- To be handcarried
- Inc)ude thi,s copy i e Blt.~-Bag to Chi,lk
- Toabe blue-bagged f
DISTRI BUT ION Docket May 22, 1982 NRC PDR P
Local PDR ORB Reading Docket No. 50-244 EDO Reading DD-82-03 HDenton ECase DEisenhut TNovak JHeltemes DCrutchfield HSmith Ms. Ruth Caplan, Chair JLyons Sierra Club National Energy Committee ELD 278 Washington Boulevard CMi les
- Oswego, New York 13126
- PSS, NRR OI5E
Dear Ms. Caplan:
ACRS (10)
SChilk (5)*
LBickwit, GC*
JMurry, ELD***
ASLAB NSIC AShepard (3)
SECY**
This is in response to your petition dated March ll, 1982, as revised by your letter dated March 25, 1982, requesting consideration and resolution of a number of issues before the R. E. Ginna Nuclear Power Plant resumes operation.
By letter dated March 31, 1982 we acknowledged receipt of your letter and informed you that your request was being considered under the provisions of 10 CFR 2.206 of the-Commission's regulations.
At that time we informed you that items 1, 2, 3, 4, 5, 6, 9, 13, 14, 15 and 16 would be considered for incorporation into the staff's Safety Evaluation Report (SER),
NUREG-0916 prior to restart of the Ginna plant.
This office has determined, for the reasons stated in the SER, to allow Rochester Gas and Electric Corporation to resume oper ation of the Ginna plant.
With the exception of items 8, lid, 15 and part of item 14, all the issues you have raised are addressed in NUREG-0916 (enclosed).
The remaining items are specifically discussed in the Director's Decision enclosed with this letter.
A copy of this determination will be placed in the Commission's Public Document Room at 1717 H Street, N. W., Washington, D. C.
20555 and at the Rochester Public Library, 115 South Avenue, Rochester, New York 14604.
The decision will also be filed with the Secretary of the Commission for its review in accordance with 10 CFR 2.206(c) of the Commission's regulations.
As provided for by this regulation, the decision will constitute the final action of the Commission twenty-five (25) days after the date of issuance of the decision unless the Commission, on its own motion, institutes a review of the decision within that time.
oF( 820b 140349 820522 PDR ADOCK 05000244
~ SURNl, P
PDR DATEP NRC FORM 318 80/80) NRCM 0240 OFFICIAL RECORD COPY
- USGPO: 1980 329.824
, gC II 4
"h
'r A~
Hs. Ruth Caplan Hay 22, 1982 A copy of the Notice of Issuance of the Director's Decision, which is being filed with the Office of the Federal Register for publication, is also enclosed.
Sincerely, Original signed by
Enclosures:
l.
Director's Decision 2.
Ginna Restart Safety Evaluation Report (NUREG-0916) 3.
Notice of Issuance Harold R. Denton, Director Office of Nuclear Reactor Regulation cc w/enclosures:
See next page OFFICE/
SURNAME/
DATEtI NR I
HDe n
Mb&82
..f!5 CC
/
82 ORB Rga 6 n/82 O.L.:...g.5...
JL 5!8/!88 J.WS FF~
- y. Q~v~p 44'e.
$ /21/82 DC ld 5)@/82-