Responds to NRC Re SEP Topic VIII-3.A, Station Battery Capacity Test Requirements. Tech Spec 4.6.2 Specifies Battery Svc Test to Be Conducted at 12-month Intervals.Copy of Eg&G Battery Capacity Tests Requested
ML17257A461
Person / Time
Site: Ginna 
Issue date: 07/10/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
TASK-08-03.A, TASK-8-3.A, TASK-RR NUDOCS 8107150011
Download: ML17257A461 (5)


Text

REGULATORY 1

RMATION DISTRIBUTION SYS i (RIDS)

ACCESSION NBR:81Q715Q011 DOC ~ DATE: 81/07/10 NOTARIZED:

NO DOCKET FACIL<:50-244 Rober t Emmet Ginna Nuclear P'lant< Unit 1P Rochester G

05000200 AUTH;NAME AUTHOR AFFILIATION MAIERiJ ~ ED Rochester Gas L Electric Corp.

RECIP ~ NAMEi RECIPIENT AFFILIATION CRUTCHF IELD P D ~

Operating Reactors Branch 5

SUBJECT:

Responds-to NRC 810612'/ltr" re SEP Tbpic'III-"3,AP "Station Batt'ery Capacity Test'equirements,"

Tech Specs 4.6

pecify battery svc test to be conducted at 12~month intervals. Copy of EGLG. "Battery Capacity Tests" requested.

DISTRIBUTION CODE.:

A03BS COPIES RECEIVED:LTR J "ENCL< Q SIZE'.

T'ITLE':

SEP Topics NOTES: 1 copy:SEP Sect; LdrB 05000204 RECIPIENT ID CODE/NAMEl ACTION:

ORB 05-BC.

04 INTERNAL': A/D MATL8GUAL43 HYD/GEO, BR 10 NRC R

Q2<

EG FIL 01 COPIES LTTR ENCL<

RECIPIENT ID CODE/NAME CONT SYS A

07 ILE 06'R ASSESS BR 11 SEP BR 12 COPIES LTTR'NCL'XTFRNAL:

ACRS NSIC 10 05 16 1

1 LPDR NTIS 03 duL 2O

>98>

TOTAL NUMBER'F CDPIES REOUIRED:

LTTR Q ENCL PB

UI

,~q y

rzriizz j zzximz

~

'ijijjpic/

iiiiiiiiiii SE;':;:;.'-:

ROCHESTER GAS AND ELECTRIC CORPORATION o

S9 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E.

MAIER VICE PRESIDENT TELEPHONC ARE* COOK 7la 546-2700 July 10, 1981 Director of Nuclear Reactor Regulation Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 Division of Licensing U.

S. Nuclear Regulatory Commission Washington, DC 20555 l )gh" JUl 1giBII1

'I<>~yggoh1@tI

Subject:

SEP Topic VIII-3.A, "Station Battery Capacity Test Requirements" R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

This letter is in reference to your June 12, 1981 letter relative to this topic.

In that assessment, it is stated that the Technical Specifications do not require a battery service test.

In fact,, the Ginna Technical Specifications, section 4.6.2, do specify a battery service test. to be conducted at approximately 12-month intervals.

This fact was correctly noted in the NRC's previous assessment of this SEP Topic, in a letter from Dennis L. Ziemann to Leon D. White, Jr.,

dated April 18, 1979.

Additional comments:

I As correctly noted in the NRC's April 18, 1979 assessment, the Ginna Technical Specifications do not require a battery discharge test.

However, the battery service test which is performed is a much more stringent version than that specified in IEEE-450-1972, in that, the test is run for eight hours (rather than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />),

at a load which simulates the design basis load required following an accident.

2.

RG&E has not received a copy of EGSG Report 1315F, "Battery Capacity Tests."

We would appreciate a copy, so that we can review the "Review Criteria."

8i07i500ii 8i0710 PDR ADOCK 05000244 P

PDR

I l

~

t g>>, I p Ir'gp I'I

~ ~

k q 4

f

ROCHESTER GAS AND ELECTRIC CORP.

July 10, 1981 Mr. Dennis M. Crutchfield SHEET NO.

3.

RGBE considers it to be useful to document. all references and previous correspondence relative to the SEP Topic in the SEP assessments.

For VIII-3.A, this should include the NRC's previous assessment of this topic, transmitted by letter of April 18, 1979 from Dennis L. Ziemann to Leon D. White Jr.

We.trust that these comments will allow you to complete this SEP Topic assessment.

Very truly yours,