ML17258A457

From kanterella
Jump to navigation Jump to search
Concurs W/Nrc Suggestions Re SEP Topic VIII-3.A Re Station Battery Capacity Test Requirements,Per .Util Will Make All Necessary Tech Spec Changes Following Completion of Integrated Assessment
ML17258A457
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/15/1982
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
TASK-08-03.A, TASK-8-3.A, TASK-RR NUDOCS 8201200579
Download: ML17258A457 (4)


Text

SUBVECIToncurs w/VRCI suggestions re SEP= Topic VII'-3,A station bette'r y "abacity test requirements~per 810731 l,tr ~ Uti'l wil)t make aiiili necessa'ry Tech Spec-changes folilowing cotopl eti ow of in'tegr sited>> assessme'nt

~,

COPIES RECEI YES:LITR Li =NCLi 0 SIZE!: l:

DISTR I BUT'IO>>V'QOKi: A035S T ITLE:

SEP T'o;o i c s 4l~r,sw

~

RKGULIAT I,VFOR'YIATI ON D'IS TRI BUT IO Vi STE>>YI (R IDS) p ACCESSIOiV i)BR: 8201200579 OOC"e DATE'o 82/01/15 VOTlARIZEO:; NO DOCKEIT FACIL;50-244 Rojoert>> EIiimet Glinna iVuc lear Plants-Unit>> ii Rochester-G!

05000244'UTH'

>>VA4lEI AVT<<IOR. AFF>>ILII'AT>>ION MAIERPJ.E>>.,

Rochester".Gas 3 Electric C'orp.

, REC'IP, VA'~IEi RKCIIPIENiTI AFF ILII ATION'RUTCHFIELOPO

~ 'perating Reactors Branch 5

NOTES:1 cooy:S=Pi Sect;. LUr;,

05000244' EC IPiIEAI'Tl ID CQOE>>/ V'A'>>IEl ACCT IOiV:

ORB 05'C>>

01 I>>VTKR>>VALI: IEI'S NRR/OK>>/HGEBi 10 NRR/Oi /

EPei 12, 6

F>>I i

04 KXTKRNALI: ACRS 14'RC POR 02 COPE E S Llr>>TR EIVCLI 2.

2.

1, 1.0 1

1, REC IP IKNT<

ID>> CODE'/VA>>%El NRR/OE'/AO'YIQKI 13.

NRR/DL>>/OR'A,St 1.1.,'VRR/DSI/CSS<07 LPOR'VT I 5 COPIES LITT R EiVCLI 1'

1 C>>

TOTALl NU.BRIBER 0<<( Ci0, iIKS RKQ J'IRKO~:

I.ITTR P1 EiVCLI

J II

~

P t

l I

j I

4 4

rf/ ffffITIZI'iaaf sestet r ~ e I

'iVj<jrV'Vfffffff

< ffffffffe I'ffffffSZZ ROCHESTER GAS AND ELECTRIC CORPORATION

~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TORK JOHN E. MAIER Vite President January 15, 1982 TELEPHONE AREA COOE Tie 546.2700 Director of Nuclear Reactor Regulation Attention:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

SEP Topic VIII-3.A, Station Battery R.

E. Ginna Nuclear Power Plant Docket No. 50-244 9

~~CP)p~

98Zm JAIg8 Ca ty Test e

irements Cv t l~

Dear Mr. Crutchfield:

In your letter of July 31, 1981 relative to this subject, topic, it was suggested that:

At least once per 18 months, during cold shutdown, a

~batter service test should be performed to verify that the battery capacity is adequate to supply and maintain in operable status all of the actual emergency loads for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

2.

At least once per 60 months, during cold shutdown, a

~batter dischar e test should be performed to verify that the battery capacity is at least, 80$ of the manufacturer's rating.

Rochester Gas and Electric has reviewed these SEP conclusions, and believes that such testing would be beneficial.

Following the completion of the Ginna Integrated Assessment, RG6E plans to make all necessary Technical Specification changes.

The require-ments for the above testing will be included into the Ginna Technical Specifications at that time.

Very truly yours, J

n E. Maier 8201200579 820iiS

)

PDR ADOCK 05000244 PDR

g~

g I

h