reinstallation very difficult.

Therefore, for the remainder of the monitoring period prior to the June 1981 Surveillance Program we propose to monitor only the three remaining tendons and reinstall cell no.

93 if scheduling can be arranged.

Very truly, yours,'o E. hlaier xc:

her.

Boyce FI. Grier, Director Office of Inspection and Enforcement Region I U.

S. Nuclear Regulatory Commission

Vl y

~

s

~ ~