ML17257A479
| ML17257A479 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/13/1981 |
| From: | Maier J ROCHESTER GAS & ELECTRIC CORP. |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| GL-81-14, NUDOCS 8107170193 | |
| Download: ML17257A479 (3) | |
Text
REGUlATORY ORMAT'ION DISTRIBUTION SYS I (RIDS)
ACCESSIOA NBR i 8107170193 DOC ~ DATE': 81/07/13 NOTARIZED' NO DOCKET' FACT,L'~:50. 244 R'obert" Emmet Ginna Nuclear Plant~
Un.it 1E Rochester G
05000244 AUTH~.NAME'UTHOR AFFLLIATION MAIER'pJ ~ E','ochester Gas Il Electric Corp.
RECIP ~ NAMKI RECIPIENT'FFILIATION CRUTCHF IKLDE D s Oper ating, Reactor s Branch 5
SUBJECT:
RespondsI to Generic Ltr 81 14'Seismic Qualification of AUxiliary Feedwater Sys;" Final response will be.'ubmitted by 810727.
DISTRISUTI N CODE'OOI0 COPIES RECEIVED>LTR
/ENCL"~ SIZEI" '
T~ITLEt: General Distr ibution forA af ter-Issuance of Oper ating, License NOTES'.1 copy:SEP Sect; Ldr.
05000244 RECIPIENT ID CODE/NAMKI ACT~ION:
ORB 05 BC, 04 INTERNAL.: D/DIR CHUM FAC08 ILES 06'ELD11 RAD ASMT BR COPIES LTTR ENCL.
"13 1
RECIPIENT>>
ID CODE/NAME, DIR g DI V OF
'. LIC.
NRC'DR 02'
'BR 10 G FIL 01 COPIES LTTRI ENCLT EXTERNALS ACRS NSIC 09 05" 16 1
1:
LPDR NTIS 03 JUL 22 ]993 TOTAL NUMBER OF COPIES REQUIRED:. LiTTR ~
ENCL<
II l
I A
~
~
'4 l
El
PBFZ IFAWN ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N.Y, 14649 JOHN E.
MA IER VICE PRESIOENT TEI.EPHON C AREA coOE 7I6 546.2700 July 13, 1981 JULES ~981 o.s ~~os~
Director of Nuclear Reactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U.
S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Seismic Qualification of Auxiliary Feedwater Systems R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Crutchfield:
This is in response to a Generic Letter 81-14, Seismic Qualification of Auxiliary Feedwater
- Systems, from Darrell G. Eisenhut, dated February 10, 1981 which we received on March 20, 1981.
We have completed most activities required to respond to the Generic Letter.
However, preparation of the response including obtaining necessary internal approval will not be completed by July 18, 1981 as requested by the letter.
We anticipate providing our response by July 27, 1981.
Very truly yours, hn E. Maier Si07i70193 Si07i3 PDR ADOCK 05000244 P