Advises of Mod to Bolted Connections in Section of Bracing in Turbine Bldg,Per 820813 Telcon.Mods Will Be Completed as Part of Integrated Set of Mods Resulting from Structural Upgrade Program,Per SEP Topic III-6
ML17256B221
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/26/1982
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
TASK-03-06, TASK-3-6, TASK-RR NUDOCS 8209080601
Download: ML17256B221 (4)


Text

REGUlATOR

>>VFORMATION DISTRIBUTION>>

TE>>9 (RIDS)

ACCESSION NBR:8209080601 DOC>>.DATE: 82/08/26 NOT'ARIZEO:

NO DOCI>>lEITI 4.

FACIL':50-244 Rooert Emmet G'irma Nuclear Pl anti Uni ti ii Rochester G>>

05000244" AUTH.NAME'",

AUTHOR AFF>>ILIIAT ION MAIERiJ.E.

Rochester GasE Electric>> Coro.

REC IP~. N AME>>

RECIIP IEbl TI AFF ILII ATION'RUTCHFIELDr D ~

Ooerating Reactors Br anch 5

SUBJKCIT: Advi ses o>>f<<mod tol boil ted connections in'ect i an>> of br acing in turbine bldaioer 820813 tel con.Nods xi ii). be comp) eted a'"

oa'r t o>>f integr ated set of mods resul ting from structurail uoorade orogramioer SEPi Tooic>> III"6.

DISTR I BUTIOil' DOER A 035S COP>>IKS RECEI VEO LITR

< ENCLI SIZEd~i TITLE:

SEP>> To'oi cs NOTES:NRR/DLI/SKPt icv..

05000244' KCilP>>I EiVT<<

ID CiODE>>/>>VAMEI NRR ORBS BCI 01 I>>VTERNALI: NRR/DK>>/ADMQEI 13 NRR/DI./ORAB 11

>>V S>>I /AEB 04'OPIES LITER ENCL>>

7 7

1, 1

1>>

1 1

1 1.

1 REC IP IENTI ID>> CODE'/NA>>REI NRR/DE'/HGEB<

10 NRR/DL/SKPB<

12 NRR/DSI/CSBI.

07 R GiV:1 COPIES LITTR ENC LI 2

2 3

3>>

1 1

1 1

EXTERNALI: ACRS NRC POR.

>>VOTES:

14'0 10 02 1

1 1.

1 LPOR NTIS 1

1 1

TOTAL. NUMBER OF>> COP>>IEG 'REQUIRED:

LITTR 32 ENCLI 32

f q N

4 l(

n f'I

rzzzxz zsw(zr Irrrrlii irii~sies etc al

~ OwIA4

  • t p

$1sst ROCHESTER GAS AND ELECTRIC CORPORATION

~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN Er MAILER Vice President Tr.LEPHONC ARCA CODF 716 546-2700 August 26, 1982 Director of Nuclear Reactor Regulation Attention:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

SEP Topic III-6, Turbine Building Bracing R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

In an August 13, 1982 conference call between RGBE, the NRC, and Lawrence Livermore Laboratories, the seismic analysis of the turbine building bracing was discussed.

RG&E committed to reanalyze this bracing, based on an input loading of 231 kips.

Based on the completion of this analysis, RG&E has determined that some modification to the bolted connections in that section of bracing under review are warranted.

Since RGSE is now in the process of evaluating Ginna structures relative to external phenomena loadings (wind, snow, etc.),

RG&E plans to complete these modifications as part of the integrated set of modifications resulting from the structural upgrade program.

s Very 'truly yours,,