Responds to NRC Re Violations Noted in IE Insp Rept 50-244/81-13.Corrective Actions:Ltr to Shift Supervisors Re Importance of Logging Start & Termination of Specific Events in Official Record Was Issued on 810708
ML17258A211
Person / Time
Site: Ginna 
Issue date: 09/17/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17258A207 List:
References
NUDOCS 8110090182
Download: ML17258A211 (4)


Text

//////////////

/S////F

~ "'""~I<<"~

AH CI

/;/IE/l,"ill" ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E.

MAIER VICE PRESIDENT TCLEPHONC ARE* COOC 7ld 546.2700 September 17, 1981 Mr. Eldon J. Brunner U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

I 6 E Inspection Report 81-13 Notice of Violations Incomplete/Inaccurate Recording of Events in the Official Record R. E. Ginna Nuclear Power Plant, Unit No.

1 Docket No. 50-244

Dear Mr. Brunner:

In accordance with the above subject which stated "As a result of the inspection conducted on July 1, 1981 through July 31, 1981 and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:

Technical Specification 6.8.1 states in part, 'Written procedures shall be established, implemented and main-'ained covering the activities referenced below:

a.

The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, November 1972...'egulatory Guide 1.33, November 1972 states in part, 'The following are typical safety-related activities which should be covered by written procedures....A.8.

Log Entries and Record Retention...

'dministrative Procedure A-20, Control Room Logs, Revision 9, August 20, 1979, states in part, 'The Official Record is a chronological record of events occurring during the shift...

the type of items which should be included in this log are...

( 8110090182 8109'24 PDR ADOCK 05000244, QG P~DR

'a 4

n

ROCHESTER GAS AND ELECTRIC CORP.

DATE September 17, 1981 To Mr. Eldon J. Brunner SHEET NO.

2 Events such as reactor trips, isolations,...etc.

Time of start and completion of specific jobs.

Equipment failures or suspected equipment malfunctions....'ontrary to the above, the following examples represent incomplete/inaccurate recording of events in the Official Record."

the following is submitted in response.

Corrective action to address this violation is as follows:

1.

A letter from the Operations Engineer to the Shift Supervisors was issued on July 8, 1981 stating the importance of logging the start and termination of specific events in the Official Record.

2.

The Training section has been requested to review this violation and the use of procedure A-20, Control Room Logs, with each licensed operator during requalification training.

Very truly yours, J

n E. Maier Subscribed and sworn to me on this 17th day of September 1981.

SHARON G.

CAVALERI IIOTARY PUBLIC, State of II.Y.,Monroe County My Cornrnission Expires March 30, 19,~