Submits Currently Scheduled Completion Dates for Evaluations of Certain Items in SEP Topics III-6, Seismic Design Considerations & III-11, Component Integrity
ML17258A906
Person / Time
Site: Ginna 
Issue date: 03/23/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
TASK-03-06, TASK-03-11, TASK-3-6, TASK-RR NUDOCS 8103260619
Download: ML17258A906 (4)


Text

REGULATORY ORMATION DISTRIBUTION SYS 1 (RIDS)

ACCESSION NBR:8103260619 DOC ~ DATE: 81/03/23 NOTARIZED'O DOCKET FACIL:50-204 Robert Emmet Ginna Nuclear Plantg Unit lg Rochester G-05000240 AUTH INANE AUTHOR AFFILIATION MAIER~J,E, Rochester Gas 8 Electr ic Corp ~

RECIP;llAMK"'ECIPIENT AFFILIATION CRUTCHFIELDED ~

Operating Reactors Branch 5

SUBJECT:

Submits currently scheduled completion dates for evaluations of certain items in SEP Topics III 6E "Seismic Design Considerations" 8 III llew "Component Integrity'

DISTRIBUTION CODE:

AOESS COPIES RECEIVED:LTR g'NCL g'IZE

'J' TITLE': Seismic Review for SEP Plants, NOTES! 1 copy:SEP Sect.

Ldr ~

050002cgl4 RECIPIENT ID CODE/NAME, ACTION; CRUTCHF IELD Qg INTERNAL: EQUIP QUAL BR07 GEOSC IENCKS 09 I!LE 06 O

L G

F IL 0 1 COPIES LTTR ENCL 1

1 1

1-RECIPIENT ID CODE/NAME GEN ISSUKS BR08 HYD/GEO BR 10 NRC PDR 02 OR ASSESS BR 11 SEP BR 12 COPIES LTTR. ENCL EXTERNAL: ACRS NSIC 14 05 16 1

1 LPDR 03 f~-

0 TOTAL NUMBER OF COPIES REQUIRED:

LTTR ENCL

s I

p 1 Is I

I

k:

il lIZEEP l'll/ZEN'hfO Illus lllllllllllll~

i llIIkl use~

ROCHESTER GAS AND ELECTRIC CORPORATION

~

NI~

y

~

A

~

, EEL

,4 E-iA o

89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E.

MAIER VICE PRESIOENT TELEPHONE AREA COOE TIE 546.2700 March 23, 1981 Director of Nuclear Reactor Regulation Attn:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch N5 U.

S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

SEP Topics III-6 and III-11, "Seismic Design Considerations" R.

E. Ginna=Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

On February 6,

1981 we submitted our response to NUREG/CR-1821, "Seismic Review of the Robert E. Ginna Nuclear Power Plant as part of the Systematic Evaluation Program."

Our response indicated that schedule data for evaluation of certain items would be supplied by March 23, 1981.

The required evaluations are currently scheduled to be completed on the following dates:

Component Cooling Water Surge Tank Bracing in Auxiliary 6 Turbine Buildings Service Water Pumps Refueling Water Storage Tank August 1, 1981 October 1,

1981 November 1,

1981 December 1,

1981 It should be noted that the dates specified above are the anticipated dates that an analysis will be complete to verify that the component is acceptable as is or the date that a conceptual modification, if required, will be defined.

Very truly yours, QA~ /c LiA,cu.~

John E. Maier

~b Q

0

~

8 jI.Q 3@epg(f

li V