Public Version of Revision 1 to Emergency Plan Implementing Procedure SC-322, Manning Emergency Survey Ctr.
ML17256A990
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1982
From: Bodine J
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17256A987 List:
References
SC-322-01, SC-322-1, NUDOCS 8206020202
Download: ML17256A990 (9)


Text

CCVi-"l "7 0 ROCHESTER GAS AND ELECZRIC CORPORATION GINNA STATION DATE:-

TIME:-

COPZROLLED COPY NUMBER PROCEDURE NO. SC-322 REV. NO.

MANNING THE EMIHGENCY SURVEY CENTER PORC REVIEW DATE LANT SUPERINTENDENT EFFECTIVE DATE CATEGORY 1 ~ 0 REVIEWED PZ:

THIS PROCEDURE CONTAINS 4 PAGES 8206020202 820525 PDR ADOCK 05000244 F PDR

SC-322: 1 SC-322 MANNING THE EMIHGENCY SURVEY CENTER

1.0 PURPOSE

The purpose of this procedure is to designate individuals who should report to the Emergency Survey Center for an Alert level or greater event. These personnel will assist the TSC and OSC with emergency functions.

2.0 REFERRNCES

2.1 SC-1 Radiation Emergency Plan 2.2 SC-200 Emerqency Resxanse Orqanizatio~sponsibilities 2.3 SC-230 Immediate Entry 2.4 SC-223 Accountability 2.5 SC-213 Site Evacuation 2.6 SC-302 Manning the Technical Support Center 2.7 SC-312 Manning the Operational Support Center 2.8 SC-323 Emergency Off Site Radiation Survey Teams 2.9 SC-324 Bnerqency On Site Radiation Survey Teans 3.0 INSTRUCTIONS 3.1 During normal mrkinq hours (or if on site) the following persons report directly to the Emergency Survey Center upon announcement of an Alert level or greater

1. Quality Control Engineer or alternate
2. Desicmated Survey Team Members per SC-600 3.2 Umn Arrival at the Emergency Survey Center 3.2.1 Assure FSC is open 3.2.2 Cbtain aoprooriate tag fran Survey Center Tag Board and log nana under taq. Tag instructions found in Attachment I.

e SC-322:2 3.2.3 Pollow instruction on taq 3.3 During off duty hours individuals will be called to report to Ginna Station. You may report directly to the Emergency Survey Center and proceed with Step 3.2 above.

3.4 Check out high range survey instrument.

3.4.1 Survey basement, auditorium and areas exterior to the building.

3.4.2 If dose rate is greater than 50 mRem/hr aBvise emergency coordinator and make arrangements to relocate after survey teams are dispatched.

3.4.3 Take an air sample and determine activity. If unidentified activity is greater than 1 x 10 8 uci/cc advise energency coordinator.

3.5 . Assist survey teams to organize and maintain team positions on maps.

3.6 Notify Security at'AS of TSC members (by nane) who will need access to the site.

3.6.1 Advise those qoing to the TSC of dose rates in the area.

3.7 Obtain accountability of all plant personnel in ESC and Training Center.

~ ~

t

) ~

SC-322:3 ATTACHMEHZ I TO SC-322 TAG BOARD ASSIGNMEÃIS Emergency Survey Center Manager Log Name on Tap Board REVERSE SIDE Follow procedure SC-322 Em rqency Survey Center Canmnicator Report to Survey Center REVERSE SIDE Manager On-Site Survey Team Blue Obtain Blue foot locker REVERSE SIDE Follow procedure SC-324 found inside foot locker On-Site Survey Tean Yellow Obtain Yellow foot locker REVUE SIDE Follow procedure SC-324 found inside foot locker Spare Survey Tean White Heart to Survey Center REVERSE SIDE Manaqer Obtain a dosimeter Follow procedure SC-323 and 324 found inside foot locker Standby in E.C.S. Hquignent Roan

Off-Site Survey Team Green Obtain Green foot locker REVERSE S DE Follow procedure SC-323 BLANK found inside oot locker Of f-Si te Survey Team Red Obtain Red foot locker REVERSE S'ZDE Follow procedure SC- 323 BLANK found inside foot locker Off-Site Survey Team Orange Obtain Orange foot locker REVERSE SlDE Follow procedure SC- 323 BLANK found inside foo" locke.