REGULATORY ORMATION DISTRIBUTION SY M ('RIDS)
ACCESSION NBR:8200210171 DOC ~ DATE: 82/04/16 NOTARIZED:
NO DOOKE3' FACIL:50-240 Robert Emmet Ginna Nucl eat Pl ant F Uni~t'F 'Rochester G
05000244 AUTH BYNAME AUTHOR AFFILIATION MAIERgJ ~ E ~
Rochester Gas L Electric Carp ~
RECIP ~ NAME, RECIPIENT AFFILIATION CRUTCHF IELD'F D ~
Operating Reactors Branch '5
~ ~
t
~ '
~
M ~
~
~
SUBJECT:
Informs tthat tfestinghouse has been,,contr acted ~to perform detailed review of ESF switchover, procedure;Intentof eeview is, to el iminate unnecessary steps L str eamt'ine.
r eguir ed operator actions. Recommendations will be Isent 'by 820630
'ISTRIBUTION CODE!
A035S COPIES RECEIVEDILTR.
'NCL.
" "SIZE TITLE: SEP Topi cs NOTESgNRR/DL/SEP 1cy ~
-05000244
, RECIPIENT ID CODE/NAME ORB ¹5:BC 01 INTERNALS IE '6 NRR/DE/HGEB 10 NRR/DL/SEPB 12 NRR/DS I/CSB 07 RGN1 COPIES LTTR ENCL 7
1 3
1 1
RECIPIENT ID CODE/NAME NRR/DE/ADMQE 13 NRR/DL/ORAB 11 NRR/D
/AEB E
04
!COPIES LiTiTR ENCL 1
1 1
1 EXTERNAL: ACRS NRC lPDR 1P 02 10 1
1 LPDR NTIS "03 5
0
'TOTAL NUMBER OF 'COPIES REQUIRED:
LlTTR
'P2 'NCL
0 q 'b 1
~
a l
+
',P<il g 'g gM, ~y fl g
I 1
t
's f
g 17 1
C
~DO I
TI
\\
amp jjjgjjjjj nfljjjj jjjjjjjjjjjjj iizzir81 tiuszui~t ROCHESTER GAS AND ELECTRIC CORPORATION
~ 89 EAST AVENUE, ROCHESTER, N.Y. I4649 YORK lY AYE JOHN E. MAILER Vice Dcee'Kient TEI.EPHONE AlIEACODE 7la 546.2700 April 16, 1982 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U.S. Nuclear Regulatory Commission Wa'sh'ington, D."C.
20555 r
Subject:
SEP Topic VI-7.B, ESF Switchover R.
E. Ginna Nuclear Power Plant Docket, No. 50-244
Dear Mr. Crutchfield:
Rochester Gas and Electric has reviewed the NRC's March 9, 1982 letter relative to this topic.
To resolve the NRc concern, RGIEE has contracted with Westinghouse to perform a detailed review of the Ginna ESF Switchover procedure.
The intent of the Westinghouse treview will be to eliminate all unnecessary steps and streamli he required operator actions.
RGSE will then evaluate the time am ine available and time necessary to perform the switchover.
The modified procedure will ensure that adequate margin is available to ensure sufficient. core cooling and pump protection throughout the post-accident sequence.
The procedure evaluation will account for instrumentation
- errors, as well as pump flow rates determined from a hydraulic analysis of the safety systems.
It is expected that RGEE's recommendations for procedure changes and hardware modifications, if required, can be provided by June 30, 1982.
Very truly yours, J
n E. Maier I 82042lOl7I 82041iii' PDR,'ADOCK- 05000244