REGULATOR)IFORMATION DISTRIBUTION S)EM (RIBS)
ACCESSION NBR 8104090430 DOC ~ DATE ~ 81/0 I/03 NOTARIZEDB NO, DOCKET FACIL!50-244 Rober t Emmet Ginna Nuclear Planti Unit 1~ Rochester G
05000240 AUTH BYNAME AUTHOR AFFILIATION MAIERe J ~ E ~
Rochester Gas L E'lectric Corps REC IP ~ NAME RECIPIENT AFFILIATION CRUTCHF IELD, D ~
Operating Reactors Branch 3
SUBJECT:
Notifies that util plans full core discharge during 1981 refueling outage. Action necessary to pal mit exam of internals of one main coolant
- pump, DISTRIBUTION CODEX'001S COPIES RECEIYED:LTR $
ENCL Q SIZE':
TITLE: General Distribution for
- after Issuance of Operating License NOTES: 1 copy:SEP Sects Ldr ~
05000204 RECIPIENT ID CODE/NAME',
ACTION!
CRUTCHF IELD 04 INTERNAL: D/DIRiHUM FAC08 ISE 06 OELD 11 RAD ASMT BR COPIES LTTR ENCL 13 1
RECIPIENT ID CODE/NAME DIR p DIV OF LIC,.
NRC PDR 02 0
BR 10 G FILE 01 COPIES LTTR ENCL'XTERNAL:
1 LPDR 03 AN1 p ~go)
'll TOTAL NUMBER OF COPIES REQUIRED:
LTTR ENCL
C II t
I'N II II jt
$$/
/tr$11/
'/i/jjZ i//II///I/
iZiiiIZi iZZ~iZI ROCHESTER GAS AND ELECTRIC CORPORATION PTT
, TOAK o
89 EAST AVENUE, ROCHESTER, N.Y. I4649 JOHN E.
MA,IER VICE PRESIOENT TCLEPHONC AREA COOE 7I& 546.2700 April 3, 1981 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U. S. Nuclear Regulatory Commission Washington, DC 20555 gQ y.
I
Subject:
1981 Full Core Discharge R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Crutchfield:
The purpose of this letter is to describe, for your infor-mation, our plans for a full core discharge during the 1981 refueling outage.
The full core discharge is necessary to permit examination of the internals of one main coolant pump.
On August 3, 1978 Rochester Gas and Electric Corporation (RG&E) requested approval from the NRC to take credit for lake temperature being less than 80'uring
- a. planned spring refueling.
This would allow a substantial reduction in the time between when the reactor was shutdown and the completion of a full core dis-charge.
NRC approval was given in a letter dated November 27, 1978.
The approval stated for a shutdown before March 2 a spent fuel pool cooling system (SFPCS) capacity of 13.2 MBTU/hr could be used and for a shutdown before May 2 a capacity of 12.0 MBTU/hr could be used.
Since the 1981 refueling outage is scheduled to start on April 18, 1981, the 12.0 MBTU/hr limit will be used.
Using an analysis identical to that presented in our August 3, 1978 request which accounts for the fuel assemblies presently stored in the SFP the entire core can be placed in the SFP after a cooldown time of approximately 17 days and not exceed the 12.0 MBTU/hr limit.
I Very truly yours, hn E. Maier g Qol