Confirms 810203 Telcon with A/E & NRC Re post-tensioned Containment Tendons.Existing Load Cells on Tendons 53,93 & 133 Will Be Tested for Operability.Load Cell from Tendon 13 Will Be Removed & Sent to Lab for Regauging
ML17258A819
Person / Time
Site: Ginna 
Issue date: 02/13/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8102250608
Download: ML17258A819 (5)


Text

REGULATORY I FORMATION DISTRIBUTION SYS

'M (RIDS)

ACCESSION NBR 5 81022S0608 DOC ~ DATE: 81/02/13 NOTARIZED!

NO DOCKET' FACIL;:50~244 Rober t. Emmet>> Ginna Nuclear I Pl anti Unit 1r Rochester I G 05000244 AUTH~ N AflEs AUTHOR AF FILIATION MAIERtJ's E "0 Rochester.

Gas L Electric Corp.

RECIP ~ NAME RECIPIENT AFFILIATION CRUTCHFIELDEDB'perating Reactors Branch 5

SUBJECT:

Confirms 810203 telcon with A/E L

NRC re post tensioned containment tendons, Existing load cells on tendons 53r93 8

133 will be: tested for operability,Load cell from 'tendon 13 will be removed 8

sent>> to lab for regag)ng, DISTRIBUTION CODEs ASSIS COPIES RECEIVED>>LTR.

ENCI..Q SIZE:.:.'~

TITLE'I Gener al Distribution for after, Issuance of Oper ating.

Licenie'OTES!1 copy:SEP Sect; Ldr' 05000244 ACTION:

INTERNALS RECIPIENT ID CODE/NAME CRUTCHF IELD 04 D/DIRrHUM FAC08 ILE>>

06 11 EG FILE'1.

COPIES LTTR ENCL<

13 1-2 1

RECIPIENT ID CODE/NAME'IRgDIV OF LIC NRC PDR 02'R ASSESS BR 10 COPIES'TTR ENCL>>

EXTERNAL': ACRS NSIC 09 05, 16 1

1 LPDR 03 FE8 P.'7 Hg" 0

TOTAL'UMBER>> OF COPIES REQUIRED t LTTR 3

ENCL 4

f li fA'W WS

~l t'.,

f f,

E 4

l

(< r'i

'1 i

~,

i/

/IIIIIIIIIIII/l III/III'lllgg/

IIIII/I/IIIII ziIIIt

/Izz///

ROCH ES TER GAS AND ELEC TRIC CORPORATION 1

o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 February 13, 1981 HN E ~

R

~

CE PRES I OENT B1-M

~ LU--

I CL fy~~

cn~

tx; 4 ii)

Aj.

~1-re

sl CQ 1g Directb'r of nuclear Reactor Regulation Attentgbn:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 U.S. Nuclear Regulatory Commission Washington, DC 20555 TELEPHONC ARCA COOE 710 546.2700

Subject:

Containment Vessel Tendon Evaluation Program Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

This letter confirms a conference call held on February 3

between representatives of RGB, our architect/engineer Gilbert Associates, and you',and members of your Staff regarding the Ginna post-tensioned containment tendons.

We'escribed our plan to implement a program for monitoring the tendons.

The following is the sequence of measures we plan to undertake to implement the program:

1)

Test existing load cells on tendons 53, 93 and 133 for operability.

2)

Remove load cell from tendon 13 (currently inoperable) and send to a laboratory for regaging.

3)

Instrument the tendon jacking system pull-rod with a strain gage and calibrate.

4)

Reinstall load cell on tendon 13 and calibrate all four load cells with the modified pull-rod.

5)

Connect load cells to a recording system.

6)

Record load cell data once each working day (5 days per week during a.normal week).

7)

Review load cell data on a weekly, basis for trends.

We will notify the NRC if the data indicate a significant loss of prestress before it reaches the technical speci-fication level of (0.6)

GUTS.

Error in the system is estimated at k2%.

0~

D 83.08250&0F

0 o

I

'I II iy C's II A

g

~

~

I

1 a

ROCHESTER GAS AND ELECTRIC CORP.

DATE February 13, 1981 To Mr. Dennis M. Crutchfield SHEET NO.

We estimate that it will take approximately 6 (six) weeks to implement this program.

Very truly yours, Jo E. Maier JEM/bdk xc: