ML17256A968
| ML17256A968 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 05/24/1982 |
| From: | Maier J ROCHESTER GAS & ELECTRIC CORP. |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0916, RTR-NUREG-916 NUDOCS 8205280110 | |
| Download: ML17256A968 (4) | |
Text
0 REGULATOR NFORMA'TION DISTRIBUTION S Eh1 (R IDS)
'AGGESSION NBR;8205280110 DOC ~ DATE: 82/05/24 NOTARIZED, NO,DOCKET FACIL:50 244 Robert Emmet Ginna Nuclear Plant~
Unit ii Rochester G
05000244
'AUTH INANE AUTHOR AFFILIATION MAIERgJ ~ E ~
Rochester Gas 8 Electric Corp.
RBC IP ~ NAME RECIPIENT AFFILIATION QRUTCHFIELDg D, Operating Reactor s Branch 5
SUBJECT:
Agrees to provide long term evaluation~to detepmine cr iter ia for deciding when to discontinue use of main condenser in favor of atmospheric steam dump~per requirements of NUREG 0916 'tudy expected within 6 months'ISTRIBUTION CODE:
A001S,.COPIES RECEIVED:LTR JENCL SIZE:
TITLE: General Distribution for after Issuance of.Operating License~
NOTES:NRR/DL/SEP 1cy ~
05000244 RECIPIENT ID CODE/NAME ORB 45 BC '1 INTERNAL: ELD/HDS4 NRR/DL DIR NRR/DS I/RAB RGN1 COPIES LTTR ENCL RECIPIENT ID CODE/NAME NRR/DHFS DEPY08 R
DL/ORAB EG F IL 04 COP IES LTTR ENCL EXTERNAL: ACRS NRC PDR NT I' NOTES:
09
.02 10 1
1 1
LPDR NSIC 03 05 d
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 29 ENCL
H II 1
e 1
tl
'll t
il I
4 II a c ". ~
f II n
/EilfilZ
/ISS g ~ I oeft4 zzi z
uzzrz 8Z:
ROCHESTER GAS AND ELECTRIC CORPORATION
~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E. MAIER Wce President TELEPHONE AREA COOE 7I6 546-2700 May 24, 1982 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Supplemental Information Steam Generator Tube Rupture Incident R.
E. Ginna Nuclear Power Plant
'.Docket No.
50-244 o
f
Dear Mr. Crutchfield:
~0 On page 4-12 of NUREG-0916,"Safety Evaluation related to the restart of the R. E. Ginna Nuclear Power Plant," the staff indicates that "the licensee has committed to perform a long-term evaluation to determine the criteria which should be pro-vided in the procedures for deciding when to discontinue the use of the main condenser in favor of the atmospheric steam dump."
Although we-had not, in fact, previ'ously committed to this study, we do agree to provide such a study within six months.
Very truly yours, ohn E. Maier