Category:CORRESPONDENCE-LETTERS
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated IR 05000244/19990081999-10-14014 October 1999 Forwards Insp Rept 50-244/99-08 on 990809-0919.Severity Level IV Violation of NRC Requirements Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs IR 05000244/19992011999-09-24024 September 1999 Forwards Insp Rept 50-244/99-201 (Operational Safeguards Response Evaluation) on 990621-24.No Violations Noted. Primary Purpose of Osre to Assess Licensee Ability to Respond to External Threat.Insp Rept Withheld ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date ML17265A5111999-01-11011 January 1999 Requests Relief Per 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME Bp&V Code for ISI Program.Relief Requests 37,38 & 39 Encl ML17265A5101999-01-11011 January 1999 Requests Relief Per to 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME B&PV Code for ISI Program.Relief Request 40 Encl 1999-09-30
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20059H5541990-09-11011 September 1990 Forwards Endorsements 153,128 & 178 to Nelia Policies NF-170,NF-208 & NF-100 & Endorsements 136,115 & 159 to Maelu Policies MF-47,MF-77 & MF-29 ML20055F4201990-06-22022 June 1990 FOIA Request for Ofc of General Counsel Guidance Referred to in Insp Rept 50-244/90-02 Re Control Room Switch ML17261B0761990-06-21021 June 1990 Forwards Endorsement 152 to Nelia Policy NF-170 & Endorsement 135 to Maelu Policy MF-47 ML17309A4441990-05-29029 May 1990 Forwards Endorsements 142-151 to Nelia Policy NF-170, Endorsements 125-134 to Maelu Policy MF-47,Endorsements 13-14 to Certificates N-14/M-14,Endorsements 74-81 to Nelia Policy NF-236 & Endorsements 61-68 to Maelu Policy MF-92 ML17251A4411989-03-31031 March 1989 Forwards Endorsements 133 & 134 to Nelia Policy NF-170 & Endorsements 116 & 117 to Maelu Policy MF-147 ML20245D3421989-03-20020 March 1989 Forwards Listed Endorsements,Including Endorsements 14,163, 144,94,75,39 & 31 to Nelia Policies NF-295,NF-100,MAELU Policy MF-29,NELIA Policy NF-182,MAELU Policy MF-61,NELIA Policy NF-281 & Maelu Policy MF-112,respectively ML20148K1111988-03-22022 March 1988 Forwards Listed Endorsements to Listed Policies,Including Endorsement 102 to Maelu Policy MF-26,Endorsement 123 to Nelia Policy NF-76,Endorsement 71 to Maelu Policy MF-56 & Endorsement 89 to Nelia Policy NF-189 ML17261A6041987-09-10010 September 1987 Forwards Endorsements 105 & 104 to Maelu Policy MF-47 & Endorsements 122 & 121 to Nelia Policy NF-170 ML17261A4741987-05-15015 May 1987 Forwards Endorsements 119 & 102 to Nelia Policy NF-170 & Maelu Policy MF-47,respectively ML17261A4491987-03-30030 March 1987 Forwards Endorsements 117 & 118 to Nelia Policy NF-170 & Endorsements 100 & 101 to Maelu Policy MF-47 ML17309A3941986-12-30030 December 1986 Forwards Endorsement 115 to Nelia Policy NF-170,Endorsement 99 to Maelu Policy MF-47 & Endorsement 7 to Maelu Certificate M-14 & Nelia Certificate N-14 ML17251A8191986-09-0808 September 1986 Forwards Endorsements 113 & 114 to Nelia Policy NF-170 & Endorsements 97 & 98 to Maelu Policy MF-47 ML17251A6911986-05-14014 May 1986 Forwards Endorsement 112 to Nelia Policy NF-170 ML17251A6511986-03-24024 March 1986 Forwards Endorsement 110 to Nelia Policy NF-170 & Endorsement 94 to Maelu Policy MF-47 ML17251A6501986-03-18018 March 1986 Forwards Endorsement 109 to Nelia Policy NF-170 & Endorsement 93 to Maelu Policy MF-47 ML17254A7001985-12-23023 December 1985 Forwards Endorsement 6 to Maelu Certificate M-14 & Nelia Certificate N-14,Endorsement 92 to Maelu Policy MF-47 & Endorsement 108 to Nelia Policy NF-170 ML17254A5431985-09-0303 September 1985 Forwards Endorsements 106 & 107 to Nelia Policy NF-170 & Endorsements 90 & 91 to Maelu Policy MF-47 ML17254A5251985-08-15015 August 1985 Forwards Endorsement 105 to Nelia Policy NF-170 & Endorsement 89 to Maelu Policy MF-47 ML17254A3661985-05-10010 May 1985 Forwards Endorsement 104 to Nelia Policy NF-170 & Endorsement 88 to Maelu Policy MF-47 ML17254A3391985-04-10010 April 1985 Forwards Endorsement 103 to Nelia Policy NF-170 & Endorsement 87 to Maelu Policy MF-47 ML17254A3241985-04-0505 April 1985 Forwards Endorsement 102 to Nelia Policy NF-170 ML17254A2171985-02-14014 February 1985 Forwards Endorsements 67-69 to Nelia Policy NF-170 & Endorsements 56 & 57 to Maelu Policy MF-47 ML17254A1651985-01-0808 January 1985 Forwards Endorsement 86 to Maelu Policy MF-47 ML17254A1421984-12-21021 December 1984 Forwards Endorsement 101 to Nelia Policy NF-170, Endorsement 59 to Maelu Policy MF-47 & Endorsement 5 to Nelia & Maelu Certificates N-14 & M-14 ML17254A9601984-09-28028 September 1984 Forwards Endorsements 99 & 100 to Nelia Policy NF-170 & Endorsements 84 & 85 to Maelu Policy MF-47 ML20094R2511984-08-15015 August 1984 Informs That as Result of ML Slade 840724 Motion Withdrawing Outstanding Contentions,Applicant Believes Schedule for Further Proceeding No Longer Appropriate.Related Correspondence ML17254A9111984-08-10010 August 1984 Forwards Endorsements 98 & 83 to Nelia Policy NF-170 & Maelu Policy MF-47,respectively ML20091N2021984-06-0707 June 1984 Requests Addition of Util to Svc List.Related Correspondence ML17255A8061984-04-26026 April 1984 Forwards Endorsements 82 & 97 to Maelu Policy MF-47 & Nelia Policy NF-170,respectively ML20088A7991984-04-0909 April 1984 Advises That Author Is Counsel of Record for Util & That All Correspondence & Issuances Should Be Addressed Accordingly.Related Correspondence ML17255A7241984-03-27027 March 1984 Forwards Endorsements 95 & 96 to Nelia Policy NF-170 & Endorsements 80 & 81 to Maelu Policy MF-47 ML17255A6981984-03-0505 March 1984 Forwards Endorsement 79 to Maelu Policy MF-47 & Endorsements 93 & 94 to Nelia Policy NF-170 ML20080A6281984-01-31031 January 1984 Informs That Util Will Not Respond at Present to SV Bollock Re Notification of Possible Untimely Filing of Petition for Leave to Intervene.Util Reserves Right to Oppose Petition If Filed ML17255A5861983-12-21021 December 1983 Forwards Endorsement 78 to Maelu Policy MF-47 & Endorsement 92 to Nelia Policy NF-170 ML17255A5871983-12-21021 December 1983 Forwards Endorsement 4 to Nelia Certificate N-14 & Maelu Certificate M-14 ML20082F7761983-11-23023 November 1983 Requests That ASLB Defer Consideration of Proposed Notice Re Util Application for full-term OL Until ACRS Ltr or Last NRC Licensing Document Issued ML17255A4921983-11-0202 November 1983 Forwards Endorsement 77 to Maelu Policy MF-47 & Endorsement 91 to Nelia Policy NF-170 ML17255A4081983-09-22022 September 1983 Forwards Endorsements 75 & 76 to Maelu Policy MF-47 & Endorsements 89 & 90 to Nelia Policy NF-170 ML17256A7141983-05-26026 May 1983 Forwards Endorsements 73 & 74 to Maelu Policy MF-47 & Endorsements 87 & 88 to Nelia Policy NF-170 ML17256A6791983-05-0505 May 1983 Forwards Endorsement 86 to Nelia Policy NF-170 & Endorsement 72 to Maelu Policy MF-46 ML17256A6331983-04-15015 April 1983 Forwards Application for Amend to License DPR-18,revising Tech Specs to Incorporate NUREG-0737 Limitations on Plant Staff Working Hours & Reporting Requirements for Safety Valve & Relief Valve Failures & Challenges ML17256A5471983-03-0808 March 1983 Forwards Endorsement 85 to Nelia Policy NF-170 ML17256A4391982-12-30030 December 1982 Forwards Endorsements 84 & 71 to Nelia Policy NF-170 & Maelu Policy MF-47,respectively ML17256A4331982-12-21021 December 1982 Forwards Endorsements 1,2 & 3 to Nelia Certificate N-14 & Maelu Certificate M-14 ML17256B2261982-09-13013 September 1982 Forwards Application for Amend to License DPR-18 Consisting of Proposed Changes to Tech Specs Incorporating Changes to Exercising Test of Certain Valves,Substituting Containment Isolation Boundaries & Allowing Low Power Physics Testing ML17256B2331982-09-0909 September 1982 Forwards Endorsements 82 & 83 to Nelia Policy NF-170 & Endorsements 69 & 70 to Maelu Policy MF-47 ML18037A3791982-05-27027 May 1982 Forwards Annual Financial Repts 1981 for Niagara Mohawk Power Corp,Ny State Electric & Gas Corp,Lilco,Rochester Gas & Electric Corp & Central Hudson Gas & Electric Corp ML17256A8711982-04-26026 April 1982 Forwards Endorsement 81 to Nelia Policy NF-170 & Endorsement 68 to Maelu Policy MF-47 ML17256A8321982-04-22022 April 1982 Forwards Application for Amend to License DPR-18,revising App a Tech Specs to Incorporate Plant Sys Mods for Containment Isolation Valve,Table 3.6-1.Class III Amend Fee Encl ML17256A8211982-04-15015 April 1982 Forwards Endorsements 66 & 67 to Maelu Policy MF-47 1990-09-11
[Table view] |
Text
'RBOUL'A'TORYlFORMA'TION DISTRIBUTION 'S'l+M ('RIBS)
AOGESSIOI9 5BR 8204020314. DOC,DATE,o 82/03/29 NOJARI'ZED! NO . , DOCKET FACIL,50 244 Rober,t Emmet Ginna AUTHOR AFFILIATION, Nuclear Pl anti 'Unilt ii 'Rochester G 05000244
.AUTH'AME SINISIeJ ~ MD Marsh 8 McLennani Ince F M "8 M Nucllear ~Consul tantsr Inc, .Di v ~
RElC IP ~ NAME RECIPIENT AFF II'ATION
'SALITZMANtJ ~ D~ Assistant,0$ rector'or 'State '8 Li censee Rel at i ons
SUBJECT:
Forwards Endonsemepts 78i79 =8 80,to NEL'.I'A !Policy NF"170 lCODE: M00 1'S )COP IES ~RECEI VED i LTR ~ ~ lENCL 'SIZE s.. 'ISTRIBUTION TITLE: Insur ance: Indemni]ty/Endor sement Agr eemenbs NOTES: icy: "SEP 'Sect ~ Ldr ~ 05000244 RECIPIENT ICOP IES .RECIPIENT ICOP IES"
.ID,CODF/NAME I;T7R ENCL 'ID lCODE/NAME I lITR ENCL INTERNAL'CON.'UEZFJ 1 1 NRR/DL/ADL 07 1 0 EG 'F IL . 01 -:1 1 'SP ,1 EXTiERNALs LPDR 03 ~ 1 NRC:PDR 02 1 1 NTIS OQ =1 1 7
tTOTAL'UMBER OF lCOPIES REQUIRED'L}TTR iENCL
0 ll r,i I
g ',I Ill III l II l f e ~
II 3 1
le ll
~
w 0 r ~gllll 1 o '1
'I e
'g I ll 4'
I ll I
Marsh 5 McLennan, Incorporated 1 Financial Plaza Hartford, Connecticut 06103 Telephone 203 278-1400 Telex 99308 March 29, 1982 Mr. Jerome D., Saltzman Assistant Director State and Licensee Relations 8 Office of State Programs >>R Oa ~9'~
U.S. Nuclear Regulatory Commission Washington, DC 20555 aha~
HCC Re: Rochester Gas & Electric Corp.
NELIA Policy No. NF-170 Endorsement Nos. 78, 79 & 80
Dear Mr. Saltzman:
On behalf of Rochester Gas & Electric Corporation, we enclose eight certified copies each of the captioned endorsements to NELIA Policy No. NF-170.
Yours very truly, Jon M. Sinisi Assistant Vice President JMS/efk enclosures (24) cc: R. R. Kussie - RG&E D. J. Barrett M&M Rochester
= 82040203 a,"~
J i4 ADQCK 05000244,,',
820329'DR PDR'gt '" i
)
Nuclear Energy Llablllty Insuranco NUCLEAR. ENERGY I.IABILITYINSURANCE ASSOCIATION RESTORATION OF LIMIT OF LIABILITY ENDORSEMENT It is agreed that:.-.
- 1. Payments made and expenses incurred by the companies under this policy have reduced, in accordance with Condition 3 of the policy, the limits of the companies liability stated in Item 4 of the Declarations and in all Increase of Limit of Liability Endorsements.
- 2. The limit of liability stated in Endorsement No. 73 which has been reduced is hereby restored to 424 000 000 . This restored limit applies only with respect to obligations assumed or "expenses incurred because of bodily injury or property damage caused by the nuclear energy hazard after the effective date of this endorsement.
- 3. The limits of liabil.ity stated in the policy shall not be cumulative.
Each payment made by the companies after the effective date of this endorsement for any loss or expense covered by the policy shall reduce by the amount of such payment every limit of liability, regardless of which limit of liability applies with respect to the bodily injury or property damage out of which such loss or expense-arises.
4 tiXy that this is a true oopy oX the original number an6 being male par art Endorsement having the endorsement (Facility as des-oC i;he Huolear Energy Liability Polioy Form) ignated,d, h erson.
on Noo insurance is afforded hereunder.
- l. Quattrocchi, icc resi n it~ n Jo n American Nuclear lnsurers Ettect ve Date of thiS EndOrSement Januar 1 1982 To form a part of Policy No 5JF-170 12:01 A.M. Standard Time Issued to Rochester Gas & Electric Corporation Dale ot Issue For the su cribinp co panies By General Manaper EndcrSement NO 78 Counterslpned by
i".
e % <g>'I
~ j III l! 4'l~
m P
C S t J W 1
r Nuclear Energy Liability Insurance NUCLEAR ENERGY LIABILITYINSURANCE ASSOCIATION CHANGES IN SUBSCRIBING COMPANIES AND IN THEIR PROPORTIONATE LIABILITYENDORSEMENT Calendar Year. 1982
- l. It is agreed that with respect to bodily injury or property damage caused, during the effective period of this endorsement, by the nuclear energy. hazard:
- a. The word'companies" wherever used in the policy means the subscribing companies listed below.
- b. The policy shall be binding on such companies only.
- c. Each such company shall be liable for its proportion of any obligation assumed or expense incurred under the policy because of such bodily injury oi property damage as designated below.
- 2. It is ag reed that the effective period of this endorsement is from the be ginning of the effectiv e date of this endorsement stated below to the close of December 31 It1982 or to the time of the termination or cancell atio n'f the policy, if sooner.
SUBSCRIBING COHPANIFS PROPORTION OF CI Aetna Casualty and Surety Co., The, 151 Fanaington Ave. Hartford, C'I 06156 9.957349 Aetna Insurance Company, 55 tie St.. Hartford, CT 06115 3.153160 Affiliated FH Insurance Co., Allendale Park, P.O. Box 7500, Johnston. RI 02919 0.248934 Allianz insurance'Company, 6435 Milshire Blvd.. Los Angeles, CA 90054 1.327647 Allstate Insurance Co.. Allstate Plaza South - Gl. Northbrook. IL 60062 4.978674 American Home Assurance Co.. 102 Haiden Lane. Neu York, NT 10005 0.871268 American Hotorists Insurance Co.. Long Grove. IL 60049 0.414890 'CS s-I g
03 Bituminous Casval \y Corporation, 320-18th St., Rock Island, IL 61201 0;414890 sbd O 74 Centennial Insurance Co., Atlantic Building, 45 Mall Street, Neu York, NY 10005 0.248934 cd Coeserclal Union Insurance Co.. One Beacon St., Boston, HA 02108 3.319116 Connecticut Indesnity Cospany, The, 9 Fare Springs Rd. ~ Faselngton, CT 06032 0.414890 I=h OS Continental'Casualty Co., CNA Plaza. Chicago, IL 60685 4.14889 S Continental Insurance Co., The, 80 Haiden I.a.. Neu York, NY 10038 7.675457 O Federal Insurance Co., 51 John F. Kennedy Parkvay, Short Hills, tsJ 07078 1.493602 g Fireman's Fund Insurance Companies. P.O. Box 3395. San Francisco, CA 94119 5.310586 General Accident Insurance Company of America, 414 Malnut St.. Philadelphia. PA 1910S 1.327647 4
Hanover Insurance Co., The. 440 Lincoln St'., Morcester, HA 01605 0.497867 Hartford Accident and Indemnity Co., Hartford Plaza, Hartford, CT 06115 7.053122 Hartford Steam Boiler lnsp. 6 Ins. Co.. The, 56 Prospect St.. Hartford, C'I 06102 0.497867 cd 8
Highlanda InSuranCe CO.. 600 JefferSOn St., HOuStOrie TX 77002 '0.414890 te Home Indesnlty Co . The. 59 Haiden Lane, Ness York. NY 10038 3.651028 eri ZO H
Insurance Co. of North America. P.O. Box 7728,. Philadelphia. PA 19101 1.659558 Of Insurance Co. of Ohio, The, 19 Rector St... Neu York. NY 10006 'onarch Northern Insurance Coepany of Neu York, P.O. Box 1Z28, Baltimore, NO 21203 0.331912 2.240404
~go NerthveStern NatiOnal InS. CO.. 731 NO. JaCkSOn St.; HIIuaukee.-MI 53201" 0.663823 Ohio Casualty Insurance Coepany, The,. 136 North Third St., Hamilton, OH 45025 0.165956 Pacific Indusnity Co., 51 John F. Kennedy Parkuay, Short Hills, NJ 07078 0.331912 +
Peerless Insurance Co., 62 Haple Ave.. Keene, NH 03431 0.124467 cd Protective Insurance Co., 3100 Ho. Heridian St.. Indianapolis, IN 46208 O,Z48934 Providence Mashington Insurance Co.. 20 'Mashington Place, Providence, RI 02903 0.165956 O Reliance Insurance Cospany, 4 Penn Center Plaza, Philadelphia, PA 19103 0.995735 g Royal Insurance Company of Aserica, 150'Milliae Street, Nev York, NY 10038 3 '19116 St. Paul Fire 6 Harine Ins. Co., 385 Mashington St.. St. Paul, HN 55102 4.699869 Seaboard Surety Co. ~ 90 Mil'liam St ~ Neu York NY 10038 0.165956 State Fare Fire 6 Casualty Coepany, 112 fast Mashington St., Bloosington, IL 61701 0.829779 O 0)
Transaeerica Insurance Coepany, P.O. Box 54256, Los Angeles, CA 90054 0.829779 Travelers Indemnity Coepany, The, One rover Square, Hartford, CT 06)15 10.787128 United States Fidelity and Guaranty Co.s 100 Light St.. Baltieore, HO 21202 leo455217 O c) 8 O~
United States Fire Insurance Co.. P.O. Box 2387; Morristown. NJ 07960 Zurich Insurance Co.. 231 No. Hartingale Rd., Schaueburg, II. 60196
'C<2 3.319116 1.244669 T te O I CO O do cd Effective Date of this Endorsement January 1, 1 982 To form a part of Policy No. NM!7a 5 12:01 A. M. Standard Time Rochester Gas and Electr.ic Cor oration For the sub ribing compa ies Date of Issue By General Manager Endorsement No. Countersigned by (1/82)
s~
Nuclear Energy Liability Insurance NUCLEAR ENERGY LIABILITYINSURANCE ASSOCIATION ADVANCE PREMIUM AND STANDARD PREMIUM ENDORSEMENT EAEEIIEA YEAA~
It is agreed that'tems la. and lb. of Endorsement No. 77 are amended to read:
la. ADVANCE PREMIUM: It is agreed that the Advance Premium due the companies for the period designated above is: $ 321,392.50 lb. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Standard Premium is said Advance Premium and the Reserve Premium is: $ 241,933.30 This is to certify that this is a truenumber oopy of the original Endorsement having the endorsement and being made part of the Nuolear Energy Liability Polioy (Faoility Form) as des-ianated hereon. No Xnsuranoe is afforded hereunder, hnL~tt American Nucl@
I p . i ty n Effective Date of this Endorsement Januar 1, 1982 To form a part of Policy No NF-170 12:01 A.M. Standard Time Issued to Date of Issue For the su cribing co panies By General Manager Endorsement No 80 Countersigned by NE-36
~ ~