ML17256A466

From kanterella
Jump to navigation Jump to search
Notifies That Franklin Research Ctr 820528 Technical Evaluation Rept Re Environ Qualification of Electrical Equipment Contains Proprietary Info.Justification for Withholding Will Be Provided by 830301
ML17256A466
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/10/1983
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8301180293
Download: ML17256A466 (6)


Text

REGULATOR NFORMATION DISTRIBUTION "S EM (RIDS)

'ACCESSION NBR ~ 8301 1 80293 DOC ~ DATE 83/0 1/1 0 NOTARIZED NO DOCKET FACIL:50 244 Rober t Emmet Ginna Nuclear Planti Uni~t ii Rochester G

05000240 AUTH'AME AUTHOR AFFILIATION MAIERgJ ~ E, Rochester. Gas':Electr ic Corp,

'REICIPeNAME<<RECIPIENT AFFILIATION ORUTCHFIELO<D ~

Operating Reactor s Branch '5

SUBJECT:

Notifies that Franklin Resear ch Ctr 820528 technical evaluation rept re environ qualification of electrical equipment contains pr oprietar y info..Justification for withholdi.ng will be provided by 830301.

DI'STRIBUTI N 'CODE:

A048S COPIES RECEIVED:LTR ENCL

SIZEe, o:.:

. /

TXTLE: OR/Licensing Submi}ttal: Equipment Qualification NOTES:NRR/OL/SEP 1cy ~

05000204 REC IP IENT ID -CODE/NAME NRR ORBS BC 12 INTERNAL:..ELD/HDS4 12 IE,"FILE 09 NRR/DE/EQB 07 NRR/DL/ORAB 06 NRR/DST/GIB RGN1 COPIES L'TTR ENCL 1

0 1

1 1

2 2

1 1

1 1

1 RECIPIENT IO CODE/NAME DICKING 01 GC 13 NRR CALVOgJ NRR/DL DIR 10 B

REG IL 00 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

EXTERNALS ACRS NRC POR NTIS NOTES:

15 02 31 8

8 1

1 1

1 1

1 I PDR NSIC 03 05

,TOTAL NUMBER OF COPIES REQUIRED:

LTTR 27 ENCL 26

~ '4XPW>>

9 l>> g<<ling f r.o fi orfaof

~

f r' i a 9

~>> ~ f n

<kyar gr~,k i 7

'I ti I i ti,. >>t,'I<< I

" tlt itlltlat><<>I >till t'

F X <<t>>'iX>> >, <<~ >><'l,"@grail

@f'>>kAi(g g]<<kQ,ll

<<,lt.ll/] l~<<kff Q Q3 rnk.l i Pe~.> f'<g f,"p<>>,< c>rlrlku jg;,"~

<>lt'k'<<Ift) ji - l'tl>'~~k<<rk'tih

~ kzrk,) a'rqfoa( f 8 ~~0 ogg>>nrfqo i

I f ~ Q g >'t<< 'f g I j J

'i 'lgY'<7>k] f j

>>,,~kk'>~i

~NB rl>~<-,~,

ki-k rkr f9oow 4 ec~o,.~~rkrto" r'ter ~>Or > r f E>l!Ek 'k>N f'VrkO 9 I

.J>>.~'.<<1 Ari>f 4<,LJ fbi'<<'<<

Cgctkkil

~ A4r<<r g'Ibf9 r'<<clk0'k>>$

'rk f f ) Ogl

$ <<Ik'ki >1 rk<<k'9 f <<>Krk<<'.'i 7 3

'-kc<<t r Y>>'>>'lg 94 f f r v4 Oo rl<>l<<f 9 r4<<

'T'<'),)

ii) f f I <<<k)4

',l f Tz Jt f

,aT W!

0 <<IVX 3') 3rl,', 0l ~k),k>>',~,-,4kul<<;,'4<llw),.>

<'.Nl flI<<,,<<K'CT>>,'X<j kk>>kF9r,>rtr fk.>>V,k 0<ka l'rugf: frkSNr ~<>>l<<.', <<,nt~~naar.~h)10:

f ffIf

~ y S f'k)i"g f <<k<<,:<<9 t;c," 1 f,')i,'

f Jl>>>> f.-).d>>l f "kl<<I.)'I~

h4t>>X kk<<<<k 4 J:)i>> ]

f k

f

,) r1

>f lk>>,:),Xu ff; f,,'<<alfi'gal, f

kk f f.

i<<<).=>>Vi f <<>>>> '.

f ff~

.).3<<'

i lt>><<X f <<>>~<>>'~>>~

a>>k Pk~)@; f krak>> lf ~ ~

c~ll ii e C>

//iII/////// j ////g//

ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER. N Y. 14649 JOHN E. MA1ER Vice Preeident TELEPHONE

  • RE* CODE TI6 546.2700 January 10, 1983 Director'f Nuclear, Reactor Regulation",

Attention:

Mr.'ennis'M. Crutchfield,'Chief Operating Reactors Branch No.

5 U.S. Nuclear Regulatory Commission Washington, D.C.,

20555 I

Subject:

Environmental Qualification of Electrical Equipment R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

Your letter dated December 13,

1982, and received December 20, 1982, transmitted the Safety Evaluation Report for the Environmental Qualification of Safety-Related Electrical Eguipment for Ginna and a Franklin Research Center Technical Evaluation Report dated May 28, 1982 addressing the same subject.

A number of responses were requested.

We were requested to inform you within 7 days of receipt whether any information in the TER was proprietary.

On December 20,

1982, we informed a member of your Staff, Mr. James
Lyons, that the TER did contain proprietary information.

We were requested to provide written justification for protection from public disclosure within 20 days.

We will attempt to provide this by March 1, 1983.

We estimate that this much time will be required to obtain the reguired.affidavits from owners of the information for which non disclosure will be requested.

We were also requested to provide additional technical information within 30 days.

We will provide a preliminary response to this request by February 1,

1983 and a final response by April 4, 1983.

Finally, a complete technical response including plans for qualification or replacement was requested within 90 days.

We will provide this response by June 15, 1983.

This amount of time is reguired to provide these responses for a variety of reasons.

First, personnel who will be responsible for preparing the responses are currently involved in preparation of a number of technical reviews to which we are already committed for the Systematic Evaluation Program (SEP).

These SEP responses are reguired prior to NRC issuance of Safety Evaluation Reports 830ii802'73 830ii0 PDR ADOCK 05000244 P

PDR i

'4 k

~'" l

I n

IJ 1N

'4

ROCHESTER GAS AND ELECTRIC CORP.

DATE January 10, 1983 7o Mr. Dennis M. Crutchfield SHEET NO.

2 supporting SEP and the Ginna Full Term Operating License Conversion.

Second, it appears that some information previously submitted to the NRC and their contractor has not been used in the NRC's review.

Additional reviews will be required by RG&E based on lack of response to this information.

Third, several issues were referred to the NRC Staff by the NRC contractor for decision;

however, no decision was made.

Lack of NRC decision will require additional effort on our part to generate responses, particularly since the TER had been available to the NRC since May, 1982.

We believe these schedules are acceptable based on justifica-tions for continued operation which have been submitted previously and the updated preliminary version of which will be submitted by February 1, 1983.

Very truly yours,

~

~

C J